UNOPS

UNITED NATIONS OFFICE FOR PROJECT SERVICES

BILL OF QUANTITIES

Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Customs and Police Office Buildings

NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE: 1. All bidders MUST examine the complete project documents. These documents include the Drawings, BOQ, Schedules and Specifications. Any discrepancies between these documents are to be brought to the immediate attention of UNOPS Engineer. 2. Quotation given by the contractor on this BOQ are to cover any and all additional materials, labor or associated costs to complete the works as documented on the complete project documents. 3. Eventual claims for extra works are covered by project general documentation of contract.

Currency: Project No: Project Title: Location: Tender No: Tender Title: Original Issue:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan 04 Customs and Police Office Buildings February 25, 2010

Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan Customs Office Building

UNOPS
Vertical Structures Unit

DETAILS OF COMPONENT
Currency: Project No: Project Title: Location: US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos. 1. General

Description of Work/Items

Project Schedules Ref.


1.1 Occupied Areas, 1.1 Existing Services Schedule and 1.1 Items to be supplied schedules

Unit

Quantity

Unit Cost

Total Cost

1.1 Preliminaries

1 2

Pre-construction work, mobilisation activities including paper/ documentation tasks. Post construction works and clean up. 1.2 Inspection notification schedule and 1.2 Warranty schedules

LS LS

1.00 1.00

1.2 General Requirements


1
Testing and Operation/Maintenance Manuals.

LS

1.00

Subtotal General

2. Site

2.3 Earthwork
1
Excavation (any soil type) for foundation. This item includes all excavations, disposal and temporary support or shoring if needed. See drawing and schedule for details.

2.1 Identified hazardous materials and 2.3 Earthwork schedules

CU.M

246.00

Ground improvement under foundations. This includes supplying of filling materials and compacting the layers according to schedule and drawings. Soil backfilling on RCC math foundation up to ground level. This includes supplying of needed materials. See drawings and schedules for levels/dimensions and details. Gravel compaction, Class 2, at any places under the PCC/RCC shown inside the building or at sidewalk/ramp. This includes supplying of needed materials. See drawing and project schedules for dimensions and details.

CU.M

110.00

CU.M

190.00

CU.M

75.00

Subtotal Site

3. Structure

3.1 Concrete-General

3.1 Non reinforced concrete, 3.1 Reinforced concrete and 3.2 Concrete- Integral Finishes schedules

NOTE: Cost for concrete items in this section includes reinforcement, steel anchorage embedded in concrete, shuttering, concrete, concrete curing and all to the complete job.

1 2 3

PCC lean concrete (10 Mpa) under the RCC foundations. RCC (20 Mpa) foundations, rectangular and trapezoidal foundation beams. PCC, 40mm thick, lean concrete (10 Mpa) at the floor over the gravel compaction.

CU.M CU.M CU.M

13.00 140.00 19.00

3/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos. 4

Description of Work/Items
PCC concrete, 100mm thick, (20 Mpa) at the floor over the water-proofing layer. This item includes the stairs steps at the entrances and the ramps. RCC Columns, includes all columns (from -1.65 to +3.55) and supporting columns/ring beams for trusses on the roof. RCC (20 Mpa) slabs and beams. The items covers all slabs, beams and RCC floor for the bank. RCC Pavement (20 Mpa), for 1000mm-wide side walks. This includes entrances and ramps. The cost includes expansion joint on side walk surface as shown and as well as the broom finish to the side walk/ ramp surfaces.

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

CU.M

47.00

CU.M

82.00

CU.M

86.00

CU.M

15.00

3.3 Pre-cast RC Concrete


1
Precast RCC (20 Mpa) exterior window sill for all windows as per drawings. This includes all work need for complete installation.

3.3 Precast Concrete Prototypes Schedule

Lin M

29.00

3.5 Brickwork
1
Second Class Brick masonry with mortar. This includes all brick walls/ brick masonry in the entire building. The cost includes steel bars shown in the walls and their connection to the perimeter RCC elements.

3.5 Brickwork construction schedule

CU.M 3.9 Light Timberwork schedule, 6.6 Interior painting and 6.6 Exterior painting schedules

60.00

3.9 Light Timberwork


Roof timber structure on the trusses. The cost includes 30mm thick wooden planks as shown on the drawing. This also cover all auxiliary and needed materials and supplying and installation of members including painting to make the surface ready for folded metal sheet roofing according to the drawing, schedule and specifications.

SQ.M 3.10 Concrete Unit Masonry

680.00

3.10 Concrete Unit Masonry


1
CMU masonry with mortar. This item covers all CMU works shown on the drawings for the building. The cost includes all needed materials, steel bars, anchors etc and works.

CU.M 3.11 Structural Steel Schedules

60.00

3.11 Structural Steel


NOTE: Cost for steel related items in this section includes supplying materials and installation to the complete condition for all members, gussets, fasteners, connections, welding and other accessories and works needed to complete the job. The cost also includes painting according to the schedules and specifications for steel member painting, which is at least on coat of anti-rust followed by 2 other coats of oil-based painting for all surfaces and sides of the steel members.

