Sunteți pe pagina 1din 2

Activity ID

Activity Name

Start

Finish

PKG 4 MPL4 Contractor Baseline Ba 111210 - Combined Baseline ...


Main Plant PKG4
Utilities & Offsites
EPC Cost Home Office Services 10% Manufacturing & Delivery 45% 45 Construction, Commissioning Commissionin & As Builts 45% Temporary Facilities 4% Construction & Pre-commissioning Pre-comm 84% Payment Milestones General Milestones Common Facilities 40% Utilities & Offsites 60% Condensate Storage & Shipping (U725) NGL Storage & Ship Shipping (U745) Utility & Potable Water Wat (U761) Demin. Water/BFW/Steam Water/BFW/S & Condensate (U762) Chemical Storage (U764) (U Fuel Gas (U765) Chilled Water (U766) Plant & Instrument A Air (U767) Nitrogen (U768) Diesel (U769) Flare Gas Recovery (U770) Flare & Blowdown (U (U771) Flare & Blowdown (U0771-East) CV Civil SS Structural S Steel BD Architecture Architectur / Building PP Piping Underground Piping Undergroun Aboveground Piping Abovegroun Piping Shop Sh Fabrication Piping Field Fie Erection 04CNS "U-771" East- Piping Field Erection-Erection/Assembling 04CNS 04CNS 04CNS 04CNS "U-771" East- Piping Field Erection-Welding "U-771" East- Piping Field Erection-NDT/PWHT "U-771" East- Piping Field Erection-Final Inspection "U-771" East- Piping Field Erection-Hydro-Test

06-May-10 A 03-Sep-14 06-May-10 A 03-Sep-14 06-May-10 A 03-Sep-14 06-May-10 A 06-May-10 14-Dec-10 24-Nov-10 A 24-Nov-10 A 15-Mar-11 A 01-Jan-12 15-Mar-11 A 30-May-11 16-Jul-11 16-Jul-11 20-Aug-11 16-Jul-11 20-Aug-11 25-Aug-11 18-Sep-11 25-Jul-11 15-Aug-11 15-Aug-11 27-Aug-11 26-Nov-11 15-Aug-11 20-Oct-11 20-Oct-11 14-Mar-12 13-Feb-12 13-Feb-12 08-Mar-12 08-Mar-12 06-Aug-12 06-Aug-12* 16-Aug-12 30-Aug-12 12-Sep-12 26-Sep-12 28-Aug-12 24-Feb-13 07-Apr-12 14-Nov-12 20-Nov-12 26-Sep-12 24-Mar-12 27-May-13 15-Aug-11 15-Aug-11 13-Feb-12 17-Mar-12 03-Sep-14 01-Sep-14 20-May-13 03-Sep-14 31-Aug-11 05-Sep-13 05-Sep-13 05-Sep-13 15-Aug-13 19-Aug-13 22-Jul-13 26-Jun-13 07-May-13 19-Aug-13 15-Aug-13 14-Apr-13 21-Mar-13 11-May-13 11-May-13 01-Apr-13 16-Jun-13 08-Jul-13 04-Jul-13 01-Jul-13 01-Sep-12 01-Apr-13 08-Dec-12 01-Apr-13 04-Nov-12 23-Feb-13 02-Dec-12 13-Dec-12 30-Dec-12 09-Jan-13 23-Feb-13 29-Dec-12 01-Apr-13 07-Nov-12 12-Mar-13 26-May-13 13-Dec-12 31-Mar-13 04-Jul-13 21-Jan-13 13-Feb-12 16-Jul-12 16-Dec-12

