Sunteți pe pagina 1din 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Security Level: www.huawei.

com New Huawei Office Renovation @ Rufino Tower, 9th Floor. Prepared on 10 April 2012 UNIT General Renovation Guidelines 1.Recommendation on interior design, color & materials coordination. 2.Utilize as much of the existing facilities as possible like partitions, LAN & AC cabling, switches & outlets, and lighting. 3.Re-use of some SSS office materials like glass panels, new flooring materials, fire extinguishers, office tables for the general office area, air-conditioners, etc. 4.Change of flooring materials according to specifications. Renovation of walls. 5.Construction of Pantry Area. Renovation of Training, PH TAC, Department & Operation Directors and Meeting Rooms. 6.Updating of LAN & AC power outlets according to required number and revised floor layout. 7.Installation of package type Air-conditioning designed to serve the widest coverage of the office with the least quantity of units. 8.General office renovation according to approved plans. 1. Renovation of Office Frontage & Reception Area a.Use of high traffic flooring materials b.Use of appropriate wall panel materials c.Supply or Construction of receptionist table. d.Manufacture & installation of Huawei Corporate logo, glass-etched to be located at the designated floor lobby wall. e.Installation of Access Control at the main entrance. f.Provision of Visitors Sofa (recovered from the SSS office) g.Provision of appropriate lighting fixtures h.Installation of LAN & Voice ports and power outlets. 2 Data & 2 Voice 2. Renovation of Training Room a.Renovation of wall partitioning including removal of excess partitioning based on plans. Provision of sound insulation. b.Installation of high traffic vinyl tile flooring. c.Installation of manual roll-up projector screen. d.Installation of ceiling mounted projector system with wall mounted controls. (Supply and Install only) e.Installation of 3 Glass Boards & Pen holders. f.Installation of window shades. (Manual) g.Construction of required number of LAN & voice ports and power outlets sufficient in quantity for targeted training attendee capacity. h.Transfer of training room tables recovered from the SSS office. i.Provision of computer chairs (color-coordinated). (20 pcs) 3. Renovation of Department Directors Office a.Re-installation of laminated flooring materials from the SSS office plus supply of any net additional required. b.Transfer of 1 wall section based on plan. Construction of built-in cabinet. c.Installation of window shade of customer preferred design. d.Installation of appropriate lighting. e.Supply of Glass board/ pen holders & seat coach. (Supply & Install) f.Installation of LAN & Voice ports and power outlets. 8 Data & 2 Voice g.General varnishing re-works. 4. Renovation of Operation Directors Office a.Installation of high traffic flooring materials. b.Installation of window shade of customer preferred design. c.Installation of appropriate lighting. d.Supply of Glass board/ pen holders & seat coach. e.Installation of LAN & Voice ports and power outlets. 2 Data & 2 Voice f.General varnishing re-works. g.Supply of 5 office tables & chairs (color coordinated). 5. Construction of Pantry Area a.Entire area design, color & material coordination. b.Construction of glass/ solid wall partition covering 60% of the floor to ceiling height. lot sq.m 1 12.6 OFFICE PARTITION 30,000.00 1,500.00 sq.m nos. lot lot nos. sq.m nos. 20.4 3 1 1 4 47 7 INCLUDED IN GEN. RENOVATION VINYL TILES 582.18 8,500.00 1,000.00 12,000.00 1,500.00 350.00 12,500.00 sq.m lot nos. lot lot nos. sq.m 16.32 1 3 1 1 12 41 INCLUDED IN GEN. RENOVATION 1,500.00 15,000.00 8,500.00 10,000.00 4,500.00 1,500.00 350.00 sq.m sq.m lot nos. nos. nos. nos. lot nos. 109.5 74.88 1 1 3 4 24 1 20 RE-VARNISH / REPAINT & DEMOLITION VINYL TILES 1,500.00 582.18 28,000.00 65,000.00 4,500.00 8,500.00 1,500.00 12,000.00 5,500.00 QUANTITY PROPOSED MATERIALS DESCRIPTIONS UNIT

TOTAL

sq.m, sq.m, lot lot nos. lot lot nos.