2 3 4

Steel support, purlin, at the metal sheet roof as (C-shape 140x65mm + L-shape 50x50mm). See drawing for details. Steel truss (TRUSS 1) at the roof. See drawing for details. Steel truss (TRUSS 2) at the roof. See drawing for details. Steel truss (TRUSS 3) at the roof. See drawing for details.

Lin M No No No

560.00 6.00 4.00 2.00

4/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos. 5 6 7 8 9 10 11 12 13

Description of Work/Items
Steel truss (TRUSS 4) at the roof. See drawing for details. Steel truss (TRUSS 5) at the roof. See drawing for details. Steel truss (TRUSS 6) at the roof. See drawing for details. Steel truss (TRUSS 7) at the roof. See drawing for details. Steel truss (TRUSS 8) at the roof. See drawing for details. Steel truss (TRUSS 9) at the roof. See drawing for details. Steel truss (TRUSS 10) at the roof. See drawing for details. Steel truss (TRUSS 11) at the roof. See drawing for details. Steel frame fixed ladder inside the toilet as the access way to the roof. The work and the cost includes construction of fixed later to the wall and the opening pane, its hardware and other accessories to complete the installation as per drawing and schedule. This also includes painting according to the schedules and specifications for steel surfaces painting.

Project Schedules Ref.

Unit
No No No No No No No No

Quantity
8.00 2.00 2.00 8.00 2.00 4.00 4.00 1.00

Unit Cost

Total Cost
-

LS

1.00

Subtotal Structure

4. Enclosure

4.1 Waterproofing
1
Bitumen water-proofing coat. This is a 3-5mm thick hot bitumen painting coats on dried PCC surface. The item applies on 40mm PCC at the floor beneath the 20 Mpa, 100mm thick PCC layer. This cost includes supplying and applying the coats with all needed accessories and work to do the job as per manufacturer's data and to the full satisfaction of UNOPS engineer.

4.1 Waterproofing system schedule

SQ.M

470.00

Single layer bitumen membrane at the floor and walls of toilets/kitchen. This includes preparation of base layers shown on the drawings. Refer to schedule/drawing for details. SQ.M 55.00 4.2 Roofing materials, and 4.2 Gutter and Down pipe Schedules

4.2 Roofing
1
Standing seam metal roofing (using GI sheet gauge 24). This includes all accessories required for installation of roof on the prepared timber plank (see item 3.9.1 for the cost of timber plank on roof). The cost also includes all flashings, capping etc needed on the metal roof.

SQ.M

680.00

Metallic gutter around the roof (using GI sheet gauge 20). The cost includes all accessories required for complete installation of gutter such as supplying, fixing and others as per drawing and schedules. Lin M 116.00 Down pipes, PVC pipe class-B. This includes all accessories required for complete installation such as supplying, fixing and others as per drawing and schedules. Lin M 45.00 -

5/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos.

Description of Work/Items

Project Schedules Ref.


4.3 Window, 4.3 Window Hardware, 4.5 Annealed Glasses, and 4.6 Glassblock work schedules

Unit

Quantity

Unit Cost

Total Cost

4.3 Windows and Window Hardware

NOTE: Prior to work, samples must be approved by UNOPS Engineer.

Wooden frame windows. The work includes making, transportation, installation, hardware, glazing, glass-block work around window, insect screen, 3 coats of oil-based painting, and other accessories required for complete installation as per drawings and schedule. SQ.M 63.00 4.4 Joinery doors 4.4 PVC doors, 4.4 Steel doors and 4.5 Annealed Glasses schedules

4.4 Doors and Door Hardware


NOTE: Prior to work, samples must be approved by UNOPS Engineer.

Wooden frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule. PVC frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule. Steel frame doors. The work includes making, transportation, installation, hardware, glazing, 1 coat of anti-rust followed by 2 other coats of oilbased painting, and other accessories required for complete installation as per drawings and schedule.

SQ.M

76.00

SQ.M

6.00

SQ.M

2.00

4.5 Glazing
1
Mirrors (40x60cm) at toilets. This includes complete installation.

4.5 Mirrors schedules No 4.7 Insulation Schedules 5.00 -

4.7 Insulation and Vapour Barriers


1
Glasswool thermal insulation on RCC roof, beneath roof structure. See drawings and schedules for details.

SQ.M 4.8 EFIS Schedules

640.00

4.8 Exterior Insulation and Finish System


NOTE: Prior to work, samples must be approved by UNOPS Engineer.

External wall insulation system, STOTHERM CLASSIC, (expanded polystyrene foam and organically bound render) "or equivalent ". See drawing and schedule for location and detail. The cost includes one preparation layer of cement render and all other process required for a complete job as per product's manufacturer data and UNOPS engineer satisfaction. SQ.M 310.00 -

Subtotal enclosure

5. Interior

5.4 Suspended Ceiling

5.4 Suspended Ceiling Schedule

6/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos. 1

Description of Work/Items
Lasani wooden board, 16mmm, fixed ceiling for all soffits around the building. The cost includes all framing, fixing, oil based painting and needed work for a complete job to the full satisfaction of Engineer. Gypsum board, 16mmm, reflected ceiling for the side entrances of the building. The cost includes all framing, fixing, and needed work for complete job.