Total Float b 2 0 0 0

Mar 23

Apr 24

May 25

2012 Jun Jul 26 27

Aug 28

Sep 29

Oct 30

Nov 31

Dec 32

Jan 33

Feb Mar 34 35

Apr 36

May 37

2013 Jun Jul 38 39

Aug 40

Sep 41

Oct 42

Nov 43

Dec 44

Jan 45

2014 Feb Mar 46 47

0 G m Bulk undation ometrics or nt nation ew . B21. B19. Equipment Shelters 80%(IFC) PKG C17. Elec. B22. 90% E&I Final B08. PO & IM Final 80%(IFC) Materials & Inst. IM DWG C21. Superstructre MTO for Piperack B02. MTO B11. HVAC, Bulk PO C25. 95% & C20. Completion (1 MRs Buildings & for MTO) DWG MRs (IFC) PO Inergen, Plate B29. for DWG for for B24. Steel 95%(IFC) Piping DWG Materials All Struct.Steel C26. Piping HAZOP/SIL Plate Fire 95% Final Inst. C23. Struc. Materials Submit 95% Det. Materials Bulk (IFC) Loop MTO PO B25. (Final Materials & (IFC) Materials materials for G-SPIRs Reviews Suppress. Diagram & Cable MTO) MRs Bulk B26. E&I Schedule for (Final Cables (Final & (IFC) Elec. Issue Materials MTO) MTO) Schedule & order for Inst. Facilities-IFC (Final Bulk Oper. for MTO) Piping spare 95% (IFC) B27. Interconnection Diagrams B30. B31. 95% Receive Complete (IFC) all Final NOCs HSEIA Phase III R 2 WATER Water WING ONTROL ment ORAGE METHODS MENT MPS MCC OARDOTHERSOperation WEATHER ORIFICE MASS WELDED ORT NTROL HILOSOPHY Generation ONTROLPHILOSOPHYFOR NIT AL NALYSIS AND ATION G AWING RAWING K O Drum(762-V-101) Drum(762-V-102) V-102) A/B/C, A/B DOUS KV MCC/ RTHING R A OREMR MR DRAWING-LIGHITNG ROCK OOK Y UMENT UIT N NG UNIT)(ICR) OR D/IFA) ALANCEFOR UNIT DIAGRAM CAUSE ATER UISHING MEA110) V/D MFC110) HV OR(P.O C App. VALVE ALVE HOWER ON ABLE CABLE ROTECT V PMENT A140) GA110,MGA130,MGA140) FA130,MFA140) FA140)MEA110)FA120,MFA140) FA120)FA140) FA130) FA110,MFA120,MFA130) C(Final) FA130)AN TY FI & B CR Paving CC RR. SHELTER FOR BSTATION NE-702-EE-621 NE-711-EE-621 RUMENT PLICING OTHERS ECTOR CK C(1st) Final) FC(Final)) PTUAL H6 AGE VAC TBE P.O S M PVC RFLY E FOB/On-Site) Approval) R/Inquiry) TERM D RS F BLE BE Caustic TMENT) EN SYSTEM EDULE EX STATION RAL EMENT Drum(764-V-104) Drum(770-V-104/204) RACK SUBSTATION CHGEAR/MCC TAILS(IFI) GEMENT ACING NTAINABILITY PORT PONSE BUILDING RAM AYOUT YOUT(ICR) N(IFI) YSTEM(IFC(Final)) PIPE NT T ROUND al) AL MCC OL D/IFA) Condensate Drum Pumps Sumps MFA120) L be strument w at oom UNIT osing nt on er nline NTORY NTAINABILITYANALYSIS ART MENT ANGEMENT ETRIC by DRAWING ORT V-102A/B) K-104) 01A/B) 6-V-101) 01) B) V-301A/B) kage 02A/B/C(IFC(Final)) C, E-101 RS 03) FD/IFA 764 02 B/C, 770 201(West) 01, D/IFA B, 772 A/B ails C/D/E/F 3 2 Plan ainage ulation ATION LATION FE DC SWGR ESSENTIAL 74A-EE-701 S-100 stem(IFC(Final)) HEET ENERATOR TA OWER ARTHING A ERALL FLOOR)(ICR) ANSFORMER CCESSORIES PROTECTION EOUS LLANEOUS FORMANCE PLAN nal) Water ENT UILDING GE RE R edule n Fl.-1 R) OCATION CR) em(ICR) FD/IFA) 0) umps s e ue V/D) ARD(Offers/TBE) OMMON pp. E) nsp. proval App. sue WELDED e) n-Site) p. ssue) ALVE ve 2" below ers/TBE) WER ue) ova O TECT NDU a 77 FOR GENERAL 78 TION 01 AYOUT 8 GA110,MGA120,MGA130,MGA140) cavenger CONDENSATE SYSTEM) GA110,MGA140)GA130,MGA140,MGA220)Unit 7 GA110,MGA140,MGA150) LARE AMTGTU GA110) nit C(1st) GA140) GA110,MGA130,MGA140) FC(1st) st) AM WATER 25 45 62 64 70 72 GEMENT AND 61,766,767,768 74A,774B RANGEMENT VE VALVE P ECTOR SHOWER ank(762-TK-101) sor 04/314) nks(775-TK-101A/B) sels, Storage ME-101(IFI) S & 101A/B,102A/B FC(Final) 103) 101A/B 772-ME-311 01A/B(IFC(Final)) ME-101A/B(IFI) 102A/B 774 01A/B/C, 303, NIT B/C/D/E/F 5 775-ME-204 775-ME-302, ajor C(Final) ON TRUCTURE Data 62-EE-613 ABLE 70-EE-613 S-01 AC 0 GEAR/MCC ATOR GER CR TIONS LATIONS G NG ALL N-OVERALL V SSORIES ND Y EMg LOCATION PES TY BUILDING STRUMENT ATURE FFECT OR NIT(IFC(1st)) HOSE QUIPMENT(IFD) UIPMENT ges ment M NEUTRAL nquiry) M(MR/Inquiry) ystem ol oy nd)(Mfg. V/D. Offers/TBE) y) P.O assue ER TEM E nqu 2nd ving /IFA (West) (Eest) or778 78-SS-01, TANK(MFB710) s(MEG110) ank(MFB110) FH SOUR FA130,MFA140)UR LSUMMARY (1st) rehouse 74 anks(MFB110) bitor er L MMISSION ND PIPING EQUIPMENT SAMPLE PUMP TYAND VE T al)) 73 DRAWING RAL NGEMENT C 74C F -104A/B) m(764-V-105) TK-102A/B) 65-V-101) V-101A/B) V-102) 71-V-101/201) TK-101A/B) r -101A/B ANKS(IFC(Final)) NKS(IFC(1st)) 725-TK-101A/B or745 1A/B/C, 45-ME-101 ME-101 or or761, or762 or764 nal) 01A/B, oundation or772 07A/B, 01, 2-ME-301, 3 -102 vaportion -202 1A/B for Area urvey orUtilities UCTURE VATION ATION PLAN N ngle ec. 25-SS-01, 61-SS-01, 62-SS-01, B EE-701 SWGR 70-SS-01, NT ECTRICAL 00-SS-100/200, 00-SS-200, 00-SS-100, BSTATION EET-725-EE-401A/B EET-725-EE-501A/B FD FC(1st)) TRENCH EDULES(IFI) RMER PCSCTION YOUT(ICR) ULATION Y, DY ERATION MENT ONSE GENCY DING REWATER (IFC(1st)) FIRE A ESIGN AGRAMFIREWATER ONDIAGRAM rol UNIT)(ICR) -1 For Fl. QUIPMENT STERN ) HVAC MGA160) Pumps MGA220) Agitators /TBE) ENCY TTERY(App. alve oated pp. p. D 1st)(P.O )(Approval) sue) FM) d)(App. s/TBE) TBE) (P.O RT 1st)(Approval) ETY fers/TBE) e O TBE R TRUMENT ERAL uipment on 725-SS-01 761-SS-01 762-SS-01 700-SS-100 774A-SS-01 o 745 761 SATE 762 764 765 766 IFD 767 t 768 w 769 770 771 C(Final) 774 te F110) 775 CESS /G FI) IFC(Final) NERAL 1A/B) EA110) 71-V-109) (IFC(Final)) FD/IFA) Unit I C, -101A/B/C, /B, t) (Final) 04 est) -311 Final) A/B D/IFA -302 /C, 101A/B/C, -ME-201A/B 2A/B/C/D/E/F 1 -204 -302, IFD/IFA IRDER G ER FP IFP IT -EE-641 774A-SS-01, S-100 0%(with TION IGHTING IRE DATA /MCC C(1st) INSTRUMENT FC(Final) CR ELECOMMUNICATION ELECOMMUNICATIONS ATHODIC TRACING ERNAL SONTROL ICR SION TEM EET STRUMENT ONS IT(IFD/IFA) ILOSOPHYFOR Gr. ymbol rainage VAC Y NG UIPMENT umps s oval /TBE RANSFORMER App. R/Inquiry) P.O EVEL ue EQUIPMENT(Offers/TBE) CONTROL /D. . DED PE nd)(FOB/On-Site) TR TEEL ALVE ffers/TBE) Extended ers/TBE) Air e) Lined Jacket Special st)(FOB/On-Site) D. t)(P.O proval) (Approval) Pipe Offers/TBE) y) Hose )al) Quick al) Injection Flame Eye Exhaust Isolation Sight Safety Strainer p E Samp S Lock Me Rubbe POWER AT GHT ARM SPHERE VESSEL(MFA120) PUMPS(MGA150) Deaerators(MEG110) Pumps(MGA110,MGA120,MGA130,MGA140) Water-Tube Stripped Demineralisation Boiler Oxygen Neutralisation Acid atic Morpholine MP Drums(MFA130,MFA140) Pumps(MGA110,MGA140)Sump ILOSOPHY Drums(MFA140)Pumps(MGA130,MGA140,MGA220)WATER CHILLED Drums(MFA120,MFA140) Plant Drums(MFA120)Nitrogen Drums(MFA140) PUMPS(MGA110) Drums(MFA130) Heat Flare NARRATIVEFOR Drums(MFA110,MFA120,MFA130) Pumps(MGA110,MGA140,MGA150) Warm Low SumpsPumps(MGA110) TGTU PondsControl Office/Warehouse Pumps(MGA140) Drums(MFA130)our Process Storage Pumps(MGA110,MGA130,MGA140) Filters(MFF110) Oily Biocide reatment Sewage kage(MUJZZ0) Tertiary Sanitary Chlorination Central Caustic Sour Scale Sumps NARRATIVE DIAGRAMFOR M STE YSTEMS(WATER P&ID ANGEMENT WING LAN Tanks(762-TK-102A/B) out KO ERS DETAIL DETAIL-1 LOCATION ute em(IFC(1st)) NATION AND OXES SESSMENT ISK EPORT UILDING ORAGE DIAGRAM ation an tion ING EM YOUT(IFD/IFA) OR P trol SYSTEM(IFD/IFA) NSFORMER T, 103) 102A/B 1st)(App. IPMENT it it(West) it(Eest) HELTER BSTATION NT & TATION D 878-EE-613 r rocess HART Unit anger(MEC110)GTU sphate DGA st) FUEL anger(MEA110)R NITROGEN DIESEL FH anger(MEC110) AS FLARE WARM ludge OILY TIONFOR ALYST BILITYAND LOT FE ETY )(MFA 61-TK-101) 762-V-103) rum(770-V-103/203) 03) m(771-V-108) V-302/312) -201A/B) 5-TK-301A/B) Treatment Issue g (IFI) -P-101A/B/C, 745-ME-101 nit -101 ME-101 C/D P-101A/B/C, P-101A/B r770 oundation Foundation l) , UNIT r774 F 02 01A/B -203A/B 5 B -202 n 5-ME-204 5-ME-302, 02A/B/C/D/E/F FA ME-201A/B ME-102 ME-203 ME-202 nage or RACK RUNWAY 52V 4A-EE-701 0(IFD) HEET TA OREMR SFOREMR TRMONIC GHITNG NG-LIGHITNG ATION TICS(IFD) OMMUNICATIONS BOARDRATORXTURE CABLE MENT GS TUBES LABILITY ANCE T TUDY 762)(IFA) SAFETY )) HEET(IFC(1st)) (IFC(Final)) HARTFOR oint ram-1 Plan BUILDING YOUT ATOR )(ICR) ENT(IFC(Final)) /IFA) Final)) strument kages PCS(Approval) pproval) nel EMPERATURE RANSMITTERS(Mfg. ARIABLE ENTURI ANK RESSURE nd)(Mfg. ed LDED C.S ELDED S.S e Alloy Site) Forged Cast Ball Butterfly Plug Needle AGM Dual Motor (1st)(P.O t)(Approval) Non. Flange Fitting t)(App. ssue) Bolt sket Gasket CTOR )(App. val) ) pp. )(Approval) UP LECTR nqu CELLANEOUS Instrument 1A/B/C, IPING 101A/B, 107A/B, 11st)(P.O 10) INGLE IPE 1A/B,102A/B anks sue SOPHYFOR 4 01A/B/C, 103 15 302, 5-ME-301A/B 75 PS IST BOARD(Approval) SWITCHGEAR CABLE 01A/B/C 5-ME-101A/B/C PLAN ICR IT 2 LCULATION LCULATIONFOR FOR C 03A/B) 0) um(764-V-103) inage /C, 05 204 75-ME-204 75-ME-302, G ER OTECTION NIT(IFC(1st)) NG ONCEPTUAL QUIPMENT P WER M ITTINGS S NSTRUMENT s A/B SWGR 20/33KV ABLESA) ATIC A p ION Schedule TORAGE NIT YSTEM it VALVE TK-101) a I 71 m iagram t V/D. al) ENT N NIT(STEAM ter ON PIPING RAWING 8 5-TK-101A/B)(MFB 65-V-102A/B) 5-P-101A/B/C, E-101 62 1A/B ME-301, 11 E-203A/B E-202 -102A/B/C/D/E/F 01 641 G-IES-702, G-IES-708, G-IES-711, pment(IFD/IFA) (App. CONDU GA150) C(1st) Recovery e(MBJ110) nitary OR UDY LAN STEM erature 6 7 9 0 1 LTRASONIC WAY ue -01 LE IFE SU-201 ELTER 775 FD Issue) CT JUNCT nal) nit(West) nit(Eest) NIT(BOILER GA110) inal) ors SINGLE FOREMR TRAY st)(P.O p. TUBE FC(Final)) GENERAL calculation lities an vey 772,774B,775 1st)) (UNIT (MPQ110) on CR FI ent /IFA Diaphragm (Offers/TBE) quiry) 1st)(Mfg. ES roval) BE) p.) ue) . u ) SHEETS MR Gr. For LOCATION IFD ARRANGEMENT PLAN DC LINE sation R (IFC(1st)) WATER Drums(MFA130,MFA140)IFI )(IFC(Final)) DETAIL CONTROL CONTROLPHILOSOPHY CONTROLPHILOSOPHYFOR IFP -P-101A/B, Details (2nd)(App. )(MRV) 1s for778 for for745 for761, for762 for764 for772 forUtilities 766-1 775-1 IS UNIT)(ICR) (IFC(Final)) OPERATIONS SUPPORT 767-1 768-1 IFD/IFA AUGE GENERATOR WIRING -TK-102) IFC(Final) st)(Approval) )(App. 725-Ss-01(IFI) 761-Ss-01(IFI) 762-Ss-01(IFI) 770-Ss-01(IFI) AS V/D TEM(App. (1st)(FOB/On-Site) 00% V (All (2nd)(MRV) IFC(1st) UTULITY 764 UNIT 201(West) App. INT FOR TRACING PERFORMANCE (1st)(App. Issue) IFS & / 745-P-101A/B/C, 775 (1st)(MRV) FLOAT) Pumps V/D) 102A/B IFC(Final) IFD/IFA POTABLE INSTRUMENT BUILDING TRANSFORMER IFI STEAM DATA Foundation S SHEET Valve OILY PLAN e in IN Data GLAND Hydrocyclone Desuperheater(MEE130) D VALVE y Piperack 773 NSTRUMENT 1s Water HVAC Compressor n P p L Drainage RTR 775-F-101A/B LOCATION 764 765 766 767 768 769 770 774 775 Spheres WWT IFC(1st) A/B IFD ICR MAPPING For (WESTERN (MUH110) P.O & (1st)(Mfg. SEAM SMLS (1st)(MRV) NG RE Area SYSTEMON d O y STATION CC INSTRUMENT 120) p.) ue Review SPRAYSYSTEM PUMPS(IFC(1st)) ELEVATION GENERAL IFC(Final) 201A/B 117A/B UNIT)(ICR) Seam PIPE VALVE Insp.) C FOR CLASS Package PLAN-UNIT SHEET PLAN-OVERALL HEAT Instrument LAYOUT(IFD/IFA) JO te . 1s ELECTR C(1st) LAN & IFI Spray Storage Dosing DATA / SUMMARY A/G IFE IN IFD/IFA PIPERACK IFP SINGLE DIST 773 (MGA150) (1st)(App. ALARM SYSTEM MR (1st)(Offers/TBE) (1st)(P.O nqu HVAC RTHING System 725-ME-101(IFC(Final)) 725-Ss-01(IFI) 761-Ss-01(IFI) 770-Ss-01(IFI) 1 IFD IFC(Final) Unit SCHEDULE PLAN CABLESSHEET(IFC(Final)) VALVE G P.O WELDED Issue) O Hydrocyclone Biocide IFC(1st) ICR 745 761 762 771 772 OVERALL SUBSTATION PLAN-UNIT PLAN-SUBSTATION EQPT, SHEET(IFC(1st)) PIPING V/D V/D. Plant (777) IFE 1s JOINT FOR & CABLES HAZOP STATION SAFETY (SPECIFICATIONS) Tank(764-TK-105) Details (sludge DATA STUDY (2nd)(App. eam IFI or MR 311A/B Exchanger(MEA110,MEB510,MEC110) (1st)(P.O MCC Drum(772-V-105/115) ova UNIT Plan ICR ROOF 775 GENERAL DC SWGR ESSENTIAL EQUIPMENT Data IFP SYSTEM STORM SHEET(IFC(1st)) Contractor) 775-ME-201A/B 102A/B V/D. e Package ence & WGR BALANCEFOR Package(MPQ110) For (1st)(Mfg. IFI O 745-ME-101 Corrosion IFD PE in 2" below 725 IN FLOOR Unit PLAN TRAY AVAILABILITY FLOAT)(App. ssue nqu IFD/IFA (777) NGS CC/ DRAWING SUB 762-1 767-1 768-1 U/G A/G Pumps F SMLS 774 SEAM -1 SHOWER SWGR D IFC(Final) 745 764 765 769 771 772, 100% WATER Diagram SUBSTATION y Operation DATA SYSTEMFIREWATER DETAIL ROOM UNIT PLOT CLASS App SHEET INSTRUMENT FIRE For LOGIC V/D. IPCS(P.O V/D) HAZOP IFI ICR IFP IFD IFC PLAN-1 102A/B FM) ssue SIL NAT SCELLANEOUS Key Electrical MR Superstructure GENERATION & JO ARRANGEMENT Building S GHT uc IN AND INSTRUMENT 201, Insp.) Piping 725)(IFA) 745)(IFA) 778725761762770774A761)(IFA) 2nd for Circulation CABLE DATA CABLES UPS 1st (evaportion Pipe TANKS(IFC(1st)) 745 STATION V/D. ICR IFI IFD/IFA 102 OTHERSFITTINGS App. IFE OF 773 PIPES UNIT Unit INSTRUMENT CONDU JUNCT TUBE P M / PLAN PIRERACK 762 764 766 767 768 769 770 App NGL LEGEND 201A/B FM REPORT 311 IFC(Final) IFD IFP IFC(1st) Utilities LAYOUT LAYOUT-SUBSTATION ON Equipments DRAWING Drum(771-V-105) WATER SHEET JOINT 762-1 762-2 762-3 773-1 Piping CAL ROUTING a (MUC120) (1st)(MRV) RECOVERY ICR PROTECT 775-ME-201A/B (UNIT Package(MUJZZ0) HAZOP V/D V/D) V Plan IFE Nut OTHERS EFFECT IFD/IFA & Fl. Issue) Insp.) FOR Unit / 778-Ss-01(IFI) 725-Ss-01(IFI) 761-Ss-01(IFI) 762-Ss-01(IFI) 770-Ss-01(IFI) 774A-Ss-01(IFI) 700-Ss-100(IFI) 700-Ss-200(IFI) Water TO 725 UNIT EQUIPMENT(IFC(1st)) TUBES W DRAWING 102A/B Drum(771-V-107) LAYOUT FM 764 775 System(IFD/IFA) Tank Drum(772-V-303/313) Equipment ELECTRICAL GENERAL EQUIPMENT MAIN CABLE JUMPERING COMPREHENSIVE UTILITY & Issue INSTRUMENT GAS Drainage HVAC C.S 745 761 765 771 772 774 FIRE ARRANGEMENT Utilities in TRAY (UNIT Steam V/D V/D. DETECTORS(Mfg. NSTRUMENT ns ON Package(MUH110) IFI INDEX s ICR IFD ELEVATION DETAIL CONTROL (1st)(App. Issue) Drum(770-V-101/201) Explanation MAINTAINABILITYANALYSIS SITE UNIT ALARM SPRAYSYSTEM 767 SUBSTATION KIT STRUCTURE PLAN(IFC(Final)) D/S BOXES Mixer(MEE140) IFP Plan 773 SEAM SMLS ASSESSMENT 102 1 (1st)(FOB/On-Site) 1s Fl. IFC(1st) Sanitary CHEMICAL for Drum(762-V-108) y P&ID Valve LOGIC PO UPS CHEMICALSUMMARY & Issue Water U/G FOUNDATION LOCATION FRAMING HVAC BALL S CONTROL Piping EQUIPMENT(Approval) For Schedule Washer PIRERACK Plan IFE 304 V/D. 700-Ss-200(IFI) INVENTORY GENERAL 725-Ss-01(IFI) 761-Ss-01(IFI) 762-Ss-01(IFI) 770-Ss-01(IFI) LAYOUT IFC(Final) 778-Ss-01(IFI) 700-Ss-100(IFI) #4 Unit FM) IFI ICR IFD/IFA e Issue) Instruments Line Dosing H/Exs Units) 765 FOR CABLE Stress STRESS POWER INSTRUMENT FORGED CAST BUTTERFLY PLUG NEEDLE DIAPHRAGM ARRANGEMENT PLANT MR 769 771 775 UP above 764)(IFA) IFS TT BOARD(P.O 774A-Ss-01(IFI) IFD 778)(IFA) 765)(IFA) 770)(IFA) 774)(IFA) UTULITY T (evaportion Temperature UNIT 762 IFC(Final) STEAM IFI ALARM PROCESS (2nd)(Mfg. WATER 778)(IFD/IFA) (1st)(Mfg. SHOWER STUDY NT Issue) ssue Special and y or Spring Cold GAS Unit SINGLE MR Update P&ID App DATA Supply Sheet SPLICING Packages V/D) ee FOR IFS -1 Gr. IFC(1st) Valve ng & For LEGEND PIPE 303, in IN PO Duct Room GAUGING UNIT(IFC(Final)) GLAND App. NG (UNIT IFC(Final) ACCESSORIES FM) 700-Ies-702(IFI) F UNIT SHOWER HV/LV PLAN (MGA130) Package(MPQ110) Water Steel Slam Plate SYSTEM for MANUALS MANUALSFOR Airflow Typical Load REPORT DATA Exchanger(MEC110)Exchanger(MEA110)Exchanger(MEC110) PE PROTECTION(IFC(1st)) VALVE Sour ICR 725-SS-01 761-SS-01 762-SS-01 770-SS-01 774A-SS-01 778-SS-01 700-SS-100 IFP IFD/IFA IFI ssue (MFA140) Glass & SEAM MR SMLS Gas Details Plan in App Hardware UNIT U OVERALL Issue INSTRUMENT CATHOD (1st)(Mfg. 303, DRAWING U/G FLOWMETERS(Mfg. (SPPID) AND PIPING EQUIPMENT SAMPLE PUMP 1 STORAGE D ELECTRICAL 2" FOR 725-1(IFI) 745-1 762-1 764-1 770-1 771-1 772-1 773-1 774A-1 KEY IFE Unit UNIT(IFC(1st)) FOB/On-Site IFC(Final) 771(West) ON SPRAYSYSTEM V/D. (1st)(Approval) (1st)(App. FIRE LOCATION PLAN 700-SS-100 TBE ICR 102 SCELLANEOUS Valve Pipe WASTE & SYSTEM VALVE App SAFETY NAT UNIT IFI API675 IFD/IFA UPS DIAGRAM-702-EE-801A/B ROUTE DIAGRAM-708-EE-801A/B DIAGRAM-711-EE-801A/B IFD (MGA110) FDN Spray V/D) NEUTRAL AREA u PIRERACK 1(IFD) STUDY IFP 725(IFI) 745 773 DIAGRAM (761 IFC(1st) PIPING Dewatering Coupling Details e Plan INSTRUMENTS Inhibitor Phosphate DATA -1 FOR 775 HVAC CABLE (1st)(Mfg. 762 Sheet (1st)(App. DRAWING SYSTEM) LAYOUT nqu s IFE Issue c ARRANGEMENT & Equipment(IFC(Final)) Control Waste IFC(Final) IPCSOPERATIONS Paving E y IFI Piping 771 764 770 772 IFC(1st) Operation 700-Ies-702(IFI) P AND SHEET SHEETS NT ICR ng Plan for MCR,Fire PIPE GAS (MPR110) DIESEL Drainage PLAN V/D) V/D. Unit(IFC(1st)) 766, Heat INDEX Nut DRAWING 775 REEL SOUR SWS nqu Issue) PIRERACK RES FM For Flare(MBJ110) & WATER STANDARDS REPORT SEAL SINGLE IFC(1st) TRAY F SYSTEMP HAZOP EAST 140) FOR 778-Ss-01(IFI) 725-Ss-01(IFI) 761-Ss-01(IFI) 762-Ss-01(IFI) 770-Ss-01(IFI) 774A-Ss-01(IFI) 700-Ss-100(IFI) 700-Ss-200(IFI) Stage 201A/B 117A/B IFI ISOMETRIC Review (MGA110,MGA130,MGA140) Arrester Package(MUH110) AND SITE -1 HVAC 764-1 Plug SYSTEM(IFC(1st)) 768 PIPING T V/D) ROOM 778)(IFC(1st)) 725)(IFC(1st)) 745)(IFC(1st)) 761)(IFC(1st)) 762)(IFC(1st)) 764)(IFC(1st)) 765)(IFC(1st)) 766)(IFC(1st)) 767)(IFC(1st)) 768)(IFC(1st)) 769)(IFC(1st)) 770)(IFC(1st)) 771)(IFC(1st)) 772)(IFC(1st)) 773)(IFC(1st)) 774)(IFC(1st)) 775)(IFC(1st)) INSTALLATION 775-F-101A/B SLD-778-EE-611 SLD-725-EE-611 SLD-761-EE-611 SLD VALVE(IFC(Final)) DETAIL LOCATION (1st)(MRV) FM DESIGN Dosing NIT y & Control (MGA140) IFD/IFA BALL 771(West) uc IFP SINGLE FOR SYSTEMSHELTER 1 DETAIL-1 DETAILS PLAN DETAIL-2 IFC(Final) PIRERACK XTURE For MAC Stage Single LIST Offsites Unit UNIT FORGED CAST BUTTERFLY PLUG NEEDLE DIAPHRAGM Instrument V/D. V/D) SHEET DRAWING AND GLASSES (1st)(App. LINE SHEET(IFC(1st)) CHART CHARTFOR (778 (762 (774 774B IFC(1st) BOARDPackage(MUJZZ0) LAYOUT(IFD) App. (3rd) above Main UNIT(IFC(1st)) IFC(Final) INSTRUMENT Sheet STATION)(ICR) TELECOM SPECAIL 778 725 745 762 764 769 770 771 772 761, 774 PLAN CABLES nqu LOCATION & (2nd)(Mfg. umen (MAIN (761 IFP FOR Issue) ICR REPORT LAYOUTS FM) 33kV For Valve Dosing Room Sanitary Piping Fitting for Expans MAINTAINABILITYANALYSIS DATA AREA)(IFD/IFA) CATALYST ELECTRICAL SIL Desuperheater Static Filters SINGLE 1(IFD/IFA) Welded Hose e System Pipe V (UNIT Supply AND HAZOP 103 102A/B (sludge Flare(MBJ110) Remaining ON Coo ova 764 Airflow Duct Load 775 GAS Tank IFI Filter ARRANGEMENT 200 767-1 768-1 Unit(IFC(Final)) 765 769 LAYOUT FLARE CAL 766, (1st)(App. UNIT IFC(1st) TRACING ICR FOR SUBSTATION MR BOXES PLAN TUBES TBE SYMBOLS Issue) FM) NGS Dev Sanitary Scavenger 2" TRAY PIPE (2nd)(MR/Inquiry) ON RESPONSE (2nd)(FOB/On-Site) MAINTAINABILITY IFC(Final) TANKS(IFI) below (MGA420) DETAIL SYSTEMS(WATER IFH Coated Unit 766 767 768 & CONTROL Welded SHEET V/D 102A/B NG ITanks(MFB110) PMT/PMC) (1st)(FOB/On-Site) A/B ec GLAND (Central) Tank(MFB110) CATALYST Plate U/G SINGLE ICR 700-Ies-702(IFI) 700-Ies-708(IFI) 700-Ies-711(IFI) 201A/B 117A/B SHEET-725-EE-401A/B SHEET-725-EE-501A/B O PLATES AND GENERAL IFD Shelter Legend(IFC(Final)) Treatment Air Sludge MRV CONTROL REFRIGERATION EQUIPMENT(P.O Equipment HEAT Sour S ROOM FLOOR Head MAC TANK 775-F-101A/B KIT STORAGE SHEET IFC(Final) ON P -1 Issue) IFC(1st) Fl. Kit U/G A/G Quill 2" PIPE TGTU App FOR & ICR -2 Hardware NEUTRAL (1st)(App. IFP SYSTEM IFD/IFA Valve SYSTEM(IFC(Final)) FITTINGS 1(IFD/IFA) 725-SS-01 761-SS-01 762-SS-01 770-SS-01 774A-SS-01 700-SS-100 KEY TT 201A/B FM) (1st)(P.O PEDESTAL Generation T LINE Explanation Package(MPQ110) DATA IFC(1st) 700-Ies-702(IFI) 700-Ies-708(IFI) 700-Ies-711(IFI) (MGD210) TUBES(Mfg. IFI -1 773 SCHEDULE (1st)(Mfg. ap PES PIPING 745 Issue LAYOUT(IFC(1st)) (778 (762 STUDY IFC(Final) SCHEDULES, Issue) Caustic Plant IFP MAIN IES INTERLOCK PIPE HOSE QUICK INJECTION ISOLATION SIGHT & EFFECT (SPECIFICATIONS) SHEETS IFD/IFA Pipe for CONDENSATE DRAWINGS SYSTEM DETECTOR PLAN nqu F FM LOCATION 1s 311 Diagram Air Relief 2nd Dosing pond) Utilities IFE IFI CONNECTIONS IFC(Final) FINISH DATA ICR 765 769 775 774A-Gh-004(IFI) Gr. SUBSTATION LAYOUT(IFC(1st)) SOUR FM) EQUIPMENT SPL Sewage SINGLE Welded Agitators(MGD210) Isometrics OR 770-1 FOR & 772-1 V/D) nqu SHEET IFC(1st) 102 DRAWING IPCS(App. (UNIT 764 1 Sys Stem Instrument IFC(Final) drying (Central) TANK(MFB710) SYSTEM C.S S.S Alloy Flange Fitting Bolt Gasket IFH CABLESTanks F S Cable Fire ICR STUDY TUBE PIPE CABLE INSTRUMENT CONDUIT MISCELLANEOUS D JUNCTION IFD/IFA (1st)(Mfg. REPORT(ICR) 102A/B IFC SLD-774A-EE-611 PLANPLAN PLAN-UNIT PLAN-OVERALL LAYOUT Issue) WATER & Details 770-1 HVAC CPVC App. (MGA120) FOR 304 IFC(1st) V PLAN(ICR) LAYOUT(IFD/IFA) SINGLE IFD FOAM (sludge GENERAL Support P&ID (2nd)(FOB/On-Site) ova Compressor(MGB110) DWGs IFI AREA IFC(Final) TELECOMMUNICATION Plan u LAYOUT(ICR) IFP V/D 777)(IFC(1st)) 1 Insp.) LINE CONCEPTUAL / GIRDER DIAGRAM(IFD) ICR AND PIPERACK nqu Air KEY 3.3KV 110V 415V Package Details EARTHING Unit MONITORING PLAN VALVE 11KV Recovery Utilities IFH 304 PROTECTION BUILDING Power OTHERS745 201A/B 773 AND Stripper(MDA110) LAYOUT WIRING IFD/IFA IFD Piping IFC(Final) (3rd) for770 for774 (SPECIFICATIONS) 311 Paving TELECOMMUNICATION TELECOMMUNICATIONS ANALYZER CONTROL Clean DUAL MOTOR NON. EXTENDED AIR LINED JACKET SPECIAL PIPE FLAME EYE E STRAINER STEAM SAMPLE SAMPL S METALL RUBBER DATA IFC ns FOR 102A/B Supply STATION 778)(IFC(1st)) 761 762 765 766 767 768 769 770 771 775 FM O 774A-Gh-004(IFI) or ARRANGEMENT & Calculation Utilities Duct Control CAL PLAN GAS Water ELEVATION RESISTOR(App. (1st)(FOB/On-Site) Insp.) Pipe WATER 1 FM) OTHERS IFD 778-SS-01 761-SS-01 762-SS-01 770-SS-01 774A-SS-01 FOR 700-Ies-702(IFI) Package (3rd) (2nd)(MRV) Valve V/D) Check TRAY y IFI 303, P V ON Hydrocyclone App. OPERATION ICR STEEL UNIT)(IFD/IFA) SHELTER CONTROL IFC(Final) TUBES 764 775 / (777) IFE check Desuperheater(MEE130) for770 for774 CABLES MAIN WIRING AIR Load Airflow I/O Control (1st)(FOB/On-Site) & CABLE CONDU JUNCT TUBE M SINGLE VALVE DWG ACCESSOR 102 SYSTEMSYSTEM(Offers/TBE) FOR Welded IFD/IFA 1(IFC(1st)) Index 772 774 XTURE SHOWER Issue) 725-Ss-01(IFI) 761-Ss-01(IFI) 762-Ss-01(IFI) 770-Ss-01(IFI) 700-Ss-100(IFI) 778-Ss-01(IFI) 700-Ss-200(IFI) Inquiry (3rd) DWGs for Instrument V/D. (1st)(MRV) Offsites GAUGES(Mfg. REGULATORS(Mfg. IFC(Final) EQUIPMENT y RTR 777 uc 767, SHEET STORAGE 778 745 762 764 770 761,766,767,768 774A,774B 700 Calculation PIPERACK PIRERACK 761 765 766 767 768 769 771 775 773 DRAWING IFC(1st) FM) ICR LAYOUT(IFD/IFA) IFI 774A-SS-01 778-SS-01 761-SS-01 762-SS-01 770-SS-01 700-SS-100 1s / ssue SIL 774A-Ss-01(IFI) 700-Ies-708(IFI) 700-Ies-711(IFI) MR Boilers(MUA110) 110V Dosing ARRANGEMENT 33KV 415V CABLE S 774C PLANT 775-F-101A/B FOR BUILDING 1 STRUCTURE IFE IFP IFD/IFA INVENTORY FIGHTING SAFETY Insp.) Issue) For 700-Ies-702(IFI) Enlarged Valve (2nd)(MR/Inquiry) Compressors(MGB120) Biocide ROUTING Hydrocyclone Details & Storage Unit STORM SCHEDULE-UNIT SCHEDULE SCHEDULESCHEDULE-UNIT700, IFC(1st) DIAGRAM(IFC(1st)) DATA 102A/B ELEVATION SYSTEM PIPE FOR Dryer NSTRUMENT CALCULATION ICR ee -762-EE-611 -762-EE-612 -770-EE-611 V/D) IFD PLAN 762)(IFC(1st)) TT / 778-SS-01 IFC(Final) Package(MPQ110) Support e T Exchanger(MEA110,MEB510,MEC110) Control IFH XHAUST Issue HAZARDOUS HAZOP PHILOSOPHY 777 745 762 764 770 772 761,766,767,768 774A,774B LOCATION O SHEET(IFC(1st)) FRAMING IFC 775 (725 (770 STUDY POWER D 762-1 MAINTAINABILITYANALYSIS Pipe Unit Piping ICR IFD SERVICES PROTECTIVE SIL FIREWATER SAFETY DATA System PIRERACK UTULITY BOXES PIPERACK (1st)(FOB/On-Site) P&ID IFI STRIPPER(MDA110) FOR FM) 415V WATER BUILDING F NGS Package Welded Package(MPQ110) Inhibitor & METHODS y ca SCHEDULE-UNIT PLAN-OVERALL 766, App. DRAWING UNIT)(IFD/IFA) 1 IFD/IFA / Control 773 1s Corrosion V/D. 303, PLAN-SUBSTATION ce Dryer Equipment e App Diagram-1 IFC(1st) IFI STANDARDS SHEET PLAN PLAN-UNIT TRANSFER ARRANGEMENT FOR IFH 777 LENCER V/D LOCATION SEAL IFC(Final) REPORT (761 GENERATION SYSTEM UTILITY nqu Support 2nd / Offsites ICR Detail SITE V/D. C.S S.S Alloy Bolt Gasket (2nd)(Mfg. DATA V/D) 102 767, for SCHEDULE 240V IFD PIPERACK REGISTER 303, Substation Lift (2nd)(MRV) IFC(1st) forUtilities for778 for745 for761, for764 for772 IFC(Final) Explanation EQUIPMENT(App. CONTROL 773 FOR SYSTEM Plan DETAILS HEAT CPVC CHEMICAL CHEMICALSUMMARY DRAWING DLOCK IFP & Discharge DIAGRAM AND PIPING TRACING PLAN Fl. 775-F-101A/B SIL KEY 110V INTERNAL UNIT(IFC(1st)) 415V 11KV App. FOR VALVE SHEET PES 771-1 IFE WIRES PE 768 (1st)(Mfg. 725(IFC(Final)) 745 1 RECOVERY Water ICR Isometric POWER Issue) LOCATION Insp.) INSTRUMENT SUBSTATION SHELTER above Piping ARRANGEMENT CABLE IFI IFC(Final) -IFC(Final) MCR,Fire Calculation GROUND FOUNDATION & GIRDER PIPING (778 (762 (774 WIRING EQUIPMENT FEEDWATER TREATMENT BUILDING for for778 for745 for761, for764 for772 forUtilities Connector Unit Package(MUJZZ0) Plot UNIT OVERALL IFC(1st) FLOWMETERS(Mfg. 102A/B (1st)(Mfg. SCELLANEOUS SYMBOLS GAS (725 (770 App. PLAN WATER App IFS 1(IFC(1st)) (sludge O ssue AREA)(IFC(1st)) PIPERACK (3rd) IFD/IFA (2nd)(MR/Inquiry) Metering Plan IFI Offsites Water V (1st)(MRV) 765 769 771(West) 775 FOR IFC(Final) 745 761 762 764 766 767 768 770 771 773 774A 772 LINE STEEL LINE-702-EE-621 LINE-711-EE-621 725 IFE FIREWATER Shelter Compressors(MGB120) SPL Discharge Control I/O SEAM SMLS em Line & y GLAND VALVE Close ICR REPORT PIRERACK IFC(1st) / UNIT)(IFD/IFA) Mixers Tank Package(MUH110) Heat S P Seam CALCULATION GENERAL System(IFC(Final)) TRAY DRAWING PLAN-UNIT umen STRUCTURE MR (1st)(MRV) Mixer(MEE140) Valve AND IFC(Final) SHEET-725-EE-401A/B SHEET-725-EE-501A/B 745 764 769 771 772, (2nd)(Mfg. Pipe Hose Quick Injection Isolation Sight O (761 (774 (MAIN V/D) C IFE XTURE Sanitary 100% y (MFF110) (2nd)(MR/Inquiry) & Structure PIPING (1st)(FOB/On-Site) Co2 C.S S.S Alloy Flange Fitting Bolt Gasket uc u Bu IMPLEMENTATIONPROCEDURE 725)(IFC(1st)) 745)(IFC(1st)) 761)(IFC(1st)) (IFI) -OVERALL -UNIT -SUBSTATION SYSTEM(777) Insp.) Enlarged WATER Dosing Package(MUH110) Plan Issue DIAGRAM-725-EE-511 DIAGRAM-761-EE-511 DIAGRAM-762-EE-511 DIAGRAM-770-EE-511 Safety 775-F-101A/B 2" AND IFI F STATION IFC(1st) VALVE Unit SUB EQUIPMENT / (RAM) IFC(Final) 1(IFC(1st)) Package(MUJZZ0) Package(MPQ110) Package(MFC110) pond) Panel 778 725 745 762 764 769 770 771 772 761, 774 SYMBOLS Main DATA ICR PIRERACK CIRCULATION UNIT(BOILER UNIT(STEAM UNIT COLD SPECIAL ON Point FOR & IFE Piping y GENERATOR(App. (3rd) TRAC 220kV 102A/B (1st)(MRV) Interlock V/D (778 (762 LOCAL A(IFA) SERVICES 775 / LAYOUT(IFC(1st)) e (sludge ISOMETRIC Shelter Diagram-1 IFC(Final) SEAM SMLS & NOTES O BOXES NEUTRAL ns IFC(1st) DATA PLAN CONNECTIONS OTHERS SHELTER SHOWER -1 IFS NGS ICR (2nd)(MR/Inquiry) Close Package(MPQ110) SINGLE Unit STRIPPER 772-1 773-1 TANKS(IFC(Final)) 765 766 767 768 C SYSTEM CABLES SHEET (MUJZZ0) CONTROL LINE-700-EE-621A IFI ACCESSOR Sour UNIT MAINTAINABILITY PIRERACK FOR Review Valve Package(MFC110)s on O IFC(Final) App. PIPING MR ARRANGEMENT WEATHER TEMPERATURE ORIFICE TRANSMITTERS(FOB/On-Site) VARIABLE MASS VENTURI ULTRASONIC LEVEL TANK GAUGE PRESSURE GAS Extended Air Lined Jacket Special Pipe Flame Eye Exhaust Strainer Samp S Me Rubbe & PLOT SYSTEM(Approval) UNIT(IFC(1st)) 100% IFD/IFA WASHER TRAIN drying SHIPPING MANUALS MANUALSFOR 764 769 770 774 775 -1 774A-Gh-004(IFI) 220/33KV Data (West) (Central) HEAT Plan 304 OPERATIONS Forged Cast Ball Butterfly Plug Needle Dual Motor Non. D (3rd) F IFE KIT PIPING EQUIPMENT SAMPLE PUMP INSTRUMENT LAYOUT(IFC(1st)) IFC(1st) DIAGRAM V/D) App IFS 700-Ies-702(IFI) 700-Ies-708(IFI) 700-Ies-711(IFI) DC ESSENTIAL 2nd FOR (East) SUBSTATION Bu ee Pipe Control INSTRUMENTS(Mfg. MCC SWGR AND C.S Diaphragm P IFI & SHEET(IFC(Final)) NEUTRAL V/D , IFC(Final) LINE-778-EE-411 LINE-725-EE-411 LINE-761-EE-411 LINE-762-EE-411 LINE-770-EE-411 / 773 (1st)(App. DWGs For nqu Dewatering 725 762 schedule/layout Pipe INSTRUMENT PIPING A/G e PES CALCULATION Nut FM) 768 SPRING SHELTER Gas EQUIPMENT PLAN App UNIT 764)(IFC(1st)) 778)(IFC(1st)) 765)(IFC(1st)) 770)(IFC(1st)) 774)(IFC(1st)) SYSTEM(Mfg. SIL Review 745 761 771 772 Waste SUMMARY beds) pond) (East) WATER PLOT 770-SS-01 IFC(Final) SWGR SYMBOL PROTECTIVE IFC(1st) 773-1 V/D) (MFB110) 765 766 767 769 770 774 775 773 FITTINGS (INCLUDING O NG PIRERACK Station Calculation & 762-1 Valve LOOP SYSTEM Piping IFE Unit Gr. FOR SLAM LINE RE LINE-725-EE-511 LINE-762-EE-511 LINE-770-EE-511 IFD UNIT(IFC(1st)) IFP GLASS STORAGE PUMPS(IFC(Final)) JOCKEY F 725 e Lift Package(MPQ110) Control 762 VALVE EARTHING I/O METER ICR IFD/IFA IFC(Final) COUPLING SEAM SMLS STRUCTURE s / MR Insp.) IFC(1st) Package(MUH110) (3rd) SINGLE Package(MPQ110) & -1 725 Agent PLATE FOR Instrument ON-OFF Safety ELECTRICAL LINE SWGR Seam SHEET-725-EE-401A/B SHEET-725-EE-501A/B UNIT)(ICR) SPL UNIT IFI GENERAL AND FIRE Review Dosing DC (2nd)(Mfg. for MR UNIT(IFC(Final)) MCC/ 773 Forged Cast Ball Butterfly Plug Needle Diaphragm PlanIssue 767, Polisher(MUH110) IFC(1st) ICR LINE-700-EE-251(IFD) SCHEDULE 764 IFC (sludge 304 MCC IFP e OTHERS SIL FM App. Plan 761-SS-01, 725-SS-01, 762-SS-01, 770-SS-01, 700-SS-100, & Unit(Central) U/G A/G UNIT Issue INSTRUMENT CABLE FITTING u VALVE y V/D IFC(Final) (2nd)(FOB/On-Site) FOR (1st)(MRV) Insp.) BUILDING 778-SS-01, 700-SS-200, 700-SS-100/200, Point IFS AND Pipe valve Mfg. for IFC(1st) V IFI SWGR ks eam PROTECT S AND / F 765 769 771 775 UNIT)(IFC(1st)) 768 V/D) FM) IFH GENERAL 304 TT IFE Issue) TUBES SHELTER (3rd) Package(MUJZZ0) Flare(MBJ110) MR IFC(Final) below Valve OVERALL 102A/B Piping ICR Agitators COMMON TRAY Packages(MUC120) 725-1 745-1 762-1 764-1 770-1 771-1 772-1 773-1 774A-1 Hazardous MCC/ 2" drying 762 764 766 767 770 REPORT (SPPID) PIRERACK DRAWING FOR LOCATION App (2nd)(MR/Inquiry) for & Unit(Central) p ence Plan Unit (1st)(FOB/On-Site) IFI 761 768 769 771 774 775 IFC(1st) VALVE App. SYSTEM HOSE Treatment 767-1 768-1 IFS LINE Sanitary SINGLE IFC(Final) DRAWING SEAM SMLS IPCS V/D ICR S 765 NEUTRAL SHEET V/D) OPERATION CONDENSATE DATA -1 FOR Insp.) e DWG 1(IFC(Final)) 2nd (2nd)(MR/Inquiry) & Diagram Operation App. Diagram-1 EAST STANDARDS 762-1 WIRING CABLES App UNIT)(IFC(1st)) UTULITY BALANCE) 777-1 SMLS AC 745 761 771 772 774 775 IFD DIAGRAM SYSTEM(BUILDINGS Issue) s D/S Packages Air REFRIGERATION Jo ACCESSOR TERM S VALVE e uc NG SHEET UNIT)(ICR) IFI ARRESTER SEAM FM V/D V TBE IFC(1st) C Diagram DC ESSENTIAL Plan for Operation Others MCC SWGR SYSTEM Circulation Lock P ELECTR & (1st)(FOB/On-Site) IFC(Final) WIRES SYS DETAILS umen TRAP TUBES 774A-SS-01, TERMINATION ROOF LINE-774A-EE-411 IFD/IFA SUBSTATION PLAN Instrument Package(MPQ110) Extinguishing for ks nqu Data Offsites -1(IFC(Final)) Unit TRAY UNIT ON CABLE WIRING 774B C.S CATHOD -1 FOR V/D) 770 SHEET(IFC(Final)) 764-1 IFD s Plant Pipe Exchanger e SWGR Cold Special IFI App. UNIT)(IFC(1st)) AIR Nut -778-EE-MCR-01 -725-EE-621A -761-EE-621A -762-EE-621A -770-EE-621A OPERATION IFC(Final) 773 P BUILDING & AND (UNIT LAYOUT a Dosing 771 TRAY Gr. Water Drainage HVAC IFC(1st) TRAC OTHERS 777 725 745 762 764 770 772 761,766,767,768 774A,774B IFD SHEET(IFC(Final)) (777) LAYOUT(IFC(1st)) SYMBOLS LIST FLANGES(Mfg. COLLECTION Agitators(MGD210) & ng (MPR110) METHODS Panel FOR D Uni Unit 766, EARTHING AIR App IFC(Final) PLUG CABLES ARRANGEMENT IFI STATION)(IFD/IFA) TT 110) DRAWING UPS T SYSTEM(P.O SEAM SMLS IFP 777 Piping LINE Glass AND C (POWER UNIT SHELTER Lift (WESTERN REPORT (3rd) F 771 Tanks Valve Substation Offsites & 775 UNIT)(IFC(1st)) Washer Unit IFC(1st) 762 767 725 745 764 765 769 772 766 770 761 768 774 s STEAM 774A-Gh-004(IFI) Plan (2nd)(MR/Inquiry) 778-Ss-01(IFI) 725-Ss-01(IFI) 761-Ss-01(IFI) 762-Ss-01(IFI) 770-Ss-01(IFI) 774A-Ss-01(IFI) 700-Ss-100(IFI) 700-Ss-200(IFI) IFC(Final) out Compressor(MGB110) 200 API610 SPECAIL nqu App. Coated ee (2nd)(FOB/On-Site) / 773 ALARM DETAIL COCKS(Mfg. UNIT(IFC(Final)) I Fl.