Documente Academic
Documente Profesional
Documente Cultură
Understanding the Misunderstanding of Hydropower Potential in Nepal Dr. Arjun Bahadur KC Nepal is experiencing an extreme shortage of electricity despite having an enormous hydropower resources potential for development not only for domestic consumption but also for export. The development of hydropower that started some hundred years ago has not been very encouraging, averaging about roughly 6 MW per year despite being touted of its theoretical potential. The hydropower development has been seriously affected by the inefficiency, politicization and rampant corruption in state owned electricity utility-(Nepal Electricity Corporation/NEA) as well as in its line ministry. Neither NEA, nor its line ministry created a investment friendly environment to foster private as well as community development of hydropower in Nepal. Moreover, Government of Nepal lacks serious practical vision for the hydropower development and its potential benefits. In addition, a very wrong information about the hydropower potential in Nepal is being disseminated to the students and the common people of Nepal. The rhetoric claiming Nepal as "second richest country" in the world after Brazil in hydropower potential has never been proved. With no surprise, Nepal's power potential is even smaller than our both neighbours, India and China. It is the time to change the course books of Nepal that claims Nepal to be the second richest country in hydropower globally. Nepali people, especially those students need true information. This article presents a clear position on the real hydropower potential in Nepal. Some half century ago, water resources expert Dr. Hari Man Shrestha conducted an academic research for his Ph.D. degree in Russia, which revealed that theoretically Nepal could generate 83,000 megawatts hydropower, of which 42,000 megawatts was economically and technically feasible. This estimate was made at a time when very little river water discharge data was generated by very few measuring stations. Dr. Shrestha also used average runoff dischange that includes the flood water as well, making the study to be only a very high level estimate. That, however could have been considered the only possible way to estimate the hydropower potential where not much measuring stations were available during that time. A recent study conducted by the team of Institute of Engineering, Tribhuwan University Nepal and led by Prof. Narendra Man Shakya has shown that Nepal has a total potential to generate 53,000 megawatts of hydropower in Nepal. This team's estimate was based on the latest water discharge data available with the Department of Hydrology and Meteorology, using Geographic Information System (GIS). Unlike Dr. Hari Man Shrestha's study, this team estimated the potential excluding the flood water from the discharge data, making this study more reliable. However, the estimate of potential entirely depends on what type of models are used and what kind of assumptions are made while developing various scenario. This study however, does not tell what is the maximum
generating potential in terms of electrical energy (GWh) based on wet as well as dry season flow durations. I assume that the team is in the way to estimate this as well. The global theoretical hydropower potential is estimated to be 38,606,913 GWh while the technically feasible potential is 14,604,209 GWh annually (Hydropower and Dams, World Atlas, 2009). All the theoretical and technical capacity cannot be exploited because of the geographical, dry season flow available and economical reasons. It has been estimated that the global economically feasible hydropower potential is 8,771,502 GWh annually. Continentally, Asia has the highest economically feasible hydropower resource of 1,107,055 GWh followed by Europe (771,408 GWh), North and Central America (688,873 GWh), South America (641,216 GWh), Africa (102,107) and Oceania (41,886 GWh) annually. China and India have the largest economically exploitable hydropower resources in Asia. In terms of theoretical potential, China has the highest theoretical hydropower resources globally followed by Brazil, India, Russia, Indonesia, Canada and the USA. Figure 1 below shows the top 13 countries in the world with their gross theoretical hydropower potential (WEC, 2010).
6,080,000 3,040,000
2,638,000
2,295,000
2,174,000
2,067,000
2,040,000
1,577,000
1,397,000
731,000
600,000
527,000
The Jalsrotoi Vikas Sanstha (JVC) in 2004 reported that based on the 83,000 MWh theoretical capacity at 95% exceedance flow, the electrical energy generation capacity is approximately 145,900 GWh per year. As 50% of this is considered technically and economically feasible, the maximum electrical energy generation could be approximately 73,000 GWh annually even if we assume Dr. Shrestha's estimate were correct. The estimate provided by Dr. Shakya's group is approximately 64% of what Dr. Shrestha estimated. If we take the scenario that 50% of the potential estimated by Dr. Shakya is economically feasible for electricity generation, it will be approximately 47,000 GWh per year. Between these two estimate, Nepal's economically feasible
430,000
hydropower potential can be estimated to be between 47,000 GWh and 73,000 GWh annually. If we assume that Nepal's economically exploitable hydropower potential is about 50,000 GWh annually, this will rank in the 30th position in the global ranking. The World Atlas 2009 "Hydropower and Dams states that Nepal's economically exploitable hydropower potential is 14,772 GWh annually, which puts Nepal on the 50th position in global ranking. Globally available economically exploitable hydropower resources for the 50 countries are presented in Figure 2 below.
1,753,000
852,000
818,000
536,000
442,000
376,000
264,000
260,000
206,700
162,000
145,000
140,000
140,000
114,000
105,654
103,000
100,000
100,000
98,000
97,339
90,000
78,000
68,000
67,000
65,000
53,200
50,000
50,000
50,000
50,000
49,000
45,000
41,000
40,000
40,000
37,000
33,000
29,800
30,000
21,900
20,000
20,000
19,000
19,000
18,114
16,024 Finland
16,500
Venezuela
Bosnia-
New Zealand
Philippines
Indonesia
Mexico
Argentina
Ethiyopia
Columbia
Australia
Sweden
Austria
Georgia
Nigeria
Bolivia
India
Zambia
Cameroon
Vietnam
Ecuador
German
Turkey
Congo
Canada
Angola
China
Norway
Iceland
France
Spain
Tajikistan
Paraguay
Guyana
Russia
The other misunderstanding in the public and government level has time and again surfaced that only big hydropower plants can rescue to the current poor energy supply situation in the country. In the last 2-3 decades, we spent significant time and efforts talking about the development of big hydropower projects such as West Seti, Arun III, Pancheswor etc. However, the results have been unsuccessful for several reasons. Hence, to meet the present power deficit, our focus should be in the implementation of small and medium -sized projects in fast track basis to meet national power demand. Once the national power demand is met, large sized export-oriented projects need to be developed, which will practically take next 20-30 years at today's rate of development. In conclusion, it does not matter whatever the Nepal's ranking on global stage is, it matters whether we can exploit the economically feasible hydropower potential for the socio-economic development of the country. We have significant hydropower hydropower potential for our consumption as well as for export. The only way forward is to have small and medium sized projects implemented to meet the national demand for all sectoral energy consumption.
Dr. KC serves as an energy and climate change expert in western Canada and can be reached at kcarjun@gmail.com.
Madagascar
Uzbekistan
Ukrain
Nepal
Peru
Brazil
Chile
Japan
Egypt
Suda
Italy
USA
Iraq
Iran
14,742
15,000