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

SQ M

152.00

SQ M 5.5 Joinery fixtures schedule

4.00

5.5 Joinery
1
Wooden frame, MDF finish, wall mounted cabinet at the kitchen. See drawings for details. The cost includes making, installation, framing, hardware, finish, 3 coats oil-based painting and all to the complete job.

LS

1.00

Wooden frame, MDF finish, floor mounted cupboard at the kitchen. See drawings for details. The cost includes making, installation, framing, finish, hardware, stone table top, splash back, 3 coats oil-based painting and all to the complete job. 5.6 Metal Fixtures Schedule Metallic plaster beads for outer corners at the corridors only, including edge of walls. This includes any needed work for complete installation. See schedules and drawings for details. Toilet roll holders. This also includes installation. Grab rail for handicap toilet. One complete set. This includes supplying and complete installation. Soap dishes. This also includes installation. 5.8 Fire Extinguishers Schedule

LS

1.00

5.6 Metalwork
1

Lin M No

70.00 3.00

2 3

LS No

1.00 4.00

4 1

5.8 Fire Extinguishers and Blankets


Extinguishers, wall mounted, powder-type (9kg).

No

4.00

Subtotal Interior

6. Finish

6.1 Plastering
NOTE: Prior to work, samples must be approved by UNOPS Engineer. Internal surfaces

6.1 Plastering Schedule

Cement render medium CRM followed by cement render fine CRF on all internal surfaces of walls/ ceilings/ beams/ columns/ reveals. See schedule for detail. External surfaces Gypsum board, decorative finish, at both main entrances foreheads. The cost includes supplying, making, installation and all to the complete condition as per Engineer's approval.

SQ.M

1,100.00

SQ.M

40.00

6.2 Cementitious Toppings


NOTE: Prior to work, samples must be approved by UNOPS Engineer.

6.2 Cementitious Toppings Schedule

7/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos. 1

Description of Work/Items
In situ colored chips, colored mortar terrazzo, including marble trims for joints, for all floors as shown on the drawing. See schedule for details. The cost also includes stainless steel nosing at the outer edges of the stair steps at the entrances.

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

SQ.M 6.3 Wall tiling and 6.3 Floor tiling schedules

510.00

6.3 Tiling
NOTE: Prior to work, samples must be approved by UNOPS Engineer.

2 3

Ceramic wall tiles for toilets, kitchen, around the drinking water fountain and any place shown. The cost includes bed preparation, bedding and grout. Ceramic floor tiles for toilets including bed preparation, bedding and grout. Marble skirting for all rooms and halls where did not receive ceramic tiles. The cost includes bedding and grout. 6.6 Interior/Exterior painting schedule

SQ.M SQ.M

70.00 35.00

Lin M

450.00

6.6 Painting
NOTE: Prior to work, samples must be approved by UNOPS Engineer. Internal surfaces

Flat water based: Interior, on all surfaces that receive cement plaster. The cost includes wall putty (gypsum filling) layer before painting and all needed preparation of the surfaces for painting. See schedule for detail on this paint system

SQ.M

1,100.00

Subtotal Finishes

8. Water Services

8.1 Water Services

8.1 Water services samples, 8.1 Water system piping, 8.1 Sanitary fixtures, 8.1 Water heater schedules and 8.1 Water Services Testing schedules

NOTE: The cost for all pipes exposed to weather includes glass wool thermal insulation cover. The cost given for all GI and PVC pipes with diameter less than 60mm includes all required fittings, accessories and work for complete system installation. Water supply piping

1 2 3 4 5 6 7 8

GI water supply pipe D=32mm, including fittings and installation. GI water supply pipe D=25mm, including fittings and installation. GI water supply pipe D=20mm, including fittings and installation. GI water supply pipe D=15mm, including fittings and installation. Water supply bronze Valve D=32mm, including fittings and installation. Water supply bronze Valve D=20mm, including fittings and installation. Damp proof Insulation rubber tape for all GI Piping. Water supply inspection manhole less than 1200mm deep. This includes excavation and any needed work to make the manhole as per drawings and schedule.

Lin M Lin M Lin M Lin M No No Lin M

30.00 22.00 25.00 50.00 2.00 1.00 150.00

No

3.00

8/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos. 9

Description of Work/Items
Sanitation Piping PVC pipe D=100mm, including supply and installation. This also includes supply and installation of PVC pipe from GI sheet downpipes to the open channel collector at the side walks. PVC pipe D=50mm, including fittings and installation. Ventilation PVC pipes D=100mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. Ventilation PVC pipes D=50mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. PVC Elbow D=100x100,45, including supply and installation. PVC Tee D=100x100, 45, including supply and installation. Sanitation Grease Trap less than 1200mm deep. This includes excavation and any needed work to make the manhole according to the drawings and schedules. Sanitary and other fixtures Western toilet, including supply, installation and accessories. Water fountain , including supply, installation and accessories. Ceramic sink at toilets and labs, including mixer and all accessories, supplying and installation. Floor trap D=50mm, including supply and installation. Stainless steel sink, including supply and installation. Ventilation cap D=100mm, including supply and installation. Ventilation cap D=50mm, including supply and installation. Service Sink, including supply and installation. Electrical water boiler with capacity of 50 Liter, including supply and installation. Electrical water boiler with capacity of 30 Liter, including supply and installation. Sewer Manholes More than 1200mm deep. This includes excavation and any needed work to make the manhole according to the drawings and schedules.