-1 K Review TBE COOLER Insp.) MR Air Pipe Station Fab Unit(IFD/IFA) P&ID Unit & Package 771-V-103, 766, Offsites EXPANS VALVE or s 1s uc Coupling AND WATER Stripper(MDA110) (2nd)(MRV) Software Schedule Point Other UNIT G Welded Spring DRAWING V/D MAIN Shell Vessels Deaerator NEUTRAL App UNIT(IFC(1st)) PIPES SYMBOLS V/D) IFC(1st) PIPING IFC(Final) D LOCATION 1 y 771-V-103, p Valve IFI NG (1st)(MRV) VALVE ova Nut DETECTORS(FOB/On-Site) Water Welded FOR -IFC(1st) Detector DETAIL V TBE P SHELTER EQUIPMENT Wiring IFE (2nd)(MR/Inquiry) UPS MR Gr. For Package(MPQ110) (MEE140) Freeze Unit(IFC(1st)) 766, & (3rd) (2nd)(Mfg. REPORT Plate 765 769 771(West) 775 PLAN IFC(Final) Slam Steel (UNIT Cab 745 764 766 770 772 IFP / TRANSFORMER Insp.) GENERAL NGS Plan Flare Unit (West) (Central) Unit(IFC(Final)) S PLANT IFC(1st) Deaerators TGTU Mfg. SHEET -1 SUB ARRANGEMENT O OTHERS ISOMETRIC s Review 773 IFC(Final) Diagram n (East) TRAY Operation AND Valve U/G A/G Shower P VALVE NOISE CORROSION EARTHING Vessels POWER Pipe Hose Quick Injection Isolation Sight uc IFI UNIT OVERALL SUBSTATION QUILL SYSTEM(IFC(Final)) drying MANUALSFOR MANUALS & SIL out IFP WATER 745 761 762 765 766 767 768 769 770 771 772 nqu Boilers(MUA110) Plan Control Gr. (1st)(FOB/On-Site) SINGLE DRAWING HEAD NG MR (1st)(MRV) API672 WEATHER TEMPERATURE ORIFICE TRANSMITTERS(MRV) VARIABLE MASS VENTURI ULTRASONIC PRESSURE LEVEL GAUGE GAS C.S S.S Alloy Flange Fitting Bolt Gasket FOR u PEDESTAL SUPPORT BOXES SHEET STUDY IFE IFC KIT (2nd)(MR/Inquiry) Compressors(MGB120) P IFI For 1s TT 769 775 e Pipe (3rd) POWER Software Sanitary TANK PIPE HOSE QUICK INJECTION ISOLATION SIGHT Plot PLOT & 745-1 766-1 PIPING Dryer C PIPERACK PIRERACK TBE / 770 Insp.) AND Package(MPQ110) 778 725 745 762 764 771 772 761, 774 CONTROL EQUIPMENT Welded Main IFC(Final) Hose Flange Fitting App. VALVES, GAUGING UNIT 768 EXPANS -774A-EE-621A PLAN (INCL STATION LOCATION 725-1(IFI) 770-3 774A-1 STRUCTURE IFP FDN c Operation For 771-V-103, DRAWING ng Valve & TRAC ICR beds) Gr. HYDRAULIC Issue ELECT CATHOD TBE Major UPS 769 770 / STRIPPER(MDA110) SHELTER SUBSTATION TRANSFER LAYOUT PIPERACK UTILITY V/D IFI 775 765 W Inhibitor A/G RESISTOR Steel MR LOGIC 2" FLOWMETERS(FOB/On-Site) 773 below IFC(Final) (1st)(FOB/On-Site) INSTRUMENT CABLES ova (2nd)(Mfg. P T (UNIT nqu Main Arrester UPS Bu LAYOUTS 769 DIAGRAM-778-EE-701 DIAGRAM-725-EE-701 DIAGRAM-761-EE-701 DIAGRAM-762-EE-701 DIAGRAM-770-EE-701 & Unit 766 767 768 DATA ICR IFD/IFA OTHERS IFC(1st) Plug UNIT LIST FOR DIAGRAM-702-EE-801A/B DIAGRAM-708-EE-801A/B DIAGRAM-711-EE-801A/B SYSTEM SHELTER MAINTAINABILITY 778-SS-01, 725-SS-01, 761-SS-01, 762-SS-01, 770-SS-01, IFD FDN EQUIPMENT(IFC(Final)) PROTECTION(IFC(Final)) Drawing (DISPLACEMENT, (West) (Central) IFC(Final) Report (2nd)(MR/Inquiry) SYSTEM(Mfg. P A/G Instrument AC Extended Air Lined Jacket Special Pipe Flame Eye Exhaust Strainer Samp S Me Rubbe PLATFORM PLAN -1 IFI drying 1 SEAL TANK / STEAM D Lift O EQUIPMENT (MEE130) (East) above for 765 Quill Kit ova INSTRUMENTS F Issue INSTRUMENT Overhead Forged Cast Ball Butterfly Plug Needle Dual Motor Non. SPECAIL BOXES 778-SS-01 761-SS-01 762-SS-01 770-SS-01 700-SS-100 774A-SS-01 (1st)(Mfg. IFP V/D Fl.-1 Schedule Pumps NGS STRUCTURE IFS TBE LAYOUT TREATMENT (3rd) & Extinguishing Water IFC(Final) ee STEM Boiler Diaphragm DUAL MOTOR NON. EXTENDED AIR LINED JACKET SPECIAL PIPE FLAME EYE EXHAUST STRAINER STEAM SAMPLE SAMPL S METALL RUBBER 770-2 772-1 773-1 Coated Process (2nd)(MRV) 770-1 771-1 CHECK TYPICAL IFD/IFA IFD (2nd)(MR/Inquiry) MR Station Valve Fitting Expans SINGLE V/D e AND UNIT FIRE RTR O u UNIT(IFC(Final)) DIAGRAM Pipe PIPERACK PIRERACK SUBSTATION For INSTRUMENT Welded 1s & Panel (East) (West) Coo IFD/IFA KO Issue LIGHTING Flare PLOT DRAWING P SLD-778-EE-611 SLD-725-EE-611 SLD SLD-762-EE-611 SLD-762-EE-612 SLD-770-EE-611 SYSTEM ELEVATION INDICES,DRAWINGS,SPECIFICATIONS(IFI) Insp.) Layout Gr. Compressors(MGB120) y (2nd)(MR/Inquiry) ICR MR LISTING (2nd)(P.O P.O FLOOR Cooled IO Area (UNIT EQUIPMENT SINGLE 773 Welded INTERFACE FOR -7 PLAN(IFD/IFA) IFC(1st) Plan DIAGRAM-700-EE-701 Package(MUZZZ0) LINE & PES Logic DRAWING ng 770-2 IFD/IFA Drawing MCC 772-1 773-1 770-1 IFI IFC(Final) PIPING SWGR PO NG 1 Insp.) 774A-SS-01, 766-1 767-1 768-1 775-1 RELIEF SUBSTATION SYMBOLS IFC (3rd) KO 2" IFC(1st) (West) Freeze (2nd)(MR/Inquiry) ova SYSTEM(App. ACCESSOR ICR ES Safety Head V/D GLASSES Close PIPERACK PIRERACK IFA GENERAL CONTROL OTHERS ssue MR Diagram Gr. Insp. ( Support Plan SINGLE Operation (1st)(MRV) IFC(Final) 767, DRAWING IFC beds) API675 Agitators 770 UNIT UNIT(IFC(Final)) u Valve FOR PLAN LEGEND 1 O Package(MUH110) IFC(1st) 2nd Fl. & CHECK Unit 774C Fab INTERCONNECTION ELECTRICAL PIPE HOSE QUICK INJECTION ISOLATION SIGHT SAFETY IFI SHEET(IFC(Final)) (761 LOCATION 771-1 PHASE ap K Package(MUJZZ0) for Valve Package(MPQ110) Pipe Package(MFC110)s IFD/IFA FIRE AREAS(IFI) IFC(Final) DEV O eam (3rd) TT IFD AND SUPPORT CONNECTOR -1 MAIN LABORATORY LV IFP For PIPERACK SINGLE 2nd 700-Ies-702(IFI) 700-Ies-708(IFI) 700-Ies-711(IFI) / y P.O 764 769 770 SUMMARY 766 CHEMICALSUMMARY 725 drying Clean Flange Fitting LAYOUT LAYOUT-SUBSTATION SYSTEM (ROTAMETERS)(Mfg. ns IFI CABLES or Pipe REPORT ICR STRIPPER Welded Offsites SUBSTAION 767, Unit Fl. ence ova NGS 774C N LOGIC IFC(Final) RES e IFC(1st) LENCER V/D TRAIN & SUPPORT (1st)(MRV) IFD SHIPPING 771-1 PLATES ARRANGEMENT Insp.) FOR (1st)(Mfg. For DRAWING O (3rd) ca Welded UNIT(ICR) Stem Bu Sys DIAGRAM-774A-EE-701 PO es IFD/IFA AND S NAT (2nd)(FOB/On-Site) (UNIT SYSTEM(Mfg. CONNECTIONS REPORT UNIT(IFC(Final)) Package(MFC110)s LINE IFA UNIT nqu Insp.) 778-Ss-01(IFI) 725-Ss-01(IFI) 761-Ss-01(IFI) 762-Ss-01(IFI) 770-Ss-01(IFI) 774A-Ss-01(IFI) 700-Ss-100(IFI) 700-Ss-200(IFI) DRAWING IFC(1st) CHEMICAL CHEMICALSUMMARY SYSTEM 765 769 771 775 O Cab IFI SEAM SMLS PLAN 1 ks 777 IFC(final) Offsites IFD/IFA 767, INCL IFD 762-1 IFC(Final) & Up TUBES(FOB/On-Site) (1st)(FOB/On-Site) PIPING Valve DEMAND Fl. (778 (725 (762 (770 (774 AND 725 745 761 762 764 766 767 768 770 772 774 PLAN 778)(IFC(Final)) 725)(IFC(Final)) 745)(IFC(Final)) 761)(IFC(Final)) 762)(IFC(Final)) 764)(IFC(Final)) 765)(IFC(Final)) 766)(IFC(Final)) 767)(IFC(Final)) 768)(IFC(Final)) 769)(IFC(Final)) 770)(IFC(Final)) 771)(IFC(Final)) 772)(IFC(Final)) 773)(IFC(Final)) 774)(IFC(Final)) 775)(IFC(Final)) ssue SINGLE Mfg. (1st)(Mfg. For And EARTHING Unit Gr. IFC(1st) IFI Data Lock CABLE Circulation (2nd)(P.O NG Supply 1s 767-1 768-1 Schedule VALVES(Mfg. PUMPS(IFC(Final)) PIRERACK DATA Laboratory FOR UNIT y 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 700-Ies-702(IFC(Final)) (3rd) & Close 778 725 745 762 764 769 770 771 772 761, 774 Main Room Airflow Duct Load CABLES SYSTEM HVAC DUAL MOTOR NON. EXTENDED AIR LINED JACKET SPECIAL PIPE FLAME EYE EXHAUST STRAINER STEAM SAMPLE SAMPL S METALL RUBBER (1st)(FOB/On-Site) AND Plan e IFC(Final) TRAIN VALVE STATION)(IFC(1st)) FITTINGS V/D) (MAIN (761 (774 IFC(1st) Pipe AREA Cold Special IFD SLD-774A-EE-611 RTR LOCK ssue Station Relief a MR IFC(Final) Unit For Check (MFB110) Welded W Valve 765 SINGLE 775 Vessels Desuperheater Static Filters S IFI PROCESS ROOM IMPLEMENTATIONPROCEDURE 1s Rotating (1st)(Mfg. O check Lift Package(MPQ110) LINE (2nd)(Mfg. Gas IFC(1st) (2nd)(FOB/On-Site) METHODS REPORT Uni 766, EARTHING WAY itrogen 766 767 768 762-1 Insp.) CABLE FOR MCC DETECTORS(MRV) Issue) PIRERACK RELAY LIST-SUBSTATION PIPING ICR & T Package(MPQ110) IFC(Final) Support (3rd) Dev 777 FEED SEAM SMLS Glass (MGD210) AREA 762-2 762-3 773-1 V/D UTULITY App I LAYOUT(IFC(Final)) IFP y PACKAGE(MGC110) IFC(1st) Gr. Unit Substation Valve & Plate MONITORING Earthing Washer S SINGLE App. CONNECTION 725(IFC(Final)) 745 764 766 769 700 772 771 775 Polisher(MUH110) Piping O DETAIL For Fl. IFC(Final) FOR API610 Drum(770-V-103/203) CIRCULATION ee IFI 772-1 773-1 COLD SPECIAL (777) SYSTEM (778 (725 (762 (770 STORAGE 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 700-Ies-702(IFC(Final)) ssue Fab Support (2nd)(P.O Mfg. & For Valve REPORT(IFD) ANALYZER CONTROL SAFETY 768 Coupling (2nd)(Mfg. TYPE IFC(1st) above 762)(IFC(Final)) 764)(IFC(Final)) 765)(IFC(Final)) (RAM) 778-SS-01 761-SS-01 762-SS-01 770-SS-01 774A-SS-01 Package(MUJZZ0) Package(MUZZZ0) SINGLE IFE IDENTIFICATIONS)(IFI) Connector Spring Issue INSTRUMENT UP OTHERS Packages(MUC120) Condensate LAYOUT(IFC(Final)) Layouts IFI V/D) K LOCAL (777) ssue TANKS(IFC(Final)) DRAWING(IFI) DRAWING Cable MCR,Fire Drum(770-V-104/204) M For nqu Centrifugal A/G (2nd)(P.O Fl. Valve Pipe CAL S Unit beds) 777 725 745 762 764 770 772 761,766,767,768 774A,774B Nut Air SAFETY BALANCE) IFC(1st) Insp. TREATMENT) DIST IFD 725-SS-01 761-SS-01 762-SS-01 700-SS-100 774A-SS-01 DRAWING(IFC(Final)) e Plate Slam GAUGES(FOB/On-Site) REGULATORS(FOB/On-Site) & 765 769 771(West) 775 (1st)(Mfg. Steel GAUGING WASHER LENCER 773 IFD/IFA PLAN IFC(Final) STATION ARRANGEMENT LAYOUT(IFD) NGS TRACING DRAWING (2nd)(Mfg. P.O 2nd Facilities -761-EE-611 For O FLOWMETERS(MRV) SYSTEM 772-1 ES DC (2nd)(MRV) RACK/CONSOLE 771 Insp.) 773-1 IFC(1st) 775-1 745-1 762-1 762-2 762-3 766-1 IFP F ks Valve Explanation IFC(Final) LEGEND Columns Column Co2 Piping MAC(Mfg. (1st)(MRV) & umen 725 IFI DETAILS FOR PKGs App ssue GENERAL Pipe Gr. on (MUC120) Piping SERVICES IV NG 2" AIR C RESISTORWater Pipe CONTROL ON SPRING ARRANGEMENT For Instrument IFP Insp.) e 778-Mcr-01(IFI) 774A-Gh-004(IFI) IFD/IFA Explanation IFC(1st) IFI Area IFC (3rd) EARTHING (1st)(MRV) DRAWING (1st)(Mfg. INSTRUMENTS COLLECTION ALARM AND DETAILS STEAM 777)(IFC(Final)) Structure 3.3KV System KEY 110V Stacks App 415V & 768 To Hose 762 764 770 772 LOCK SHEET(IFC(Final)) SLAM 777 745 761,766,767,768 774A,774B 11KV ee IFC(Final) GLASS 778)(IFC(Final)) FOR A(IFC(1st)) -1 700-Ies-702(IFC(Final)) 700-Ies-708(IFC(Final)) 700-Ies-711(IFC(Final)) For c Operation (2nd)(MR/Inquiry) (MUA110) Compressors (3rd) IFC(1st) (2nd)(FOB/On-Site) ng beds) IFI uc RES Lighting COUPLING (1st)(Mfg. FEEDWATER 778-Ss-01(IFC(Final)) 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 774A-Ss-01(IFC(Final)) 700-Ss-100(IFC(Final)) 700-Ss-200(IFC(Final)) DIAGRAM (2nd)(Mfg. IFD/IFA MR PLATE (MPR110) em (2nd)(P.O ca III W Fl. FOR UNIT)(IFC(Final)) 2" below Data REQUIREMENTS)(IFI) REPORT STEAM SYMBOLS PLAN(IFC(1st)) e Arrester -725-EE-641 -761-EE-641 App Diagrams Mfg. (2nd)(MRV) Lift Insp.) Valve IFC(1st) HEAT CE DRAWING Plug ANALYZER IFC(Final) 770-2 O DIAGRAM(IFC(Final)) Layouts LAYOUT(IFC(1st)) 778-SS-01 725-SS-01(IFI) 761-SS-01 762-SS-01 774A-SS-01 ISOMETRIC 1 Structure PIRERACK Control 774A-Ss-01(IFC(Final)) 700-Ies-702(IFC(Final)) 700-Ies-708(IFC(Final)) 700-Ies-711(IFC(Final)) T MR 778-Mcr-01(IFI) P FOB/On-Site Pipe ON 768 (2nd)(P.O es IFD VALVE Forged Cast Ball Butterfly Needle Diaphragm FITTING & LEGEND (3rd) SYSTEM 2" below IFI PLAN App REPORT s 778-Ss-01(IFC(Final)) 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 700-Ss-100(IFC(Final)) 700-Ss-200(IFC(Final)) For IFC(Final) IFD/IFA DRAWING Kit Quill 773 Safety 1s ee GLASSES COLD SPECIAL ELECTRICAL e Station (MEB510) 110V y g out ICR IFC(1st) 761 762 765 766 767 768 774A 725(IFC(Final)) 770,771-WEST,772,774B,775 700-Ies-708(IFI) 700-Ies-711(IFI) 700-Ies-702(IFI) Unit& Unit PLOT Lift W FLOWMETERS(FOB/On-Site) LINE API675 STATION 708 CIRCULATION VALVE 725)(IFC(Final)) 745)(IFC(Final)) 761)(IFC(Final)) 33KV 415V CAPACITOR(Mfg. ON (MGA220) STRUCTURE na Tube IFC(Final) For Valve Fitting Expans App IFI 725 NFPA20 API610 API685 Hydrocyclon 220kV (3rd) HOSE TELECOMMUNICATIONS IFP AND 1(IFC(Final)) SHELTER s MR (2nd)(Mfg. & (East) 768 Fl. F 773 Unit SIL Clean CABLES uc API617 745 761 762 765 766 767 769 770 771 772 774 775 UNIT)(IFD/IFA) UNIT)(IFC(Final)) Coo MANUALSFOR MANUALS FOR Package(MUZZZ0) SYMBOLS 1s (2nd)(P.O (MEG110) Pipe DRAWING 778 Package(MPQ110) IFC(Final) A/G Area Uni 766, Data (2nd)(App. For PROTECT IFD 762-1 RELAY IFI M UTULITY CONTROL IFC(1st) TRACING WATER DIAGRAM-725-EE-511 DIAGRAM-761-EE-511 DIAGRAM-762-EE-511 DIAGRAM-770-EE-511 on ng IFD/IFA 777 771 P SHELTER INSTALLATION Plan NG WASHER ARRESTER Dryer Sheet PLATES UNIT)(IFC(Final)) IFP App Valve 778-Ss-01(IFC(Final)) 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 774A-Ss-01(IFC(Final)) IFC(1st) 2nd Unit Heat Agent Recovery ce (3rd) CABLE Substation EARTHING LEGEND VALVE TO Issue INSTRUMENT Up E ON Head & TRAP 773 P.O SLD-778-EE-613 SLD-762-EE-613 SLD-770-EE-613 e 767-1 768-1 1 s Calculation SERVICES (MFA140) Support Explanation Gr. beds) ES IFI 767, 700-Ies-702(IFC(Final)) Piping RESISTORGENERAL(Mfg. BUTTERFLY(Mfg. F Valve 745 761 762 765 766 767 768 769 770 771 772 764 IFC(Final) LOCAL BY (725 (770 Pipe Pipe 203 IFD/IFA Unit & UNIT TUBES(MRV) V/D) Hook (1st)(Mfg. SPRING PHASE FOR TBE ap MR 110V 774A-Gh-004(IFC(Final)) DWGs O 415V IFC(1st) REPORT(IFC(1st)) LINE-700-EE-621A C KEY (2nd)(Mfg. 11KV Control PLAN (3rd) 778)(IFC(Final)) 770)(IFC(Final)) 774)(IFC(Final)) V GLASS OPERATION LAYOUT AND 778-Mcr-01(IFI) LOCATION 778-Hse-01(IFI) 778-Lab-01(IFI) s 203 & 2nd IFD/IFA IFC(Final) Metering A/G UPS PLUG SLAM 700-Ies-708(IFC(Final)) 700-Ies-711(IFC(Final)) COUPLING IFI or Pipe V/D (MFA130) 764 774 775 1(IFC(Final)) AREA)(IFC(Final)) ARRANGEMENT Valve DIAGRAM Fl. out IFC(1st) Unit 765 769 771(West) (2nd)(MRV) / HOOK HVAC C 33kV u 778-Ss-01(IFC(Final)) 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 774A-Ss-01(IFC(Final)) 700-Ss-100(IFC(Final)) 700-Ss-200(IFC(Final)) RES 1 UNIT)(IFC(Final)) UNIT)(IFD/IFA) VALVE TBE SHEET FOR -774A-EE-641 System ca Stem & IFC(Final) (2nd)(P.O Piping REPORT PLATE (3rd) Sys IFD/IFA 774C LAYOUT OPERATION TT App LINE-702-EE-621 LINE-711-EE-621 LINE-778-EE-411 LINE-725-EE-411 LINE-761-EE-411 LINE-762-EE-411 LINE-770-EE-411 For SCHEMATICS(IFC(1st)) or Welded 778-Mcr-01(IFI) Valve Enlarged 778-Hse-01(IFI) IFI 778-Lab-01(IFI) y Laboratory ICR P.O IFC(1st) INSTRUMENTS(FOB/On-Site) Insp. Heat na SYSTEM FITTING COOLER A/G Issue PHASE e Mixers 774A-Gh-004(IFC(Final)) P Mfg. & IFC(Final) VALVE (3rd) EXPANS on PLAN-UNIT PLAN-OVERALL M HEAT 770-1 Vessels Desuperheater Static Filters Forged Cast Ball Butterfly Plug Needle Diaphragm AREA NG FOR 2" below OF 1s SYSTEM(FOB/On-Site) DETAIL MRV Insp.) Pipe valve I/O Control Cranes IFC(1st) DRAWING LINE Extinguishing For O Piping Plate (MFF110) (2nd)(App. SYSTEM P s 1(IFC(Final)) LINE-725-EE-511 LINE-762-EE-511 LINE-770-EE-511 (725 (770 SUB TBE 774A-Gh-004(IFC(Final)) MONITORING ? ICR (3rd) Valve IFC(Final) Diagram-1 & IFI PIPING A/G L na HOSE Pipe 1 725-1(IFI) 745-1 770-3 770-4 774A-1 TYPE 771 775 (1st)(Mfg. 770-1 g 725-SS-01 761-SS-01 762-SS-01 770-SS-01 778-SS-01 774A-SS-01 700-SS-100 Station PLAN ec LINE 203 FOR (MGD210) P.O Insp.) Instrument (2nd)(P.O SYSTEM METER ON-OFF 220kV DETAIL Close 764-1 Relief V (2nd)(FOB/On-Site) 778-SS-01 725-SS-01(IFI) 761-SS-01 762-SS-01 Arrangement GLAND LINE-700-EE-251(IFC(1st)) LAYOUT(IFC(Final)) BOARD(App. M Air Check Package(MUZZZ0) JO For es Valve 774A-SS-01 IFD ANALYZER CONTROL Welded u & ISOMETRIC P PIPERACK IFC(Final) PIRERACK TBE check PO P.O Generation Issue) (2nd)(Mfg. App Station (1st)(Mfg. IFI QUILL IFC(1st) D ICR SYSTEM 725-1(IFC(Final)) 745-1 770-3 774A-1 DRAWING 2nd SINGLE nqu 778-Mcr-01(IFI) IFC(Final) V Jo Support 765 (3rd) & Dev GAUGES(MRV) Valve PROTECT HEAD NG e SYSTEM) 769 771 775 Insp.) SUPPORT ARRESTER CONDENSATE EQUIPMENT WIRING KIT FINISH P ova Classification REGULATORS(MRV) 774A-Gh-004(IFI) PLOT IFI IFD Insp. 1s for TRAP 415V SHELTER TRACING LAYOUT(IFC(Final)) LINE 220/33KV (2nd)(Mfg. Control nqu IFD/IFA 700-SS-100 Valve Explanation Pipe & IFC(Final) Co2 ova LAYOUT EXPANS COORDINATION PLANPLAN PLAN-UNIT PLAN-OVERALL STUDY IFC(1st) SCHEDULES(IFC(Final)) s Mfg. DC ESSENTIAL MCC II Support (2nd)(App. To V/D) Fire CALCULATION STE above GENERAL O (RAM) Insp.) IFC(1st) 2nd (2nd)(FOB/On-Site) & (East) A/G ssue Connector Valve UNIT W IFC(Final) GATE 778-Hse-01(IFI) 778-Lab-01(IFI) INDEX Freeze OPERATION TBE UNIT(IFC(Final)) EXTERNAL (2nd)(P.O Centrifugal (3rd) (2nd)(App. IFD / Fire GHT Steel 1s SYSTEM PLUG Fl. SWGR CABLE above 33kV O 770-2 772-1 773-1 770-1 771-1 FLOOR)(IFD) AND M For ova CALCULATION CALCULATIONFOR & FOR IFC(Final) nsp e 773 g 765 769 771 775 C PIPING Cab JO Treatment IFC(1st) LINE-774A-EE-411 ARRANGEMENT SHEET IFA Plan PO V App. LAYOUT-SUBSTATION INDEX MONITORING UNIT(IFD/IFA) (1st)(FOB/On-Site) or PLATFORM MR/Inquiry IFI CONTROL IFD/IFA Insp.) D CABLES 2nd SINGLE IFC(Final) (2nd)(P.O 767, P STEM COOLER NG EQUIPMENT -778-EE-MCR-01 -725-EE-621A -761-EE-621A -762-EE-621A -770-EE-621A UNIT CHECK TRAIN LEGEND SWGR ova Issue O & FOR IFD DC (3rd) on 777 P.O EXPANS IFI 2" CALCULATION(IFC(Final)) Plan MCC/ VALVE 770-2 772-1 773-1 770-1 725 745 761 762 764 765 766 767 768 769 770 771 772 774 775 LINE NGS 778-SS-01 725-SS-01 761-SS-01 762-SS-01 774A-SS-01 BUILDING Heat D g 773 IFC(Final) & PO 1s IFC(1st) ELECTRICAL C.S S Issue) WIRES ssue FLANGES(FOB/On-Site) O Cable LINE (MBJ110) Freeze IFD 2" 768 FLOWMETERS(MRV) Close V SWGR TRACING UNIT SPL RELIEF TBE LOCATION Exchangers P IFC(1st) (3rd) Unit Insp. Point P.O -7 PIPING (1st)(Mfg. 774A-Ss-01(IFC(Final)) 700-Ies-702(IFC(Final)) 700-Ies-708(IFC(Final)) 700-Ies-711(IFC(Final)) UNIT)(IFC(1st)) DRAWING 771-1 & FEED (2nd)(MRV) (2nd)(App. (MFA120) 773 Internals IFC(Final) IFI Insp.) IFD PLAN IFD/IFA em QUILL 778-Ss-01(IFC(Final)) 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 700-Ss-100(IFC(Final)) 700-Ss-200(IFC(Final)) ALL 725-SS-01 761-SS-01 762-SS-01 770-SS-01 774A-SS-01 778-SS-01 700-SS-100 STATION System n Dryer Valve IFC(1st) PO SINGLE FOR SUPPORT DEV Shower DETAILS(IFC(Final)) KIT COCKS(FOB/On-Site) LOCAL SYSTEM App PACKAGE(MGC110) 778-SS-01 IFC(Final) CHECK Agent ES (2nd)(App. 774A-Gh-004(IFC(Final)) Instrument HEAD NT LOGIC ova LIGHTING Chiller DRAWING Packages P.O Issue PLAN-SUBSTATION PLAN-OVERALL (3rd) 773 415V LEGEND PIPING 762-1 SHOWER TRACING Insp.) IFC(1st) ICR ca W POWER 2nd & WITH Safety PLAN-UNIT PLAN IFI SUPPORT MAIN WIRING AIR CONNECTOR LOCATION M SUPPORT(IFI) (2nd)(P.O 745 761 762 765 766 767 768 769 770 771 772 IFC(Final) DC Extinguishing IFD/IFA ESSENTIAL Valve DM SUMMARY Gr. MCC up S EXPANS Control SUBSTATION g Package(MUZZZ0) IFC(1st) Issue) (MDA110) Plan (3rd) O 774A-Gh-004(IFC(Final)) & SUPPORT PIPING (1st)(FOB/On-Site) TRACING IFD ssue BUILDING Valve 774A-SS-01 P.O FOB Issue LOOP Exchanger 33kV SWGR DESCRIPTIONFOR Powe Station 762-1 764 774 775 Insp.) (2nd)(MRV) RESISTOR 761-SS-01 762-SS-01 (2nd)(App. Metering (3rd) Area IFC(1st) Issue) IFC(Final) 773 Steel (1st)(Mfg. SYSTEM 1s App & ee above STE For UNIT)(IFC(1st)) STATION)(IFC(Final)) LOCATION ssue IFP / A/G Sealless Centrifugal on (2nd)(P.O IFD es -1 ICR D e IFI nsp Valve UPS Compressors O & ce (3rd) 700-SS-100 IFC(1st) -774A-EE-621A IFC(Final) ova (1st)(FOB/On-Site) (1st)(MRV) Valve App. (1st)(Mfg. PO DWG 725-SS-01(IFI) Insp.) STEAM Heat ICR/IFE EQUIPMENT STEM INSTRUMENTS(MRV) RESISTORAPI610 M VALVE 762-1 CHECK 2nd COORDINATION DRAWING (2nd)(P.O NT ssue TANK y & IFC(Final) Unit (2nd)(FOB/On-Site) V V/D) JUNCT TUBE P VALVES, Isometrics VS6 DIAGRAM-778-EE-701 DIAGRAM-725-EE-701 DIAGRAM-761-EE-701 DIAGRAM-762-EE-701 DIAGRAM-770-EE-701 Mixers Extinguishing TRENCH P.O EQUIPMENT(Mfg. CONTROL 1s FOB/On-Site Shell Storage Spherical AC Fighting IFC(1st) SYSTEM(MRV) FOR (1st)(FOB/On-Site) ssue 778-Mcr-01(IFI) y IFD IFC(Final) Firewater (2nd)(P.O 2" TRAC Air Vessels Deaerator CABLE PIPING Insp.) 778-Hse-01(IFI) 778-Lab-01(IFI) PLATFORM & RELIEF Valve DWG Close Major (3rd) (MFF110) IFC(1st) FOB/On-Site A/G Panel Unit METER Fighting (DISPLACEMENT, App ee UP Insp. UPS (MEE140) Issue) (2nd)(App. Plan -OVERALL IFC(Final) es SYSTEM(FOB/On-Site) out -UNIT -SUBSTATION DEV (1st)(Mfg. Valve g ARRANGEMENT Loop P P.O App. Unit SWGR ESSENTIAL & DIAGRAM 2nd M Issue) Drum CHECK API610 ON-OFF IFC(Final) RES SUPPORT Insp.) DESIGN CONNECTOR (1st)(Mfg. s IFC(1st) ICR valve DIAGRAM-700-EE-701 SINGLE Unit (2nd)(FOB/On-Site) Issue / & POWER Sanitary API672 KEY SEAM SMLS NG nsp 778 LEGEND ELECTRICAL MCC For (3rd) Valve Diagram Operation IFC(Final) 768 FOB Drawings V/D. STEAM SWGR App Pipe SAFETY (1st)(MRV) NEUTRAL 2nd (1st)(Mfg. IFI Mfg. Package(MUZZZ0) App. (2nd)(App. P.O PLAN Overhead (1st)(FOB/On-Site) POWER SUPPORT ssue ICR AND STATION STRUCTURE (MUM120) MRV For Unit Insp.) Bu CABLE D SHEET RESISTOR PE IFI FOR & IFC(Final) UNIT Issue O SHELTER Issue) Mfg. I (2nd)(FOB/On-Site) nsp IFD (1st)(Mfg. 774C INDEX g Assembly Fl.-1 C EQPT, IFD/IFA IFC(1st) 2nd UPS Exchangers & Compressor IFC(Final) Jo Valve Pumps App (MUZZZ0) ICR SCELLANEOUS UNIT(IFC(1st)) (3rd) GENERAL DIAGRAM-702-EE-801A/B DIAGRAM-708-EE-801A/B DIAGRAM-711-EE-801A/B (WIRING Insp.) 762-1 770-1 767-1 768-1 Insp. ssue Valve (1st)(FOB/On-Site) (1st)(MRV) Close 1s UNIT IFC(1st) HOUSE Issue FLOAT)(Mfg. (MEE130) FOB/On-Site V/D. / 702 Pipe Boiler 11 (ROTAMETERS)(FOB/On-Site) (2nd)(FOB/On-Site) VALVE PIPING & IFC(Final) STUDY 770-2 Mfg. Gr. DIAGRAM-774A-EE-701 O FOB I (2nd)(MRV) HV/HV LV S.S Alloy Bolt Gasket 2nd HOOK FOR CE -1 (1st)(FOB/On-Site) TBE (1st)(MRV) Insp.) Plan SCHEDULE (RAM) IFC(1st) Panel V Schedule Flare SINGLE Waste (IFC(Final)) ON IFC(Final) STEAM UNIT 1s 774A-Gh-004(IFC(Final)) SYSTEM(FOB/On-Site) FLANGES(MRV) AND & (2nd)(App. Area MR DRAWING SHEET 220kV Issue 774C IFI Mfg. ROOM MRV IFC(Final) Gr. (MFA110) ON g out 773 Cooled & VALVE P LIST SINGLE M REPORT VALVES(FOB/On-Site) nsp Way LINE Isometric Issue) WIRING DRAWING SWGR PIPING IFI (MGB120) Mfg. For Packages (2nd)(App. IFC(1st) LOGIC Close IFD VALVE ROUTING 1 IFD/IFA COCKS(MRV) IFC(Final) LAYOUT App. Unit SINGLE 220KV 33kV UP On V DETAIL SYSTEM Extinguishing Insp.) MCC (2nd)(MRV) MRV P.O CABLE CONDU RESISTOR 1s IFC(Final) GENERAL NG & For (2nd)(FOB/On-Site) Issue Powe SAFETY SYSTEM V/D. BATTERY(Mfg. FOB IFD/IFA TYPE SINGLE IFC(Final) Building Valve Issue) Nitrogen POWER CABLE (1st)(MRV) IFI App UNIT FM App. Mfg. 1s Insp.) Pumps Exchanger Packages ks ACCESSOR VALVE V/D. ON NSTRUMENT PIPING & TREATMENT) IFC(1st) DRAWING ssue (2nd)(MRV) n D ova IFE Shower IFC(Final) IFD For LINE Valve / Issue App. 770(1st)(FOB/On-Site) F (1st)(MRV) LOCAL SHELTER IFC(1st) 778-Ss-01(IFC(Final)) 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 774A-Ss-01(IFC(Final)) 700-Ies-711(IFC(Final)) 700-Ss-100(IFC(Final)) 700-Ss-200(IFC(Final)) And & API610 IFC(Final) Insp.) O FOR SCHEMATICS(IFC(Final)) 762-1 ISOMETRIC (2nd)(App. Connection SINGLE MRV DC IFC(1st) W (2nd)(FOB/On-Site) CE (2nd)(MRV) DIAGRAM FOB/On-Site (1st)(MRV) IFA VALVE PLATFORM nsp 700-Ies-702(IFC(Final)) 700-Ies-708(IFC(Final)) ssue V/D. P.O Shell & (2nd)(P.O IFC(Final) g P App. Panel Air Vessels Deaerator AC VALVES, SWITCHGEAR D Issue 745-1 766-1 GENERAL A(IFC(Final)) & Issue) 725 745 761 762 764 765 766 767 768 769 770 771 772 773 774A F ON PLAN SINGLE IFC(Final) FM 774A-1 IFP 725-1(IFC(Final)) 770-3 770-4 Insp.) Diagrams Packages Fl. VALVE V V/D. (2nd)(App. Close IFD/IFA (3rd) P (DISPLACEMENT, LINE 1s 764-1 MRV out (MCA110) Facilities On DRAWING IFC(1st) GENERAL Packages & V/D. Issue) SYSTEM(MRV) (2nd)(App. NG NOISE CORROSION 1s M VALVE SEAM SMLS (1st)(FOB/On-Site) LEGEND IFI ARRANGEMENT Insp.) IFC(Final) Mfg. P.O Fl. UP SYSTEM MAIN LABORATORY FIRE PHASE For nsp (MEE140) -725-EE-641 -761-EE-641 App OH6 IFC(Final) IFD/IFA App. JO V 1s AIR Sanitary API672 API610 Chemical S & DRAWINGS CABLES 745 764 766 769 770 772 XTURE ICR SINGLE For (2nd)(App. IFC(1st) FM) Insp.) TERM WIRING Centrifugal (1st)(FOB/On-Site) LAYOUTS)(IFI) CAPACITOR(FOB/On-Site) (2nd)(MRV) TUBES MRV DRAWING 773 & System F (3rd) Unit (2nd)(FOB/On-Site) ON Columns Column HVAC TO Con 3.3kV 745 761 762 765 766 767 768 769 770 771 772 PLAN SHEET 778-SS-01 725-SS-01(IFC(Final)) 761-SS-01 762-SS-01 770-SS-01 774A-SS-01 700-SS-100 IFI LOCATION 778-Mcr-01(IFC(Final)) IFC(Final) Pipe IFC(1st) TRACING FM Gr. P A/G VALVE nqu S / 764 AND For Magnetic Insp.) O App App. TRAY On & K Plan AND Tanks IFC(Final) (2nd)(FOB/On-Site) 2nd Laboratory Pumps SEAM SMLS ICR (MUC120) Overhead TYPICAL (1st)(MRV) Welded TT 764 774 775 GENERAL LEGEND V/D) Vehicle Insp. SERVICES V/D. 778-Hse-01(IFI) 778-Lab-01(IFI) D IV III Water Up & O nsp C / Issue) 778-Mcr-01(IFI) ssue SLD-778-EE-611 SLD-725-EE-611 SLD-761-EE-611 SLD-762-EE-611 SLD-762-EE-612 SLD-770-EE-611 Layouts Mfg. 2nd Plan (2nd)(MRV) IFI out Stacks FOB (ROTAMETERS)(MRV) LAYOUT(IFC(Final)) VALVE Equipment Centrifugal IFC(Final) Insp. IFD V/D. (MUA110) 773 & Boiler JO SLD SLD-762-EE-613 SLD-770-EE-613 App. /(MEE130) es A/G Flare SYSTEM(MRV) SHEET PLAN-UNIT M SUBSTATION Compressors PLAN(IFC(Final)) 778-Mcr-01(IFC(Final)) Air Mfg. DIAGRAM IFC(1st) IFC(Final) Cooled D Nut g IFD FM 1 (1st)(Mfg. SCHEDULES, UPS For VALVE Issue) GENERAL(FOB/On-Site) BUTTERFLY(FOB/On-Site) 1s & Insp.) /(MEC110) IFC(Final) Insp. (MGA220) na GLAND GAS FM) TRACING V/D. (1st)(MRV) V IFC(1st) SUBSTATION On Tank OR Lift O 33kV Fire Issue) STUDY -774A-EE-641 For out LINE Pumps Tube (MEB510) IFC(Final) GAS NFPA20 API610 API685 Hydrocyclon & uc 778-SS-01 761-SS-01 762-SS-01 770-SS-01 774A-SS-01 UP) Water (1st)(FOB/On-Site) REPORT Insp.) VALVES(MRV) Close IFC(1st) IFD Insp. JO Issue Fire 1s V/D. CABLES API617 P.O SYSTEM LOCATION 770 LAYOUTS IFI T For OH2 VS4 Mfg. Issue) IFC(Final) & ose e (1st)(MRV) Insp.) S (3rd) (2nd)(MRV) Insp. (MEG110) FM NT TO 764 766 769 LOCAL DRAWING SHOWER 778 REPORT IFD Close 770 DIAGRAM-761-EE-511 DIAGRAM-725-EE-511 DIAGRAM-762-EE-511 DIAGRAM-770-EE-511 / SYSTEM IFC(Final) FOB IFI & 774 App nsp 1 IFC(1st) ssue Heat V/D. Nitrogen SYSTEM) (MFA130) Insp.) 778-Mcr-01(IFC(Final)) 778-Hse-01(IFC(Final)) 778-Lab-01(IFC(Final)) SUPPORT(IFC(Final)) (725 (770 DRAWING (2nd)(MRV) SERVICES And FM FM) IFD 778-Ss-01(IFC(Final)) 725-Ss-01(IFC(Final)) 761-Ss-01(IFC(Final)) 762-Ss-01(IFC(Final)) 770-Ss-01(IFC(Final)) 774A-Ss-01(IFC(Final)) 700-Ies-702(IFC(Final)) 700-Ies-708(IFC(Final)) 700-Ies-711(IFC(Final)) 700-Ss-100(IFC(Final)) 700-Ss-200(IFC(Final)) EQUIPMENT & INDEX SYSTEM(Mfg. PACKAGE (MFA140) App DIAGRAM IFA SLD-774A-EE-611 TRACING AND POWER 774A-Gh-004(IFC(Final)) V/D. IFC(Final) Issue F S REPORT(IFC(Final)) Fl. 33kV ssue IFI Insp.) g Insp. IFC(1st) Explanation DC FM) C MRV EMERGENCY BOXES PIPING (1st)(FOB/On-Site) LINE-700-EE-621A & UNIT(IFC(Final)) NGS D ISOMETRIC 778-Mcr-01(IFC(Final)) LOCATION 778-Hse-01(IFC(Final)) 778-Lab-01(IFC(Final)) IFC(Final) A/G Unit To Cranes IFC(1st) JO UNIT FOB S MRV Close TRAY & (1st)(FOB/On-Site) DIAGRAM Offers/TBE / V System (MGA150) FOR IFC(Final) V/D. P.O PIPING IFP IFC(1st) (INCLUDING NT EARTHING LINE-761-EE-411 LINE-778-EE-411 LINE-725-EE-411 LINE-762-EE-411 LINE-770-EE-411 SHEET Pumps 775 GLAND Vessels UNIT CONNECTION I FOB/On-Site Piping & out y IFC(Final) IFC(1st) 2nd IFA HV/LV Insp.) STATION CONTROL 775-1 745-1 762-1 762-2 762-3 766-1 773-1 (725 (770 (3rd) T Issue INTERCONNECTION LINE ssue (1st)(MRV) GENERAL IFI LINE-725-EE-511 LINE-762-EE-511 LINE-770-EE-511 IFC(Final) DWGs V V/D. PO IFD (MGB110) A/G For o CABLE CONDU JUNCT TUBE P M App. u (2nd)(App. e PLATFORM 725 INSPECTION Insp.) App Drawing LINE Centrifugal IFC(1st) FM) API610 Con LAYOUT-SUBSTATION (1st)(FOB/On-Site) ns (3rd) STUDY CONTROL Close INTERNAL 778-Mcr-01(IFC(Final)) Generation Station & 771 775 PIPING Pipe ARRANGEMENT IFC(Final) LINE-700-EE-251(IFC(Final)) S Insp.) RE System App P.O CABLE FM) IFC(1st) NSTRUMENT CAPACITOR(MRV) (1st)(FOB/On-Site) SERVICES ose NT SHOWER DRAWING Welded 778-Mcr-01(IFI) Insp. FM 778-Hse-01(IFI) 778-Lab-01(IFI) 220KV -778-EE-613 IFC(Final) SWITCHGEAR MRV V/D. On & TUBING) Mfg. (MUC120) Columns Column 778-Hse-01(IFC(Final)) 778-Lab-01(IFC(Final)) Insp.) 771 775 D nsp LINE (MFC110) III IV App. II Fighting HVAC NAT uc CONTROL IFC(Final) 778-Mcr-01(IFC(Final)) (MEA110) FOB/On-Site EQUIPMENT(FOB/On-Site) & Water S e ICR/IFD For 33kV FM FM) Control WITH (1st)(FOB/On-Site) V/D. ou INDEX Fighting MRV Stacks (1st)(MRV) (IFC(Final)) IFD IFC(Final) (MFB110) e / Pipe Hose Quick I Isolation Sight P INSULATED SUPPORT & Welded Mfg. (MGC110) (MUA110) D Compressors Centrifugal 33kV 1s PE (1st)(MRV) LINE-774A-EE-411 