31.8 12.52 1 1 4 1 1 4

CERAMIC GLAZED TILES ALUMINUM CLADDING

1,650.00 5,000.00 15,000.00 18,000.00

FINGER PRINT SCANNER

28,000.00 2,500.00 12,000.00 1,500.00

52,470.00 62,600.00 15,000.00 18,000.00 112,000.00 2,500.00 12,000.00 6,000.00 164,250.00 43,593.64 28,000.00 65,000.00 13,500.00 34,000.00 36,000.00 12,000.00 110,000.00

24,480.00 15,000.00 25,500.00 10,000.00 4,500.00 18,000.00 14,350.00

11,876.47 25,500.00 1,000.00 12,000.00 6,000.00 16,450.00 87,500.00

30,000.00 18,900.00

c.Construction of counter top and kitchen sink (color-coordinated). d.Installation of high traffic flooring materials. e.Construction of bar-type table around most of the wall partition perimeter & provision of stool chairs f.Installation of appropriate lighting. g.Installation of Power outlets for appliances. h.Supply of window shade i.Supply of sets of dining tables and plastic chairs (color-coordinated). 6. Renovation of PH TAC Area a.Renovation of room according to design b.Installation of vinyl tile flooring. c.Installation of LAN & Voice ports and power outlets. 6 Data & 5 Voice d.Installation of Glass board and pen holder. e.Supply of 5 computer chairs. f.Re-installation of Workstation tables, television, and other appurtenances from the SSS Office. 7. Renovation of Meeting Rooms a.Renovation of area (wall & floors) according to plan b.Installation of LAN & Voice ports and power outlets. 10 Data & 4 Voice c.Installation of Glass boards and pen holders. d.General re-varnishing works. e.Installation of vinyl flooring. f.Installation of window shades. g.Supply of Meeting Room tables &chairs. 8. Office Common Area Renovation a.General wall & floor renovation according to plan. Demolition of specified existing partitions. b.Installation of Access Control on the 2nd office entrance c.Installation of the required quantity of LAN/ voice ports & power outlets. 54 Data & 27 Voice d.Re-installation of office tables & partitions from the SSS office in accordance with the office layout plan. w/o pedestal e.Ceiling renovation. f.Lighting check. g.CCTV installation in accordance to plan. h.Provision of window shades. 8. General Office Improvements including wall, flooring, ceiling, LAN, Power, Access Control, & CCTV a.Flooring change to vinyl tiles.

lot sq.m sq.m lot lot nos sets

1 17 1 1 2 1 VINYL TILES 7.92 SYNTHETIC STONE COUNTER W/ WOOD FRAME AND SINK

15,000.00 582.18 4,500.00 8,500.00 12,000.00 8,500.00 10,000.00

15,000.00 9,897.06 35,640.00 8,500.00 12,000.00 17,000.00 10,000.00

sq.m sq.m nos nos nos lot

16.45 16.45 11 1 5 1

VINYL FLOOR TILE VINYL TILES

528.18 582.18 1,500.00 4,500.00

COMPUTER CHAIRS

6,263.00 10,000.00

8,688.56 9,576.86 16,500.00 4,500.00 31,315.00 10,000.00

sq.m nos nos sq.m sq.m nos. sets

26.22 14 3 87.2 26.22 4 2 WALL RE-VARNISH / RE-PAINT VINYL TILES

2,500.00 1,500.00 4,500.00 235.75 582.18 8,500.00 35,000.00

65,550.00 21,000.00 13,500.00 20,557.40 15,264.76 34,000.00 70,000.00

sq.m nos nos nos sq.m lot lot nos

284.94 2 81 54 192.94 1 1 5 FINGER PRINT SCANNER

1,500.00 30,000.00 1,500.00 1,500.00 150.00 20,000.00 125,000.00 8,500.00

427,410.00 60,000.00 121,500.00 81,000.00 28,941.00 20,000.00 125,000.00 42,500.00

sq.m

372.22

VINYL TILES PAINTINGS ONLY PAINTINGS ONLY

582.18 235.75 150.00

592.45 b.Wall renovation and repainting. Removal of all existing walls that are not in accordance of the approved floor plan layout. Removal of existing toilet andsq.m pantry facilities. sq.m 404 c.Ceiling repair. d.Ceiling lighting check. e.Centralized Air-conditioning duct check. Supply of AC PACU system that will provide cooling to most areas with the least number of units. f.Supply & installation of specified LAN/voice servers. g.Construction of LAN & Voice ports and power outlets.(IT Requirements) h.Re-installation of office tables (recovered from the SSS office) according to the design lay-out. Supply of 50 of computer chairs. i.Renovation of designated room for Transient Material Storage. j.Installation of CCTV and access control systems at both k.Re-installation of Fire Extinguishers (recovered from the SSS office.) lot lot lot nos lot sq.m lot lot 1 1 1 5 1 7.68 1 1

606,202.70 1,500.00 510,000.00 2,500.00 38,000.00 7,500.00 GRAND TOTAL

216,699.04 139,670.09 60,600.00 20,000.00 300,000.00 606,202.70 7,500.00 510,000.00 19,200.00 38,000.00 7,500.00 4,368,182.58

Permit Processing - 15 to 30 working days *can start work while permits are being processed
DURATION OF WORK: 45 WORKING DAYS