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

Lin M Lin M

34.00 50.00

10 11

Lin M

15.00

12

Lin M No No

10.00 4.00 8.00

13 14 15

No

1.00

16 17 18

No No

3.00 2.00

No

4.00 6.00 1.00 2.00 1.00 1.00 2.00 1.00

19 20 21 22 23 24 25 26

No No No No No No No

No

2.00

Subtotal Water Services

9. Electrical Services

9.1 Electrical Services

9.1 Electrical systems, 9.1 Electrical supply mains, 9.1 Electrical switchboard design, 9.1 Main 380VAC Distribution System, 9.1 Panel Construction, 9.1 Power accessories, 9.1 Lighting control and fittings, 9.1 Fire Detection Equipment Schedule Schedules and the Attachments

9/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos.

Description of Work/Items
Note: for all items below the cost includes complete/installations with all needed accessories and works. Switchboard and sub boards

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

Sub distribution panel, 750x500x250 mm, powder coated, weatherproof, outdoor mounted metal. With Digital Measurement equipments. No. 1.00 1.00 16.00 38.00 Main circuit breaker, MCCB, 3x160Amps, TypeC. Circuit breaker, MCB, 1x32Amps, Type-C Circuit breaker, MCB, 1x20Amps, Type-C Distribution wiring

2 3 4

No. No. No.

3 (1X6mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. 3 (1X4mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. Fittings/Fixtures Single pole/double pole or two way light switch.

Lin M

600.00

Lin M

1,500.00

7 8 9 10 11 12 13 14 15

No 32W circular surface ceiling mount, IP54 fluorescent light fixture. 60W circular Pendant ceiling mount, IP54 fluorescent light fixture with all accessories. 60W Circular Surface ceiling mount, IP54 fluorescent light fixture with all accessories. 2x36W pendant ceiling mounted fluorescent light fixture, IP-44.with all accessories. 1x36W pendant ceiling mounted fluorescent light fixture, IP-56. with all accessories. 16 Amp Duplex power receptacle. 16 Amp single water proof power receptacle. 25 Amp single water proof power receptacle for electrical water heater and kitchen. AC/Split Units and Exhaust fans 12000 BTU AC/ Split unit 220 V, 50 HZ Samsung made in Italy with all accessories. Roof mounted exhaust fans . 25 Amp single electrical non-fuse disconnecting switch for AC/ Split unit. Emergency evacuation lighting 2x10 watt IP-65 wall mounted Emergency Light Fixture. 1X10W surface mounted IP-40 Exit light. Fire alarm system (including all associated cabling, wiring, mounting, etc) No No No No No No No No

42.00 35.00 21.00 7.00 25.00 2.00 98.00 9.00 9.00

16 17 18

No No No

15.00 3.00 15.00

19 20

No No

7.00 4.00

21

22 23 24

Addressable fire alarm panel, with all accessories, to the complete and functioning job. Fire alarm push button, double action type, UL Listed Fire alarm Photoelectric type smoke detectors, UL Listed

LS No No No

1.00 4.00 4.00 22.00

Electrical Grounding and Lightning Protection.

10/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Customs Office Building Original Issue: February 25, 2010

Pos. 25

Description of Work/Items
Lightening protection as mentioned in lightening protection drawing with air terminal, electrodes, tape, connectors, clamp and grounding cable

Project Schedules Ref.

Unit

Quantity

Unit Cost

Total Cost

Set

1.00

26

Grounding system as mentioned in grounding drawing with electrodes, tape, connectors, clamp and grounding cable Labeling Proper and correct all circuits numbering, cable circuit drawings, cable and switchboard labeling to the full satisfaction of UNOPS engineer.

Set

1.00

27

LS

1.00

Subtotal Electrical Services

11/24

UNOPS
Vertical Structures Unit

SUMMARY OF COMPONENT
Currency: Project No: Project Title: Location: Tender No: Component: Original Issue: US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan 04 Customs Office Building February 25, 2010

Work Type
Total for General Total for Site Total for Structure Total for Enclosure Total for Interior Total for Finish Total for Water Supply Services Total for Electrical Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total for Customs Office Building

0.00

Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan Police Office Building

UNOPS
Vertical Structures Unit

DETAILS OF COMPONENT
Currency: Project No: Project Title: Location: US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 1. General

Description of Work/Items
1.1 Occupied Areas, 1.1 Existing Services Schedule and 1.1 Items to be supplied schedules

Unit

Quantity

Unit Cost

Total Cost

1.1 Preliminaries
1
Pre-construction work, mobilisation activities including paper/ documentation tasks.

LS

1.00 1.00

Post construction works and clean up. 1.2 Inspection notification schedule and 1.2 Warranty schedules

LS

1.2 General Requirements


1
Testing and Operation/Maintenance Manuals.

LS

1.00

Subtotal General

2. Site

2.3 Earthwork
1
Excavation (any soil type) for foundation. This item includes all excavations, disposal and temporary support or shoring if needed. See drawing and schedule for details.