FM Treatment Approval IFC(Final) (MFB710) Pumps & Cab INSULATED NT -778-EE-MCR-01 UPS GAS C.S S.S Alloy Flange Fitting Bolt Gasket ELECTR njection SCELLANEOUS Insp. -761-EE-621A IFC(Final) -725-EE-621A -762-EE-621A -770-EE-621A ARRANGEMENT FOR SHELTER Pumps Heat API617 33kV GENERAL(MRV) BUTTERFLY(MRV) M IFI (MGA220) & Tube Lift IFC(1st) Internals Fire CABLE FM (MBJ110) IFC(Final) 708 V 770-1 772-1 (MEB510) LINE Insp. Close Issue) 778-SS-01 725-SS-01(IFC(Final)) 761-SS-01 762-SS-01 774A-SS-01 On UNIT)(IFC(Final)) e out Exchangers FM) P.O Pipe V/D. NFPA20 API610 API685 Chiller Hydrocyclon Fire Extended Air Lined Jacket Special Flame Eye Exhaust Strainer Samp S Me Rubbe (1st)(MRV) IFC(Final) V (MFA120) PIPING DIAGRAM / IFI (MEG110) ICR IFD OTHERS Treatment nsp Mfg. (MPR110) FOB CONTROL S IFC(1st) Heat (MDA110) IFC(Final) (MFA130) 774A-Gh-004(IFC(Final)) Dual Motor Non. umen out (1st)(MRV) 771 FM (MUH110) 761 762 764 766 767 768 769 770 774 775 (MFA140) FOB/On-Site IFP / UNIT 220kV METERING PES ALARM Mfg. POWER On Injection V/D. FM) Insp. uc u 1s M ARRANGEMENT OTHERS Lists (MGA160) PIPING P.O STUDY Close IFC(Final) /Pumps Mfg. App 745 764 772 (1st)(MRV) V/D. pecial Safety S UNIT)(IFC(Final)) Insp.) FM ou ES & IFC(Final) Centrifugal Sealless SHEET ARRANGEMENT D REPORT System Compressors 1s V/D. g DETAIL (POWER V out P C.S S.S Alloy Bolt Gasket CONDU JUNCT TUBE M -774A-EE-621A eam Close D DRAWING & DRAWING(IFC(Final)) Cranes Mfg. AND Vessels CABLE PLATFORM (3rd) 778-Mcr-01(IFC(Final)) 778-Hse-01(IFC(Final)) 778-Lab-01(IFC(Final)) IFC(1st) V VS6 ence o Storage Spherical Connection & IFC(Final) FM Close DIAGRAM-761-EE-701 DIAGRAM-778-EE-701 DIAGRAM-725-EE-701 DIAGRAM-762-EE-701 DIAGRAM-770-EE-701 ee FM) MRV Firewater API610 11 e NSTRUMENT IFC(Final) 773 & Layouts M V/D. CABLES ON 778-SS-01 725-SS-01(IFC(Final)) 761-SS-01 762-SS-01 SHEET Mfg. / Station FM) Circulation FLOAT)(FOB/On-Site) FOB F SEAM SMLS out POWER ARRANGEMENT I 774A-SS-01 (MUM120) MRV 220KV HV/HV LV IFC(Final) LAYOUT g DIAGRAM (MGA120) P.O Generation Special es (3rd) ICR Cold & ACCESSOR Mfg. INCLUDING S a DIAGRAM-700-EE-701 BBX M (INCL MRV POWER D MCC FOB/On-Site Fighting PE u e ISOMETRIC IFC(Final) 1s & IFI SUPPORT(IFI) TRANSFORMER O EMERGENCY Glass P.O D IFC(Final) WITH Close II FOB/On-Site & I Powe Fighting Washer INSULATED App 700-SS-100 TUBES Insp.) GATE / SCELLANEOUS MRV Insp. Exchangers SEAM SMLS Cab ON TRAY (MUZZZ0) S BATTERY(FOB/On-Site) POWER Centrifugal EQUIPMENT(MRV) CONTROL Coupling MONITORING Treatment FM) IFC(Final) (BUILDINGS Mfg. UNIT (3rd) Spring GAS Waste Insp.) & Heat P FOB/On-Site / TT IFC(Final) GENERAL DIAGRAM-774A-EE-701 TRAY T g , IFD FOB IFC(1st) P.O Pipe UNIT FOB/On-Site Insp. Nut On (MBJ110) & Issue (1st)(FOB/On-Site) Close FM) Exchangers Plate Slam M e (MFA110) 200 Panel Valve Internals out IFC(Final) SEAM SMLS LAYOUTS Insp.) & e MRV FM) #4 g (MGB120) M (MGA140) Packages V Vehicle (MFA120) IFC(Final) FOB/On-Site ACCESSOR 778 Hose Chiller IFC(1st) / SUBSTATION c (3rd) 770-SS-01 ng PACKAGE Forged Cast Ball Butterfly Plug Needle TERM SWITCHGEAR 725 FM MCC Pipe (MGA110) MRV Equipment FM) Packages P.O INTERCONNECTION 220kV Diaphragm 774A,774B 745 761,766,767,768 762 764 770 772 ee IFC(Final) nsp Operation Arrester / & (MDA110) Plug UNIT(IFC(Final)) IFD T FM Insp. Compressors below 2" Pumps e IFC(Final) For 2nd out SMLS SEAM O Kit Quill TRAY P Cab 761-SS-01 762-SS-01 DRAWING GAS F V/D. & Insp. INDICES,DRAWINGS,SPECIFICATIONS(IFC(Final)) Close Valve Fitting Centrifugal Sealless Expans IFC(Final) Lock 3.3kV FM S ARRANGEMENT CABLES Mfg. Coo & ISOMETRIC RESISTOR 725-SS-01(IFC(Final)) /VS6 out Insp. Close (2nd)(Mfg. g DRAWING D CAL Storage Spherical F Nut On ROOM & MRV nsp Head BOXES LAYOUT-SUBSTATION (MCA110) out NGS (1st)(MRV) IFI (MGA420) Pumps Mfg. AREAS(IFC(Final)) g Firewater Packages Support Insp. SYSTEM FOR SPL ap IFC(1st) es MAC(Mfg. INTERCONNECTION API610 11 FLOAT)(MRV) GENERAL SWGR Close 2nd SYSTEM(FOB/On-Site) Chemical TERM TT S ANALYZER V DESIGN & Packages P.O HV/HV LV PES (3rd) TUBES IFC(1st) -761-EE-641 -725-EE-641 Mfg. MRV Stem Sys or & ON ee Pipe 702 (MUM120) / OH6 TRAY EMERGENCY Insp. Mfg. DIESEL RACK/CONSOLE INSULATED Welded (WIRING Exchangers IFC(1st) I Magnetic (2nd)(Mfg. nsp TT Insp. (3rd) Mfg. MRV (MUZZZ0) out Centrifugal T POWER FOB Tanks & F IFC(Final) BATTERY(MRV) On Valve A/G Waste M Relief Packages INTEGRITY Mfg. PIPING MRV & P.O Pipe Hose Quick Injection Isolation Sight AND IFC(Final) FOB/On-Site -UNIT App HOUSE Close Flange Fitting nsp IFI 778-Mcr-01(IFC(Final)) Support Check 778-Hse-01(IFC(Final)) 778-Lab-01(IFC(Final)) MRV Welded D SUPPORT check IFC(1st) Mfg. Valve FOB/On-Site SWITCHGEAR LIST Insp.) PHILOSOPHY REQUIREMENTS)(IFC(Final)) (3rd) P.O Insp. IDENTIFICATIONS)(IFC(Final)) (MFA110) es CABLES out Steel CONTROL (2nd)(Mfg. Support Valve IFC(Final) SWITCHGEAR e Water Mfg. MRV (MEC110) Tank P.O IFC(1st) Connector & / S TRANSFORMER Vehicle above MR FOB/On-Site (2nd)(Mfg. Pumps Extended Air Lined Jacket Special Pipe Flame Eye Exhaust Strainer Samp Me Rubbe IFC(Final) (3rd) FM) UNIT SUBSTATION (MGB120) -774A-EE-641 Packages e P Dual Motor Non. & RE FOB Mfg. Equipment 2nd OH2 VS4 Pipe IFC(Final) SWITCHGEAR ns INSULATED NGS For Pumps 765 769 771 775 ng SYSTEM(Mfg. Welded Mfg. Packages Con HV/LV g / nsp IFC(1st) HEAT NAT FOB/On-Site Close 2" MRV GAS F & TRANSFORMER out nsp Pipe Hose Quick Injection Isolation Sight Safety BOXES IFC(Final) C NGS (2nd)(Mfg. em Flange Fitting ELECTR SWITCHGEAR Valve P.O diagram W METERING 3.3kV LV STEAM IFC(Final) FOB Welded (2nd)(Mfg. out M MATERIAL INDEX eam MCC S & (MGA150) Safety Insp. ence FOB PES (3rd) DRAWING e IFC(1st) CONTROL IFC(Final) & (MCA110) Packages Pumps / IFC(Final) Extended Air Lined Jacket Special Pipe Flame Eye Exhaust Strainer Samp S Me Rubbe Valve PIPING (2nd)(Mfg. P.O & Dual Motor Non. out (MGB110) Mfg. on FOB/On-Site IFC(Final) Circulation Chemical Lock ns RE Insp. Valve & OTHERS On 778 OH6 2nd Dev Cold Special SYSTEM(MRV) IFC(Final) NG / V a (3rd) (MGA130) FOB AND NAT ALARM MRV FOB/On-Site IFC(Final) F AND & Close umen NOISE ARRANGEMENT /Insp. Magnetic Tanks (MFC110) ES Safety FOB/On-Site SLD-778-EE-613 SLD-762-EE-613 SLD-770-EE-613 Glass 778-Mcr-01(IFC(Final)) (MEA110) g & W 778-Hse-01(IFC(Final)) 778-Lab-01(IFC(Final)) DRAWING SUPPORT(IFC(Final)) (BUILDINGS / Washer Insp. (MGC110) nqu (2nd)(Mfg. Centrifugal (3rd) ELECTR FOB Valve RES e MRV CABLES PIPING Mfg. IFC(Final) (MFB110) Coupling eam Close P.O out Insp. Spring Valve Steam UNIT SWITCHGEAR FOB/On-Site DIST & (MFB710) Pumps ence / (3rd) 725 762 765 766 767 768 772 778 770,771-WEST,772,774B,775 774A Close M Insp. Slam Plate Water #4 MRV On valve (MEC110) P.O & P (2nd)(Mfg. Pumps BY D Close Valve Tank IFD A/G UNIT Pipe TT 771 nsp Mfg. Circulation PACKAGE 2nd Insp. ON REPORT M Treatment IFC(Final) 1s Jo Pumps e (3rd) o GENERATOR(Mfg. COMMON METERING Lock WIRING OTHERS DRAWING Mfg. MRV & Cold Special Hose Forged Cast Ball Butterfly Plug Needle Close M INSULATED c Operation a (3rd) OH2 VS4 Insp. GENERAL (MPR110) P.O ng DIESEL Arrester IFC(Final) FOB/On-Site & 2" below umen ALARM DRAWING Injection Pipe ES 774 Glass Diaphragm Plug HV/LV MRV On T (2nd)(Mfg. Insp. out Washer & (MUH110) IFC(Final) TRANSFORMER S AND (MPQ110) (MGA160) Kit Quill TRAC Up K Insp. O Pumps PACKAGE MRV 774C Coupling POWER On IFC(Final) & (3rd) Spring g (2nd)(Mfg. Expans Valve Fitting es MATERIAL INDEX L (MGA150) FOB/On-Site & ce Coo SWITCHGEAR ARRANGEMENT Slam Plate (2nd)(FOB/On-Site) Mfg. Cab ng Insp.) FOB MAC DRAWING (MGB110) g P.O M Pipe & Head C IFC(1st) 774A-SS-01 IFC(Final) Pumps Valve (MUJZZ0) Support 700-SS-100 g ON App. MRV n (3rd) e INSPECTION On FOB/On-Site Shower IFC(Final) ap / Hose Forged Cast Ball Butterfly Plug Needle HOOK & Assembly NGS S FLOOR)(IFC(1st)) Operation c BBX y ng 2nd nsp F OF or TUBING) (2nd)(Mfg. & 2" Arrester GHT below IPCS(Mfg. T MRV Stem Sys Plug Pipe Diaphragm e , On M Insp. / & TRACING (MEA110) MRV out Quill (MGA120) Kit Piping Mfg. (MFC110) Close (2nd)(Mfg. FOB/On-Site (2nd)(FOB/On-Site) 1s Valve Expans Fitting ssue & ose W Insp.) (MFB110) P.O Coo (2nd)(Mfg. CAL (3rd) To 725 745 Cab 761,766,767,768 774A,774B SWITCHGEAR Relief 762 764 770 772 IFI CABLES GENERAL BOARD(Mfg. S MANUAL M MRV (2nd)(MRV) g out Check (MGC110) & MCC / check (MFB710) Close Mfg. TT NEUTRAL (2nd)(Mfg. Pumps ng Support Dev Valve 2nd out S 778-SS-01 MAP IFI Head FOB/On-Site Insp. Steel 725 IFC(Final) (3rd) Pumps (2nd)(Mfg. Treatment MRV / e out ap Support (2nd)(FOB/On-Site) Mfg. Valve SYSTEM above SPL Tracing 2nd & Insp.) or Connector MATERIAL INDEX g Close (2nd)(FOB/On-Site) DIESEL M Stem 2nd Sys & out e (MGA140) Insp.) IFC(Final) CONTROL GENERAL MRV nsp Insp. FOB/On-Site S 774A-SS-01 (MPR110) es (MGA110) DRAWING MATERIAL Close Injection 773 Mfg. (MUH110) & Insp. MRV 2" (2nd)(MRV) g Valve PIPING SWITCHGEAR RES nsp e (3rd) SAFETY Cab On Relief S (MGA160) Pumps P.O Check CAL -FAT POWER FOR CABLES nsp check V/D. em (2nd)(FOB/On-Site) Valve & NG 33kV FOB SYSTEM(FOB/On-Site) e Insp.) Support Valve FOB/On-Site TELECOMMUNICATION Mfg. MRV Dev Pumps FOB (2nd)(FOB/On-Site) Steel P.O Insp.) Safety / NGS 700-SS-100 & (3rd) (2nd)(MRV) Support above Valve ou M (Mfg. NG FOB SPL g & P.O (MGA420) Connector PIPING GENERATOR(FOB/On-Site) SYSTEM Valve DIAGRAM FOB/On-Site Insp. (2nd)(FOB/On-Site) / (2nd)(MRV) es OF (Mfg. & P.O e Insp.) MRV IFC(Final) on Mfg. 2nd IFI / Packages Valve BBX & ce HEAT (3rd) A/G Close INCLUDING 2nd FOB/On-Site nsp 2" W LAYOUTS)(IFC(Final)) , IFC(Final) (MGA120) P.O & e Close M FOB/On-Site MATERIAL INDEX COMMON WIRING UP) /out TRANSFORMER Valve & Packages IFC(Final) (2nd)(MRV) em 2nd FOB/On-Site Arrangement (3rd) MRV C Close 765 769 771 775 Valve (2nd)(FOB/On-Site) MAC (2nd)(Mfg. MRV M (2nd)(MRV) Insp. Insp.) #4 / g I MCC IFC(Final) nsp & PIPING Safety out FOB/On-Site S valve M (3rd) Mfg. Close BY ARRANGEMENT & FOB Valve (2nd)(MRV) es (2nd)(FOB/On-Site) Insp. SYSTEM Insp.) & / IFI Mfg. on Valve FOB/On-Site nsp out P SYSTEM(MRV) Close MCC 2nd Jo & / (3rd) LV FM (MGA140) ce g HEAT WIRING #4 Insp. 2nd RES MATERIAL F & NG STEAM IFD (MGA110) out FOB/On-Site 1s On Mfg. 2nd Valve SWITCHGEAR SAFETY & Close NEUTRAL g (3rd) (2nd)(FOB/On-Site) On OF Powe C IFC(Final) (2nd)(MRV) Insp.) / Close Valve Piping nsp MRV g (3rd) Insp. & e On (2nd)(FOB/On-Site) W MAC valve PIPING P.O MRV (3rd) Insp.) 700-SS-100 & IFC(Final) Mfg. Valve O (FOB/On-Site) (2nd)(MRV) Pumps GENERATOR(MRV) & XTURE FOB Close NEUTRAL P.O /(MGA420) PIPING Valve Insp. & (3rd) IFC(1st) 2nd FLOOR)(IFC(Final)) IFC(Final) Jo MRV n GENERAL Shower IFAT 1s DRAWING App MAC INTERCONNECTION FOB & DIST NG Packages (MGA130) (2nd)(FOB/On-Site) MRV P.O out Insp.) IFC(Final) EARTHING ARRANGEMENT IFC(1st) IFI FOB/On-Site TRAC nsp Close MRV 2nd & (2nd)(MRV) Insp. Insp.) Packages out IFC(1st) -FAT IFC(Final) MRV (3rd) P.O / (2nd)(FOB/On-Site) Up TRANSFORMER & K Insp.) DATA (2nd)(MRV) On W GENERAL out INTEGRITY S & (2nd)(FOB/On-Site) (3rd) L IFC(Final) MATERIAL MRV Insp.) S FOB FOB/On-Site es COMMON /(2nd)(FOB/On-Site) out OF nsp Insp.) MRV PHILOSOPHY S SAFETY (3rd) Close 774C IFI & ARRANGEMENT n Shower FOB/On-Site INTERCONNECTION Insp.) FOB (3rd) Insp. 1s nsp (2nd)(MRV) 2nd FOB/On-Site out C SAFETY MRV & MCC LV nsp FOB/On-Site GHT 2nd T MRV Insp. / TRAC DIAGRAM FOB GENERAL & (2nd)(MRV) P.O MRV out Up DRAWING e K /IFC(Final) & (MPQ110) out e (3rd) (2nd)(MRV) -UNIT IPCS(FOB/On-Site) P.O Insp. MRV On To L Insp.) & Close es (MRV) e (2nd)(MRV) FOB/On-Site P.O ose Plan V S / NEUTRAL IFI Close MRV FOB/On-Site On (MUJZZ0) (3rd) out 2nd / MAC TRACING MRV P.O MATERIAL UNIT SUBSTATION Insp. / & DIAGRAM BOARD(FOB/On-Site) FOB/On-Site M Insp.) T FOB 2nd MRV GHT SAFETY Close DIST C (MGA130) P.O & / GENERAL out Con Close IFI / TELECOMMUNICATION MRV NOISE DATA On D Close NG & To MRV (FOB/On-Site) GENERAL P.O / SHEET MRV e (2nd)(FOB/On-Site) 33kV Close FOB On 773 P.O Insp.) Close PIPING FOB/On-Site / S FOB 2nd ose out NG g EPC EARTHING Plan ou Close TELECOMMUNICATION & SAFETY On MRV /P.O ou S OTHERS FOB/On-Site /MRV Close C /EARTHING NG Close P.O (MPQ110) (2nd)(MRV) FOB 33kV Close MRV IPCS(MRV) / S e out ARRANGEMENT & 778 725 762 765 766 767 768 772 774A 770,771-WEST,772,774B,775 (MUJZZ0) SYSTEM / MRV Close IFC out DATA On MRV ose NG 771 S / e Close C MRV P.O PIPING o TECHNICAL FOB/On-Site BOARD(MRV) DATA P / Close RESISTOR(Mfg. ou out ARRANGEMENT IFC(Final) FOB/On-Site & F S P / MAC Iout Close On / & C SAFETY out MRV Powe (MRV) SHEET e / On Close nsp DRAWING FAT MANUAL Close out ose SYSTEM out e Cab Close MAP /O P.O NEUTRAL -UNIT700 XTURE Close ARRANGEMENT O / P.O out TECHNICAL IFC ose 770-SS-01 & e S F DATA (MSDS) Close out ou On / EARTHING P P.O Close FOB/On-Site GENERAL Powe out /P.O & IFC(Final) out P.O S / -UNIT Close 778-SS-01 IFC(Final) FOB/On-Site S out SAFETY P.O / Close XTURE IFC(Final) SYSTEM(Mfg. SHEET ARRANGEMENT e P.O DRAWING DATA C Close out ou O MRV P.O out TECHNICAL 774A-SS-01 IFC(Final) Support SHEET C ARRANGEMENT Close & es out M P.O ou P e S out MRV DRAWING P.O e ose out GENERAL & P.O 700-SS-100 out RESISTOR ose NEUTRAL out P.O FOB IFC(Final) (MSDS) O TECHNICAL g P.O P out SHEET e P.O RESISTOR(FOB/On-Site) Con WIRING MRV out DATA / & P.O 2nd P MRV & INFORMATION out P.O 761 773 P.O out Close / O MRV & P.O ou out SHEET P.O WIRING OTHERS & ou out Con INFORMATION IFC(Final) FOR Close O HSE /P.O EARTHING ICR & (MSDS) P.O On Close nsp DATA (MSDS) 700-SS-100 P.O P.O ARRANGEMENT o OTHERS M IFI /P P.O HSE INFORMATION RESISTOR(MRV) P /P.O DRAWING SHEET Close IFI & INFORMATION Close Cab IFC(Final) out S (MSDS) O g DRAWING STEAM o AUDIT O IFC(1st) DIAGRAM IFD/IFA Insp.) FOR out ARRANGEMENT HSE EARTHING SYSTEM(FOB/On-Site) & (MSDS) DRAWING Cab IFC(Final) e out SHEET AUDIT DIAGRAM P.O Mfg. SYSTEM(MRV) IFC(Final) es Insp.) HSE FOB P.O nsp out DRAWING IFC(1st) out P.O DRAWING ICR STEAM AUDIT (MSDS) es RESISTOR REPORT MRV 2nd TRACING & P.O FOR P.O AUDIT IFC(Final) On FOR REPORT IFI & Insp. 2nd FOR (MSDS) FOR -UNIT700 IFD/IFA 770-SS-01 FOB RESISTOR S FOR REPORT HSEIA -UNIT TRACING DRAWING STE FOR MRV HSEIA e IFC(1st) STEAM REPORT -FOR IFC(Final) On ICR DRAWING STEAM HSEIA -FOB/On-Site HSEIA IFC(1st) IFC(Final) 761 773 PHASE IFD/IFA S & STEAM PHASE -700-SS-100 e TRACING IFC(Final) IFC(1st) - FOR PHASE IFC(Final) IFC(1st) MRV TRACING PHASE IFC(Final III FOR TRAC STE III REPO / Clos REP III S -II -R RV) /On-Site) s e D24 D25 1 MTO F na C D22 v MTO S A u C S v 1 ee MTO S u Ma S bu e ee k a E& Ma s D01 a D08 Ma e D06 s a e Bo F D02 a D03 PA D12 D04 a D17 s e s e e DM a S D11 A Package F 33KV F HVAC D20 D23 acks N s D07 a D10 Wa e e e D21 100 ogen Wa D16 Gas D09 D05 A A a Ch e nsu 220 ne a MVA s F e P F Package Package A Recove na S ed A a e gen Wa na Pumps KV ed e ba e Wa Eme T MTO Ma MTO e Gas SWGR D18 ans F D26 ance Was e e y a a gency a P a o De bu PKG nsu A a s S E p nsu s me s S e k ec e a ng ec F e es a & E& e Gene e s ance a ed Sewage bu s on d ca a e s Ma e k SWGR ns s Eqp D13 e Eqp a spa a e e o umen s a T a s es e a CS s a ea s D15 & a s s e s a men Tagged Handove e s D27 e e s D14 e A e PKG ba Ope Ba ance ems ance a o COMPANY s ng a Mech e Spa s ns e Ro Con es a & Handove o ng & Eqp Te e a sys s o COMPANY e em a s e 337 WER WELDED ORT NGER XCHANGER D M HV V MENTS NT App VALVE ALVE ASKET ON A110 FA130 Pumps GB120 A140 Rec AN S PVC RFLY w FOB ATHOD ANGERS BE TOR TEM P E G ER N LUMNS LUMN 0 30 MEE130 de BBX ps a D ages HGEAR 3 & WEATHER TEMPERATURE OR TRANSM VAR MASS VENTUR ULTRASON ece OAT ENTS LEVEL NG TANK GAUGE PRESSURE GAS nspec T CLE p pec n d ALVE 2 ve be ce ORT V Rece umps A110 A120 c ns ckages MGC110 MER SW N ubo Rec SH VEH 2nd LDED LVE ECK CK PPORT s R NS S ER M AT B510 FM H6 agne ess ps ec ne MUM120 CHGEAR TH A EM de CEMENT a e H App 3 PE nd Ma pec d LOY D pp ep RT ETY SAFETY VALVE 710 10 E140 0 OH2 en RAL V ve EXT DED p S TR TEEL ALVE c NNECTOR s Rece XCHNAGERS umps Packages on ckages kages E PMENT N AGERS A140 e FM ges ckages men Rec M120 n o bo T G ed App LDED D 2nd VE d AGM Accep PPORT CTOR pp EM 20kV UP 1s FB110 ubo TTERY ga c EXT Ag ARTH p MGA220 ece ATED UZZZ0 TEM CHANGERS Pumps above LT MGA160 V L ENCY an ec 0 Wa on B110 uga MBJ110 Packages & 2nd EF 1s Rece VALVE V FM Subo PE ON C Rece MEB510 T 2nd e App On 3kV MPQ110 SW pp de uga FM Rec SEAM SMLS S V CONTROL PE MFB710 HV 2nd ROTAMETERS 1s Subo DC NG VALVE 2 CE C Pumps P JO uc Rece App GULATORS VS4 e Ma V CAT d VS6 ON VALVE Subo MCC App Rece 1s 2nd D Ma Packages LV NG o V ve de Subo GENERATOR VALVE & ow App ye 1s GAS P D EMERGENCY V e & Accep MCA110 MEC110 MUH110 SYSTEM Rece HEAT App D uga MUM120 V Ma a Packages AGENT JO S Rece MGA150 FLOAT Rec FLOWMETERS NG CABLES 1s 2nd Pumps P ea FOB VALVE ON umen D EXCHANGERS V ve de F BATTERY Ma SYSTEM Subo PE Packages HVAC VALVE P MGA220 PROTECT V & Rece App D e TO LV TCHGEAR Magne de OH6 A C UP V HVAC & D a CAPAC 2nd Pumps VALVE Accep MUZZZ0 ve Subo Rece BALL S P Pumps 1s FM V & On PE D CLE e FORGED CAST BUTTERFLY PLUG NEEDLE ABLE u 2nd DETECTORS App above de EARTH VALVE 1s V FM SEAM SMLS SHOWER D NT Ma HV App MUC120 uga ee NGU Rece Subo ve FOB Pumps nspec P UPS & 2nd V FM NGU POWER PE CE D on BBX App VALVE TCHGEAR EQU Rece c MGC110 ve CATHOD SW P Packages JO D NUT 1s 2 App Subo GAUG FOB POWER Accep FM Ma OH2 Packages P o VALVE Rece 1s V SYSTEM D men ve CABLE S Subo FLOWMETERS FM Rece Pumps Ma e 1s P & NT D Accep Rec MGA160 de ve V AP FM MGA220 MGA130 Rece ON APHRAGM NTERNALS Rec MEB510 SW HVAC D App V T 1s NG nspec FM Subo de MPQ110 ve Ma D Rec uc PE ON NEUTRAL SW SYSTEM JO e Rece C Pumps MGA110 V NSTRUMENTS & FM VS4 ve de Rec TO SPECA 2nd NG 33kV Ma Rece Rema V P FM de s & MPR110 PE GLASSES D S Rece Ma App ve Coa 1s HVAC WELDED nspec FM V NSULATED Packages MDA110 S MUJZZ0 NG Accep On Ma ve MUH110 & MGA140 PE D FM V P MGA150 LV 1s HVAC Rece 2nd D SPLACEMENT DESUPERHEATER STAT F PLATES MCC NT SHOWER Pumps Ma ea 1s App P HOSE QU S MEC110 Rece ve EXCHANGERS de TTERS ESEL Fab D FM FOB LV PROTECT Ma Rece TUBES 1s MGA420 V PLATE 2nd App Subo OH6 MEA110 C S ALLOY FLANGE F BOLT GASKET TCHGEAR NJECT SOLAT D ve CPVC V PE A de Ma Rece u 675 FLOAT FM D Pumps SH V CONTROL MGD210 ee VALVE W On Ma NT F CLEAN DUAL MOTOR NON EXTENDED A L JACKET SPEC P FLAME EYE EXHAUST STEAM SAMPLE SAMPL S METALL RUBBER ns ve 1s e D nspec SYSTEM V PE EQU AREA FM RES SH PMENT Ma MUC120 de Rece MON App STEEL TCHGEAR On LTERS ve Pumps Subo FM CABLE CONDU JUNCT TUBE P M VALVE PE GHT HV ANALYZER CONTROL EXT 1s Ma MGA120 R nspec uc OFF App TCHGEAR 33kV V de ve c CABLE FM 1s MGC110 2nd D Packages Ma S V Subo NSTRUMENT TT WELDED ve de POWER 1s App TRA CABLE C e nspec FM D Rece men GAUGES REGULATORS SAFETY & V Ma S ve Pumps TOR D e NED 2nd App 1s FM MGA160 V FOB R PE LENCER VALVES MGA130 Rece MEB510 D 1s App de ve Ma TR ed NG TH MPQ110 V nspec App PE HVAC CK 1s 3 POWER ve MGA110 Pumps D Subo FOB Ma App EQU CONTROL SCELLANEOUS Rece Rec PE 1s D FM ve SEAM SMLS Rece MPR110 NG GLAND App HVAC & Ma VALVE S umen n MaNEEDLE d MEA110 V FLOWMETERS HV LOCK Accep D FM TRANSFORMER Me ve ca CO2 u 1s NG Rece 2nd Ma MGA140 MUH110 FM F D FOB & VALVE V On S e Subo Fab MGA150 ve LV C SPEC COLD ON nspec CABLES ST Ma FM Pumps 220kV CONTROL NG MEC110 ve 1s CABLE CONDU JUNCT TUBE P M D d & Rece C Ma de MGA420 Rece GENERATOR L VAR EQU WASHER 1s Subo nspec FM ye ve Ma NSTRUMENT App ng P C V & ee STOR FOB FM Accep NGU App D a e PMENT WEATHER TEMPERATURE OR TRANSM MASS VENTUR ULTRASON LEVEL TANK GAUGE PRESSURE GAS SPR Ma FOB FM V MCC VALVES ns ve P SLAM LV RE e GLASS BATTERY D Ma MUJZZ0 TOR FM METER RES COUPL & Rece 1s de Subo MUC120 PLATE V P NER RCULAT SYSTEM POWER App D NSTRUMENTS AL FORGED CAST BALL BUTTERFLY PLUG Rece PE nspec Accep HEAT PCS e MGA120 Ma F METER FOB SEAM SMLS FM V M Packages de VALVE PROTECT S & ON n Rece Subo SCELLANEOUS ve on HV Ma V On 2nd MCC App EARTH SYSTEM PE VALVE POWER D HOSE & e Ma S Rece V P Rec NUT ns Subo ve FM & SYSTEM nspec D BOARD MGA130 AGENT S TERM VALVE App V NG ARRESTER P Ma 1s ELECTR & On TRAP TUBES SYSTEM Equ App an TRAY ON CATHOD D Ag PMENT Rece V nspec Ma ve Packages MGA110 MPR110 de Rece TRAY ESEL TERM APHRAGM EXT Rec TT D OPERAT nspec MFF110 ve Ma 1s FOB L PLUG Accep Subo T ca MCA110 GLAND TRAY App C 11 D On MEA110 ve EQU 2nd SW Rece nspec FLANGES XERS umen Subo SPECA & Coa ee ALARM D PE F FM COOLER EXPANS VALVE Fab uc Accep P Rece 2 be ng de MGA140 ee D SW NG FM Ma WELDED ON Rec ve Rece ABLE CONTROL AP COCKS & App nspec V e TRANSFORMER A PMENT Accep D 1s ve ne V App On Ma de & POWER Powe P HOSE QU S uc NG AL DETECTORS 2nd SYSTEM HEAD C ALLOY FLANGE F BOLT GASKET SUPPORT On MGA420 K SH P FM POWER HOSE QU S OFF SHELL VESSELS DEAERATOR & umen FLANGE F EXPANS STOR NJECT SOLAT NG V CE Subo & Ma AP Accep 1s ve 3 MCC nspec San NJECT SOLAT FM S BUTTERFLY GENERAL Ma A App VALVES GAUG SYSTEM VESSELS PE On & de ve AC EXTENDED L JACKET SPEC SPECA P FLAME EYE EXHAUST STRA STEAM SAMPLE SAMPL S METALL RUBBER F a MUJZZ0 TUBES FM NG D V ON TRAY FORGED CAST BALL BUTTERFLY PLUG NEEDLE DUAL MOTOR NON BOXES Ma FLOWMETERS NGS Rece o on STEM ve FOB VALVE Bo D EXTENDED A L JACKET SPEC P FLAME EYE EXHAUST STRA STEAM SAMPLE SAMPL S METALL RUBBER 1s R CHECK FM MGA120 V pmen de SYSTEM PE GHT AC u nspec & ow 1s F V S STEEL Ove TT EXCHANGER T Pumps Rece ve Ma VALVE RTR PE GHT Bo Subo Accep Rec MCC PES HV V FOB de P TT App e D REL Ma ACCESSOR Package 1s Rece SAFETY & F nspec NSTRUMENTS 2nd TCHGEAR CONTROL d u V WELDED NGU 610 Subo ve CHECK Fab SAFETY NED o 2nd Accep PCS SYSTEM DEV R PE V LENCER SUPPORT RE 3 On GLASSES CONNECTOR TCHGEAR S D Subo ve ns ed CLEAN NED NG AP FLOAT NSTRUMENT e FM Ma App N FOB R PE LENCER SUPPORT S D ca AND a APHRAGM NAT CK PMENT COOLED & 3 LL LV Rece de ve GENERATOR nspec D SMLS SEAM above Subo Rece Ma & P V N CK Rec 672 PLATES de App MEA110 D HOSE QU S LOCK CABLE a ve SYSTEM e 1s Rece NAT NG Ma C ALLOY FLANGE F BOLT GASKET CABLES TTERS & VALVE Accep PE V ve P ON ROTAMETERS SPLACEMENT SOLAT TUBES D s Ma VALVE DESUPERHEATER STAT Rema S & 1s NJECT 3kV Subo e FOB ELECTR EXT D 2 NG VALVES 2nd & 1s AREA BOXES C TRANSFORMER App COLD SPEC NGS Rece Ma SPECA LOCK S VALVE NG e a FORGED CAST BALL BUTTERFLY EXTENDED A L JACKET SPEC P FLAME EYE EXHAUST STRA STEAM SAMPLE SAMPL METALL RUBBER C COLD d Accep FM MEE140 1s LV Ma nspec F PLUG NEEDLE DUAL MOTOR NON V FOB D UP MTO OTHERS WASHER MON App VESSELS e & de Ma P CAL PE GHT AP EMERGENCY PES SAFETY Accep CONTROL Rece S Capac L WASHER & ANALYZER OTHERS TT 2nd D Rec p SYSTEM DC head SPR ALARM On PLATE Accep Subo nspec umen ogen Ma CO2 SAFETY & Cen 675 App FM ve D A MUJZZ0 on C Dem ON SPR GLASS e EF V Rece DC GAUGES REGULATORS 1s VALVE P SLAM MGD210 COUPL Ma SYSTEM Accep SEAM App S NED FOB ogen SMLS RCULAT NER COLUMNS COLUMN ee ns On GLASS ve Ma Packages PLATE y AND e uc R PE LENCER AL & STEEL Wa COUPL NSTRUMENT Subo Manu s de ca VALVE NER RCULAT D Rece Ma ve 1s AL CE S nspec ON SH NG LTERS Accep ng MEE130 ACCESSOR VALVE PE FORGED CAST BALL BUTTERFLY PLUG NEEDLE D APHRAGM F RES CK FM Subo NUT Comp SEAM SMLS V CABLES FOB nspec ON HOSE ee 1s 2nd MUC120 Rece de LOCK S VALVE CAPAC ON On & FM App PCS F Rec O 220kV HOSE Subo nspec de POWER Rece MUA110 ARRESTER L CABLES AP V ST D NG P 1s Subo PROTECT FLOWMETERS FOB TRAP ve SW e nspec d ON ack VALVE NG & NFPA20 AP Hyd ARRESTER App Rece ve TO FOB TRAP Accep LV de 2nd C App NGU COLD SPEC 610 nspec Ma ve Rece 3 PLUG & OPERAT MGA220 a SYSTEM On C FOB acks TT V S nspec D 2nd APHRAGM UPS PLUG P 2 be Ma VALVE HVAC C WASHER u GENERAL BUTTERFLY nspec Accep COOLER Manu de 1s EXPANS NG & TT VALVE F ve Rece 2 be WELDED UPS Ma Me COOLER Rec umen V C SYSTEM D S On PE nspec 1s VALVE EXPANS on HEAT Co HVAC SPR he FM 2nd n AGENT NG e Rece uc Accep On V VALVE L NG GLASS & Ma COUPL ns SLAM METER EXT Fab TOR V AL QU GLAND NER NG STEEL RCULAT nspec ve SEAM JO C d HEAD SMLS SUPPORT Subo & NEUTRAL SYSTEM K AL ne Gene e PLATE NSTRUMENTS QU Ma D S V VALVE HEAD EXPANS ON n SUPPORT VESSELS 1s K ye de Ma 3 P 617 On Rece & PE ve BOARD Fab TUBE EXPANS S Accep NUT TT e D ng Ma Manu s Gene F Rema nspec 1s HOSE 610 685 & o SYSTEM p 2nd Wa uga Rece M FM & L F FF GHT STOR de SYSTEM nspec 33kV ow TCHGEAR o D ve Ma STEM FOB 2nd JO ARRESTER Rece HEAT On e NG ac TRAP o & V CHECK S D ow CABLES Gas ocyc STEM P de Cen 2nd FOB nspec T ve CAL VALVE App HEAT 3 NGS MFA140 REL WELDED D umn anes 1s C L S u On FM T V Ma e ve App d de VALVE 3 PLUG STEEL PE OPERAT SPL REL MTO esso C Accep SYSTEM DEV TT V a On MCC MFA130 Ma de P 1s Manu & Ro RE S ST FLANGES 2 be a ve oca CHECK F VALVE Rece nspec NG MEG110 CONNECTOR SUPPORT FOB COOLER umen WELDED ES EXPANS VALVE SPL NT Ch Subo & RE SH On SHOWER 2nd ve POWER 3 W SUPPORT CONNECTOR 1s XERS SYSTEM Ma above FM Accep D Powe NG nspec & LL COCKS Equ ne Manu Ch DEV MBJ110 SUPPORT 3 V FM above Packages W e PE d ea S LL nspec & NG Ma App ee AL 2nd ve QU K MFF110 Rece D FM d HEAD S OFF SUPPORT VALVE ac u & Comp ca ON TOR NGU D Equ 2 1s nspec 2nd ng EXPANS ve VALVE Manu Accep NT Rece NG 3 Ma PE FOB TT ON JUNCT TUBE P M 1s MEB510 on Cen Sea e 2 S nspec & sed Equ 2nd Tanks AC Accep Ma & d VALVE TRAC CABLE 1s CABLES AP nspec e o SYSTEM Manu de ca 2nd VALVES A Accep Rece TRANSFORMER VS6 FM EQU CONTROL ow d nspec D S & Ma 2nd STEM A VALVE ve F NGS 1s Accep NTERNALS a App CHECK Cen SAFETY RES S T Rece Ma Recove SEAM SYSTEM San FOB P SMLS F SHELL STORAGE NG REL BOARD NEUTRAL nspec ve 1s SAFETY App FM VESSELS DEAERATOR 3 e On Accep TH WELDED a on AP VALVE FOB F NG d POWER & 2nd EF S ac ng Manu ve Rece HEAT CABLE PE DEV D 1s men V SPHER On Accep EXT 2nd Ma C EF MFA120 n ed App W V nspec SCELLANEOUS VESSELS VALVE ON Accep 1s u ng ns CHECK WWT CE Subo 3 SUPPORT CONNECTOR Pumps e MDA110 2nd Vesse Ma NG VALVE Bo Ove & EXCHNAGERS Accep Pumps s e App on C 1s HV Rema S ALLOY BOLT GASKET R ee SUPPORT FM 3 above nspec pmen ON uga F VALVE Was & LL FOB On MUM120 nspec 1s 220KV ng Bo 11 FLOAT App NG GHT EXCHANGER e 2nd on 3 ve P ON Fab ROTAMETERS VALVE LV d PE ewa 2nd pmen & D MUZZZ0 CE F Package 1s Accep GHT SYSTEM e ac ng on ES de 220kV VALVE 610 Ma FOB 2 App 220KV 33KV UP ON V SPLACEMENT Rece nspec Wa Ma pmen 3 s CABLE C 1s VALVE D NG VALVES e ON App d FOB nspec ess Packages ac VALVE N CABLES 33kV ve Accep 1s ng u Ma & ACCESSOR a ON S nspec NSTRUMENT SH d FOB NG 2nd RES On COOLED Accep LV App BATTERY MGB120 Wa Capac ve 610 nspec F FOB VALVE Pumps d Packages 672 PE EARTH & a S Rece DC nspec SAFETY SYSTEM Accep FOB 3 VALVE ac S ONDU ESEL 2nd MEE140 & V nspec umen Rece PMENT 1s D EF esso ve VALVE d App & 3 e a 1ST uga F Package Ma HV FM nspec 1s V On Rece ac 2nd & FOB ve S Equ u MTO JO e NG Accep SW NGU CE SMLS 3 On nspec ON SEAM Packages App 2nd SYSTEM & 1s ng P Rece JO V Chem S FOB CABLES VESSELS Fab XTURE nspec uga ve 3 TERM CAPAC head NEUTRAL e Accep TUBES App Packages nsp ON Ma u FOB HVAC TO VALVE 1s & MFA110 d Rece OH6 V nspec AP P 2nd ac Accep D ogen TRAY e VALVE Cen FOB K WELDED d Packages y de TRAC Ma 1s COLUMNS COLUMN HVAC 3 FM TT V nspec P On e & MEE130 ca Dem UP JO EXCHANGERS NG D App Accep 2nd Rece Magne Sphe S L FOB nspec MCC u Packages App K UP AND d JO NG Accep ON V s Rece Wa On PE ng Ma VALVE e D & Accep S n UPS y d Cen V 2nd FOB u Comp ve GLAND F nspec Accep Ma On VALVE MUC120 L D 3 33KV Rema 2nd & FOB G App ng F Rec O uc CAL 3kV PE Wa S 1s V On 3 FOB FM MUA110 & NT 1ST FF GAS AP PE GENERAL BUTTERFLY D SHOWER T G SEAM H Ma Accep App SMLS GHT 33kV 2nd S ST On nsp GAS NT ack NFPA20 AP Hyd Pumps FM & SHOWER Sewage Package Rece FOB VALVE SYSTEM 3 1s u App On ng & Comp OH2 VS4 D T MGA220 TCHGEAR pmen Subo ve V 2nd Accep NUT e Manu POWER JO FM a F S W Rece nspec D 610 33kV acks s & App ve P Eme BOXES NGS Rece Manu Package on d SYSTEM 2nd RE & NT On Accep ng S App Ma TRAY FM GENERATOR V TO ve FOB D EARTH Rece Pumps d S s Accep EMERGENCY RE NT ca & On TO Co 1s SH 2nd he SYSTEM V FM VEH S EX o & HV Ma e FOB CONTROL TANKS Rece ve T App 2nd C d 1s On EQU nsp Con JO Pumps & CABLE CONDU JUNCT TUBE P M u e Accep ans D 2nd FM NSTRUMENT ng 3 On S Rece Gene e & P V nspec Accep ve RE FOB MGA150 NSTRUMENT FM VESSELS ns 2nd S ca ne PE Equ NG WELDED TR V & 220KV Rece Accep On 617 MGB110 MCA110 TUBE nspec BOARD D 1s e S Ma ve Manu NAT uc 610 685 RES FOB & Accep es Equ p App Wa uga 1s SW 2nd 3 D e S W ve Ma Rece Accep FOB On NT NG e P HOSE QU S & App SHOWER nsp V Accep EQU CONTROL 1s Ma TANK PE HEAT 2nd nspec On ocyc anes Gas FOB d & e 1s FM V On App C S ALLOY FLANGE F BOLT GASKET ELECTR Rece a NJECT SCELLANEOUS SOLAT Accep nspec D MGC110 umn 2nd TOR Cen T NG PE on MFA140 & D uga Ma Pumps nsp Manu W G CABLE F 33kV Accep V e S On 2nd GAS FOB NG NSULATED n Manu LV Pumps Rece Ch EXTENDED A L JACKET SPEC SPECA P FLAME EYE EXHAUST STEAM SAMPLE SAMPL METALL RUBBER FM 33kV Ro nspec s esso MFA130 Accep e Ma MGC110 ve c 2nd NT oca App OTHERS & d NSULATED S T V FOB MEG110 FM e a Manu de App gency S 220KV DUAL MOTOR NON GHT Ch PE Accep & nsp PCS ve D V P 220kV Rema PES ALARM POWER e Ma umen ac u FOB 3 On 1s Accep nspec OTHERS MBJ110 TH ve o WELDED S Rece D TT GHT CLE RES SWGR esso Manu Ma TRA SAFETY METER ea nsp Accep FM n ng ve nspec 2nd FOB ES ac & on pmen V On GHT D FM MPR110 3 Comp NED S e App & Pumps FOB EARTH R PE LENCER P PMENT o ve e App AND Cen Sea nspec MUH110 pmen D & Tanks MEB510 RES Accep TCHGEAR ea S MGA160 Manu On SYSTEM ee CK FOB sed ve D Cen e S nsp Rece nspec NTERNALS 2nd Manu FM T VS6 CABLES ON PE d ec me Rece Ma SEAM POWER FOB ve 2ND F V MEC110 SMLS On 3 e App a FM HV Rema S AP nspec FOB Manu ACCESSOR Recove 11 V STORAGE D On d MaFORGED Rece FLOAT SYSTEM 3 e FM Ma NEUTRAL ve on u LV ac PE TRANSFORMER NG ed FOB Eme V C PMENT COLD SPEC Accep On SPHER & Sys Ma BBX HEAT Was WWT App nspec men TUBES NG MFA120 MDA110 Equ FM 2nd u ON TRAY S e BATTERY FOB