2.1 Identified hazardous materials and 2.3 Earthwork schedules

CU.M

190.00

Ground improvement under foundations. This includes supplying of filling materials and compacting the layers according to schedule and drawings. Soil backfilling on RCC math foundation up to ground level. This includes supplying of needed materials. See drawings and schedules for levels/dimensions and details. Gravel compaction, Class 2, at any places under the PCC/RCC shown inside the building or at sidewalk/ramp. This includes supplying of needed materials. See drawing and project schedules for dimensions and details.

CU.M

85.00

CU.M

147.00

CU.M

60.00

Subtotal Site

3. Structure

3.1 Concrete-General
NOTE: Cost for concrete items in this section includes reinforcement, steel anchorage embedded in concrete, shuttering, concrete, concrete curing and all to the complete job.

3.1 Non reinforced concrete, 3.1 Reinforced concrete and 3.2 ConcreteIntegral Finishes schedules

1 2 3

PCC lean concrete (10 Mpa) under the RCC foundations. RCC (20 Mpa) foundations, rectangular and trapezoidal foundation beams. PCC, 40mm thick, lean concrete (10 Mpa) at the floor over the gravel compaction.

CU.M CU.M CU.M

10.00 108.00 15.00

14/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 4

Description of Work/Items
PCC concrete, 100mm thick, (20 Mpa) at the floor over the water-proofing layer. This item includes the stairs steps at the entrances and the ramps. RCC Columns, includes all columns (from 1.65 to +3.55) and supporting columns/ring beams for trusses on the roof. RCC (20 Mpa) slabs and beams. The items covers all slabs, beams and RCC floor for the bank. RCC Pavement (20 Mpa), for 1000mm-wide side walks. This includes entrances and ramps. The cost includes expansion joint on side walk surface as shown and as well as the broom finish to the side walk/ ramp surfaces. 3.3 Precast Concrete Prototypes Schedule

Unit

Quantity

Unit Cost

Total Cost

CU.M

36.00

CU.M

66.00

CU.M

66.00

CU.M

12.00

3.3 Pre-cast RC Concrete


1
Precast RCC (20 Mpa) exterior window sill for all windows as per drawings. This includes all work need for complete installation.

Lin M

23.00

3.5 Brickwork
1
Second Class Brick masonry with mortar. This includes all brick walls/ brick masonry in the entire building. The cost includes steel bars shown in the walls and their connection to the perimeter RCC elements.

3.5 Brickwork construction schedule

CU.M 3.7 Light Steelwork, 6.6 Interior painting and 6.6 Exterior painting schedules

46.00

3.7 Light Steelwork

NOTE: The following steel items include painting according to the schedules and specifications for steel member painting for complete installation. See drawing for details.

Steel frame cabinet for First-Aid-Kits at the hall of Police Office Building. The item and its cost include making, transportation, installation, hardware, finishes and all other accessories and work required for a complete cabinet to the full satisfaction of the Engineer. LS 1.00 Steel frame cabinets for Weapon Storages at the hall of Police Office Building. The item and its cost include making, transportation, installation, hardware, finishes and all other accessories and work required for a complete cabinet to the full satisfaction of the Engineer. LS 1.00 3.9 Light Timberwork schedule, 6.6 Interior painting and 6.6 Exterior painting schedules

3.9 Light Timberwork


Roof timber structure on the trusses. The cost includes 30mm thick wooden planks as shown on the drawing. This also cover all auxiliary and needed materials and supplying and installation of members including painting to make the surface ready for folded metal sheet roofing according to the drawing, schedule and specifications.

SQ.M

495.00

3.10 Concrete Unit Masonry

3.10 Concrete Unit Masonry

15/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 1

Description of Work/Items
CMU masonry with mortar. This item covers all CMU works shown on the drawings for the building. The cost includes all needed materials, steel bars, anchors etc and works.

Unit

Quantity

Unit Cost

Total Cost

CU.M

46.00

3.11 Structural Steel


NOTE: Cost for steel related items in this section includes supplying materials and installation to the complete condition for all members, gussets, fasteners, connections, welding and other accessories and works needed to complete the job. The cost also includes painting according to the schedules and specifications for steel member painting, which is at least on coat of anti-rust followed by 2 other coats of oil-based painting for all surfaces and sides of the steel members.

3.11 Structural Steel Schedules 3.7 Light Steelwork Schedule

2 3 4 5 6 7 8 9 10 11 12 13

Steel support, purlin, at the metal sheet roof as (C-shape 140x65mm + L-shape 50x50mm). See drawing for details. Steel truss (TRUSS 1) at the roof. See drawing for details. Steel truss (TRUSS 2) at the roof. See drawing for details. Steel truss (TRUSS 3) at the roof. See drawing for details. Steel truss (TRUSS 4) at the roof. See drawing for details. Steel truss (TRUSS 5) at the roof. See drawing for details. Steel truss (TRUSS 6) at the roof. See drawing for details. Steel truss (TRUSS 7) at the roof. See drawing for details. Steel truss (TRUSS 8) at the roof. See drawing for details. Steel truss (TRUSS 9) at the roof. See drawing for details. Steel truss (TRUSS 10) at the roof. See drawing for details. Steel truss (TRUSS 11) at the roof. See drawing for details. Steel frame fixed ladder inside the toilet as the access way to the roof. The work and the cost includes construction of fixed later to the wall and the opening pane, its hardware and other accessories to complete the installation as per drawing and schedule. This also includes painting according to the schedules and specifications for steel surfaces painting.

Lin M No No No No No No No No No No No

440.00 3.00 4.00 2.00 8.00 2.00 2.00 8.00 2.00 4.00 4.00 1.00

LS

1.00

Subtotal Structure

4. Enclosure

4.1 Waterproofing
1
Bitumen water-proofing coat. This is a 3-5mm thick hot bitumen painting coats on dried PCC surface. The item applies on 40mm PCC at the floor beneath the 20 Mpa, 100mm thick PCC layer. This cost includes supplying and applying the coats with all needed accessories and work to do the job as per manufacturer's data and to the full satisfaction of UNOPS engineer.

4.1 Waterproofing system schedule

SQ.M

360.00

16/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 2

Description of Work/Items
Single layer bitumen membrane at the floor and walls of toilets/kitchen. This includes preparation of base layers shown on the drawings. Refer to schedule/drawing for details. 4.2 Roofing materials, and 4.2 Gutter and Down pipe Schedules

Unit

Quantity

Unit Cost

Total Cost

SQ.M

55.00

4.2 Roofing
1
Standing seam metal roofing (using GI sheet gauge 24). This includes all accessories required for installation of roof on the prepared timber plank (see item 3.9.1 for the cost of timber plank on roof). The cost also includes all flashings, capping etc needed on the metal roof. Metallic gutter around the roof (using GI sheet gauge 20). The cost includes all accessories required for complete installation of gutter such as supplying, fixing and others as per drawing and schedules. Down pipes, PVC pipe class-B. This includes all accessories required for complete installation such as supplying, fixing and others as per drawing and schedules.

SQ.M

495.00

Lin M

98.00

Lin M

38.00

4.3 Windows and Window Hardware


NOTE: Prior to work, samples must be approved by UNOPS Engineer.

4.3 Window, 4.3 Window Hardware, 4.5 Annealed Glasses, and 4.6 Glassblock work schedules

Wooden frame windows. The work includes making, transportation, installation, hardware, glazing, glass-block work around window, insect screen, 3 coats of oil-based painting, and other accessories required for complete installation as per drawings and schedule. SQ.M 50.00 4.4 Joinery doors 4.4 PVC doors, 4.4 Steel doors and 4.5 Annealed Glasses schedules

4.4 Doors and Door Hardware


NOTE: Prior to work, samples must be approved by UNOPS Engineer.

Wooden frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule. PVC frame doors. The work includes making, transportation, installation, hardware, glazing, and other accessories required for complete installation as per drawings and schedule. Steel frame doors. The work includes making, transportation, installation, hardware, glazing, 1 coat of anti-rust followed by 2 other coats of oil-based painting, and other accessories required for complete installation as per drawings and schedule.

SQ.M

60.00

SQ.M

6.00

SQ.M

2.00

4.5 Glazing
1
Mirrors (40x60cm) at toilets. This includes complete installation.

4.5 Mirrors schedules No 4.7 Insulation Schedules 5.00 -

4.7 Insulation and Vapour Barriers


1
Glasswool thermal insulation on RCC roof, beneath roof structure. See drawings and schedules for details.

SQ.M

495.00

17/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos.

Description of Work/Items

Unit
4.8 EFIS Schedules

Quantity

Unit Cost

Total Cost

4.8 Exterior Insulation and Finish System


NOTE: Prior to work, samples must be approved by UNOPS Engineer.

External wall insulation system, STOTHERM CLASSIC, (expanded polystyrene foam and organically bound render) "or equivalent ". See drawing and schedule for location and detail. The cost includes one preparation layer of cement render and all other process required for a complete job as per product's manufacturer data and UNOPS engineer satisfaction.

SQ.M

250.00

Subtotal enclosure

5. Interior

5.4 Suspended Ceiling


1
Lasani wooden board, 16mmm, fixed ceiling for all soffits around the building. The cost includes all framing, fixing, oil based painting and needed work for a complete job to the full satisfaction of Engineer.

5.4 Suspended Ceiling Schedule

SQ M

117.00

Gypsum board, 16mmm, reflected ceiling for the side entrances of the building. The cost includes all framing, fixing, and needed work for complete job. 5.5 Joinery fixtures schedule Wooden frame, MDF finish, wall mounted cabinet at the kitchen. See drawings for details. The cost includes making, installation, framing, hardware, finish, 3 coats oil-based painting and all to the complete job.