POWER Rece Manu ng & ve T Pumps EMERGENCY s Vesse FOB MGA120 ea FM WASHER App On e Rece Ma V MUM120 POWER TT EXCHNAGERS D S d MFB110 T MUZZZ0 & e men s FOB 2nd XTURE ve V On ng POWER SPR D NSULATED ac Ma on ewa uga FM d & e FOB MFB710 GLASS ac Manu Ma D COUPL S nspec On & Accep Rece ng NER RCULAT 1s NG STOR on AL PACKAGE CAST BALL BUTTERFLY PLUG NEEDLE TERM SLAM & ac nspec FOB SEAM ve Accep Wa D ans SMLS On ee V Rece NG Gene Ma ng ess Packages HV PLATE Fab VALVE ON 610 & s S u e Wa D V On CS 3 MCC FOB Rece n Packages TRAY P SW HOSE nspec FM e ac S GAS F D 2ND NUT Rece 1s Pumps Ma MGA140 G LOCK FM MGB120 CABLES On e S Accep RES Rece men NG L ARRESTER s & MGA110 TRAP Accep nspec V CAL On ve FM 3 esso & Ma uga BOXES NGS ac u em ve On Manu Packages Package e D s FOB ng Pane pmen App MEA110 APHRAGM SYSTEM PLUG & SPL nspec Accep u ac uga D C d S e Pumps ve FM gency On s Chem 3 TT V ng nspec OPERAT Rece & PE PES u e Package ac Packages COOLER Ma n EXPANS FM VALVE F FOB P NG S 2 be On SYSTEM V Packages Manu 2nd Accep MFA110 e WELDED & MGA420 NG On FOB ve D e F App S 3kV d VEH u Accep & OH6 Packages On ve D e EXCHANGERS S NG AL QU ac FOB EQU Magne HEAD o P HOSE AND FM SUPPORT Sphe App K ng Con e Cen Fab FLANGE F Accep On ng MTO nspec Wa d FM EXPANS Ma CABLES o & D S e NJECT SOLAT FOB TCHGEAR u Ma y CABLES Rece TT CONTROL On Accep ve ca ng SYSTEM S D PE e u nspec TRANSFORMER & na nsp SW ac S 2nd Ma EXTENDED A L JACKET SPEC SPECA P FLAME EYE EXHAUST STRA STEAM SAMPLE SAMPL METALL RUBBER Rece CAL ns Accep ve e o On FM & VALVE STEM MOTOR SW RE FOB Sewage u nsp H ns NSTRUMENT ve NGS ow ng Pumps me ESEL DUAL NON PE GHT STEEL e T STOR a HV s VALVE CHECK TT & REL ve Ma nspec Rece OH2 VS4 HEAT Comp FOB NAT Package P e NSULATED Accep S ve & FM 3 SYSTEM Ma TRANSFORMER WELDED Package SAFETY S FOB Manu C u s Pumps V RES 3 ELECTR nspec U&O e On ng Rema FOB W NED CONNECTOR SUPPORT FM & S nspec TR NG R PE LENCER s ng Rec CHECK e & SUPPORT 2nd EARTH FOB nspec METER SW LL LV S ac o Ma e EX CK Rece On TANKS ng MCC above ve & nsp Accep NG FOB u on e 2nd V Ma OTHERS CLE S On MTO P VALVE d PE Accep Gene Pumps ON OTHERS Ma MCA110 2nd ca VALVE MGA150 D d LOCK & NG V On S ac e FOB ca ng ALARM umen CONTROL 2 Ma PMENT MGB110 F umen e 3 TCHGEAR Accep NG & Manu o Ma FOB ES C VALVE CONTROL nspec COLD SPEC LV On s TCHGEAR e nsp es FOB RES nsp & Accep TANK nspec ve SAFETY WASHER D e uga p ng & S 3 MGA130 nsp #4 T On u MGC110 SWGR nspec ve SW SPR EF Accep D e Ma Pumps FM FOB TT & MGC110 2nd DEV ON d GLASS 1s Accep Pumps COMMON Common COUPL On nsp e Sys c FORGED CAST PLUG RCULAT NER s Manu ve AL SLAM PACKAGE 2nd TCHGEAR CS nspec On S u ON & ng FOB 3 STOR GENERATOR BALL BUTTERFLY NEEDLE ON PLATE D P VALVE nspec package On V & on 3 FM d S MPR110 TRAC FOB UP VALVE HOSE K nsp 2nd n ac POWER esso nspec Manu ea On L ST ng P nsp e FM 2nd & Accep Ma S NG ARRESTER On n Pumps ve nspec VALVE MPQ110 TRAP FOB ON MAC & nsp Ma 3 nspec MUH110 e MGA160 App Accep d FOB T On & p VALVE 2nd PLUG 3 nspec S ec ng D OPERAT d APHRAGM C NGS e On ESEL & FOB 2 be Ma nspec a COOLER GHT nsp MEC110 T MUJZZ0 ng 2nd EXPANS VALVE F FOB 1ST TCHGEAR PE On S e BBX Accep & 3 ac W NG s S FOB nspec Con u NG ng VALVE d men W e 2nd Accep & S em JO CAL NG F AL ea QU CABLES PCS o Accep 3 HEAD TO d CE SUPPORT & nsp On K NEUTRAL Ma S FM FOB nspec o & EXPANS Accep P MFB110 BOARD Manu MGA120 MCC e S nspec 2nd TT FOB On 3 SYSTEM SPL & d o nspec MFB710 2nd JO S e ow on & STEM na On ac VALVE STEEL 3 e nspec ng d RES S T Rece u Pane s CHECK e REL Accep ns SW PE RES nspec S U&O FOB F On nsp & ac V s nspec men 2nd e MTO d MGA140 NG FOB & On Accep NT TELECOMMUN DEV SUPPORT CONNECTOR 3 SHOWER e RES FOB MGA110 nspec NG 2nd SYSTEM Accep & CHECK SUPPORT S above On FOB CABLES Subo d NG 33kV LL nsp Pumps On e MEA110 & CABLES NG nspec FOB e 2nd ng na On GENERATOR CABLES nspec & VALVE u Accep Package Packages D FOB s HEAT ON 2nd NT o 2 e MAC Accep & Packages VALVE MTO 3 nspec d S MGA420 Common s On TRANSFORMER & Accep u 3 C FOB MAC COMMON nspec umen Manu On Accep S & e FOB 2nd nspec SAFETY Accep TCHGEAR S ac #4 3 s e SYSTEM nspec ng EF Accep d 2ND & S FOB 2nd nspec Accep 1ST & e ve nsp On ON d FOB s F package MTO 2nd & NG ng CE On LV MCC 3 NEUTRAL ON s VALVE & nspec Package Accep STOR On on FOB VALVE d e 2nd & FOB nspec On 2nd VALVE Ma e s & Accep FOB POWER de On u FOB Accep & ON MAC XTURE S e On s VALVE nspec NEUTRAL 3 & Accep d nsp sys nspec VALVE 2nd 1s e & On Ma FOB Accep nspec EARTH 3 On TRAC & FOB S Accep 2nd D e S On & VALVE FOB Accep UP E K VALVE nspec 2nd ng S e JO d L E & FOB MGA130 ac Accep nspec On FOB S Con 2nd nsp o & FOB s On d nspec 2nd Accep Ma & s on nspec ST 3 Accep s ec JO On FOB & nsp e GHT 3 T em On e FOB ec S Accep & FOB On 2nd e S nspec FOB On W MAC Accep S 2nd e & u FOB TO Accep Fac d NT e MPQ110 SHOWER 2nd e & d Accep On S MUJZZ0 FOB Accep PCS On Rece S MAC 2nd e FOB & On 2nd NT BOARD & e Accep nspec S On TELECOMMUN ng S FOB e ca NG On 3 RES & nsp Accep o FOB ca S On 3 & FOB S e s 2nd & Accep On EARTH NG e App 33kV Manu CAT Accep On & Rece S d On OTHERS Accep 2nd FOB e S & On nspec e 2nd d CONTROL sys & On FOB S EARTH e Accep S e F S Accep On 2nd es 1s FOB SYSTEM & S FAT On ve FOB Accep e Ma Accep FOB S e RES FOB On 2ND S & na e F On S FOB nsp e FOB On S Accep e s V S em ON & e POWER FOB Ma NEUTRAL ve S XTURE On e ac FOB MTO e S On Manu e D o e Accep MTO FOB S e On S s 2nd FOB & NG On S s On e Ma STOR On e u SYSTEM FM On FOB Fac S NG On e Accep FOB S e e On nspec On S ng FAT S RES S e FOB S On CABLES ac FOB e On S On S RES e & e S CAT & On e S e e u es e OTHERS Ons S S CONTROL EARTH STOR e nsp nspec e On On ng & S STOR e e ON nspec FOB Accep e S & S 2nd SYSTEM e nsp e & NG On nspec FOB & Accep FOB CABLES nspec Accep RES s e On On & FOB STOR Accep S & SFAT Accep ee On 2ndFOB S FOB e On OnS S ee 0 mpo yo Fac aWo e 917 RACTOR s n on a Wo aa Temp on k E CONTRACTOR Secu ec es on yS Fence k o& SUBCONTRACTOR Ga e ns a a on 182 mpE04 eee E05 eC Comp C E11 vv Comp FDN FDN Comp e E03 e E28 eo FDN o eComp E09 e C A Comp F e E08 v 95% Tanks ewa o Comp FDN e A Comp ee o E02 E10 e FDN DM and e o Pumps_773 FDN U e e G Wa Was Comp FDN Sphe e o P FDN o p e_762 PA e ng P e E21 o es Wa pe e A_767 o Eme ns FDN P 95% ME E19 Comp acks e F 101A E12 aa & gency a 103 e o & Comp C Sewage E26 Comp P on and RCC e FDN E24 101A B peways e and E22 E20 C Comp & Gene S ns e Comp & Hyd Supe e Bo o acks_771 B e E23 Comp 773 T a e C A ns ea e o 95% a & e E27 E14 & E29 Comp e s P o Ba P on a E18 men es PKG_762 767 P e e s 102A uc pe a Comp o ance e Comp ns ng E16 on ME Comp u B E15 ME FDN ab Tanks ns e PKG_775 a e E17 o B e dges E25 50% Comp 101 Ma a ca 101A E13 e o Comp ns e A a e ME o on Comp e F o Comp & on Comp a e P 95% F on E30 U 771 MCR Comp a o Sphe Mechan B e 101A a ns ewa G e o V 50% Eme e C ab on Gas Comp e ME e P o a 302 e DM Was D ns e Te p e es ns e o a ca B e ns P and ng e 201 gency a Recove ns C & on Wa ns ecom Pumps_773 F ca a p 95% on e o a a 775 D ng a ns N2 Wa E33 o a e & a on e A Ro on a A a 100% 771 Ch Gene a on S & o PKG_768 B ME PKG o on Fac G e on Comp y a o acks_771 Rece dg o ns E31 E32 E34 Comp PA P & ME ed o on ng o 201A A p S P a Sewage SS Equ a Bo P Wa A ng es & P p Comp o ve 102 e A a E35 S 101A ng PKG Hyd s ocess e B & Ba esso nc e pmen ME on P ns e A N2 ME Comp e PKG & o ance Re o a e E37 T 101A Equ B E ab Rece PKG s_770 e A a S Comp 101 ea ans _762 es C ec A ge on ns a ca P & Ma p P e S men G ongw ng B o ve U ov ca 773 pe e 771 a & ed o ME P C E38 esso me G E36 Hyd a ns de on P 100% p o acks & Spoo 101 A Mechan PKG_775 P & ME ng on e 103 h a Powe Comp PKG_766 CS A Comp 102A U&O ab s o A o a E39 201 eas P ns G 201 s Comp T es on peways Duc ca A P a a e B Ach ca e esso p Supp & e o ng S SS ed a ns e V ng e ES 771 ng e A on S e ME Ro Spoo eve 302 50% E ns T e Cove T y w P She HSE ec P & ME e CS a & a 101 pe o umen Mechan & h p Hyd ns ng Comp s n Ba ng O Equ 775 ca 102 A B e a ng eg LAB & & he s o & dges Fac S Equ e a & PKG ME n U p a E& es y e EPC e A ca on ed B G n L e Cove p 201A dg Wo ng aces m & O MCR Equ Sys es Comp SAT o A E Con he 100% ks G ec eady o A em p B ng w O Ma P PKG o e Fac ac o h ca p U Loop he A on O o Com ng o AUn G Sy he EP o s Eq E & C R e U C 0mp 220kV Comp Ready Powe e e ns Rece o a Occupancy a v ng on Desa o Ready PKG om A TRANSCO na S Eme 4 a o n ed Ready Ready c e Occupancy Comp gency Equ Wa na e Powe pmen o o Gene e Rece Occupancy e Occupancy Ready Fue Conc Ready Comp Ene o a Subs v Gas o ng U&O e g o She e e za o Rece a Occupancy om e S Occupancy ons A Labo on F o ADWEA uc Bu v s e u ng S a e d a o ngs o on y Comm Bu ES Ma d Bu n ngs ss Con d ng on ng o Bu d n 0 No ce o Company o ssu ng Mechan U 777 U DW 777 U UW 777 Was U PW 777 Sa e U CW Wa es 777 F Gas a PA e e O L & Un & A ne he B Fue & owdown Un N2 M L ne L C L M ne ne Un C Un L Un S40777D ne M M C M Un C C S40777F M S40777E S40777A C S40777C 194 R777 _P P Excava ES 777 7 77 Cab 01 cava 00 8 Eas ack _P Cen PR777 U en 700 70 P 77 R777 e 777 01 G 3b_P 5c_P Eas Cen a 7 U c Excava SS 4A 78 xcava P s ounda 61 62 S SE 762 7 Wes es 0 a 08_P 101_Eme Eas 777 770 U 700 Cab pe SS MCR Wes 09b_P a DG 725 Ca U Cab pe 770 777 16_P Excava e pe 101_Eme Ca 777 06_P PR777 Pedes Excava 702 762 Cen pe SS 01 700 708 on U ES Founda 711 PR777 777 Wes SS 700 Eas a ES PR777 Wes U Ca Founda e 03a_P 01 100 778 777 07_P SS 01_S 700 U PR777 Ca ack Wes DG 774A a ack 02_P 200 778 Ca ch 777 DG 03b_P on Manho U a e ack SS pe 101_Eme ch PR777 U Wes 09c_P SS T 777 ack e Founda Manho U pe SS Ca 700 777 Manho U 01 770 702 725 Wes U DG Founda 14_P 01 Ca Pedes on ch 708 AOC Eas 711 PR777 Cen Wes T on Founda U 777 Manho Eas pe ch ES 100 ench 777 pe a T Wes 700 778 Bas Founda HSE 777 ES 774A U Ca SS on ch 761 762 Manho 101_Eme ack Founda 700 778 Bas 777 Wes U Cen Manho Founda 777 101_Eme 200 ES MCR ack Founda ench a 778 700 U pe 01 ch 777 Ca 15_P Founda U Wes 01 ench Bas Back Pedes Manho PR777 U E 11_P ch Excava uc SS on 778 777 pe gency Bas Ca ack Eas Cen 101_Eme 09a_P 12_P on SS 770 U 777 Pedes ack Eas PR777 Bas Manho 702 13_P on Ca Pedes 700 770 ch 777 778 Cab pe on 708 Pedes 100 01 n 777 ec gency pe DG Cen Wes L e Bas Founda a 761 762 Manho Wes ack Back SS n 700 U ES 04_P 05a_P 01_P HSE 711 Cab ch Eas Wes Pedes 777 U e Bas Founda Excava u Ca Pedes 01_S ES e Cen Wes ack SS 725 700 U E Manho a Eas Cen ne ch 01 Excava n 778 700 Va a ES Manho 200 U Cen on 16_P Bas e Founda 01 Excava SS 774A n ch 777 Ca Va ack E Excava e 01 pe Founda Back SS 700 Va Wes U 777 gency on ack Cen Cab n Eas 778 e ec E Back pe on DG SS Wes Bas e LAB Excava 777 AOC a 700 ca Back 101_Eme Ca Lean Va pe 01 770 777 U Founda 702 n on Wes 100 Eas Lean 725 ch Manho Gene a SS Cen Bas pe Wo Eas AOC Ca ec on Back Founda e 708 Excava Wes U ve ng n 05c_P Lean 01 774A Lay Va 777 Ca pe Bo Founda E on a 761 762 ec Manho Bas Va Back U Cen F G SS a 711 700 778 T ve on 01_S Wes Eas ch MCR ack pe ve 01 SS 700 gency Gene e Bo ES on Back n 10_P 777 U a 725 700 ack E 01 Va 777 770 762 gency T a Ca Manho Bo E 777 ve ack pe Founda 200 ch Ca Duc ca Bas a Eas e ec uc 101_Eme 774A Cen U pe HSE Cab 700 770 ench 777 n ack a Manho SS ES Box Eas Va ound 725 ch E on Bo ve G F 01 U e a ack Pedes 200 SS gency 777 ch ve G on Wes 01_S k Box ES 770 778 n F ec Ca ench Bas Eas ng Box 700 L e ack Va ec on om T G F Conc PR777 778 ca Gene Lay 01 700 U Ca n SS Conc 777 Bo G ve 100 a Ca Founda 702 on 770 Eas E Cen DG U ec Box L Va om F SS 711 PR777 778 Bas ch ack u Conc 761 762 AOC U Manho E on a Excava ound 777 ne ES ch PR777 700 Wa ack SS F Va Duc Manho a ound DG om on AOC Bas ve Founda P Box ES ench E Cab Eas Ca Pedes 700 n Bas Bo Box pe ng G F ound Wes 01 708 777 ne e Founda 761 762 U Ca Manho Eas DG e on SS Assemb ec 770 700 TR ng uc a ound 01 om ch 777 Bank ve Founda o SS Gene 711 700 725 778 e on ng Co U Cen 777 Box ec T TR ES a Manho Duc ch Reba SS 01_S 770 n Gene Founda E ng TR a on ec Cab PR777 U ch Bas ve Cen 01 Ca Va Wa on ng Beam LAB Bas om P gency Manho 700 Reba T o ound Lay ve 200 ES 101_Eme 777 ca E Box e 100 ng Wo 774A Ca TR Va G Founda Co Cab SS n 708 ES 778 Manho MCR 01 T PR777 700 Eas U ch Reba Gene ack E ench Co SS HSE 101_Eme ng 702 She uc Back 777 Wa 778 700 We G e P a u 711 Bas n ch Box ec Manho Co TR 777 om on P o e T Wes Cab Reba 770 n O TR a umn 100 Conc 725 700 L Bank Bas Va 101_Eme ench G ca U ec on Beam 01 SS Bas Box e Wa ES Ca O 725 U F L Beam She ng Back 08_P ench ve 708 Eas ound O 01 SS G ec ch 777 Va TR e Box 700 U a Cen ES Beam ca o Pa 761 762 770 778 Conc SS e ne 700 774A n ound gency ve a umn m ench 09b_P T Wa Cen Duc Bas ch Ca HVAC Beam n 711 774A 778 Bank O e umn ng u T 03a_P a 700 Excava ne o e k 14_P SS 01 702 Bas TR Manho on Co ound 777 Reba AOC HVAC a umn 01_S 01 778 U E 200 on e T LAB 700 d Sump SS E Wo O 777 AOC Eas ewa ve P a ound 700 778 762 U e Conc O Co SS uc S n 777 PR777 Back Fo Va TR on o Beam Box Lay Suppo Duc ES Sump U ench e She Wa Bas ch HVAC Sump o & Va ench 01 SS Conc Wes ES 774A ca ve n on m ng Gene Founda S G 01_S 100 702 711 o F n Eas Fo 01 Box TR O 07_P 200 Bas ng ec on & ng Lay ca SS We ES PR777 700 774A 777 Duc ench ec o a 702 Assemb Co U 778 Va e ch P Sump 01 TR Subs Fo ab Reba Pa S Hyd 777 e Back on m SS ng umn Ca P Cen Wo G 778 n Va O m Pa ng T Ladde F 05b_P 200 ES 777 700 Box SS pe ab Co Sump HSE Fo 778 S Manho u 761 762 700 P n Sump umn a & Excava T ound Conc AOC Bank e m ve o on 100 Wa P Va Bas U She & ng SS e k a S p Box F HVAC O ve 100 T 01 SS P ng ab e Wes 777 708 725 700 o DG & She HSE Bond Va pe Conc Eas Duc m Co a ng Sump SS Suppo ES TR 01_S LAB 01 711 Back L Gene gency & ench S n 200 Wes Bas ab Excava O umn e ve ound ES 700 725 Eas on ns T & Cen pe Duc 761 762 770 L F m Va Room ng Wa Ladde n Suppo d ench 01 Bank 711 700 ecas ca TR pe e S Conc O 708 ab 725 U Wa uc Pedes gency Fo o ch ve Sump n ng Up ench SS Back 777 She Room ans a S ack 01 umn m ne E Excava Wa 200 e 778 U ewa Box ab k SS Bank 702 Eas 700 01 Ladde Up Back ve ne o gency Manho MCR Box pe ng Wo 100 778 L na Excava TR Sump a ans Ladde Suppo SS on Subs Cen & ab uc Eas AOC 700 778 U Lean Room SS 01 ve a 13_P 15_P ec P e umn ack ab Co Suppo n Wes ES 777 AOC T 01 a Up Box ns 700 778 TR ab P Sump Lean Va O 770 ES U ec & T ack 101_Eme 200 702 01_Ea e 708 Shop 778 ve o Excava Fab Co S ns SS ne 774A 700 e ack & Fo u Sump Tes 708 777 Box 770 Bas L m o Beam Suppo 09a_P 12_P U PR777 700 778 Duc n O e Wes ES Back T Wa Up Co SS U Bank pe on 01_S F 777 p Excava ng Box 200 ns S P 725 700 ecas ans T & o ons Suppo 01 SS 774A 778 Lean a ack E Sca Bond Hyd Bank e 725 Wa o Back ans u 01 ES 778 ne 777 a m ng e Box Beam ab TR O Room Shop Ladde MCR o T Co F umn HVAC k uc Suppo 100 e SS on Cen 762 700 725 a U T Gene Up TR & 01 Excava 761 770 774A ng nspec 777 F Bo ans o ve e Sump HSE 700 Box Cove n E Manho She Up a 708 725 P O on E umn ab ec GL+2 Excava SS ES 777 700 AOC G Up ans Lean Wa m o ns ecas e 708 Gene TR 700 725 778 ca Va Sump me E ec P 01 SS LAB A U on o Bo umn a Wo GL+2 & 700 G Compac MCR T Co ack Sca E Conc Fab ans Suppo na Eas L 01 & Back n 711 TR U P ans pe Wa e Suppo 200 01 SS sh Gene 761 762 700 777 L on me MCR Ladde o ng 770 ec ewa Conc ca Fab Suppo ES 777 Subs p L Lean a GL+2 ns 01 Wes Lay 778 700 ewa Wa Sump ec umn TR u Pou 761 762 U Bank G o Manho SS Sca E Co Wo e 711 Fab PR777 700 778 Shop ound O Box S Up pe ns ne U HVAC o m Sca ec SS ea 761 762 770 774A 778 Cen Wa 777 on ans O Ove TR 100 700 F ne P Sump Bo nsu ec Ladde a p AOC ound o GL+2 Up on ons 778 700 ng ne Excava om She Conc SS Fab Suppo 777 774A 770 Cen U ve Wa o Up 200 01 711 778 TR on ng pe e SS O Cove 700 Duc o umn Tes & h uc Fab Conc Suppo Cab Va 774A 778 Subs Roo Up me 100 ec F 700 770 Eas 777 ack ab Accesso 04_P a 01 Compac ES Co ound MCR Manu om me e k S Suppo ng SS 700 U nspec O E & Tes 01_Cab na a Wes ES 777 770 p FDN d GL+2 on o Suppo 100 01 SS 700 778 nspec & a Fab 200 L G o Conc on umn GL+2 ES Suppo 01_S 711 778 725 774A ca U Sump me SS & 711_A Accesso O 700 777 GL+1 ng ack o Up ca Room Wo 16 F 01 on GL+2 Sump Wa ns Cove 100 778 762 770 e Pa me MCR Sca k Fab SS Shop 700 We Cen a on 01 o F O Lay ng 774A 778 e U gency Box TR ca Founda ab 16 SS Co A Cen 700 MCR e P Wa Suppo Reba ewa 770 U ne om Bo o a ec ack Ladde & Up me u SS ng Sump 777 725 778 761 762 774A 700 Conc 01 200 Co ve Cab Fab ca O F me on a 725 770 U e MCR d o head Wa Shop Suppo 01 n 200 umn 700 Eas S 777 ound on A DG 16 SS 770 778 P Sump MCR Ove Suppo 777 a Fab o Up G on Roo PC GL+1 SS ca 711 ES 774A 725 700 778 Conc e P S E 702_A Suppo 100 01 HSE Wes L e Bo SS Accesso Va LAB 708 MCR FDN 778 725 U Compac & Sca Assemb ea 01 777 a 700 Bank P Back Sump Wa e nspec Duc L F me d GL+2 ca Fab o S T ng 16 708_A on SS U 778 770 Cen n e Shop Room 100 P d Hose 01 702 Fab Roo GL+1 sh Suppo LAB A 700 Wa ES Hand T Sump 05a_P ons 778 762 a ab U e C She on E o ng umn Fab Duc k Cab Wes SS MCR 777 774A 761 700 pe S ewa GL+1 ns ES 100 d 725 770 U ne FDN O 01 on Box ca P Hyd Wa A umn SS p a & Sca Lay Up MCR Suppo nsu ng ab 100 725 774A 778 700 U Sump Reba Duc ec ound ES on 01 ne 770 F Cen P ac TR She SS Wo Co 778 700 7 p Eas om Wa ng a E 01 o 16 Suppo 200 777 762 e ans Va ca ns SS ES ab 761 a nspec F 16 MCR 778 700 A ans e GL+1 Fab Roo PC Accesso 01 ea on ES 777 P 16 FDN Up She SS DG T 101_Eme ve Back uc Pane ng Duc Suppo 725 774A 778 ab F Equ on ec a 200 Cen Wes ES 708 Fab 00 ons P U 01 Hand G 711 o ca SS HSE Wa 778 770 761 762 700 711_A C 01 100 oo 200 ng 777 O 774A Bo om T MCR Up DG on P Suppo ns SS ES & 700 U Cen p gnmen a o e head GL+1 Fab Roo Gene nspec 777 778 770 C d MCR Suppo ns SS 01 Wes ca S e m ec ack Fab 100 ES 778 Sump T P o Up Fo Assemb Roo PC S We 702_ 700 F ns U 01 FDN Wa on Hand SS Nozz Fac Pou 01_Ea DG 711_ 774A u A Roo o 01 708_Te ench ES Beve PC Suppo 01_S Excava Wes 711 708 778 100 Eas Cen Pa gnmen Hand on e umn es ca GL+2 Co Ba SS L MCR 700 725 774A Bank O 01_Eme Ad ng a A Suppo 16 01 ecas ewa 778 U ve Sca SS ca 702 TR o ES Ba ns 01_S DG 777 Ove e F Reba ng ans Equ 01_Eme ound S 200 01 Back a 778 700 Conc U Wa m e Up ca T Box & on k Condu u Pa Bond o SS Cen ES 725 770 he DG Shop MCR 16 100 Fab 01 Wa ab 708_A 777 774A 700 a Box C o on es SS Pane 708 708_ San 778 O n A & ans Founda anes m MCR Suppo ab 16 p ns 702 Shop 700 762 P Back & a ES Equ d ay 01 ne SS 708 702_A 761 777 ec e ns Te Founda m o on Wa Fab 101_Eme 778 G 16 C ES 01 ng Wes 777 a 762 700 Eas ndoo gnmen SS Lay Beam GL+2 Fab PC Suppo 725 761 U nsu Conc Wa na pmen a HSE pe ea Roo 01 on DG 702_Te 711_Te 770 774A 700 778 he om Mason 101_Eme o ca MCR ab Te Duc Fab e m Doo Wes SS 711 777 761 762 Up T on ay Wa G Cas Roo S Suppo Ba Tes 01 Bank Ove 700 F Cen Mason P ng Pane ca SS sh 711 777 774A U 200 L Fo n m d & E MCR umn F a Conc ES Shop 778 DG O C AC 01 me Box on us Equ G o ns Pane Re Cen p Sump AC Loca Hand ng Ladde GL+2 ES 16 711_A PC Fab a 01_Cab 101_Eme 100 200 SS HSE 770 700 Eas he s me o & MCR ca Ba 01 LAB Wes 778 U A on Wa n Fab a O e 770 700 SS Equ C Up & 01 MCR es ca 711 Cab Roo Suppo 200 778 DG T ound Co on Accesso P Ladde e 101_Eme a 770 774A 700 ng Po ns Fab Wo MCR S 01 100 SS 711 U 777 ne Reba ecomm o Wa ans Roo Equ 16 Doo Excava ab Suppo Lay ndoo e pmen S 101_Eme a 100 & TR ng ns MCR 778 U C O on Founda DG Mechan Ladde SS GL+2 Roo ound Po 200 01 HSE head P ecas 702_A G o ec a Cab 711_Te Wes 777 725 700 770 ewa Co2 Founda & P ack Ladde 200 ecommun Re A We 01 100 MCR 702 711 ES F 778 he es m DG ng ound a on Accesso Pane Suppo y SS Back 700 pmen ES ng S 01 ca Shop & 16 ns Roo AC Wes F Hand o Ladde Conc on Po uc Cab y a SS Cove 777 P m U ans gnmen s ng 101_Eme 200 01 e 761 762 700 778 nspec O Up AC Eye Manu Equ anes Mechan Roo a ab Eas ns ndoo SS G he o ng me MCR LAB ca & uc Po e 200 700 778 O Coo 01 E ab HSE Wa a Roo P Suppo SS 708 Cen ES 777 725 761 762 Fo ndoo Condens d 708_A ns es ca Sump h Pane Re AC Fab 711 p 778 101_Eme Equ Conc 01 Mechan o on 708 s 702_Te 708_Te Roo L 777 ES Ba U & he umn ecommun me TR ns San a MCR Ladde ca S 200 E Cen O head A C pmen s on Hand ound 01_A e ea PC na 761 762 778 Hyd FDN gency 01 ab L AC Po Bond S ns ES E a and SS Eas Shop U Te s y & 200 o DG ng MCR 16 on LAB e ewa 778 A 101_Eme p G Ou F SS Suppo C ns 01 HSE 774A O Roo pmen F e a MCR Up ca LAB Cab k Ba y Back ES 725 ewa ng Assemb o on AC HSE PC 01_S SS O 761 762 700 778 U he gency 01 ca Suppo e p Cab Wo ES & 01_Ea 01_Loca ne a Fab 725 7 L on ec pmen Mechan 101_Eme gn Suppo ns u U he F gency Mason She m e d PC Doo Wa HSE 702 ES 778 G AC a s E gh on ca 16 Fab L NDT ab y ec Condens 01 S 700 761 762 200 Wes P A C on 708_Te 101_Eme e u SS 702 F ng ns Equ Wa T 01 Roo o p ab Cab Suppo MCR ec L Condu 774A 700 he O y Sys Duc Coo Pa Mason a Ladde P ns e ecommun SS Pou 25 761 762 770 m Loca on C na Wes S E 01 777 700 U ea y o Cab T ng Lay e ns Wa a G 01_S Equ 100 ne L p m on Beam HSE gh Re 01 Condens SS 708 700 O P he Wash pmen me Sca A 100 S Fab Po e Ou W 777 ns ecommun O & on ng gh a 16 Wa SS HSE 702 711 Cen U 762 700 he Fo FDN Cove gn Beam ES 01 Pane Cab L E F 708 777 761 725 778 e G ed den Coo gh a LAB ab pmen 770 762 774A p & s Hand Mason HSE 01_Duc Suppo P ec A Lay Sump Fab ns Assemb Shop 200 01 SS 711_Te 702 ES F 778 T L doo gency Condu e ans m on nspec o oo & PC a Eas gnmen C Ma Mason Re 01 101_Eme Fab ng Lay Wa ca Suppo SS HSE 778 ne Roo Junc ndoo Equ a 01_A e on Coo ab ns Pane Po DG ec P We Room 100 Cen 702 708_ ewa o O G me he ench Founda Mechan Sca Lay 01 S SS Se L 778 U gency Wa nuca Ra oo Up a ns ab Beve ac Suppo 708_Te Ou PC Room e 777 708 700 p A on Eye gn 702_Te gh Pane Wo Re Roo ound anes SS P C 778 U Coo Co2 ecommun Sca Suppo & ea ng on a W LAB k 01_F HSE 708 711_ e y he G Ou n Beam C SS ec on ne ns ca 01 Cab gnmen Sca T ng 01_A Shop gency a Wo Suppo ndows 01_Loca 01_Eye e 100 777 Doo 762 P D F C Ladde ES ns 01_Condu 200 HSE Fab Pa 725 778 U Mason ay L p Back ans on es e ns Loca Po Suppo a ca 01 100 and SS 762 MCR P s 01_Co2 F Cab ne 761 pmen em e Gene Equ a Cas Re ng & gency ns gh ewa Tes 762 UW Condens 01 Sump Roo p y m ca San Duc G A e doo SS 700 U umen on ab ed ES ng Te a PWHT 01_Cab he L ca C pmen gency on Sca Lay T Wa Cab p 200 100 778 U G E ecommun ns Mechan Ladde Te ng 702 Fab uc Suppo A Room Condu e 01 ea 762 F & Gene Equ Mason a T on es Lay p Cen anes L 778 ne gh ng u ay e Pane Wa SS 01 702_ 761 762 as ca s P Gene n ad on a 711_Te ndows & Mason Doo oo LAB ns Te ES 700 L Se G s p Re o ca Equ Up ng SS 01 761 762 778 Eas U as UW Cab Condu ed Wa DG P 01_Duc a Doo MCR Room Suppo ES d e ns E Shop 700 F gency ng Ladde Lay o 101_Eme Pane doo Back 01 Eas 778 ne gn on a ns h p e Fab 01_Eye 01_San 01_Duc LAB U 774A 700 Wes Suppo G Te P pmen ca o ng Cab Wa Condu ea S HSE 01 Tes T Equ y E doo G ed a k uc ench ne n e ng 778 A U umen ec L x P & F gency na 01_A ca 100_Func gh on p Cab HSE 100 01 UW Loca Wash ns sh P ay Hyd Condu oo ea a SS ne L ance ecommun F Hyd Sca ng Connec on Fab o 702_Te k Wa 01_Loca HSE ed Se 762 Condens y & ecomm a Sys d P Lay ns W Ba ndoo Cen 200 01 ES U e ca G oo C ad on ng Cab DG 700 Wes DB o gency me ug m P 01_A LAB ns Fab p S u ec SS 01_Loca 01_Eye a 778 L G E Gene Accesso F Ladde Wo Condu 01 s 761 762 777 Wa e & Ou on 702_PKG 708_PKG 711_PKG o 708_Te Roo oo 200_Func S n C ns 01_Cab ndoo SS Cen Wes 200 778 U ne p u pmen us Connec ng gn a DG We ecomm A Suppo ca 702_Te e PW ay ec on D o Cab Shop DC Wa G ns 777 774A E Gene ne L p oo Sa ng ame Condens C a Assemb ns Roo 01_F ea y gency & UW ound d ug Fab e G Wa Cab p 01 SS 778 L na Un ame F ad DG Suppo Re Connec on P a ecommun ns Equ ES 708 y ecomm AC ec pmen 01 p ug & ns HSE 702 gency L ne Room T s d Condens o on Gene e 708 u A SS 778 Suppo me Equ ng a Fab 101_Eme ug Ladde Suppo ca oo ab We P & ns 777 UW ec and pmen d on sh ndows Cab HSE LAB SS e PW & ecommun ng Condens s oo Hand F ns G ne L ecas on na Gene a ca P 01_Cab LAB ES Accesso E on s us ng e ane SS Bond F A ea Re Condu Cab d ns Room ndoo 778 ec ne UW Box Ladde y ES Recep Sca Accesso a Te Wa 01 p P & ca on ng na Fab Equ Gene Lay LAB n ound A 778 ne Towe ns Cab L a ng on ug G ca x Wash Po Ladde 01_San 01_Duc 01_Co2 708 p ES U 761 762 700 PW Pane d Assemb Re Accesso DB Roo & ound e ns ay L a em ng Connec y Un o Wo F Ladde 01 and 101_Eme P Fab DG W doo an Hose Te p & Condu ns 01_A on ea Cab 778 U ne gency e Sys o Hand Recep Connec ng 01_Co2 ns n 01 SS a Lay P UW as gh us ca Equ Sca e Ladde d MCR & Fab on k PC 01_Duc F 700 778 Gene C ance Recep Tes 101_Eme na UPS G a Cab 01_F 01_Cab E SS ec y UW P Boa & Mechan F A Wa e 01_Condu ns HSE Boxes ug ES ne CW L on nsu 01_A ad Un ng Recep Lay y a ca sh Doo u 01_F 01 Roads 761 762 700 as P Coo o Beve Connec e gn on AC p Se Fab 711_Te Wes gh & ecommun Gene 101_Eme ng Ladde y ns a Cen ea UW A PW P o C Sca on oo Wo F S 01 Cab HSE 778 FDN Ma Hand Suppo a Tes p d Ou ns and Cen 777 P F sh E ng W ound 01 U ca Cab y Shop d MCR on T a nsu & m Hyd Ladde Wa oo Roads 770 p UW Tes pmen Hand Gene Lay Recep gh W n Wash F ns 702 777 761 762 778 PW ne ndows CW on P Connec SS e a Fab & 01 DC Ou d UW as She Beam Equ F Hand 702_PKG 708_PKG 711_PKG G ng Cas ns ec U ca Tes DB on ng Te a e ound ea 01_San Eas as ecommun ad Lay F m Pane NDT L & A and 01_Cab E LAB 711 Cab PW Se O Sa ca e MCR on ns ng oo P Gene Nozz p nuca pmen Suppo ug 01_F a HSE 01_ Roads 778 CW ea Showe Boxes oo ng on Equ k P SS Recep 101_Eme e UW gnmen us ec na Wo a o Gene ng ns & Wash Pane A Te F 01 Roads p ecommun Hand ca G gency FDN 01_Co2 sh ay on Boxes oo Ladde 01_San Se n P Equ em ng e a ns 01 HSE E ES 777 U Cove nuca n as gn on & na Lay P S ndows Cab 702 ca UW PW d ng pmen nspec A Suppo a Coo F gh p o Fab Ad HSE L S na y ns ndows x Ou PW A on Te F Lay a ec Ladde Mason 777 Roads 778 & d nuca nsu FDN o ca p ea G and doo nspec SS ES Wes 762 U e Cab on ng na & k C ns a Lay Suppo ed CW gnmen Box es F ng d o s p Roo nsu 761 PW e Boa on ac Po n oo Boxes sh HSE Assemb U a ng sh us m ca ea 01_F e doo LAB 761 762 700 UW as nspec 01 on and T UPS a Shop n 778 P gh Gene Pane E 4 C e Recep Bond o SS as ab & p u ec She CW PW ound ns a Hand Ladde T on LAB Wes 777 Suppo ng gh ab ns 01_Eye nspec PW F Pane pmen o on d ac Ladde T nsu n m G 01_D a ng 770 700 778 SE umen gnmen e Te She & Eas S ns Socke CW ng gnmen den a F ac na FDN Re ca Sys Ba Ladde Roo d P Doo Sa 01 on Roads ush Cab Sca sh e n oo ound 777 ndoo Eas & Fab ca G ac Connec k a us gency F Room nspec Te LAB A ng Roads 761 762 01 Wa pmen on o sh & p 01_Cab 01_Condu ns es 711 PW P MAC s a Sys ng d m She ay S PWHT nsu 01_ 702 T 777 U y o F es Te na Lay O & e doo Condens ec ca pmen Equ a Tes ng We on T Pa ns ay P 778 nspec CW SE ng ecommun sh Te n 01_ A Se Cab e ca PW FDN ns Accesso Hose on es She F ay & 01 100 Eas 711 CW d ed a n o ac Suppo e ab W ng E A nspec Cen P F T sh na p oo and HSE Cab She on gency ca a n 01_Duc SS Cen Suppo oo s FDN ng es G Roo Wo S y x e CW SE & Showe Founda F Tes a Assemb and Connec Eas on ea 01_Duc SS Roads 778 U p Ree es n o Hand 01 ab & Te Equ DW ay 725 ug nspec FDN d Shop s ng Gene m a ca Sa Eas SS e 778 gency PW es na on sh ay Socke p ns Wa P nsu HSE 777 ac CW O s Eas sh ng gh T S he LAB U MCR A Wes 761 762 & on She E F ES ad a e Ladde nspec Equ ns 01_F ea Te m Leak CW na o on P ng & Hand gency 01_San U Se Suppo p a gh T SS n ec e ea u LAB 778 Excava d S ca ay sh F Hand em DW 01_Cab nsu Roads ng & MEGAR on m ns sh o She ndows Cab oo e Po n 778 S SE nspec d ES a es ng G on Fab m Wes Sa Eas ng Pane F s Condens Sys e SS A Condu U E CW em d ns on a Te T Socke SET ndoo y 777 Eas Cen ng Condu o s S p A 4 F ca n Hand She na on ab nsu ay 01_Condu ns U Roads ng SE pmen Fab T e S Assemb ndoo Ladde 01_ LAB ea 774A ns CW & Boa Excava Towe ca ec ug sh on Ba y a n Wes F Suppo 777 ng Recep E Te ac Wo m O ay e Cab Equ 01 DW na P 778 es oo & Ce d ng Hose gency a ns on Wes Roads 777 SE Equ She A Wo k & E 01 Ou Fab Eas ab on G Cab F oo ng us NDT Sca na e Suppo age s ns a Wes Wa Gene on and & Showe ec Roads 01 m o Lay ca sh She d ns ng na T ance Fence ea G ay Eas LAB a MAC e oo ng on y p ab SS nspec Wo 777 UW CW F Se s Shop 702_PKG 708_PKG 711_PKG Box a Wash 01_Duc HSE Wes Eas ea Accesso Cab n Wa T ng A & ay sh ab 01_D F P SE We Se Equ na a Back 01_Func SS e 777 Lay E Connec P p Ad on ug A ns & SE ec G m Wes a Te y U S ng A Roo na Cen Suppo nsu SS W 01_Ea he 702 Roads 778 Tub on ush e ng Gene 01 a P UW ec o 01_ Manu on gnmen es Recep & LAB ea SE Nozz Lay and em e Wo E ay n d a Tes Wa A 01_Cab umen on 01 oo m Te Cab 778 U na Suppo & e a nsu sh ound A Gene She Te Cen ca ay on O Boxes Cab p ng SE S ng ns a ea F e ndoo y AL A Showe We k p Cen s Wes Cab Roads U doo SE & G ec F a on Gene ng A Fence ea ab d and ca e k Assemb p Ladde Boxes nsu HSE UW Hyd Cab Fac F ea on na Check T E 01_ L 777 Po as Excava pmen sh ns Was a O ca U 700 ng d Boa Wa s o on Lay 01_Func & ndows Recep G Equ es Wes us ec a Ou Ladde k ephones Cen ng d ea ns SE Ca ng e F on S SS ca Showe A Founda Wa na Hand Wo o y 01_Func Te ea 01 777 PW Cen & ng F Founda PWHT on ns e s Ou a Back 778 A G oo Box Mason C Fab he 01_F ea U LCS SE We ng pmen Was 01_Func gh Wo SET A e Cab and We Ce Ma oo s on Mason E Boa a ea m Cen Assemb Eas 777 Lay MEGAR den uc Suppo Gene e ay A ng m MCR a ec Was Boxes Tes 01_San G F S ndoo U on ac Nozz k T GN PW E Roads A ns Manu F n FDN s x he 777 on Cen Eas Aspha S Hyd Cab ng Te & Suppo d a eam ns e on ng s She na p o Wa Back nsu LAB U ea SE a & n 01_D ns Cen Assemb ng on Te add Wa Fab y U 778 ea T Hyd S F e ave on Cab Po d a y nsu 777 Cen 778 ea ng G ns o S ec ephones Ce Aspha We NDT gnmen sh ng a on ac na Suppo ndoo Fence G doo u e ea PW eam b oo ab Doo Wa F ance S ay an nspec L na on E 01_Func We 777 and ec a ea P Check S ns Ladde doo Cen ea ng G d pmen u oo k a Sa es F Suppo ES ac G Po Ga ns on e ng Fence Wo 01_ CW Assemb A a & Ou h 777 U ay d MCR Hand eam E n on Socke F k P e Aspha Wa a Founda ephones 777 Lay ng Hyd m Ce on Wo o Fab Sa Fence gh es and We Wa A S e G ab a U ns Suppo T FDN F Cen ca d & Socke Wo GROUT es C AL Ce A m on Te e and eam CW 700 LCS ave umb a She uc ou Condu o ec F n Eas on Func 4 ng A Ladde Wa Te e Roads E and & We a u Wo d L o ng Hand on Po and Suppo e Wa Pos ac O S x ns U Fence sh F Cab o ea a p Wa L E A ca Cab on ec 777 LAB Suppo Roads Bond d T ng e es a G 01 01_D Boxes U Fence o on oo eam Pane d ng & A HSE Func ay na Su ea n a ca es e Ga Ou CW add Fence Suppo S ng Wa Po F She sh Assemb ave ac 777 Aspha A on MAC ea Wa y e s Socke ns gh Te & na 702_PKG 708_PKG 711_PKG nsu age p NDT Fac doo E u T a G S s ea Te y Wa ng es gh L k Tes n ec PWHT She A a on ndoo Cen Fence Suppo ng F PA GN ns u on Tes a E m Boa L he ec 777 ea ac d sh k nsu o ay G e Bond ng She a on es m y Secu A ns Bo F & Assemb Ou ave k ea Wes 777 o Tes a on Hyd n ance ns T ng Excava & gh F A ea nspec G P Fab d e oo ns Tes ca Gas ay PA sh on ee Hyd & NDT ec a Suppo ng ac Su Ce e ng gh k A L 01 ave a ou ea Po ES E u T ng e Ce ns & n Founda Te on Showe A c Po Wa ec Gas a ng doo m nspec e ns oo S on na F and m P e Tes n s A ea ng & ac Wa on na a F She Bond G W P y ng O 01_F & L PA Tes Suppo Ga ns e Ad nsu gh a umb and ea G & p Cab on Te Su s T a e NDT Aspha ng Tes ns ac L s O Wo 01_F 01_ ea on GROUT ndoo A & S Te a ec Fence T CT F Excava Ga doo ng L Cen ea 700 ns Lay Tes on eam Pos e PWHT A & Aspha Te Ma Equ Ce T as Assemb ng Boa Wo d NDT gh L Suppo na nspec Te e on Ree ea ns 778 ug Fab Bo a na n as umb & Founda Cen Ga on Equ ns L ng Su m S n a P ave e & an B es he A CT ac ng o ne on ndows 702_PKG 708_PKG 711_PKG ance O Fence ac ave ng s L ns ndoo gh Ou a F P G eam an on oo d & ay ng ee ca a Boa he gh A 778 Tes Su ea F S on d Pane us Fab & Ga ay ns O Hyd ng B m Wa e a ne & Ga Du nspec a m Fence y ephones A eam L F on umb Equ Tes S owdown e B ng Te Ga & a ne ng ac P na on nspec Aspha L Secu ns m D e Cab E k Recep umb S a m Secu Hyd ephones ndoo Fue nsu he on N2 o oo ng Fab P E Ce ab and Equ S k n na Fence Du ea Ga e ng on Check B ave a owdown nspec F & We Fence PWHT Sys gh pmen Re Equ Ladde F ns he Fue a na ng & Boxes ES d L MCR n gh Aspha on e 125M a 4 ng owdown ac doo ea Cab N2 T pmen o Equ na ug on Te S F ns mens ng Boxes Fence Lay Wa ca on Su L ec a Du e na Leak ug sh Fac c Su na T ng ec ephones C a y ns ac Te ush owdown MCR Doo on e Excava Fence G PKG P uc Punch a ne na gh d Aspha & Suppo LCS oo sh Boa Back e T P MAC on o F N2 ca Cab L ac age Po a ne n na T on e & p A y L ns nspec ng a Fence e D ns on d Back T 125M o Ce P add & L nsu ng Wa on ng d Equ Boa Recep Pane nspec A a Fence umb pmen Suppo Wo L m Road Ga 702_PKG 708_PKG 711_PKG y ng Du Back Ready ne ac ave umb ca Su on Recep Tes em e a ns d L pmen sh ne y Boxes ng on & m P u L e Aspha pmen on F Leak & a ea gh Back mens ac 125M Ou Road Ladde ng ug L on y Ready ne Ga ac ng ns Back ne e Re F y on ea d a gh Common nspec Po 01 a n Ladde es & na M ou s P & E a Tes Te Pos d ne Suppo on ns F umb 4 ush Ree nspec e Lay Road ng G L Suppo 125M Wo Ga gh Sys na 4 ng Func ne a Ree T on es Sys y Heavy Tes F 01 e ng Pos n Hyd & Punch Connec Wo k G ng pmen Pos & NDT Po ndoo a 125M on Cab ns d L Ga F ng a Bo ac P Recep Pane ug Pos e B ne MAC C es Su ec ng Te F THK ndoo Lay doo Du Re on MAC S Leak L ns Heavy o e Ce n ush Loop and M sh ay Aspha a Fence Suppo Pav Du Check m ne Punch Boa on nsu Road F & LCS W L Fab on e and Aspha d Tes ug nsu & Func umb ow ne ea ac ng ush on Heavy e SAT Punch a ee k ns Pav Func Fence F Ladde on Socke ng a ac n ndoo M ng em Recep Founda P o Func & on Suppo 125M THK ne k em d e a Ga F Tes m Fab ns 125M Cab na ng o y & on Ga P e ng Founda ndows Pav Fence & T ac on F o G M y e ns Re ng a on es Recep d Te P Assemb p Heavy F THK ng ush T B a L Back G on Ene on ns Leak es M 4 Check a Tes Du Equ & na d C Te umb Lay ng Boa G Road F Func na ay nspec ns 125M a Assemb Punch ca Fab ng THK ac MAC gh Ene and na e Road on D ns ug Pav ng ow ay Du on MAC a e LCS on B Pos and & PSSR ns Suppo ea We Tes na THK e on C Func m ng a Suppo ca ave on ns a Ea S ng Du C We Leve mens B y on m a M ng S Pos s on M a es Heavy ow Te P ng F on ac ea a Recep Sub T pmen on ns g ng SAT F a Check Heavy na ng d nspec y ee Tes a & ea G 125M Po Te ow on ng a ee Fab on ng Road na Check ca THK n & d g Base Tes umb ac z Du Pav B Te on THK ay B a na y Tes on LCS n M Equ L Compac Suppo h d & es Pav Founda Ga ng on a on Pou Road m sh z ave C ng y P ns PSSR on a Leve & nde ephones sh Te on ow n gh ng Wo & on es on Wea base Road Ready ng y F THK Wo ns on m ng y Tes ea & on a ug na n Suppo PSSR & on ng Po ca Fence Th a ng Assemb nspec Du e & Fab na PSSR ng Loop pmen M ac n Tes & Cou Pav m Du ng Fence Compac E Th na Cab on Road a ng G Ready Pou Check We ns ng S ks Recep Ready e a k Pav E ks P Ready & e F THK Road ead ec na es y on a ng F Cou & ave Check ee ng Pav ead Leve y P F Fab on a ec na PSSR me ca ns ng d oo on se Ready na Tes Road o on ng oo ug L on ng Road S a on Tack Pav ng ns on Wo Po & Log S gh on a Ene SAT ng se Ea y Pou Comp on Shou Coa nspec ac o Te Check Rece ca o Fence Wa Sub Th a on o ng n Wa Po eng Ene ks Bas Pav es B c En m a E h Co Pa on En on g ns o e n F W d 196 U0725 Un M C 20 P Hea Conc o k ensa 5 ho 725 25 C 1A_Condensa e P U da pe xcava nk 5 25 e nda unda ean Reba nsa B_Condensa Manho age E 102A 101A 5 ne om COC on e Hea 725 eepe 101_Condensa ME pe Fo TK S TK o L S AOC 101A 102A om 725 P e 101_Condensa Founda ME Wa Ancho on Hea Excava ne Founda ec o Manho P AOC o Excava S 725 U Reba Conc e Rad Wa 102A 101A m U e on Tank Hea 101B_Condensa 101_Condensa U 725 e 101A_Condensa age 725 Conc pe U age B on L Rad 102A eepe 101A 725 S S Lean 725 Lay on 101_Condensa 725 U Founda e Sump COC e B 725 ne Reba C_Condensa Reba 725 U Rad o ME o S a COC Fo 725 ME Pa C_Condensa Conc TK P Tank TK ME B age Rad Tank e Conc age P a Bo Back ng eepe Hea 725 U Fo We on e P e 725 U B Hea 102A Conc on 101A Sump 725 U C_Condensa e Founda Hea on m 725 101_Condensa n 102A 101A L a 725 Back 101B_Condensa e U 102A 101A 101A_Condensa 101_Condensa C_Condensa Assemb Excava 725 e m 101_Condensa Sh Sump Fo Conc 725 Tank L ne d a Tank P S on U e Fo on Sump S 725 P ME Sh Rad Founda e ME ne ng 725 on Founda TK Rad e P 725 o TK U B P m Rad 725 epa Hyd e o epa Sh Hea O B Lean m Hea U S e B ds ec age 102A 101A Bond C_Condensa Back 725 Sh e 102A age 101A 101_Condensa E Sh e C_Condensa 101_Condensa E a 101B_Condensa 725 he ds on Sump Bo ee 101A_Condensa C_Condensa TK 725 pp e a TK e Pedes a Sh Excava e on Bo ec o 725 a ng on Sump ec pp e Sh ds Boos Rad S Tank Lean on Rad 725 Sh P Conc S Tank on U ng P on U Sh Boos Founda 101B_Condensa Sump om B ds TK es ng 101A_Condensa 725 pp B on e P TK on o U ng Sh on Reba 102A o Sump U om pp G a 725 P C_Condensa Sh 725 e pp U Me Sh C_Condensa Boos Wa age 102A U pp Fo e a age P 725 ng e a U 101B_Condensa Reba 725 & Back e a L Me Sh Boos 101A & Conc E Wa 101A_Condensa ng U e P 725 Sh E e Conc ng on 725 e 101A ne pp on 102A We Sh ds 725 ng e We m Me Sh ec Pumps Pa P Equ ds e B 104A S 725 Tank ec P Sca pp S Pumps ds Tank Reba e Back e pp Pumps P Me B Sh on ng Equ p 101A U Sh e 104A Conc C_Condensa Sca Excava Pumps pp o a Conc UW o e d pp Pedes Founda n B P Sh Fo Boos on d e ng Fo a Equ Ancho C_Condensa on e P Sca Lean Sh Boos Pumps e age Equ 725 ng pmen B age ng Sh e Boos o Pumps a C_Condensa ng e P 104A o Pumps Sh 725 B_O e a ng Sh o E Reba e & pp m E pmen C_Condensa Pumps ds Shop m & ds PW pp o p d Me Excava Fo S o B B_O pp e m S pmen Fo o ec We U Me e Excava Tank pmen ec V e pp We ng o Me Tank d Lean e pp Conc & ng ec m P Conc e C_Condensa Pedes a o Back e V Lean ng Bo o m e & Bo Sh ng Boos on m d 725 101_C ng Sh y B_O Boos e S m CW Bo Pumps p on age Reba adde ng S Shop Hand & 725 age on e d ng Pumps S 101_C Fab Founda d e Reba & Wa adde on y Pumps ng S Fo Hand pp ng e Conc Pumps o uc om pp E adde Fo Conc ng e o om E & Founda S Wa Me Fo & adde Me e Hand S Conc Ancho e S P & on age Tank Shop uc y e age S V m Tank ec a e We U ng ec o on u e We ng Sh o ca U0725 m osed p Fab SE uc o a P 725 Wa m F P uc e o 101_C e Pumps u Sh osed Conc 725 Sump A ng Pumps Annu a e age 725 Pumps Fo on Founda Annu e Pedes s Conc Pumps a on Tank Boos age e d u pp Ancho Tank G E Fo d on Founda e u Sump on a Conc e Pedes F Boos gnmen E Ancho d Back s Sh F Fab e E Excava pp ng Shop P e ng ca E & 725 ec D Bo m e ou U on & na s E ng A e ec m Beve Tank P Founda ec E D Sump 103_C Tank Pa e a We Boos E ec pp U ng o F We osed a d 725 o ec Pumps NDT e gnmen on p NDT 103_C Conc Pedes ec Pumps e ng a Back ca n na e ec on E P Pedes Conc nspec 725 on Roo Pumps ng e U Back n ng Fab P Roo Pumps a Bo U on n Pumps d D e d on Bo We Founda a ec 103_C on F D Bo Pumps U on ng a 725 D & on ng e Founda O & Shop D 725 ng Pumps U um osed e nspec A F Pedes e a F e We 725 U O um We a on P he ca Assemb osed d Pumps a G e P 725 o NDT nage F o gnmen e Bo T a nage Assemb on n 725 a ng he E e & O U a 1s & U na ou D She 1s gh d Assemb osed She on d A Fab D e U Pedes Hyd e U ec O P 1s Hyd 725 he kes Pedes ng 725 on U ng P D T a 2nd PWHT U G gn um en A a & on ng p A U 725 & D he nspec nc den gh nc p 725 on n 2nd G a o ng C A 725 L o U0725 U gn P ca D C o Open kes ng P gn 725 Bo o U Pump n P U0725 Ladde ne A P ean ng L a Accesso en G gn U ean a Accesso Suppo F a Pump es Suppo U0725 p 725 P a es U0725 ne ng A on Suppo p e gn E e D G n Open L e U ca ng Eye P 725 U0725 E T UW ng p U0725 on ng gn ne Pump d kes ec D U0725 ng U L E Hand p U0725 gh 725 Coup ec UW U0725 Suppo ns Assemb E on P ne F ng P ou ec ch ns 725 U0725 Coup Wash ou PW 1s on D UW F en ec Open p e D U0725 on a ns y ns Eye U0725 U Ma y Suppo em PW ng kes d e F Cab a UW Excava U0725 on e U0725 2nd ns ng a ch ng ns A d on 725 E a e CW P a ns PW o ns F Cab umen on k E zed ng & d Wash U gn Open a CW ec p F a Lean D m e on PW o ng E e ns U A a E U Sa ec ng Cab a e 725 a on o U & S Te d a CW D ch ns ec on e 725 gn Cab o a ec d E a F 725 U ns E U on & SE umen ns o on F kes 725 e CW Cab U o Lay E m on Conc e Ca D & e ec on Cab Reba a 725 SE on ec We age Coup e 725 y U & on D a U0725 o d e a 725 o ec Te e Sa na CAB NDT d a Aspha Showe ch o Open U Lay Conc SE ng o kes & e E F 725 a Assemb on b G Lay Aspha a U on F E U0725 Assemb Condu d e on We ecommun T gh 725 e U SE on Aspha m E Connec Conc a ec e Aspha Fo F U on ave 725 ng T ec G U ng F ec JBS Open y ench d Hyd PWHT e o 725 ng na on U0725 U 725 Aspha We ench ng Pa o d e D U0725 Showe na on o m ave 725 d Back on Assemb ns G Ea U0725 725 S ng e Su on Heavy Pane Conc L e ca ch U0725 T s n Sys LPS ns nsu o NDT d ng Conc Heavy ave T a y gh Hyd e nspec D Aspha U0725 L Bond Su ay umen T on ng_Touch Aspha ng Heavy h & Heavy ays Conc U0725 es Hea on gh ac n ca F Conc umen ays ng ch L Re a Jo ng Cove Pos Fac ush e Bo Su Heavy Loca F Loop gh o ng ac Founda Du e on Leak ng Du Func e & Back ng n na ns Du Sys Tes Sys e on Mechan ng Du ng L e ng Du ac y 125M L Sys Punch Heavy o y on e a s Loop gh y Heavy Tes e L S es gh nspec Road 150M Du B Tes ng Pou D y 125M a gh up P y on Road a L n ow mens on 150M ns p Road on Du Road gh y ng M JBS Tes Mo 125M ng Du C ca Du ng & Du Pav a Road M THK on Sys y M ea Pav Du o Suppo y a Runn y s 150M on THK Pav M THK Pav y 150M ng M on So & y Road THK ng Check Road Pav G 150M THK PSSR ng Ea o ng ng ave M Pav Sub Leve Run M ng Base Pav B THK Tes Pav Pav hTHK Compac M ng nde Pou Wo base Wea THK ng ng Cou Leve Pav k P Pav ng Road Compac Cou F ng me se na Pav ng on Tack ng se Shou Coa Po Check ng Fo ye Coa on Con m de hy & U0745 Un M C 37 A V ounda cava Manho phe Founda 5 p 101A xcava U e anho 45 1A Reba T ean phe a e 5 Gas 745 Fo ap P Founda 745 Sphe B 101A 102A 101A_NGL 101B_NGL Ancho V AOC 745 Lean ack 745 ack Gas ap P on 745 P V B 102A C_NGL P 102A es m U Bo Conc pe es P pe T C_NGL e B on 102A Bo V Excava P 745 Founda 745 Founda P e on COC B B_P es T 101A 102A Conc Gas V P AOC ap C_NGL 745 ack U 102A Back 101A om on ack 745 Gas 745 B_P C_NGL 101A Bo pe B_P 745 ap 102A om on 745 Lean 745 P e V Wa P B_P Sh Reba AOC Founda opane P T Reba e Founda L epa ack Wa P 101A_NGL 101B_NGL COC B B_P Fo Su 102A P e V T 745 Sh Conc B_P P opane B 102A V 745 ne on opane ap pp on P 745 B V C_NGL 101A 102A e on B_P AOC 101A 102A U Conc Reba ap Sh C_NGL 101 opane 745 m ge 102A pp Founda 745 C_NGL 101 a 102A COC Sh ng Excava Pa 745 U Conc opane V 745 Fo L opane T P pp Fo B_P Back P 745 on e ng Sphe Founda B_P 745 opane 101A_NGL 101B_NGL ne pp 102_NG on T P Pumps U B B_P n V COC ans 102A S on B 102_NG B_P V e 102A m U e ng V U m B_P Fo Pumps L U C_NGL ans 101 S B_P T 102A AOC 745 Sh C_NGL P o ng 102A Lay U e P Ancho opane 745 Sh Conc P 101A_NGL 101B_NGL Su ne 745 U T opane Pumps U 150 Sh o Pedes 745 ans e S on age U es o opane e m 101 745 opane on pp L U Pumps o B_P ans S 745 B_P e 102_NG age opane pp ec 745 U o ng Pumps opane We 745 ge pp ne P Excava ec Back Founda on COC U E B_P 745 o B_P V P M ng U e Pumps age P Vesse Sca Sh 745 150 102_NG e pe ng Lean T Sh Assemb on Sh P ec Sphe 745 e ng age a Sh Bo Vesse Hyd 102A 745 U T opane d V M Su 101 on 745 Pumps opane P e a Pumps T 150 P 745 U Reba ans S Sca P pp pe U Pumps ng ack opane o ans 150 pp Vesse S 745 102A opane L pp a Fo Sepa Pumps S M pp on ans 101 o Pedes pe P o 745 U ge Vesse 745 m Excava ng Su V ne Conc 102_NG o P Sca ack Sh o Bond d M ng es on a P e ng Excava age B_P Y on ng m & E 745 Lean o M e age ng ack pe a 102A & T Sphe m T age es U e 150 102_NG Lean p P M Back ge 101 o Sepa Pumps Sh ng We B_P pp d ec 745 P Reba Pumps Conc E a S U ans Pumps M ng o adde 150 S U ans & Founda Hand Fo 745 o opane Pumps ng Reba Vesse ack m Fo Sepa a U Ancho opane e ng E p ec Sphe Vesse ng o on m P pp 745 Fo Vesse o d Conc Sepa M on 745 adde d 102_ Shop ng B_P e & U es Y on 745 Hand Conc ec m opane age ng p e m M age & e ng a Sh E ng Wa M on 745 P e on m 150 ng adde 745 F 101 O U0745 AOC Shop F Pumps a Conc M E adde Pumps ec Hand U on e Conc 150 Pedes T opane Sepa Founda Sh o es Back e P 745 Fo pp S opane T P a & Conc Vesse e he A Ancho 745 Vesse Shop O U s Fab on Bo ec Founda A Fo Sepa d Y 745 ans p a e Ancho M Founda 102_ She d Wa Excava We o e ans opane G on S F O ng pp NDT gnmen m 745 he ng E U M gnmen e 101 T E s Fab Y G U Wa age M on e m o ou e P a U he F ec ng Wa F ench 745 e A M ca T P e d a ec G Shop 101 e Conc Pedes Fab ou O S Sepa 745 age e Back U a na 101A s Lean & na 745 P Conc on ng e 102_ Pedes E Back O Pumps on ans Bo opane gnmen Sepa Vesse ng 745 U L F P on o G U he Pumps T F ca Founda on Bo a We Pedes on P U ng ne ec 102_ he on Wa Founda F Bo o na age 745 G Vesse opane P w ans e nspec L ca Bo nspec 745 oo P Fab & 745 e Wa Beve on a F Conc U B P ne 745 Uppe d a 101A S ewa L om 745 e 102A on UW e Hyd a 101A U a G Pumps T om C on U ne ng 101A nspec Vesse ewa 102A e ee ng T U We Wa E F Excava 745 T P Bo G a on UW Pedes Lean ans ca & Reba P L gh 745 P T Wa on Pumps P gh e 745 U o Pedes ec NDT on 101A 102A PW A ng Conc ewa U e o on UW ne L B G P B_P p on Wa d e 101 ans B & 101A en 745 ne e on P S L B T ng U0745 gn B_P Reba en C_NGL 745 U PW e pe 102A ng es a Assemb on C Lowe on ne L Conc F Ladde gh P U0745 UW CW Conc C_NGL 101A Co a U F Pa e PW ng PWHT U0745 U 745 a Pumps Fo Shop ng B opane B_P ne 102_NG e & U UW den on ack p U0745 Back ewa a way 745 Excava P CW en ewa opane B L G umn C_NGL P 745 e ng U0745 n Pumps 745 U0745 Cove m B U0745 PW & Lay ne p CW Fo C Pa p ound 102A B e U0745 & Co ng PW P opane Sh ng U0745 SE _Ove F Wa Fab ng e & P ca e U0745 C ng ns Mechan T We p m Sh U0745 Founda o P ng n e ns CW F P ume & SE P pp a F L p ng T ns U0745 & Suppo ans ec d L CW p Sh oo ng a Excava on e p U pp ne ng U0745 Beam SE B ns Sh e 102A Assemb a S d ne ns ans P ca E ng ns U0745 ng U head F T a o d Cab U & U0745 745 _Ove on Sp ng Lay ee ns pp U a ng 102A Ma ec Suppo ns e a pp Hyd S & E a 745 ans m Back Suppo SE on Pumps Cab ns 745 U F We umen on e ca 745 d a ab Bond ng U SE on Pumps ay ec a Pumps B on ng S e U & on Eye ns U0745 745 C k E o Cab F a U Pumps Hand P on a o 745 e on d _Ove Te a Hyd Co head B e P Aspha 745 ns uc o e U ec anes Pumps ng on Conc a p Assemb E F 745 ns Back on G Aspha U ng umen Pumps es Cab on o Lay p d _Ove opane Wash ng o m F Ca 745 U e on Cab Aspha Conc ec Assemb a U u ng e F ave We 745 on E U S G Eye a o Bond Te e o Assemb 1s ng Te CAB Cab C na 745 e F a head ns 745 U ng o Aspha E ec eam U0745 e 1s d a 745 on b ave U0745 es F NDT d gh e Condu anes ecommun d on G 745 T head m e E 2nd Connec ec Su & A o on F a Wash e Conc S T Heavy d E T ng e Assemb on ng 2nd F JBS A ng U0745 Conc ave Heavy ench d S e ec Sa na o ng Aspha e on E a eam C gn L Heavy ans U0745 Lay Su ec T ench Aspha S o na Heavy Ra d ng U0745 PWHT A gn ac o gh Assemb ns Conc ec on Ma Ea ac anes Pa U0745 C Heavy L eam e ng on Sys A Pane L U0745 T e age on LPS ns nsu Su gn & Heavy s gh E ng e ac T Du y gh T anes e nspec o ng gn F e Du on ay umen T n Sa on E We Du & h F Showe ec ays Pumps ca e NDT Du ac Coup ng Re umen ame ng F ays a E Du T e ng_Touch ng C ac Du y ush ec F 125M L Jo Heavy Coup ng Cove Loop Hyd y Loca e Heavy Du ec y ame L e Leak Func Heavy ng ac gh on d e y on ane Punch Road ns A 150M Du ng n y 125M & gh y Sys on ng d Road on F 250M ng Heavy n L ng Showe F y gn L 150M ng o Sys a Road Du ca o na Tes gh Loop y ns M Pos s S C 250M 125M ng Bo gh e S Du B Tes ns F a on Du P Pav d add Du a Road THK M y a ow Hea M C e Pav Du n a on M nspec p y up Tes on ns 150M ng Mo d THK Du M ea a Pav JBS ng y Tes THK on ng y 150M 250M ng THK M ng Fac Road y ns on THK Founda 250M a D Road ng Sys Pav G o y THK 150M & ng mens Ea s a 250M Roo a M ave Assemb Pav on PSSR So Sub Leve on M Pav a ng es Pav Base B THK Pav Pav M h o THK Pav Compac on nde ng M Pou We & Wo base Wea on Run THK on ng M ns ng THK S ng ng F Leve Cou Check THK ng Pav y d & a d Leve k P na Pav Road ng Compac ng Cou F Suppo n a ng Pav Compac me na ng Pav E se on Th nspec ng Pav Tack ec ng se Shou Coa Po Check ead ng Fo Po on ng Fo ye Coa on Conc m ye on ng on de Conc hy m & hy & ene Cu S e ene S ope e eb ope W e P W U U 761 761 Rece Un v M ng C Desa na e Wa e 63 Manho Wa 61 o 6 U A age ean e 66 101_Ch Wa a as 1 61 y S e cava Reba _Po U761 A P U o 1_Ch 7 761 h Ch b k ank 1 ab P B_Po B_U Bas a Ca Manho age Wa e y U hod TK 766 ab e ME U761 767 Wa S y B_Po B_U e Wa o 761 766 S Fo age 768 B_Po B_U 101A 102A U ch ME 766 761 Wa S n 101A 102A 767 ME S e U761 761 Wa o Wa Tank Conc e ch 761 age e Pumps o y ab 766 na Ancho 761 eepe e U761 n Tank 101_Po 102_U c 767 Wa 101_Ch m Bas age o e 761 768 Pumps on e 766 o 761 Wa e na 767 age Tank ab 761 773 Pumps e 101_Ch 767 U761 P TK S 768 Bas 766 U 101_Ch e y ab age o e U B_U on B_Po ab Pumps U761 Tank B_Po B_U TK y S na 767 ME o eepe y S Wa 766 e 768 on 761 n Excava Tank e S 773 Pumps U761 ME 767 761 Wa e ME na eepe 768 Pumps Tank o 766 101_Po Lean TK ec Founda Wa 768 Package e Wa n 773 age o 767 Excava e U761 Tank eepe 761 on 102_U Pumps Excava Bo Reba Wa 761 age Package 766 U S ab Wa 768 U 101_Ch e U761 age o 767 U Lean 773 y on ab 766 TK Fo Excava 761 101_Ch e ab on 768 101_Po 101_Ch TK S 773 761 o y 767 Excava e Package 761 773 y Founda e S U o 761 Ancho Tank 768 Wa Lean Pumps 766 S e na Conc 761 Reba ME Lean e Wa Founda eepe Pumps Tank age Package e 767 TK 761 Wa U 773 e eepe m Back Pumps na 766 Tank Fo 768 Wa 101_Po 761 o Pumps na Founda on Reba 767 102_U TK 773 Wa ab Bo Pumps 761 768 Wa 766 TK Conc on 761 Pumps Lean Fo e ME age 773 on 767 S Bo 761 101_Ch Excava 101_Po on AOC e m Tank y 768 e Conc S o TK on e Conc 767 773 Lean e 102_U eepe o S Bo Package 768 o ab on Back U761 e 101_Po S om Wa Founda m Pumps e eepe Bo 761 P 773 767 on TK Wa Founda Pumps Conc Bo on Package e 761 na U 101_Ch Tank 768 om Founda S o Package Reba AOC Fo ME na eepe Wa AS 102_U 761 na on Conc Ancho e 773 Pumps epa U e Conc ab Pumps 768 COC 761 om Fo Founda o age on Reba 773 P E Wa e 102_U U761 Ancho on Wa y Conc 768 e P om 761 m Conc on ME P Wa Founda age o 773 on U761 ab 761 e 001_Ana 101_Ch on epa ec Wa P S Founda e m AS 761 U a 102A E Reba U761 COC 773 Package S Wa 101A P Tank ab na Founda Conc Package e y Pedes Conc on Back O L Package 102A e o Pa 773 U Conc on 761 o ec 101_Ch on Tank 101A Bo AOC 773 Founda P e Conc on Wa U Fo Y ne Pedes Reba Back 001_Ana 002_Ana a Wa e Excava age Ancho he y S P Founda age 761 on 773 e na U U761 Bo n on 102A Pa U e Conc U761 101_ L 761 B_U & on Wa S 773 y Founda o B_Po 101A E U m U761 Fo Back on o e AOC 761 e B_U S ne Package P We 761 U e on Wa Tank o Lean yze age a COC n Tank E B_Po ec & 761 e e o O Reba on na S e o Conc G Back m Pedes age Fo S a U761 o O We Excava 773 e ec B_U Fo P Lean 761 Package e 773 U761 age d ec Bo Pedes on Y o he ab e B_Po on o AOC L Tank 766 S y Founda COC yze She O on U761 na he e o ng m Conc Pedes E U0761 age O L ne 101_ y m on age Tank U Wa E ab o S d on ec e & he 761 ME e Tank ne U Conc ec Wa Package 773 he o ng Fo on 766 age U Conc 767 ec o 761 a Wa U Co We 773 & e She Founda COC UW G y e ab U Tank L E e on Tank a 761 age U Bo 773 U761 761 G U on Wa We o Package Wa 761 e m 101 E ne Y U e on L umn Pedes 761 a Founda ec G 767 Tank Pumps 768 e Pa d 761 G on Ancho L e E P ne Bo ec 101_ U G PW Conc P & 761 Pumps e Wa ng om Y Tank ne ound Pedes & d U761 L e Pumps L e ec E p Back on P ME n _Ove NDT We e o 761 L 766 U 768 ng ne S 773 101_ We Founda ng P F on UW o om ec Pumps p U P ne on Founda ec ng CW D NDT e UW & a on 761 oo ee p P ng 761 o U0761 U e d p 101 U761 Annu Shop 761 a Assemb & D U0761 Beam S Bo a We d 767 766 ng UW on 773 ME Pumps p U P on ng e a U0761 UW PW Excava & F head Annu 761 1s nage Shop We 761 ng Wo & ee a S Assemb PW a p 761 U0761 U Shop ME P We U0761 & F _Ove nage Pedes Shop d SE_U761 o Suppo ab 768 767 ng 101_Ch e P PW 1s & U0761 on o a 2nd 766 Shop F U0761 A Lay p Fab 761 CW d We PW S ng on ks & ME Roo p P CW C Hyd F 761 U0761 ng & ns a ME d e U0761 U Roo 101 ng F 101_Ch Fab P ns gn 761 P 2nd ng Co A uc ng 773 768 p U o d CW ng Fab Hyd ns U0761 anes C & A ng 767 d e ewa U a 761 head Fab on P CW & Suppo a p ng U0761 o ca F 101 E a ns gn U d Fab 761 & ean ng She C ME F ns U0761 101_Ch e o u ng U0761 U gn E em _Ove a P 761 e SE_U761 o Cab ME a U0761 U Assemb A o P ca F U0761 773 ec She E a ns ewa SE_U761 ean e Suppo 761 & e We 768 o a on U ec ca es e 761 766 o a U & E Accesso Cab on e F ns a 761 ca gn d umen E _Ove Coup on ec na U C SE_U761 101_Ch ng zed o e a U on ca F d es Eye 761 a SE_U761 101_Ch e on U0761 ec Accesso E L 761 P ns F U ec Beve ewa on ng d o Cab 761 U anes a e head Hyd 773 Coup E o U on na a d ne Aspha 761 767 F ou P Te on a ewa nc e ec U Conc ns ng We 761 o E on ewa ns U G nc Cab Aspha P a 761 on F E ns e a ec L on ou ns umen 761 U Ra NDT Cab Wash head Lay U o ng Aspha 761 Package U761 on Conc ec m We o F p Ca Aspha U e ne 761 na 766 d den ave on Cab a Bond ec G o Eye 768 Hand e Back Suppo 761 ng d a 766 umen Ma C e 761 o y a Suppo on o Te E e na 761 ng a CAB o ns Aspha F L Package ng U0761 e ave S F es on o U761 d a 766 Conc NDT b U anes y on a Lay PWHT L na ec F Assemb ne 767 C G gh 766 Condu e on Su L 773 ecommun n Conc Assemb T na eam Wash & ame m E Heavy ng 766 Connec a 767 e on ne F ca e ng on S 761 Assemb Package T ne e Aspha Heavy F anes ave U0761 U ng Sa Conc ench Aspha e ec on U761 JBS U Su Heavy d L na o a 767 on ng d eam Loop Heavy on 768 & ench o Heavy 767 ame PWHT na U761 U ac Assemb 766 o gh d 761 e on C 767 U761 768 E on Excava 761 T Heavy ns L Ea e Package o AOC nsu We e on Sys S e Pane L 761 Heavy & Su Package T ng ac gh ane 768 s Sk LPS ec Du y A S T Ma e 773 gh o 768 e ng Du nspec eam T 767 766 Sa y Du Tes ay umen 768 T 773 Showe Heavy L NDT on Pa & h U ns Du ays d ng o 766 a gn e U ca ng p Du F ac Heavy Re L 766 on y E Du 125M ac gh n Loop Accesso ng ays T Heavy 773 Jo ng y k e ns age Cove 761 y A ush Du gh Leak on Func 773 a Loca n ec 761 Pos 768 767 Heavy L Lay y ng Road s F ench 773 Du T 150M on 125M ng ns y Hyd 767 y We n & gh F Road Bo Du Sys ng_Touch gn 250M a 767 2nd e on Showe ac y o Du C 150M ng Road F E Tes na L Hyd Road ca a y d Sys M 773 768 Mechan ng S Du Back 250M 125M Punch Tes s gh d add y on Du e ng Excava S 768 ec o P w ng a Pav 768 B Road ns A THK a y M Du ng d 150M Assemb y Hea Pav nspec Tes a p y M S o 773 n ow F 250M 150M on Mo Tes y gn D on Lay Pav THK M ng ns a Pav ns 773 ng Bond 250M ee JBS y Road e 773 ng THK Fac M 150M es mens Road ng C a THK Founda ng d 250M Pav o G a ca up Sys Sys ng THK M Roo We ng ea Ea on G ng ns a M Hyd on ave So Pav Sub Leve THK Back ng Runn M ng Assemb a Pav ng M Base es on THK Pav on d B Assemb & a Pav h o M THK & ng ng Pav Compac nde THK o Pou PSSR Wo a base Wea Run Check We on ns S ng THK ng Pav Cove ng on Bond es Cou d Leve Pav ng & a Road k Leve d ng Pav P ng F Tes ng Pav Compac Cou F Suppo ng y ana Pav Compac me ng na se ng n on on ng Tack Th ng Po ng Shou E se Check ng Po Fo Coa ng nspec Fo ec ead ye Conc ye m Coa Conc on hy m de on on ng & hy & ene on S e Cu ene S e e ope ope e W Pou bW Pou A e A e gnmen Mesh ng gnmen Mesh ng U U 762 762 Dem Un Bo e n M PKG Wa C e S BFW eam Le & Condensa down & B ow e 0 Wa ME Manho Condensa D_Bo S _Caus Dem A B_Caus _Bo _Oxygen _Mo E B anho U nuous 02_Bo Ac 03_Su 04A ndensa 08_U 762 B_Bo B_Chem B_Dem B_O xygen o ME e Condensa a 2 TK 01_Bo en phu y m 62 hospha anks _Neu d s Box hu Caus ME _Dem E Bo 01A 03A e 762 Va P n am _S S a Wa x m phu ensa Phospha Scavenge o 2 e Tanks s anks em B_Dem 03A_Neu eu 03B_Neu 3_Su ks ne 4A C A A_Dem us 2_S 1_Bo 2_Bo ge aus 8_U ppe 8A 108A n o d y B_Caus e a 01A 03A 02A 04A 07A 10A 11A 12A Tanks Condensa age ME C_S C nuous 762 a S sa e c Box TK y B C_S o C 101A 104_Bo 105_Oxygen pho 111_Mo 762 B_Dem T A B_Bo B_Caus B_Chem B_O sa ME TK Con Wa B 762 U Gas Va Tanks e ppe ne 103_Dem a en P 762 101A 103A 102A 104A 107A 110A 111A 112A Excava S o Tanks Scavenge n age ne sa d TK e B A D_Bo Con Ca P sa age 103_Dem 762 sed D 103A_Neu 103B_Neu o A ve Con 762 U age S B eam n C D c e a 101A 104_Bo 105_Oxygen 111_Mo Lean Dos C_S B_Caus 103_Dem owdown 762 ea ap ME Phospha 102_S en n ne Condensa e Gas 762 a age sed B S TK o pho c P 101A 103A ppe C_S C ne y on U 762 o ea e 101_S 102_S 111_Mo 101A 104_Bo 105_Oxygen B_Chem B_Dem c B_O D 108A B on B_Caus a ve Reba B_Bo 102B_Dem S age Ac owdown o 762 E_HP 102A_Dem ea ME P e Dos TGTU Gas D_Bo za 762 102_S eam Reba D B E_HP P ME um on Scavenge B_Caus phu ne B Packages eam DA c ppe 103A_Neu 103B_Neu ch m ME a Ac e on sa TK Box C C_S age o Wa T ME 108A e y Phospha Va c DA 762 S Condensa D Ac nuous Excava a y TGTU C Tank Fo 762 B ec m o C_S ME e za Wa age ne um D TK Co Tank Fo Ca B a ME P 108A e Tanks owdown Condensa m B B_Caus B_Chem B_O nuous ng B_Bo 103A_Neu 103B_Neu S B_Dem E_HP 106_Neu 111A 101A 102A 103A 107A 112A TK 110A Packages c Va Tanks 104A Box 762 U ne d age B eam Condensa S ME sa D nuous Wa Tank ca T Scavenge Ancho o ap A Tanks Conc 762 E_HP ne um ME Co e on Con Dos B Ancho C age Bas sed P d eam Tanks D ne a owdown Con c e TGTU Dos 762 Tank 103_Dem 106_Neu ME n on en Excava za 109_Ac 110A C_S d 103_Dem 103A 107A 101A 102A Ca e C ng ve 111A um 104A Pumps 103A_Neu 103B_Neu 762 U 112A o B P S DA T pho ME y 110_Caus c owdown m a o 101A Gas 762 on Tank e ca B B_Caus um 111_Mo 104_Bo 105_Oxygen a E_HP m Tanks age en Condensa c D Package ap 762 ch S ea Condensa TGTU 103A_Neu 103B_Neu eam C P a Ca Pumps ve e ec Dos 101_S D_Bo Condecsa en 102_S Lean 109_Ac 101A 103A 102A 111A Co 107A ME 110A 104A E_HP Bo Tanks 762 112A za 111_Mo 104_Bo 105_Oxygen S 102B_Dem Packages DA e eam um 102_S 106_Neu on 102A_Dem ppe P 762 Sump age Lean Bo Dos Wa C_S Pumps D C ne pho B_Caus 108A Package owdown o 762 Gas U Sou age ap a ME 110_Caus c Phospha zed e C Ac D Tanks 762 102 ec sa Package Box ne Excava Sump ppe 102 y um e 762 on B_Caus Co ch o TK Condecsa Dos Lean D_Bo n Tanks 108A B sed Wa ng m 762 U pho B_Dem B B_Caus B_O B_Chem B_Bo 106_Neu ne Reba ppe o D c Package TK 101A S 762 Bas Sou Sump 109_Ac pe ca Condensa ME Bo age e nuous S E_HP D V Box Pumps 112_MP Reba 762 B e Phospha zed Scavenge Conc Packages Lean eam um ch nuous a on 762 ne D_Bo c Tanks P Wa e Conc Sump B age D Dos S Bo Tanks T a ec owdown e ME on 762 Fo B_Chem B B_Caus B_Dem 101A Bo V B_Bo B_O 109_Ac C_S ne age d C Pumps ng Back 762 e a V owdown o Phospha e P Back B D Ca Condensa on Bas um owdown ME o V Bo Ancho 762 Sou S Package ng ne D Package 104A 108_U Excava E_HP 101_Bo Scavenge 102_Bo Tanks 102 Pumps c Wa 103_Su B e Condensa Bo 762 112_MP Conc a eam ca sa owdown Reba Bo TGTU Package Dos 101_S T Condecsa B B_Dem ec B_Caus 107A 110A 102A 111A B_Chem 101A 103A 112A ME Gas B_Bo ack 102B_Dem en 104A o 762 B_O Conc ap e za C Sump C_S S um Excava TK DA 102A_Dem Wa d Bas a D 104A 108_U Bo ng e Feed Wa 762 Dos B_Caus TK TGTU age Ca Sou Scavenge 102 110_Caus D zed 101_Bo om eam za C n a on Package Feed ne 103 102A 110A 101A 111A age 107A 103A 102_Bo ME 104A 112A Lean e o Excava 103 Sump Pumps D 103_Su Gas um 762 m a on ME Wa owdown TGTU Package Conc Fo y e um Pumps 762 B_Caus za Lean C_S C age Wa ap Co d D Tanks ng 106_Neu ppe Package pho and c a om B P ch Reba ne Excava D o e Dos D_Deae TK ppe Condecsa Lean ME sa Tank Sump U ne Conc S D E_HP um TK Reba Co Lean pho Sump on V Excava Feed e Packages D_Deae sa Fo Ca 762 age 106_Neu eam um n Bo D_Bo Wa Co e S Package AS B 762 y on zed Pumps and c B 101_S Founda DA 762 U e Dos 106_Neu Pumps D ng Sump TK Feed 101A 102B_Dem on ch D_Bo Conc 109_Ac age Excava e ne a V C 102A_Dem 762 Ca Wa Lean sed E D um Phospha sa epa T TK Ancho d Reba Condensa E_HP n Fo a 103 o m c Founda B_Caus ng Reba P e Tanks 762 um Wa Sump eam Lean Packages y on S Fo 109_Ac c D B 104A Package e Phospha Bas 762 