SQ M

4.00

5.5 Joinery
1

LS

1.00

Wooden frame, MDF finish, floor mounted cupboard at the kitchen. See drawings for details. The cost includes making, installation, framing, finish, hardware, stone table top, splash back, 3 coats oil-based painting and all to the complete job. 5.6 Metal Fixtures Schedule Metallic plaster beads for outer corners at the corridors only, including edge of walls. This includes any needed work for complete installation. See schedules and drawings for details. Toilet roll holders. This also includes installation. Grab rail for handicap toilet. One complete set. This includes supplying and complete installation. Soap dishes. This also includes installation. 5.8 Fire Extinguishers Schedule

LS

1.00

5.6 Metalwork
1

Lin M No

54.00 3.00

2 3

LS No

1.00 4.00

4 1

5.8 Fire Extinguishers and Blankets


Extinguishers, wall mounted, powder-type (9kg).

No

4.00

Subtotal Interior

6. Finish

6.1 Plastering
NOTE: Prior to work, samples must be approved by UNOPS Engineer.

6.1 Plastering Schedule

18/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 1

Description of Work/Items
Internal surfaces Cement render medium CRM followed by cement render fine CRF on all internal surfaces of walls/ ceilings/ beams/ columns/ reveals. See schedule for detail. External surfaces Gypsum board, decorative finish, at both main entrances foreheads. The cost includes supplying, making, installation and all to the complete condition as per Engineer's approval.

Unit

Quantity

Unit Cost

Total Cost

SQ.M

880.00

SQ.M

40.00

6.2 Cementitious Toppings


NOTE: Prior to work, samples must be approved by UNOPS Engineer.

6.2 Cementitious Toppings Schedule

In situ colored chips, colored mortar terrazzo, including marble trims for joints, for all floors as shown on the drawing. See schedule for details. The cost also includes stainless steel nosing at the outer edges of the stair steps at the entrances. 6.3 Wall tiling and 6.3 Floor tiling schedules

SQ.M

390.00

6.3 Tiling
NOTE: Prior to work, samples must be approved by UNOPS Engineer.

2 3

Ceramic wall tiles for toilets, kitchen, around the drinking water fountain and any place shown. The cost includes bed preparation, bedding and grout. Ceramic floor tiles for toilets including bed preparation, bedding and grout. Marble skirting for all rooms and halls where did not receive ceramic tiles. The cost includes bedding and grout. 6.6 Interior/Exterior painting schedule

SQ.M SQ.M

70.00 35.00

Lin M

360.00

6.6 Painting
NOTE: Prior to work, samples must be approved by UNOPS Engineer. Internal surfaces

Flat water based: Interior, on all surfaces that receive cement plaster. The cost includes wall putty (gypsum filling) layer before painting and all needed preparation of the surfaces for painting. See schedule for detail on this paint system

SQ.M

880.00

Subtotal Finishes

8. Water Services

8.1 Water Services

8.1 Water services samples, 8.1 Water system piping, 8.1 Sanitary fixtures, 8.1 Water heater schedules and 8.1 Water Services Testing schedules

NOTE: The cost for all pipes exposed to weather includes glass wool thermal insulation cover. The cost given for all GI and PVC pipes with diameter less than 60mm includes all required fittings, accessories and work for complete system installation. Water supply piping

GI water supply pipe D=32mm, including fittings and installation.

Lin M

30.00

19/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 2 3 4 5 6 7 8

Description of Work/Items
GI water supply pipe D=25mm, including fittings and installation. GI water supply pipe D=20mm, including fittings and installation. GI water supply pipe D=15mm, including fittings and installation. Water supply bronze Valve D=32mm, including fittings and installation. Water supply bronze Valve D=20mm, including fittings and installation. Damp proof Insulation rubber tape for all GI Piping. Water supply inspection manhole less than 1200mm deep. This includes excavation and any needed work to make the manhole as per drawings and schedule. Sanitation Piping PVC pipe D=100mm, including supply and installation. This also includes supply and installation of PVC pipe from GI sheet downpipes to the open channel collector at the side walks. PVC pipe D=50mm, including fittings and installation. Ventilation PVC pipes D=100mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. Ventilation PVC pipes D=50mm (from toilets to roof). This also includes supplying and installation of PVC screen at the pipe inlets inside the toilets. See drawing and schedule for details. PVC Elbow D=100x100,45, including supply and installation. PVC Tee D=100x100, 45, including supply and installation. Sanitation Grease Trap less than 1200mm deep. This includes excavation and any needed work to make the manhole according to the drawings and schedules. Sanitary and other fixtures Western toilet, including supply, installation and accessories. Water fountain , including supply, installation and accessories. Ceramic sink at toilets and labs, including mixer and all accessories, supplying and installation. Floor trap D=50mm, including supply and installation. Stainless steel sink, including supply and installation. Ventilation cap D=100mm, including supply and installation. Ventilation cap D=50mm, including supply and installation. Service Sink, including supply and installation. Electrical water boiler with capacity of 50 Liter, including supply and installation. Electrical water boiler with capacity of 30 Liter, including supply and installation.