a Reba S B_Chem B_Caus B_Dem B_O owdown Bo o B_Bo 112_MP ca Pumps ME a ec 762 109_Ac Ancho S Pumps owdown Feed Lean C Condensa T Wa e Conc ne B_Caus on Backwash Tanks P 101_S 762 Ancho Wa d Reba 103 c E_HP Pumps D ME Tanks m 102B_Dem and Sump e sa Dos 103_Su Scavenge on D_Deae Conc eam Sou ch 102A_Dem Packages Caus Wa B_Dem B_Chem Pumps ec B D B_Caus Feed B_O a B_Bo Reba Bo ap 762 ne Po Package age 102 Excava um ng sa Wa S c Pumps e B Package 110A TGTU Bas Fo 762 U Conc ca a ec owdown Pumps Tank 001_Ana Scavenge e phu C_S C TGTU age ME Package za 762 Sou ne D um sa on P 101_S Fo 101A ch a Wa za ME eam e m Package Reba and Conc S Backwash D_Deae on ap 102B_Dem Caus 102A_Dem Pumps Founda y Pumps D Condensa P Dos 110A 107A Sou Reba Condecsa e Po Fo Package Conc Lean ng ppe m 762 ppe Wa um c C_S D Reba C B on P e Back Pumps sa Excava E Ancho a S 762 o Sump Fo ca e um Bo Tanks owdown on U Co phu Excava ME Lean Pumps zed e y c Feed Package n 762 Bas on Fo Wa D ME B P U Dos Conc 106_Neu Sump on Package 108A Pa e a um Condecsa A Pumps 103A Fo P Conc c Con on Dos m 762 eam 102 S Pumps Conc P 107A e she Sump on y um 110A a ng eam owdown AOC Bas Caus Po Reba Fo Bo B_Caus D Tanks Lean Excava m 108A n age e 112A P Package um on ec 762 sed Fo Pumps A Conc Lean a zed Back n Sump ne Wa P on Condensa 762 m Fo 109_Ac Pumps Tank Bo Feed Backwash e Condecsa Conc C Dos Sump Back ne Pedes M c Con E_HP a y P S 111A AOC 762 U Pumps d 109_Ac 102A ppe Bo she D 103 m c on ea Wa eam Packages a 112A 104A Caus Po Pumps Sump Bo e 762 Fo U n on ng B_Chem Wa 103A Desupe m Pumps c e zed Tanks E P Lean eam Back Conc d & Bo ec E_HP o Packages n Sump D Pumps 111A Package ME m B AG 762 Fo ne TGTU a 104_Bo 105_Oxygen eam ea on Conc Excava Wa e d TGTU Wa ppe S D c 102A 101A o Founda n Bo and 111_Mo Package Excava B_Chem B_Caus 108A D_Deae Sou e Lean Fo m M c Ac P D Tanks ng 107A 104A a xe B e Sou Founda 762 Ancho m Dos S D Pumps Backwash phu ne Package eam sa Reba on ca P um she e Pumps ng Conc AS m and a c Reba Fo n U Pedes Back We Wa ec 762 112A s Tanks on Desupe e Package S Condensa Feed epa a Pumps C and Conc c nuous B_Caus Wa B Fo Eas No P Sump sa Excava 762 um ne Founda a om ca Dos Package s e m 103 Condensa Lean Ac Pumps E age Dos Conc U B_Caus e ng she COC Founda um B_Chem 101A 111A Pumps Conc S AG sa eam owdown a on Bo Condensa um Dos e xe m Fo Reba yze B_Caus pe sed Conc B_O S Pumps Founda Sump on um a 102A Excava Ancho c P 762 sed Pumps Feed om Wa d nuous Co TGTU o Package Lean AOC Fo m e Condecsa on 111_Mo Conc 104_Bo 105_Oxygen 101A 762 COC Founda E o a owdown Dos & Lean D_Deae Ancho B_Dem 101C e ne on Fo Pumps C Package 103A P ME 104A Founda B_O Sump Wa Condensa B_Bo c Pumps Bo Assemb ec m Po Founda Caus Ancho Conc e Fo B Dos S en 762 Condecsa on zed c 002_Ana a TGTU Feed Pumps o e Ancho m U ng d S B_Dem Excava Pumps Sump on G Conc e s pe Po Package 103A Wa 762 Founda Caus c age B_Dem B Pumps Bo Fo on Conc Reba P U d D B_Caus e ne We ppe Wa ec Condensa M zed c a NDT m h Wa ack B_Bo 762 Caus on d Back Ancho ng D ec epa S DA Po Pedes en Tank 101A Dos Sump Sou a Backwash umn Pumps Conc Excava C o ng m 762 1s Sou e Lean Pumps Back Pedes ng AOC S a s B_O age Ancho Wes Conc sed Wa m Package D Co Excava e o Ac hea She Fo 762 and Wa Conc Desupe C_S ME pe ound S & on m e 762 L and Pumps 104_Bo 105_Oxygen 101A a Package ca y B um B_Dem on e ng ME E Bo 111_Mo she U S Pedes Founda E_HP Pumps xe Pa sa Fo Backwash Pumps on ack e age Sou pho B_Dem G D a m Conc F COC Wa Reba e ng c L Package age o sed Conc she on B_Neu AOC ca Lean e Package Pedes y ppe B_Bo Conc a B Package on d Back Founda ne D_Bo Tanks o We e ME hea Wa B Back Pumps Backwash D Conc she 101A E Pedes Wa C_S owdown Pumps Package Founda Sou S on O o A Co d e umn ec ME U Wa c a Feed Founda m 762 Phospha Excava Conc Bo TGTU e & o Pumps ack ng ne Fo F age sed E_HP Conc on B DA e D ound nage Package Pumps c Pedes Wa V 762 Back Fo ng Conc Bo Founda Sump Wa e on ca c C n m 105_Oxygen ne Sou owdown age Feed F Back ME Caus 762 Po 101A 101C Conc 104_Bo Wa Package e B V Bo G on Founda Conc S y Fo ME E Po 2nd o ec Back c B_Neu Dos Pedes age Caus pho 111_Mo 106_Neu Bo & um e eam COC Pumps 762 E a Founda Lean on he gn Scavenge Sump oo Ancho on Conc s We Tank e Excava 762 Reba Pumps B ne a C P O Back ng Ancho h Conc Beam 762 U Founda Dos e Wa Fo Pumps 108_U Excava ne umn D um on Back d a B S Pumps Bo Package Dos 762 103_Dem e Co Wa on Founda yze C_S P Lay S m Fo age 101_Bo 102_Bo L Conc E We o TGTU 103_Bo 102_Po ec 101_C ound S 109_Ac e Bo c m F Phospha COC Conc a Ancho ec B Package E 101A eam Founda Sump on owdown pe a e Co Wa & D Founda ng m oo he Pumps e ME Backwash B on she 762 C_S Fo o Pedes um Excava E 102_S hea e D a E_HP she ne Fo o age Wa DA O E Reba Dos 106_Neu om Sump a Pumps oo s A e Tanks U o ec S E ee & Conc m d ne ng Scavenge Pumps Beam Backwash a Annu owdown e ME A pho sed Pumps Wa on & Pedes ec 762 U e Bo Hyd ME a m Condensa Wa B_Bo E_HP Excava A Founda um e Fo Sou Ancho Sump C D_Bo DA 762 age ng Pumps ec on L S F Conc e Pedes a ng c 102_Po 101_C 103_Bo Po age d sed on Package ME S ack Po um e o ng Tank B ec O Ancho age G c Founda Assemb ab Conc C sed E She Package he D ec We on gn eam Eas No m Pumps Lean e a Phospha ng Fo on gn We 762 U m Back e Pedes sa & a Package E ne Dos 762 oo 103_Dem Founda e D_Deae gn U o on ng Pedes S Back P Condensa Beam 101A L Assemb Dos e Founda ee a o D Bo Pedes Sump owdown on B eam Pumps ean Conc age e Package ng 1s Pedes Feed Bo m Roo on ec & he L pho 109_Ac e Back Scavenge Assemb 1s Wa on um sed ean Package Sou O G Pumps 102_S Back Eas e No o A on E 101A 762 Conc S ne Co Reba ME Po Founda o S on ec e Dos ne age Tanks she sed a Coup ME o ab she age d Tanks on Bo E 762 m Ladde Pedes Founda 106_Neu y sa a ne Wa en e C U d on Bo Tank Pedes um e Wa Pumps Hyd We P Phospha Ladde & o uc h d 762 Fo Pedes E U Conc Po Feed 762 S ee on e Pumps Eas Founda No ME 102_Po Dos 101_C 103_Bo Bo he L Package Condensa a on ne She o S gn pped e Pumps age ng Wes Y 762 and 2nd D Pedes A Conc on E ng e es Back ec Dos G sa Founda D_Deae U Scavenge A ng a Ancho Conc Tank ean pe 762 E Co P Sou Back U e Con & Bo on ne Bo D B Wa Pumps ec o ab Condensa Assemb 103_Dem she h Accesso 762 Founda e n ME age Dos Tank on U Wa u a 106_Neu P en ng Tanks Bo on e Package Pumps 101_ 102_ 103_ 762 UW & m Wa ea ec Tank a um Wes Fo Package A uc d Ladde G & gn 1s a e on Pumps L & Founda Package B p S gn ec she a We Back e ng owdown o Pumps E 762 U Package Assemb a Sou e Dos C 109_Ac Backwash um ou Pumps o h Bond Y on 102_S ME P e a Assemb ack ng U y Tanks Ancho 762 A Co on Feed ng ME E Caus ne Dos e a sa Dem d on Wes Tank ng 762 Dem Backwash Wa sa Conc Pedes gn Pumps B C e a UW L E 2nd Po ME We Package Condensa pped om e Condensa Pumps P TGTU U0762 G a m Back h u 102_Po 101_C 103_Bo U ne Pumps Bo Con Pedes Founda e on Sou ng D_Deae Feed p 762 uc 103_Dem a Tanks es 103_ 101_ Fo 102_ P Dos U0762 U A e nuous & on E o ean F 762 Conc Assemb and Ancho NDT ec P U0762 gn ne PW on e a d Pedes Package owdown Eas No Assemb Ag D_Deae P ec o ng en A e a Shop 1s Back & y 762 Package Founda 102_S L Backwash ng e Dos on E h a F D UW Pumps e Bo Dem on s P Sca U0762 109_Ac ec AOC a 762 gn ng & Po 102_Po 101_C 103_Bo E u A e she Pumps P 1s d nc Assemb U0762 U on en Pedes Package Sca E p m 102 Con ng a e U ne PW U0762 Pedes om We Annu P Coup Conc ne Dem Wa e gn on Dos d S ne E Ag ec 762 ng e h a Shop UW 2nd am Pedes y B sa c on A e ng We Condensa TGTU P sa CW Caus a NDT Package ec Y o Back Founda G h A gnmen 102_Po Wa 101_C 103_Bo 762 U0762 Assemb d Sk Package Pumps on Dos ne gn a Bo o d Package pped E p 762 U0762 U A Sk on Sou F e Pumps P ME a nage Wes Dos ng Conc ean ec F a e 2nd A Sk she owdown PW Pedes B ng D o Back & Suppo G m P 1s a gnmen s Sou 103_ ns 101_ U0762 102_ UW and y Assemb ng Fab P o E en d Package ou gn on Sca ne U CW & a e o m Shop U0762 Pumps Coo na on ec T ns 762 Bo Annu am ng o Pumps on Assemb 101A 103A sa nsu ona F p a d E ewa U 103 A owdown s m PW Coup p gn Con We A a sa Coo ne d o ng & sa Founda a Package ou e E Pumps ean o p A ng Pa ec We Dem e on & pped ne 1s ng ME a E d P o ench 762 104 Roo 2nd Fab A Assemb on ng Shop o a 101C 101A Pumps B U0762 A en Condensa nage sa F 102_Po Assemb 1s ng 101_C 103_Bo ns Pedes CW Package ed 762 ewa a c gn e Accesso ng & Wa m SE A Package gn TGTU on ns P U0762 a Sou o m & Coo PW na ng Caus Co ng s o adde ec on h Hyd P Pumps U and & e a ec 101A ean 103A o Sk ME s ca E on Pumps owdown F U0762 Dos on Coo n d sa 762 y S a gn Package ng CW E on ns e a 1s y gn en Dem o We Bo m p d A C adde Package Fab ns & ewa e on a B am 2nd s Hand F Condensa gn 104 SE on & Ladde ng Pedes Coup 105&111 sa a Sk A F na d 762 Hand ng on ec ed Assemb Roo Package U Con ng E ne Cab ns sa umen on Fan A 2nd Eye ca e Bo & ec p P C TGTU w on ean e F Excava PKG owdown She L & CW Assemb PKG gn C e ng ppe adde a U B_Bo ng & Fab on Hyd na D_Bo P Coup o B ewa Caus 101A 101C Fan y Condensa Wa a gn Pedes Accesso A a ng ng A ME ec Coo d 1s P 762 U SE na D p e Package add a ne E & o ean S on T B c Po Cab U0762 U Condensa a A Sou Shop Con D C F L ewa e adde on 105&111 2nd o _Ove a Coo owdown 762 Lay on ca nspec ne en F Accesso a on ng es Beve Hand y ng A e ns gn E PKG 101A Dos 103A SE & ng gh Wash T ee C ec 762 U0762 um am gn a ne Coup P Accesso A e Package F ean sa y 2nd a She 762 & ed E e Accesso gn nspec ns ng a 2nd on n Sk Excava She Con o A L & PKG Mechan TGTU on e a Cab Excava A ca o 104 Lean e P she Lay gh Mo ec ng Package Eye add a We gn B d o Ca D a n s Condensa on B_Bo Sou p _Ove e D_Bo P o SE E 2nd a Coo gnmen nc on G ne A U0762 ng ec _Ove en ns e c s ou E Mo am e Assemb Lay on U Coo gn a na Wa G Po es Condensa ng a o on p Coup Ladde E L _Ove e Coo F owdown sa Fab U0762 U Te Hyd o P on 2nd Te Dos p E um A Coo head ng Accesso en a CAB y ec e on F P U ng A Co gn ou Package on ec e ng B a o Package ng NDT ne U A Roo e a L 762 Assemb d 105&111 am ng on b We ns y A & ec P a on Wash p ng Con Po F ed 762 P Coo Suppo Assemb na gh _Ove o A Accesso on Condu p Back Conc E gn PKG Package she Cab ecommun gnmen nc e A C ng ne 762 U gn on o s Wa T ou d ng ns m U e Coo a _Ove 762 y E Sa on Sou p e gn umn Assemb em Coup F ng a ns Ladde head on U e den A Hyd ng o head a ca F gn ec e y na Coo on E m ca D y Condensa ed _Ove e d JBS ng Sk 762 ench on E Roo o head C she ng S na on e Po 762 Coup ec Assemb Coo ns Back U Bond Bund PKG PWHT P Bo Suppo & nspec 762 e 2nd Package gn na o a Suppo P E umen Cove es am e S Package F Suppo ng ec d E ns Package U zed Bund ec ng Sk Aspha ed e anes F ns & on Ea A d Suppo p head uc Conc Condensa e S 762 U a Founda y Wa o Sys on ec Te e G Aspha y on she Pane L A head C T _Ove Fan umen Po C oo uc s ng LPS 762 e ca Sa Bond Accesso E ng U A na Coo e Accesso a Showe d T on G e & p _Ove A E Bo nspec gh F 762 U Aspha C Condensa on a ng head Hand Conc Aspha U on y P u Coo es ay ave umen S ng Cab e gn anes o ng Accesso Roundness G h anes & m ec o on A E 762 gh ays a S ng e gn ca u F U ound ec e gn ed she F 762 anes on a Roundness Assemb Ma S E Connec ee ng 762 C ns & Aspha e E Jo Accesso m ave ng d Cab Cove e ng na ec Fan F C S on Assemb gn n e T Coo y Po Loca 762 U0762 en head ab ng G on e ec Mo 2nd Su U anes Fan ng E on 2nd Condensa ec Loop d Conc Heavy Ma e Coo a C F head 2nd Showe & eam o gh n e on anes S Tube C ng Sys Coo E on o Ma Lay Heavy ave Conc 2nd E d S ec e ng 762 Beam L a Heavy Tube E We NDT e A Aspha Ma F Su m anes y she U0762 & Sys y Ra Aspha e o Heavy ane on U ec en uc Heavy A E d s ac gh ec k A & a T eam Coo Conc U C ame e A y o S ec Mo on gn F e ns n Heavy L C ns Tes ng on U T e y E C on ec 762 U A gn Mo n Su d U C on S ench Heavy gn ng Connec u na nsu ac y a gh F Du 762 anes Coo gn ns S Ra Check n & F on e ac E PWHT U ane Du S a ec 762 F Connec ng on anes a ns A 762 Du Ra Bund Fac o gn & Check e Assemb 762 U ane ng ame eam U Du ns JBS e T on Founda Dem ame U ng s o Pa a ec ame ca 762 Du y e ns ng a 125M ac Co Heavy Du L U e gn a age uc Hyd Dem nspec Assemb 762 y a on Heavy ac e 762 F A T y Sys Dem Heavy 762 e a Du gh L U Coo on A ns We y Road F on Bo 762 150M a n ng on Du Bo F 125M Hea y ame ns u ays A gh Dem U y e gn Road ng T Roundness a 250M on ns NDT 762 U es ne ame Heavy L gn Dem on ng_Touch o e y a ns e Assemb 150M Du Road gn Bo 762 n ac Road d Dem e gh M a on o y e Dem Bo 762 d Fan 125M y F n a Tes Du 250M Coo a Bo on Du ng ns a Pav Wa Sys Du THK n ng M PKG Road e P n y ns M PKG Bo Wa Tube F e Dem ng sa Pav Du n M e y d & Pos Dem 150M Bo a p Wa & THK e na y Du n Pav e Bo M THK F Pav y n PKG a 250M e 150M Wa ng THK Suppo M PKG e ns on Mo a e y Road e PKG 250M Wa y THK ng Road a Wa G S Pav n y Connec S e ng THK 150M d on nspec PKG BFW Check up Ea a ng n on PKG ng on e BFW 250M eam o M ave Pav Wa eam Sub Leve ns PKG S e a D e M BFW Pav Wa S ng Base THK B Pav S BFW M h Assemb Pav eam Pav mens on THK eam a e Compac BFW & ng M Pav S nde Pou BFW eam C Wo Le base Le & Wea THK on e M ng a Condensa eam on ng S THK add We & ng Condensa BFW ng Leve down Cou Le THK down Pav on & ng eam BFW Le k Condensa Leve on P Pav ng Le & Road & Cou Condensa Compac d F ng down Pav y Le F down Condensa Compac me Condensa Check ng Pav na se down & on na n & ng Le Pav & Tack down & Roo Condensa se ng Th E B Po Shou Coa B Check Condensa ng & down e Po Fo ec owdown & nspec e owdown ng ead & Fo B F ye Coa e B Re on & Conc ye m B ush owdown on e Conc de Ca owdow hy S m B e & owdow ng e ns Loop hy & d owd Leak ene B & ng on Fun a S Cu ng e en e a F Ch ow S ys R e o e B M e U 764 Un M C 1 O Ca Un D Se B_F _Lean _Se _F _O S Pump on ho 4 64 nage 02A ad 03A n 04A ump 09_Se xso p a h Tank e age ge exso F o Bo s ounda pe _F T oad exo mp so Pump A Sump DGA age 3_Se 4_F d 5_Con xcava 4 ge e Lean oad Se F xo O n OC 64 nho _F _DGA B_F A ean mp ump xso sh esh o GA 03_Se 04_F 05_Con a p 103_Se pe D ans e Un b exo 01_F age Lean _Lean ed 101A as U S epe 9_Se 101_F _F _DGA 3A 4A 2A o 0_F 1_DGA Bas exo 764 103_Se A 101A exso age F Tank Un Pump Sump DGA AOC ec nage b Conc Ca D 764 Co COC oad n exso TK Co DGA Tank o y a Pump e F exso exo DGA o nage a ans age S Sump exo b Excava Sump T Un Pump Manho a oad exso S om exo y e ng 764 ch Founda Sump P ec b Co Tank S Un o 764 Co D esh exo y exso DGA age n Sump Pump Lean nage Manho Wa a F age exso U P om B_O ng exo oad B_Lean Lean b Tank 764 B_Se B_F AOC Pump exso eepe COC D esh S T Sump oad ng Tank Founda DGA e Wa b Sump nage ans on Wa ch 764 pe U age o Pumps Excava exso ec eepe D Tank esh Co n b Sump 764 Wa 102A_Lean ec Tank nage exso Un S Pump DGA Bo ng D exo Excava a T oad TK exso Founda pe Sump Bas Ca DGA Excava e oad B_F 764 esh Reba exo on b Tank Sump ans o Pumps Lean Wa ec a B_F D S age COC ng Excava L am ec Un Co T on b S D TK exo nage DGA 764 Bo Pumps D e T b a Lean S o Co esh 764 Conc Pump o D ans Tank S Bas a ng Un b Tank nage P AOC age Fo on TK exso DGA Sump am exo ng T Un e oad Lean ne Pump Pumps on b S o Reba exo ec Co nage Conc ans a y e TK Un b Tank DGA o Pump Conc ans ch 102B_Lean D COC age om nage TK b L a age o e T ng Reba exo eepe Un Co Pump on n Excava S Sump um oad pe b Ca on ng Excava e Founda DGA ec ans nage D Lean 764 age na Fo Pumps 102A_Lean Co eepe on esh b S o e Sump T Wa Pump D Reba Tank nage age oad b Founda Ca on esh om Pumps nage ec S ne age m T Conc D oad Sump Pump Pa TK oad S ans DGA Excava um 764 Fo n Wa 101_F e L o DGA Sump ans TK Fo Reba O Pump 764 na on Bas Excava oad S Tank ec T Co ng on 104_F Conc 764 age Un Back Fo Pump ans a Pumps S 103_Se o D 105_Con oad e 102B_Lean on Reba T a Fo D ans e o COC 764 Tank ed hod ec um Co b Ancho Excava ne Un m on Wa Conc age Tank Lean um ng Un 764 on ec Co Pumps nage Lay Lean ch he L Conc on e ans Ancho Excava n o Founda age Co nage DGA V Tank Pump Fo m eepe on e o 764 ed ng 103_Se um ans age m DGA Tank 101_F Lean D a 104_F Un Ancho um age 105_Con T Pumps S Tank a ng Co e Founda Conc oad m on Reba Pumps V ec Fo Co 764 Lean Conc ng n TK ne m Reba age F Co e DGA Founda We Reba oad age 764 Tank nage e ng D on TK S 103_Se P Pump T ec Sump Fo Pumps nage oad Bas Conc c e um Excava ans 764 o D on Reba TK Pumps Ancho ec Fo Tank F m T on Excava U 103_Se exso Founda ng Pa Pumps Fo 764 Pump ec on esh e TK Reba T oad Conc L 764 D e o Tank Ancho ans um Lean exso Conc P D T m on e TK Ancho 764 Fo ans Pumps on ec Tank Hyd age Excava Tank Conc e 764 exso um D T Co ec ng on 103_Se Pumps ans Un 764 G ec e Co m Conc Fo on d ne 102A_Lean TK Un 764 Conc P ans D exo DGA 104_F Tank Excava Reba ng age ec P Founda V Tank Bo m Back Conc um on ans Assemb Pumps 102B_Lean Lean e Pedes o Conc ng Reba n m 764 e on exso ans Conc Pumps S Excava TK esh DGA e Bo 105_Con Co am um ng 101_F Lean Fo L m Co D ng TK P DGA 764 Bo 111_DGA on 109_Se T 103_Se exo P Fo um Excava e ec 103_Se 110_F on oad e Back Lean Pumps Conc b m on D oad Pedes TK Ancho Reba Tank ec T P Conc Founda 764 on o TK 104_F ne e Pumps 764 D T Conc b TK Fo DGA Founda P Lean 764 am um e 112A ans Pedes TK exo Back D 111_DGA 109_Se on Conc Tank 764 b 110_F S Bond Bo Ancho Fo e Back 103_Se on T 764 m P um Pumps on Reba e ans TK age na Founda ec D o S 764 exo Conc DGA Fo m e 105_Con Back Ancho ec ans on 764 Bo Founda e um D es Back U Conc 112A on Pumps Bo 764 S Ancho Founda Reba TK Fo um b on o exso P 103_Se 764 S e Pumps Ancho ng Excava Fo ans Founda 104_F m exo ng ec e Conc 101_F UW on 111_DGA 109_Se Pumps S 102B_Lean a 110_F um V P o TK 764 e Conc 102A_Lean na m um Pumps P TK Conc Fo V ed um S esh e on 764 o age Pedes U m on e 101A Lean 105_Con TK P D 103_Se Conc o Founda 104_F 764 on exso Fo S D ng Conc e age V o 764 on Tank TK m D e B_O T 105_DGA a 112A P 764 Ancho o exso 104A 103_Se exo e ng m T 102A Back TK 101A 104_F age Conc U o exo TK on 105_DGA Bo Back 764 e Pedes age ed am S a Pumps 103A P 764 exso e Reba F 104_F Founda DGA m age o Fo um e Founda 105_Con 104_F 764 PW B_O ec S on ans 101_F U Conc D um b e Pumps 104A TK Pedes Back DGA 102A ans Ancho Bo D age exo Sump m 104_F on a Pumps DGA Conc Tank Fo 764 o exo nage e exso TK P Back Tank Pedes 103A Bo 102B_Lean age 101A P O Founda e exso Fo Pumps o S Tank V 102A_Lean F on Bo e Conc esh nage um exso 105_Con TK 764 na Ancho on B_F Bo V P Pedes Sump um b Tank exo e m Sump S Founda on age am Fo y e TK 764 Tank D on P 104A exo e a B_O b Conc Ancho on 102A exso B_F Tank TK 101_F U e Pedes B_Lean Founda age 105_Con he CW Back B_F 105_DGA o m TK O e Sump b B_Se 104_F 103A 102B_Lean Tank Wa o exo S y Sump m exso e S ed epa TK a Sump Bo on S B_F Tank e B_Lean age exso 101_F O Conc exo e S 764 Pedes am m exso DGA Co Sump Back b he Founda e P Conc Pumps esh 102A_Lean na Wa age B_Se Pump a esh B_F Pumps DGA b exso o Tank nage S 102B_Lean O o DGA P Founda TK Co e b Fo 101_F U e Bo o on a Sump D Tank exso Back Conc on e S he & F Pedes Ancho esh y E D epa e Founda S age B_F Pedes Pump am b 102A_Lean 102B_Lean B_Lean o age a Sump e Conc S P Pedes Back epa age U G he ed a na Bo e ec exso on age a Tank B_Se U SE Pedes E Wa b exo esh o a S e m DGA U Pump ec a Tank o 102A_Lean P DGA e Founda Bo age Sump b exso E Pedes Pump on o am esh b epa S DGA e Pump nage on 764 U L D G on Founda e b age S Co ec o exo esh F na DGA nage Pump S age E ed a o p Sump a am Tank exso 764 Assemb age on D b DGA U ec e Tank o ne DGA E U Pedes e a Tank G D Conc S Pump on e esh exso Back age a DGA ng o L Excava Un o age ec on a e na 1s on Tank b G Assemb age ed a DGA Pump e E F on ec Bo a exo 764 nage on DGA S ne ec a Pedes o age L Un Tank b D E Sump age DGA U on na e Founda D a DGA T Un Tank Assemb & Co on S nage UW Tank Shop exso Pumps 1s D L ec ne a Co Un nage oad on DGA age S ed o P D 2nd Pedes oad b DGA F Tank um E S & A ec kes T Tank E 764 1s We ans on U ne o Pumps E on oad Pedes Tank b & ed e E UW um S age p oad Un exso o DGA a 2nd Tank We on ec o D Un E Tank F P oad ans gn on ec A U & age S Co e ec ng 764 UW PW We o ng P age ec S 2nd ng on & nage E T Tank DGA A age F D Co exso kes Open on b d Pumps a p U UW e NDT ec Fab We Co S oad gn o 764 A ng age S P o oad epa ng We & on Tank PW Pedes D exso d ec ans E on ng Shop U S A gn um ng U on Assemb E e T ec a & ng on E age 764 d Tank o b Pumps S CW ng p age PW gn We E A o ng ec a Tank on E D T a ec NDT Open o Tank 764 1s d ec gn ans We & U ng D E T 764 age PW S ng & ec Shop o Pumps Co S age on d D & Coup Tank age ca b T ng nage ec & CW a e on gn kes P ans Ladde ec D ng age F E We o ans ec & We 764 um on ng Tank age U b d S We E o Bo on Tank CW & ans Coup a Fab We F um on Shop T 2nd p A on d U Pumps a & E ec T e ch U We on CW age S Bo D ng Coup Tank age o nage Pa E on o ec ng 764 SE D & Tank ans F E Open Bo ng o D & e on d ewa gn Tank & We ans d ec Fab 764 Assemb D e E U & ng d 764 o um Pumps om ng age ec Tank d U Bo kes Hyd A e Excava F U & on on o ng Beve ec A SE um Annu ng n & We Shop d ca E ch 1s Pumps ng on om o C ec Tank age um & ng We NDT 764 P Pumps Tank Fab ng 764 SE Lay om e gn on We U0764 E d 764 Pumps ng Annu gn We ewa F U & E e ec on ean P o D U0764 ng E Hyd NDT U SE a Roo o on om Tank Open ca P o & Lean D U E ng on P 2nd o d A ec We on C P Pumps 764 U0764 ec d ewa a & Ladde NDT D e Tank um Pumps ec o Annu P a L Coup p 764 U Roo d & We U0764 ng a She p ec Annu d on Fab D 764 U0764 Hyd & ch ca ean a Annu gn E Assemb e es ng F o on We nage D ne P ng F a ng & Back Accesso on o We U0764 a ng 764 on kes A d Assemb e We U0764 P on Assemb ec m 1s o nage a F p NDT & Conc e Ladde She a ewa on D d We L Reba e U ns o ewa P U0764 1s on ng ou NDT Excava F es & U0764 a P o Suppo ng gn E d ns e F D a o nage P We & ca ne Accesso ng Bo P d ng a p U 764 2nd a d ch Roo Eye e Open L on P & Hyd A a ng p kes ec 2nd a Roo Bond em We p U0764 a Roo ng d es A P Suppo ns den ou a d ne F Coup ng e ns U0764 & 764 a e P C o Lay Hyd U0764 We on e P ng nage F gn a d Cab e ng & PWHT Fo U0764 U om ng a nc o E e gn a e Hyd ns on A a & ean o C F U Wash L P a y ng She Open zed e o d We L U ng A on Suppo e d P Cab ns ng nsu Hand ec F 764 U o nc Annu on e P ne D d & ean C ng Eye e P on m ne a E gn ng She 764 o F P E a e She 764 gn ca Suppo es U o e umen m ng d o a 764 & E Hyd ean y Cab e ng a Accesso d o ch U ec on Cab a o e Te Assemb Hyd d ec on a es o Back ns E Coup e Suppo F 764 Roo ns Accesso C o e P ec ng d U Coup a & F Wash D P ng e on U o ns E 764 es ou a Cab on e Aspha U ng Lay Conc o ec a Accesso U ean m nc o on Conc P E ng m on e Sa p o P 764 G a nc on U Aspha e umen ec ch 764 She ou Bond d nc F o on e Ma a P 764 ng ec Te Ca 764 o a U na Aspha S CAB F Lay Conc P a E on e U es ou o ave 764 ng o e We ng G a U Accesso Suppo a e es Back on ng & gh eam d Suppo 764 Condu a S F on y ec Suppo ecommun U e 764 T m y on k Aspha e ng Mechan on b S F ave NDT 764 on Sa E P e ng y S ou G Showe o e d nsu e F 764 JBS ench Su Connec na e ng a eam o Conc Heavy a e on Assemb d y ec eam o age ng Pou na d ave Heavy T Conc e nc on e Heavy L E U0764 Aspha Su Ea E Sys U Aspha on PWHT Heavy a Pane ac L y We ac T gh on LPS s ns ec Conc ec y T Heavy L gh Showe nspec 764 on T e ay Suppo ca Su ng Heavy & ng h gh ays ac Du S ca NDT U e d Du ac on umen ng on U Du Jo ng ca Cove Du y e a ng o F Loca ng 764 U ns Du ac y e 125M L Heavy Du Pa ng on 764 y Hyd Heavy n U e & on y U Sys Du P Heavy L gh 764 e Hea Bo y on F Road 150M d ng Pos Du Fac 125M L y F gh Sys 764 umen n y p 764 U Road 250M na Founda s e Heavy L gh U S y ns ng F e o 150M Du ng_Touch Road d M ng y Re gh 764 125M 250M d Du ush a Sys 764 Tes Loop Du n a on nspec Pav Du ns THK Road M y es M D Func ns JBS ng Leak Pav M Du Loop a y 150M ng THK y mens M Pav Du a THK y Mechan 250M a 150M THK on Sys M ng on ns Punch Tes y Road a 250M THK B ng Road G Pav a y Tes THK on 150M Tes & a Ea ng Assemb on ow up 250M on M ave Pav on Sub Leve Suppo a Mo Tes Pav M ng Base B ng THK We Pav Pav C h M s Pav F on Check ca THK Compac ng Pav M nde Pou Wo o ea base na Wea THK ng M d ng THK Runn y So Leve ng Cou ng THK Pav ng & Leve k nspec P n Pav ng Road Compac Cou o PSSR F ng Th Pav E Compac me ng Run Pav se na on ec ng Pav Tack ead ng se Tes Coa Po Shou Check on ng on Po Fo ng Fo ye Coa on Conc ye m on de Conc hy m & hy ene & S Cu e ene S op e eo W b e U 765 Un M C 90MP s _MP V P 2A e as Gas MP V a A P Ba Gas Fue Ba Fue ance 101_MP Gas 101_MP Fue B_LP B_LP Ba Fue ance Fue ance Ba Fue Ba Gas ance Gas Ba D Gas ance Gas Fue ance Fue Gas D um D Gas ance 765 Ba 765 Fue Fue um Ba D 765 um 765 Ba Ba D Gas Excava ance Ba um U0765 Gas D Ba V ance V ance Lean um D Gas Excava V ance Gas um V 765 102A ance 101_MP 765 ance Reba Lean um Ba 102A Ba 101_MP D Fo D Reba Ba D Ba Conc U Pa V ance um D ance V Fo on um D B_LP m U um D Conc 102A 765 ance um B_LP ance 101_MP U n on um m 765 U Conc um Founda Fo Fue ng D 765 e Ancho U D U 765 Fue Conc AS U Fue P Founda Fo e um B_LP D e um Ancho 765 D m U Fue 765 P p 765 e Gas um U P um 001_Ana m ng 765 p Gas P Conc e Pedes Fue Back Gas e p ng 765 P U p Bo on Gas Fue P Shop ng Pedes Conc e P Back Founda Ba ng U0765 p U Shop p 765 Bo P Ba on p Gas ng Ba Shop Founda ng e P p 765 ance Shop ng Ba Gas a ance e ng U0765 Fab p yze Suppo e ance Shop U0765 P a F ng Ba ance Fab e Pedes F Suppo p Fab P U e on Ba U0765 D Fab U0765 ng F D She Suppo ance Pedes ca d U0765 e p 765 U0765 D um on Fab U e ca E ance ng um P D U0765 F ns um U0765 ca d on U0765 F ns 765 U0765 ec ca a oo um e F E D on U0765 e a P A F d ca ns Beve on a e E ec d ns D on um p U ng ns a Cab e E Eye F gn We A d ns a E U0765 ec ng um a Cab d NDT on e 765 U0765 ec E a on E Cab gn em ns a on ns ec den Ladde E S a ns d d e F ec a Wash ng on ec Hand a o ns Ladde a on E ec We ng e o a Lay Eye zed on a U0765 PWHT e on Assemb Cab ec d on ona Te a on a U0765 F NDT o a ns Te ca on d E o Assemb ns ng on o a on & Wash Cab P F on o ng Assemb m e Condu CAB ec e m Cab We y on umen Sa a P na F o o na E T PWHT o NDT ns e na o a gh e on o ec Pa Ma Ea e ench d Te o ng JBS S e L Lay & on nspec y ng on T umen y gh ng Pane m Hyd T o o s Sa n ecommun Ca Showe F k ca h ng ay o m n ench age ng Bo ng_Touch LPS & T na ng Sys ng e Pos F o b Hea Cove Jo ays on y Loca e & Sys Connec Tes a ng nspec Showe T n d L on S on ays U0765 D gh Sys ns s ca a S mens U U n up on a umen on ng 765 U on 765 Fac U JBS Founda U 765 ns Sys Sys on U 765 765 nsu F 765 Check umen es ush Re Leak Loop a Func on ns Punch ns ng on Loop & a a Tes B Tes Suppo o a on a ow C on P on Tes ea ng Mo p ng s & o PSSR So o Run U0766 Un M C 106 Wa B_Ch Ch o h A y ns a d nda Su ed B_Ch ack P 6 66 oo d e Re Ch 766 unda ounda h A Wa on 101_Ch ack ed Chem ge 6 P B ans Wa 101_Ch P O ca Coo U Chem Wa e y P 101_Ch 766 Su B ed Wa pe 766 a T Chem ed B 766 101A ME P C_Ch Coo O e ed 101A Wa pe e ge 101A Excava Wa ed 766 101A a U C_Ch y Sump Excava Founda ans Su ed e C_Ch P on T Founda pe ge e Wa ge U ack Pump Wa e y 766 e Lean Su Wa Re P on 766 ed D ack a ME ans Wa ed 102A_Ch 101_Ch P Re e ca Wa e Pump on Package 766 ge Re Lean C ca ack a Chem Sump D B 102A_Ch Reba e B Coo O ca um Sump on e B ge 101A Package Wa Reba Founda e B ed Coo C O Wa Sump ed P e Fo U C_Ch Coo O Founda on T 101_Ch um ed Excava ge cu C_Ch D Fo e P 766 C_Ch Pump Conc Sump e T ed C_Ch 766 y Su ge Package Founda on ME C U T Excava 102A_Ch D Sump ge 766 cu y ans Wa Sump on Su Excava Wa on 101A um y Conc m e ans Su Pump Package a Re Wa e C a U Sump Re Wa ans m e U Pumps Lean 766 Wa ca um B cu a e ge V a Lean 766 U Conc on P ed O ge Coo 101_Ch U Pumps Fo on 766 O cu e Founda 766 ge V C_Ch Fo Reba U e Excava ed on Founda 101_Ch Ancho Sump e Reba ed a on 766 Bo T e D ed ge 101A 766 e Pumps ed 766 Fo B Lean ge e ed y on Pumps Wa D e 101_Ch Su Bo y a Package 766 Pump m C Sump ed Su Conc D Re ans Pump on m P U Fo Pumps Wa Re Package 766 on um C C_Ch e Wa Pumps Sump Conc Pump Package e Ancho Wa C on a Reba P Sump um Wa e on Sump m Wa a om Conc P V 766 Excava um cu 101A 766 Wa ge ed Pedes Fo e Pumps ge Sump om Conc cu pe m e Back P Pedes on B ed cu 766 Lean Conc Wa e o on P 101_Ch e ge P Pumps e ge ed a Bo Founda on U Fo pe e Reba Re D Wa C_Ch e Pumps Conc ec on D a m Wa 766 Ancho Founda pe Reba ed P E Excava ack e Package a Pump Founda Fo Chem 103A Wa C Conc Pumps Sump Package C e Sump on P U Pumps Ancho ed a C 766 e B Fo um ed Wa a C Y Lean Pa 766 U Chem um on m Bo e 103A ack Conc 101A e on Reba U Re Conc on Wa Founda ack pe e a cu Fo Back C_Ch 766 U m on e cu ge a Ancho on Pumps P cu 101_Ove 102_Ove E Wa Reba 766 e cu U Wa Conc m U Pumps n 766 e Conc Pedes e Pumps Fo Chem 766 Back Pedes B_Ch a e E 103A ed ec ack 101A P U a m Package a ed Conc 766 ca Pumps Pedes e Package C Back E Pumps Pedes a Conc 766 Bo on ge P U0766 B_Ch e Founda Re p U Fo ca on ec 101A P 766 e Bo on m Ancho on Wa Fo ec P Sca Su on Conc o cu e Wa Pedes ng 766 Founda P Back E T ed e p a 766 C P e Su a Pumps ec E m Bo Conc on T B_Ch Pumps P Sca ng p Pumps e Package ca P a ans Founda m ec a Pumps Fo e on ed ge F Y Shop on e Ancho 766 Wa e cu head a ng 101A P Sca o ans p e a B_Ch E o e ed ge Conc on F Pedes e A Back 101_Ove 102_Ove Shop o e ng T a m P Wa Pedes C G on 766 Package D Excava a d a Lean d 101A Su Bo e Shop o on o e Pedes m gnmen Wa D ng p ans E Founda e Pumps & o E ou 766 um on Shop U0766 ed cu Fab m o on d 766 C Conc F Pump e Pedes B_Ch ng P Back & e Excava ge 101A um Pedes C m Lean Y ng ec d adde e Pump Hand Bo ed na Fab on & anes Package a oo e Wa Co Pumps Conc ng Founda B_Ch adde Shop E U e O Fab 101_Ove 102_Ove & a E cu D Y Hand adde ca on Wa A a O Coo Fab on Pump ec head 766 umn e 101A adde nspec ng Hand Pedes y um U G B_Ch 101_Ove 102_Ove Bo e Co Conc a Pa Assemb ca 766 ed a U on gn 766 e a Wa Pumps F on y E 1s ca 766 ound e on Fab O on Coo A 766 U Wa e umn ed s n 766 Ladde Wa U ec ca on G a Pedes e P Founda G T C Beve ME Coo d B_Ch on F e A gnmen