Unit
Lin M Lin M Lin M No No Lin M

Quantity
22.00 59.00 78.00 2.00 2.00 200.00

Unit Cost

Total Cost
-

No

4.00

Lin M Lin M

50.00 45.00

10 11

Lin M

23.00

12

Lin M No No

8.00 10.00 15.00

13 14 15

No

1.00

16 17 18

No No

5.00 2.00

No No No No No No

6.00 7.00 1.00 3.00 1.00 1.00 2.00 2.00

19 20 21 22 23 24 25

No No

20/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 26

Description of Work/Items
Sewer Manholes More than 1200mm deep. This includes excavation and any needed work to make the manhole according to the drawings and schedules.

Unit

Quantity

Unit Cost

Total Cost

No

3.00

Subtotal Water Services

9. Electrical Services

9.1 Electrical Services

9.1 Electrical systems, 9.1 Electrical supply mains, 9.1 Electrical switchboard design, 9.1 Main 380VAC Distribution System, 9.1 Panel Construction, 9.1 Power accessories, 9.1 Lighting control and fittings, 9.1 Fire Detection Equipment Schedule Schedules and the Attachments

Note: for all items below the cost includes complete/installations with all needed accessories and works. Switchboard and sub boards

2 3 4

Sub distribution panel, 750x500x250 mm, powder coated, weatherproof, outdoor mounted metal. With Digital Measurement equipments. Main circuit breaker, MCCB, 3x160Amps, Type-C. Circuit breaker, MCB, 1x32Amps, Type-C Circuit breaker, MCB, 1x20Amps, Type-C Distribution wiring

No. No. No. No.

1.00 1.00 12.00 30.00

3 (1X6mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. 3 (1X4mm2) wires pulled in 24mm PVC Conduit, assorted colors as per phase requirement RST/UVW, white color for neutral and green color for grounding. Fittings/Fixtures Single pole/double pole or two way light switch. 32W circular surface ceiling mount, IP54 fluorescent light fixture. 60W circular Pendant ceiling mount, IP54 fluorescent light fixture with all accessories. 60W Circular Surface ceiling mount, IP54 fluorescent light fixture with all accessories. 2x36W pendant ceiling mounted fluorescent light fixture, IP-44.with all accessories. 1x36W pendant ceiling mounted fluorescent light fixture, IP-56. with all accessories.

Lin M

400.00

Lin M

900.00

7 8 9 10 11

No No No No

38.00 26.00 16.00 2.00

No

16.00

12

No

3.00 54.00 16.00

13 14 15

16 Amp Duplex power receptacle. 16 Amp single water proof power receptacle. 25 Amp single water proof power receptacle for electrical water heater and kitchen.

No No

No AC/Split Units and Exhaust fans

12.00

16

12000 BTU AC/ Split unit 220 V, 50 HZ Samsung made in Italy with all accessories. No 8.00 -

21/24

Currency: Project No: Project Title: Location:

US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan

Tender No: 04 Component: Police Office Building Original Issue: February 25, 2010

Pos. 17 18

Description of Work/Items
Roof mounted exhaust fans . 25 Amp single electrical non-fuse disconnecting switch for AC/ Split unit. Emergency evacuation lighting 2x10 watt IP-65 wall mounted Emergency Light Fixture. 1X10W surface mounted IP-40 Exit light. Fire alarm system (including all associated cabling, wiring, mounting, etc)

Unit
No No

Quantity
5.00 8.00

Unit Cost

Total Cost
-

19 20

No No

5.00 4.00

21

22 23 24

Addressable fire alarm panel, with all accessories, to the complete and functioning job. Fire alarm push button, double action type, UL Listed Fire alarm Photoelectric type smoke detectors, UL Listed

LS No No No

1.00 4.00 4.00 16.00

25

26

Electrical Grounding and Lightning Protection. Lightening protection as mentioned in lightening protection drawing with air terminal, electrodes, tape, connectors, clamp and grounding cable Grounding system as mentioned in grounding drawing with electrodes, tape, connectors, clamp and grounding cable Labeling Proper and correct all circuits numbering, cable circuit drawings, cable and switchboard labeling to the full satisfaction of UNOPS engineer.

Set

1.00

Set

1.00

27

LS

1.00

Subtotal Electrical Services

22/24

UNOPS
Vertical Structures Unit

SUMMARY OF COMPONENT
Currency: Project No: Project Title: Location: Tender No: Component: Original Issue: US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan 04 Police Office Building February 25, 2010

Work Type
Total for General Total for Site Total for Structure Total for Enclosure Total for Interior Total for Finish Total for Water Supply Services Total for Electrical Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total for Police Office Building

0.00

UNOPS
Vertical Structures Unit

SUMMARY BILL OF QUANTITIES


Currency: Project No: Project Title: Location: Tender No: Tender Title: Original Issue: US Dollars 810 Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan 04 Customs and Police Office Buildings February 25, 2010

CONTRACT COMPONENTS
Total for Customs Office Building Total for Police Office Building

BOQ Value for whole tender in words: Zero

Agreed on behalf of Contractor Name Position Signature

UNOPS Name Position Signature

Address and Mobile Number