P 766 y Pumps a ng U0766 2nd F Fan 766 s e p U0766 gh ound Wa 766 a on head U ed E ou anes e We U Wa on oo P Ra e ca na 101A gn s ME ng Beam Sump A e P 766 U0766 Founda NDT d 101_Ch S ec 766 ng F en p U0766 U 766 e F head 101A Eye U0766 Sump Wa A F p U0766 Coo & gnmen e ng 766 E a ng d F P den S oo ee on U0766 e na ng 766 U0766 F n ed nspec 101_Ch Beam C U0766 A ng gn E Mo ME on P Ma ng on ec e a Coo ab p 101A S B U0766 ns Bo Coo Sump ame Assemb PWHT e F U0766 ns Wash P & Pumps Hand anes d P ec S gn ng Suppo 101A e Wa ME C ee B C_Ch U0766 Coup nspec e Eye Pumps o p Co on E n P Coo p a 101_Ch o em ca on ab U0766 a ns C_Ch U Bund uc anes d ns e S Suppo F ng U0766 ns T ed on ng F U0766 e & Cab U ec 101A Bo m a E B U0766 S e on U 101_Ch U0766 a E ns e 766 gh ns C Pumps ame U a on A Co B Wash & zed ng u uc U a Suppo C_Ch 766 E ec Wa U0766 U ed on e F Cab ns d 766 Coo umen on ec uc U ng on Assemb ed C_Ch a Sa e ane 766 gn ng on a en T 766 e ec A E F ns 766 Ma u U Roundness e 1s o Wa Cab B 766 a ed on o Cab u a Te d gh P U0766 Assemb on e Aspha E a Wa ec e gn ns U ed Fan Conc ng S ns 766 F e C_Ch G a Aspha U on E F ns & e d p on ns umen U0766 Cab Coo ns Wa ec k on A S Lay U0766 Re y o ed en U e m o Aspha 766 2nd We U0766 Conc ng Ca Aspha U e on E a Wa Sa ave Tube ec 766 nsu a e U0766 G S F U Showe e ed eam a d U0766 o gn a & age 766 Te a na o Te CAB U0766 Re ng Wa on ec Lay 766 U a e F Aspha ng a eam ng e F E ave o 766 e a C NDT d Mo b on a ge A Wa F ns e d a gh U0766 G on Condu ed 766 ecommun Su e T on y ec Conc ng on Assemb m Heavy Connec y C e a on F Pa E Connec E gn T ng cu e d Conc on Heavy Re ge Check ave nsu F a Loop Showe ench JBS o Aspha e d ush Su Heavy Wa na ng Func umen L T o on e ec Aspha ac cu E ec Heavy o Leak on Mechan PWHT na Heavy S Assemb C o n ac a d Re on Punch gh Coup Conc ac a ns Ea Heavy L o E C ec a Sys ng e on ng_Touch Pane L Heavy ge Su on ng T Pass cu e LPS ng We ac gh s Du Package Tes T ec on e ng gh e nspec P a Du on cu on ay Du umen ge on Tes F ng h e ays & C Du on Pumps a B Loop ng ca NDT p Fac Du a Package e y ng Du F 125M d L ac Heavy e a C Heavy Founda Jo ng Pumps ca ow Cove y Tes o on a va y Heavy ca Du cu Hyd Loca L gh e y Mo ng d on y Road ea Du 150M on 125M ng y gh y & n d on Sys Road Mechan n 250M ng Hea a Pumps on Package Tes ns L F Heavy on Runn Bo y 150M Road o L Du es Pos Road Sys Pumps ns y M gh Assemb o up & na Assemb 250M 125M on Package s Du gh S Du a So Tes Pav Du PSSR Road 1s THK s M y a ng ns on Sk Sys a Pav Pumps Du M n y nspec ng 150M y a on Pav o THK Du M y Pav on ng 2nd JBS D A 150M 250M ca & a p ng THK M Run Road y on 250M C Tes Accesso THK ng Road A mens Pav Suppo G a gn y Sys ng 150M THK Assemb ng add Ea ng 2nd A 250M on gn We M ave F Pav Sub Leve C on M E Pav E gn na ng Base Pav THK B add M Pav ng h Pav on A ec d THK ec Pav Compac M nde ng Pou Wo Coup base Wea THK ng M gn y nspec Check ng Roo y THK on ng on ng Cou Leve Pav THK ns ng Th n k Leve P Pav ng Road Compac Cou Roo F E ng Pav ng a ead Compac & me ng se na Pav on ec a on Tack ng S Pav se ng Shou Po on & Coa ng d Check on ng Po Fo ng S ng Fo ye Coa on d Conc ye m on de ng Conc hy m & hy & ene Cu S ene e S ope e e ope b W e Pou W A Pou e A e gnmen Mesh ng gnmen Mesh ng U 767 ns U 767 umen Un P an A M A D C ye Comp PKG esso & Rece PKG ve & s KO Un D M um C Un M C 70 B_ ns & C_P 01A nda A umen B_ D D_P ack P ce men O an 102_P 7 01A unda ounda KO n _P C_P on ack umen um E ME C ece an 02_P P an & Rece umen pe ME um ns D 101A P ns A & ve D_P pe Rece ns umen an Excava A ns Founda B D A Excava on an Founda 101A B pe ve um & an ack ns A umen Lean on s 101A 767 C_P KO ack um umen an C_P A umen an 767 ve & KO A on ns umen Lean an KO ack s Excava & B A Reba ve & Rece umen Reba Founda Lean ns Rece D A B Fo Founda s C 767 A ME Rece Fo ns an D umen ME Conc & an ns 767 D B Comp Founda s on Reba C um on D_P A on Conc A um 767 Comp umen m KO A Fo C U um KO ns m D_P umen A ve & 767 101A C & umen Conc 101A ve U Conc A C D_P Comp Fo ve 767 on U Rece Rece Founda Fo m 101A ns e Founda D an 767 umen Ancho ns Comp on D V s 767 A 101A esso on s 767 U V D e an m s 767 um Conc um 102_P esso m A B on Founda Fo C V an U0767 umen e Ancho & 767 B 102_P P A umen D U ye e V A Conc P ve 767 C ve esso Pedes B 101A & e P C pe e Comp Conc Back Pedes ns 767 ye V s m P B 101A U o esso & A Comp D_P D C_P pe p Comp Packages s Bo D_P e C ns on s Excava pe ec on 102_P C_P Founda P ack 767 ng V an Conc ns ye e Pedes U umen Packages Lean Back D A e 101A an Pa C s A ack pe U B_ Bo B 101A P on ack umen U an e on 767 e a an Shop B_ s Founda ye esso Reba an A a 101A E C_P 767 umen Packages an p Comp esso e n Comp ack P 767 A ns esso Fo 767 E U Pedes ng ec an e Conc ns & E & U B ng p & Packages KO C U Pedes a A on ec & B_ U e P 767 on m KO ng ec umen C_P an Fab Shop s E Excava ns P Sca 767 ns A B on Y 101A 767 ns A P s umen p 767 ns s D Pedes Conc esso A D ns ec a Lean on esso Shop C_P ng Founda a 101_ Fo on D e & Ancho umen a F umen Sca ye KO um P umen o an ca e umen P D o 767 a um A e on Reba Shop Fab Y umen Sca ye m ns G B a P A m d a 767 m d an s Conc ye 767 e s A Packages gnmen 101_ D E & on Fab p C_P 767 Fo ng a F ou o & E o A Conc e Y Pedes Packages o & Back Rece umen ng um ec A na ca A m o ns & d Rece A Bo Packages ec on adde Fab Beve Hand m ME gn 101_ Y A adde Founda ng A d C Shop an & ca 767 e ns D on Comp & 767 Ladde on 101_ ng D umen on nspec e Founda Comp 101A ve Hand adde U Rece Bo ye a adde ca ve A on ye & e umen Hand U0767 767 We ng a F C 767 Conc ME A s Fab ns e Packages 767 s Pedes Comp on NDT Fo U 101A E Packages T Assemb esso B gnmen on 767 d A ve P a F Ancho C on esso G U gh Eye 101A ec 767 F C ng umen a E m e a den s ca on gn e A 101A C F ou 767 Comp s na 767 d PWHT en e _Ove s ec D_P C U A e B on s Ladde esso U 101A a Pedes Wash 767 E e o F on s Comp U0767 P 101A 767 gnmen C Excava ng B U0767 Founda Eye on nspec P 767 na U Bo m ec Lean ng ME P ca p B A Conc U0767 C an _Ove Hand 767 Back oo esso ng C U0767 head p 767 U0767 C s B D_P on P & on ng Comp Wash U0767 nspec a B T 101A 767 U0767 P Co esso & U0767 _Ove C F Conc ng U p Sa ME ns U0767 gh C_P a on e p U0767 ns Suppo C Bo Ma e head on ng ns P _Ove s C umn 767 an on U0767 U ng e d C e a U0767 en em Mechan 101A p G U0767 ns a B 101A anes s & o F ns E esso 767 U0767 k ng umen y head o on an Cab Pedes F a 101A U0767 T Suppo e & ound C U0767 a F C_P ng Sa m ns e Showe C ns ec S a Conc Founda zed gh e a head on U oo Cab ns d F Suppo U umen D_P on & d B U anes a o F e Conc a P B E s e 767 ns on en 767 C o Cab E a ns an B C_P age e Cab on o ns 767 y Beam a ca Te d p C S on A umen U ec a e ns nsu e anes C an ec d C_P U Showe a ns ng F E U umen U on ab ns D_P F Cab a ee on 767 o Lay e & S Ma m o E U Ca Conc umen D e anes on a S 767 Ra ec e an 767 U a 767 F U0767 Conc on a & o U Te ec e o na ns 767 Heavy eam CAB ye L Lay d a S F an & ng e 767 n o on a C We an A b on a gh U0767 ns S 767 E Conc F & gh NDT Condu on d Co F Heavy ecommun L T m uc S on Connec a e umen ane A F Packages Fac on e eam U o & ng ns gh E ec ns A D Founda ame Assemb e F & ench d eam JBS U T e o na d umen ng ns Du on gn u e o Assemb 767 ec ns U e E na nsu Du o ng ye d ac PWHT ns 767 U on Comp umen Mechan e umen Du L Ea ns Heavy U ns ec Sys on L Pa 767 y T Pane umen Du Heavy T L ns gh e LPS s on es 767 ng umen T y A gh Packages ns 767 a 150M We nspec ac gh umen P a y ay umen on 250M & h n ac ays A L P Heavy ca y F Hyd on umen 150M NDT an a Du ng Comp ns P ng Jo gh Assemb esso ng_Touch Cove an A 250M d y A P Du e ng Loca D P an A Hea ca Du & on ng a d o F M y n & an A Sys an o D ye Du on A F D M A y Comp Suppo F 150M Pos a e L ns D THK Du M P Sys Bo A y Tes s Loop e 150M 250M esso ye D s na Comp d gh ye A THK M S Sk on A D Sys y p 250M Packages Comp ye d E THK a ye y ns Comp ng a 150M THK ye ng n PKG Comp p ec ns a PKG on Comp 250M nspec M up esso Pav PKG ng Tes JBS s A a M E PKG on Pav D esso a THK Packages PKG on M Body Pav esso a Sys gn ec THK mens Pav & M a ng & esso Assemb s THK on s & esso ng M esso Rece Rece on & THK on ng Accesso 2nd s Rece & Leve PKG Pav THK ng A Rece We Leve PKG C Pav Rece on F Compac PKG gn Pav add PKG Compac A na ve ve PKG ng d Pav 2nd Check ve & y ng Pav gn ve ng & s s ve ng KO n Po ng nspec & y s KO F ng A & Re Po Fo s Th E Coup & KO Loop Leak s ng ns ush Fo ye KO D Func gn ec Roo KO on Punch Conc ye ns m D ead on a um Conc hy D m ng um D on & hy a D ng Tes um & ene ng & S on um F a B Re um on ene e S Leak S Loop ope C ush e ow e on Func Tes ope Mo W d ns ea Mechan e Punch Pou W ng ng A ng Pou a Tes e o A & e gnmen Mesh a on B ng So PSSR gnmen Mesh ow ng on C Tes ca Mo o ea ng Run Run o &S P U0768 Un M C 70C V ME nda ack P 8 unda ounda on ack 68 P 768 V ME C 101_N pe 101A P pe 101_N Excava C ME 101A V Founda on Founda pe ack 101A C ME V 101_N 101A on ack 768 on B Lean 101_N 768 101A ack 768 B Reba Founda B_N 101A C_N ogen Founda Fo B_N C_N ME C V B ogen Founda on ME C V on ME on V C Conc B_N B 101_N C_N 101A U m ogen 101_N 768 101A 768 101_N B_N ogen 101A U C_N Rece 768 Conc ogen Fo 768 101A U ogen 101A Rece Founda ogen on 768 on ME V C 768 U e ME C V U B m ogen Rece U ogen C B U on Gene U e Ancho 101_N B B_N ve 101A P 768 ogen Gene Rece C_N 101_N e 101A 768 ogen B_N Conc P 768 C_N 101A Gene ogen 768 B_N ve Pedes P 101A Gene Sca C_N pe 768 101A e ogen Back P o 768 pe Gene a Excava ve Gene C pe ec on a Founda P ack Gene Sca Lean B ve a P ogen Gene Rece B V U o a ogen Sca e Rece ack B o 101A pe P ogen o B_N Bo C V a Rece C_N 768 B_N ack a Reba ogen C_N on 101_N m e a ogen 768 d on C_N 768 a m E U 101_N Fo 101A a on ack ng o on a & E Conc Pedes Package Gene ec o ve & a 768 A Gene E V a on m d ve Gene B on Package ec adde m ve C Hand d ogen A Rece m Gene P on ogen Rece ng adde on ec ogen E 101_N U on C_N & 768 ng Comp ogen Package 768 B p Conc 101A A & C Founda Fo on ogen ec Comp P 768 Hand e Package ng adde Ancho a C_N on A ogen Hand a F adde 101A p Gene e a Comp ve Y Gene 768 a ve F m Gene A ME a on e Shop U ng on Excava Gene A G Comp ogen on B 101_Ove e s esso d Rece P gnmen Lean on ogen 768 gnmen Package a Pedes Conc d F ou e esso C_N Rece Shop A Back E ME G Package Y ogen 101A a p 768 A B Reba Package F Bo a E na on e s A a ng esso ec 768 a 101_Ove Fab ou Founda s Gene Fo C_N 768 na Comp a ng d A s ec on Comp esso Conc ve P 101A on F Rece on Y Comp Shop s E 768 on e Excava ve Gene nspec Fab gnmen B_N m ogen p ng na a Y Bo Package Lean on 101_Ove e Package ME nspec A ec head ca Bo s ng A E Conc A 101_Ove a ogen s Reba Fo Founda A U ME 768 B_N esso Pedes e ve Ancho ec nspec Comp esso Shop ca on Fab 768 Comp T U0768 on Fo 101A esso Gene e Comp gn a 768 T ogen head U Conc m on C gh on 101A gh Bo Ladde Beve on C m A e Gene 768 U s anes C U U0768 ogen ca en Pedes s Conc e 768 Back Fab 101A head en a s P B_N Conc 768 A We esso Gene C on Comp a 101A esso Founda Bo Fo 768 on U T Pa e head U esso Ancho ng p Founda C on B_N ng P anes on gh ng e Comp ng 768 a C E 768 m d Gene ca P 101A n p U e B C P NDT s a e ng F P ogen A on en ec Assemb s 101A B ng U0768 a Suppo e ng C U0768 s C_N p 768 esso Pedes Conc anes e U on Back p Excava e C_N ogen U0768 Ma P ng Lean on P A ng U Comp Bo anes Shop F on Pedes ng Ra U0768 o B 768 esso P a U0768 Founda p U on PWHT p U e Eye Gene 768 U den Suppo B Package U U0768 n m C_N ng Comp U0768 oo ng F s on d 768 C ogen e 768 U C_N Gene F 768 U0768 ns Conc U a 768 ogen Co e E ns U0768 ng A F U e Fab Suppo P U0768 ane F U s Package Wash 768 ame esso ng d ns a G on 768 e U0768 ec p a gn 768 G ca ns e a Eye U0768 umn Pedes E Conc 768 U ns ogen U0768 d Gene em ng ave Conc esso U on d Cab a G Aspha U0768 nsu U0768 ound P Gene ogen a on U F ns ca ec e E on 768 U a Conc Aspha on E Assemb a s 768 U on ns P ave Conc F pe e Cab umen Wash & U on Aspha 768 zed ec a Founda 768 Package ns Aspha U G F a ec Su E on e F p U d Gene a 768 Sa Ma U s a 768 o ns a e Cab on Sk oo ack o ng Gene a Package d e Aspha 768 Beam E ave Te on ec on a 768 U S ns Su Conc e on o 768 U0768 Cab Hand We a d E F ns e on Conc U0768 U e ns ac ec Conc on Cab U0768 o p k ee a F Heavy umen & e Lay 768 on o Conc S m Ca E & on Assemb e Cab y a L ec S Heavy A o NDT e U0768 768 ng a Su e U0768 Sa A on Aspha ng ac Te o d a Conc ab U0768 Showe gh e Aspha on Te Heavy Mechan na ec CAB eam a A Conc F & S d Heavy U0768 L Accesso e ng Assemb o on gn Mechan a b on a Lay U0768 ng E F e ng o gh S Condu ecommun Comp e E U0768 on Co gh on e T Heavy 125M We ac m nsu e 2nd on uc a Comp Du F S e PWHT on Connec Pa Du ns A ec e T eam y ec F E ench JBS e Du T d o Heavy ng na on eam A Re Showe 125M ng e F Du y u ench o L NDT na ec Du o Leak Loop d Heavy y e n S a ac Comp y Du on A S umen Func e L ns on ush Heavy Ea ca gh e n y Heavy ng 150M Mechan Sys Comp on ns Pane esso L M 250M ng_Touch T o ca gh s on Punch Road LPS 125M y ng Heavy Du a gn y esso T Pos gh T L nspec ca y Road Hyd ac age ay 150M umen THK T Bo F 250M M Du a ng on h & ays Tes gh Du ns on ca Road ac F o y Road Du na ays ng Du on Fac esso ng a Jo Hea s THK Cove Loop Du M Loca B Founda e a M y Pav Du ng s esso Road y M on o P ng Du E C on Du d y Pav Tes & n ow ca F y 150M Sys Mo THK a Body G 250M M THK on nspec Tes p M y THK ea ec Pav F 150M y L D 250M Sys ns Pav e s Sys ng y Tes on ave ng up THK y es ng s Leve THK Runn gh e Road d S o mens s 2nd ng Road 150M Pav on 250M a d & C ng A a Ea Pav ns M ng So Pav M on ns n Compac PSSR a s Pou Sub ns M on add M ng gn A JBS THK Pav ng Base a THK Pav ng Pav on B o & a on h Pav THK ng M THK a ng gn M a Sys Run nde Suppo Wo a ng base Wea Tes ng a THK Assemb Check ng THK ng on Leve ng Coup on Leve Pav ng Cou on Pav Roo Pav k Pav on Compac P Compac We Road Cou F ng F ng Pav Pav ng me se na ng na ng d Tack & yPo se ng Po ng Shou S Coa Check ng n Fo Fo nspec d ye E Th on ye on Conc Coa ng Conc m m ec hy de hy ead & &ene on S ene on S e Cu e ng ope ope e eW W Pou b Pou A A e egnmen Mesh gnmen Mesh ng ng U0769 Un M C 100 D ese A Excava o T ese e A P um ans P B_D o se age Lean B_D um age ans B_D 101A T age 101A T Reba S e ans S D ese Fo D ese ans e o D Conc ese o Pumps um B_D on B_D age um Pumps e m age um T 769 e T 769 Pumps T Conc ans U Founda Fo ese D e Pumps ese ans Ancho D ans V e 769 Excava um um V m 769 e 101_D Lean T e T 101_D e U Pumps Conc Reba Pedes e ans Back Pumps P ans V Pumps 769 Bo Fo on U p 769 Founda Conc 101_D ese ng on 769 e m e ese e P U a Pumps P Shop Pumps e Conc 769 p Founda Fo P 769 S Ancho e 101A P ng ese S Pedes 101A e o p on m o P Shop ng age Fab e P age 101A S B_D Conc e Pedes Back p Shop B_D Bo on o a D ng Founda ca D Fab age U0769 ese um B_D Shop e um ese on Fab a e U D E ca T Beve ese A Pedes 769 um T ec Fab ans Pa on ca on gn ans on T Ladde n on We P e ng ca ans ng e a p Pumps NDT U Assemb ng d Pumps on 769 e ng U P Shop Pumps den PWHT U a 769 Ue Assemb P 769 U 769 U 1s o ng Fab p U0769 769 ca P ng 769 m U0769 A P U0769 2nd p U0769 U P F U0769 on ca ng p U0769 gn 769 p P U0769 e P ng A U0769 ng Ma Suppo U d F p ns U0769 on p U0769 Suppo ng E gn U0769 U e ng Eye 769 ns F ns a ns Hand d k ec ns 769 Cab Suppo e ns Coup F a Cab E ns a d umen Wash U0769 e ns Cab a P on ec a E F a em Eye d ns e a p a ng e ns on a e F ec E o on Lay ng on ng a e Te on a U0769 d zed on a ec & o Wash F Cab o Ca on o Te d E U0769 a F U0769 We on ng o ns Sa m e a U0769 S o U0769 E F ec U0769 e on Te U0769 Cab o d U0769 NDT m b on o na CAB F e Condu d o ec F e d umen E a o Cab & ecommun e age na F on Assemb T E ns e ng F y o T E on ec e d F na on Sa Re d ench Showe ec Ea gh PWHT Loop ec JBS ay Lay Assemb Leak ush on Func L Mechan umen Pane ns e Pa nsu & Punch on We gh e ns s on ng Connec nspec T Cove h Jo y ca ng T n LPS umen NDT ng a Tes ench Tes ng Showe ng d Hyd Sys ays n on ng_Touch Loca ca S a B Hea ng Loop on & C y Sys s ca ow Tes a on Mo F L ea T o Bo on n o on gh na ays Runn Tes ng Pos Sys S Tes Sys Fac o P & Founda ng a np nspec PSSR So ng up JBS s ng D on ng o Sys es mens Tes Run on ns on & a Suppo a Check on U 770 Un M C 590 e 70 P U ack U P pe 770 P 770 pe pe Founda ack U ack U U P 770 ack P 770 U 770 Founda 770 pe pe 770 Founda Founda V 770 P C V ack on P ack V 770 P C 104_F 204_F 103_F 203_F 101A 201A P 104_F 204_F V 101_F 201_F 103_F 203_F pe P 104_F 204_F pe 103_F 203_F 101A 201A 770 Excava 101_F 201_F P C pe Founda 770 104_F 204_F 103_F 203_F Founda on pe 770 P C ack 201A 101A 101_F 201_F on ack 770 ack B_Hyd on 101A 201A V 101_F 201_F 770 Lean ack a V 770 a B_Hyd V Reba Founda 770 a 104_F 204_F 103_F 203_F e a Founda e 104_F 204_F 103_F 203_F a Fo Founda P C 103_F 203_F 104_F 204_F B_Hyd e Gas on Founda U P e C 770 Gas on e P a C 770 on B_Hyd 101A 201A Conc Gas 101_F 201_F Gas m V 770 a 101A 201A oca Gas 101_F 201_F 770 U e 101A 201A 101_F 201_F 770 Conc 770 oca Fo 104_F 204_F 103_F 203_F U e Recove a Gas V U Recove 770 a V Founda 770 770 on a Recove Gas U e P Recove C 770 bon oca 101_F on B_Hyd e Recove V P C 770 201_F m on Equ Sca P C U e B_Hyd V a on bon Gas oca B_Hyd 770 101A 201A U Gas 101_F 201_F 770 e Ancho Recove a 101_F 101A 201A V p 770 pe 201_F a Gas V 770 Conc P 101 Equ 201_F e Sca V 770 P a Pedes Recove bon V ng L e 770 Back 104_F V P pmen e o Gas pe 204_F 770 Equ a 203_F P 103_F o bon 770 L qu y ack e o Recove Gas 770 y 104_F a V Recove Gas p Equ P Sca 204_F 203_F m C a Founda on Shop 103_F oca 201_F P pe d qu y Comp B_Hyd V pmen Recove Gas P ec o Comp y B_Hyd 770 oca ack ng o P L e y 101_F a d oca e P C V ng pe 770 a Comp P 101 & Comp 201A 201_F pmen Recove m V o 770 a E Bo 101A qu Comp L d V Gas p 770 d y E ack Pumpou e a Recove Gas e 201A pmen on 104_F o a 101 p Shop Recove bon S a qu 101A ng m adde o e Hand 203_F 204_F ec y Comp a ack & Pumpou E Recove 103_F bon P Gas 101_F 102_F 201_F 202_F Gas a ng Fab d bon m 770 e P a Pedes 201_F d Gas e Comp a U esso e E & S y esso ec E adde uc oca d 201A Hand C Pumpou y Recove e Shop Gas B_Hyd ng a oca 770 on Recove 201_F B_Hyd e Gas 101A & esso y L Shop Comp e Gas esso E a 101_F 201_F 102_F 202_F 770 S Comp Pumpou adde B_Hyd Gas esso ec U0770 L Fab Recove 101 uc e Gas B_Hyd Comp u qu L Recove C 770 a Gas S on y ca adde 770 F Hand e Recove ec qu a F esso bon y a qu Gas a 770 e uc bon y Comp e Recove E 770 101 u 2nd Pumps Recove s 1s a on Gas B_Hyd esso e y Comp Recove d 2nd 1s U Fab uc a Excava e Y A B_Hyd Comp E e Recove on 201_F P 770 d Gas Pumps 2nd Fab 1s on Recove F 101_F 201_F C 102_F 202_F e d a Comp ca U u Pumpou Lean oca Gas Recove C esso oca 2nd 1s Gas s a G 770 esso y Gas 101_770 Pumpou L gnmen G p ec E u Recove y e S C 770 Pumpou oca L esso Gas Pa E e S a 201_F C Pumps F 101_F oca Beve 770 U Recove A S Feed 201_F Reba qu e F ng U Feed y S ou 770 qu d on e y ec ca ou age E Y Pumps Gas S Recove esso age na 101_F ec s S U0770 U age y bon Fo 201_F ca Gas na on bon age S Comp Recove 770 gnmen esso n U0770 Feed E age Recove 770 oca Comp Recove Conc esso Excava d y a 101_F 102_F 201_F 202_F Shop 101_770 P U bon age Feed F C ec oca y d 2nd a 1s Recove bon esso We y 770 E ng C 2nd age on 1s U0770 Lean ng y Comp ec P U on Pumpou m Y Comp na e 1s D 2nd p C U0770 F on y Pumpou D Comp nspec 770 Recove Suc e ng y 101_F U0770 D a L nspec Suc D Comp 101_F 102_F 201_F 202_F L Bo Recove a Y p D ng E on bon Pumps Comp Gas e y Reba 101_770 P 770 U0770 scha S Comp D C Gas Conc NDT 101 P U0770 L bon qu d scha 770 A S e a Pumps y qu on L Suc scha Founda ng a S D Pumps Fo e Feed Assemb esso 101_770 d e scha Fab 101_F 102_F 201_F 202_F P den Suc Ancho p qu nspec esso age S ns U0770 scha y ng p Feed a Gas Suppo Conc qu 101 2nd scha 1s e age U0770 G ns gnmen y e Gas Bo on scha P E age d e y ng T p U d on y Comp ng L esso Suppo Eye F on Recove age esso e m Gas 201_F y Comp L Recove esso Gas E d C a Comp ou Pumpou on ng p Comp em ge gh PWHT U0770 ec qu Pumpou d esso a ns on ge na e 770 D esso Gas Comp S ns U0770 qu ge F y on esso ca Pumpou D 201_Ove S F ng ge e Recove Cab 102_F 202_F 101_F 201_F Pumps Suc a U0770 Conc Pumpou 101 y T ge ca e Conc D Recove U0770 Pumps Pedes ge ns a Founda Comp F Suc Back age Fo KO en scha e Wash D d um ge a ng D KO Gas e on Ancho KO scha C age Comp Recove zed um gh a d KO Gas Bo on Recove scha D ns Cab F Suppo U 2nd KO on d umen nspec ng e Eye Pumpou esso 2nd d scha U0770 KO C Founda 1s Recove F a Bo on KO Pumpou um esso a 101 ng e m KO 2nd 201_Ove esso d e E on um esso s Gas 2nd 1s D en E 770 U F y o D Cab e esso a on y 101 E e D o a Hand Cab e d Te Recove a on E ge D Recove Excava Comp ec ns Ma S e Lean D ge um d ec U Pumps Comp S a scha Wash & 770 Conc esso um D Gas e Pedes ge Pumps a F A ns U um scha e ng ec y E Back T D on ns um 201_Ove esso e U S Cab y ec ge A D d um o Pumps Lay age E head S 2nd Bo on m o Recove Sa U um age Pumps KO Comp Ca 770 e a on gh 201_Ove 1s y 2nd P um KO Comp Gas ec on gn 770 1s y e Founda E um age on U KO 2nd 1s Pedes k a 770 s F gn ns um o Excava a ec age on U Te Lean Comp KO y Te Excava na 770 on Comp a CAB p U ng Lay Recove F Lean G Conc U Pumps e ec ng ge Reba U en s e o Co a 770 D S ge Comp Pumps a esso Reba E b on ng & D F Fo We 770 esso Ladde head Condu S gh on S 1s 2nd y 770 Fo ecommun a C D on d umen T ave Recove 770 G D S Ladde Assemb m y e on NDT 770 scha a U D Assemb age F e on um ec Sa scha o KO S ng Comp age on ng umn esso um Showe KO age E Comp 1s F eam esso Conc Aspha anes um scha ench m JBS age d o 1s ound e na ng U scha a S d y on ave Conc U0770 m Assemb eam 770 um Pedes head Conc S esso o Aspha e o esso S na ec U0770 U G s e d on Comp We Su C Conc ng head on D ns o Aspha Ea 770 1s 2nd U0770 U esso age eam D d e on Fo Aspha A Conc Founda y PWHT D Sys ge on Fo F age L y A Pane Ancho 770 U Founda 2nd ge ave T P D s Connec U0770 Ancho T LPS U scha anes age um Assemb Comp on E T Su P ge scha gh 770 Showe E um oo esso gn e scha nspec Aspha T Beam ge e E y U d ay esso gn a C scha umen m 770 S ac e KO ng h U & m 770 KO ays S D ec ng a A U Body e ca Comp a ec e Body Conc U0770 ac ng C D T e ec NDT A KO ng ns 770 age e ee Heavy anes Su Conc esso KO Jo 1s 2nd Back ng e Cove Conc y 770 ng S scha age ac ns a U Back gn Pedes 770 o Loca E e scha U Heavy ac ge F anes Ma Conc Pedes E D on Aspha gn ng ge e U o Bo D on ge Ra L ab n Aspha on Heavy esso Bo & ge n 2nd 770 m on Heavy Conc Sys umen Pa D ec Bo 1s 2nd S & ng nsu F a 770 on S 2nd ec D Heavy um e ng m Coup ac gh Founda A on U 125M KO S Pos 770 um Conc A F Fac D L e Founda ng KO Hyd Coup n KO U Sys Coo Co esso F C e um age Heavy P a Founda Coo Chem ge 1s 2nd e scha s uc Re Lube ng um na gh n e age gn ge Du 770 on scha e F ng S gn A 125M d on ush e a S 770 a e ane Du A E oo on Loop D s e a E d ng_Touch Leak D ame age Coo e a u D ns Heavy Func gn Du Coo A o S n e age on D Du y Loop C ec S A ng Du e M gn Pedes um nspec ec Heavy L d 125M Du D e es ns um o Pedes e ng mens y Heavy 2nd um 1s ge JBS Mechan ng Tes age O L gn e scha add ge gh ca age a Road Fan Du gn Punch ns scha on Coup THK y ns 150M D M Fan y e 250M on o Tes gh Coup Heavy E y Road on a Tes D y e Sys B Ladde on ns Coo a L Ladde Sea S Coo scha Road P ec Tes on 150M S THK a Road C D 250M scha y Du P a F ow ng gh D M & F on age a Du on pe & ge & ean age a n scha p ge Du Pav on a Road Tes Mo scha G n e Mo ng M THK up y ng C Suppo Pav ca a Mo ng Coo e s O Roo Du Check Assemb on Coo ack y ge ave Coo Pav 150M D ge ea 250M Leve M Pav y We THK A P on M ng D o P 150M A ng o 250M Hea Runn Road L o ge scha y Coo a F Road THK ge scha ng gn Pav Coo e a THK & So e gn Compac ne E & d 150M ng e 250M Pou na Ea ng E e Coo Mechan E Coo S Sub M PSSR ng o ec Pav ng Bund E o S F e o ec Sys Bund ng M Base y ge e ng Pav B ec m d ge THK Run Pav h ush nspec uc ec m Pav Th uc ng e on A n THK nde M on e Wo ng A Wea base Coo Tes Coo on E u on ng e gn ead Roundness ng u THK e gn ng on Cou Roundness ca e ec Leve Assemb Pav e k Assemb P e Fan Road Coo Pav on e Fan Cou F Compac ng Coo Compac on me Tube se na ng Pav Tube Tack & ng e ng & e se Shou Coa Mo Check Po Mo y ng y Fo Connec Check Connec Coa Check ye o on on o Conc m de hy & Cu ene S e on on ope e b W Po A 29 31 34 U ack U e V ow _Low P Eas 771 Se Low o 09A 71 B_Low empe 111A xo V Se 9A Tempe 09A w pe 107_Se 109_Low 111A 771 Tempe exo 771 P pe Regene 107_Se 109_Low 111A 771 Eas Regene U 107_Se 109_Low Tempe P exo exo B_Se pe Regene Founda ack 771 B_Se Tempe 771 Eas B_Se ack 109A P Tempe B_Low P V Regene 771 a V ME B_Low Eas ack Tempe Eas B_Low 111A Regene pe Founda 771 P Regene 111A a u V ME 107_Se 109_Low 105_Low 107_Se 109_Low exo a Founda exo Eas exo pe u e Tempe a 105_Low exo 102_Low a V ME P u exo B_Se ack Founda Tempe U Tempe F e o a on V ME 102_Low u o P pe e Tempe 105_Low P ack a B_Low Regene B_Low 771 a F Tempe o Regene u e Regene a 105_Low pe F LP Tempe 771 a 102_Low u Founda pe LP Regene U Excava Regene P 771 a e ack a F exo on U o 102_Low a LP u exo e Founda on pe 771 C e Tempe ack U F o a Tempe V ME ack F o e U 771 F a Eas LP ME V on C Lean a osed u F Tempe a ME V Founda e 771 U C a 105_Low F Tempe LP u Reba ack LP Tempe Regene 771 Regene 105_Low 771 u osed e a Founda 771 Tempe C a e 105_Low Founda F osed 102_Low Tempe a u Fo Eas 771 e a 102_Low on C e u KO a F o e Eas on osed Tempe a KO 102_Low F o u e a U C F o Manho Founda Ca Conc D Eas F U o a osed KO e on o a ME V m Tempe Eas C e a ME V F LP osed Conc LP 771 D a U F u D LP e a Eas u 771 D KO e LP 105_Low a F osed ch e LP 105_Low on Ca a Fo e a n C Founda D a u KO 771 F e Manho a um KO Tempe 102_Low u e F C um on 102_Low u F on D Tempe C n Ca e U F osed o Bas u e F o a Tempe Ancho um n D u Manho C e Eas ch U a m osed e a Eas Tempe D e osed C U a F D n on um e u Ca Conc Manho Tempe 771 Pumps a D Excava C LP e Pumps P F osed um U Excava a LP e F 771 ch Eas e n osed Bas e a D um F KO Pumps u e Lean Pedes n 771 F a um KO osed n um a o KO Back 771 D C KO ch e a F Founda Excava C KO Sump e F a Tempe Bas n um D e Pumps Ca Tempe on ec Reba e D a Manho Eas osed KO Lean e a um D n Excava osed F Pumps e Bo u Eas Tempe a C D Fo Pumps Tempe Bas C a D u Manho Ca Eas n D e a Conc Sump Lean D e Bo u ch a KO on Reba Excava e um osed Eas n a osed um on u e n a D um on Bo KO a m Fo e u KO um F Lean n Reba D um Sump a ch Pedes Excava F n D Bas e Ca Conc D um a F Fo e D Pumps n om Manho Conc on a Reba Pumps e um a Sump F Pumps m Founda Conc Ca Fo D um a om Bas F D Pumps e Ancho a u Excava Fo D Manho u a um e Lean on ch Wa a e m n n Conc a e KO Reba u um Lean u um a e Founda Wa m KO a Fo ch e on D Bo Sump D e Conc Ancho m KO a F Bas Conc e n e F n Reba Founda Fo e on um Bo D a Ancho F Pumps um Sump Bas Reba Conc m Fo e a Pedes F Pumps Back Conc D Founda Fo om e Conc D a Pa e Bo Ancho on a um e n m Fo on Founda um m Conc e Pedes KO om Back e um KO Wa Sump n m n Reba e Bo on Pedes e Conc m e Sump Conc Back e Founda Fo Wa Founda Fo a P on D Conc Bo e Conc D Pedes Ancho e Back Founda Reba e o Bo on um m um m a Pedes Founda Pa Founda e ec e Fo on Conc e a Back e e Pedes Conc n Back a on m on e on e Bo Fo Pedes P Founda on a ePedes o m on e on ec ae aon Pedes a on a U 771 U U U 771 U 771 U 771 Eas U U 771 771 771 Eas 771 U Eas Eas U 771 G Eas U Eas 771 Eas Eas U ave 771 G U Conc Aspha 771 Eas ave 771 Aspha Eas G Conc Su Aspha Eas Aspha ave e Eas Su Eas Aspha e ac Conc eHeavy Su Conc L ac ng e Heavy Aspha gh Aspha Heavy Conc Heavy ng Lac 125M e gh Heavy e Du e Du ng 125M e Du e Du L y Du y Du L e M Heavy gh 125M 150M Heavy y gh y Road Du THK y M L y Road 150M Du gh Road THK Road Du yM M Du y Pav Du Road Du G THK y Pav 150M THK M y 150M ave Pav Leve Pav y y ng THK Road 150M Road ng Pav Compac Pav ng Ea M Pou ng M Sub ng THK Pav ng Base Pav B THK h ng Pav M ng nde Wo Wea base THK ng Leve ng Pav ng on Cou Pav k Com P Roa Cou F ng ng Pa m n se 250 UU 771 U 771 771 Eas Eas U Eas U 771 U U P U 771 P 771 771 U pe 771 P pe Eas 771 U pe ack Eas ack Eas Eas 771 Eas ack E Eas P E a ec P E Eas Sca ec P a Sca o ec pe on P m on oa o on ack m P Sca F & o d A o e a & d ng adde G gnmen m d E ng o adde o ou E Hand ec & m d Hand ec ng adde & ng F on e on A adde Hand Bo ad F a gnmen s na E G s F T ec A ou e a F gh nspec d gnmen na s on en ng E F Bo ec na nspec ng on T on nspec Bo gh on en T gh ng onen ng 0 99 204 U U771 771 UU 771 Eas U 771 Eas U U 771 771 Eas U 771 U Eas AOC 771 U AOC Eas 771 Eas Eas 771 AOC COC Eas AOC COC Eas O Eas AOC O COC he L COC O he Lne O ne he U COC O L he U Excava G ne L he Lay U G ne LU L G We 771 ne U ng G ne U Hyd L G U d ne L 771 UW Assemb on Back Eas L ne UW ng 771 o ne U UW PW Bond es Eas UW 771 U PW UW Eas FPW 771 AOC CW ng ewa PW CW ng Eas F PW CW F & Eas ewa T CW e & CW SE ewa ench F SE L &e ne & SE ewa F Excava & e SE L Lay w Excava SE ewa ne LWe S e ne Hyd ng ee Lay Back L e d We ne Assemb on ng L G o ng on ne Hyd d a Bond es Assemb ng Back ng o Bond ng Cove ng es ng 29 56 U 771UEas 771 U 771 Eas PU p ng 771 Eas P Shop pEas ng PU Fab Shop p ng P 771 p Shop ca ng Fab Eas on Shop Fab ca Beve Pon Fab p ca ng We ng on ca Shop Assemb dNDT on ngFab den PWHT ng caca onon Hand Ma k ng o S o age 35 32 U 771 Eas P p ng F e d E ec on E ec on Assemb ng 32 32 32 35 0 41 35 104 124 32 199 107 U 771 Eas P p ng F e d E ec on We d ng U 771 Eas P p ng F e d E ec on NDT PWHT U 771 Eas P p ng F e d E ec on F na nspec on U 771 Eas P p ng F e d E ec on Hyd o Tes U 771 U 771 U Eas 771 EasP Eas p Png p ng P Suppo p Suppo ng Suppo Fe Fd eE d Fec E e ec don E on ec Assemb We on d NDT ng y n Bo F Pos na ngnspec on D mens on on Check UU 771 U771 771 Eas Eas Eas SS eam S eam eam TT ac T ac ac ng ng ng FF eF e de dns dns ns aa a aa on aon on Assemb We F na d ng y nspec Th nE ead ec on ng on 771 771 771 771 P 771 771 771 P 111A 771 V 111A V P 771 P 771 109_Low V 771 107_Se 109_Low 109A P 111A B_Low 107_Se V 109A B_Low VP V 109_Low 105_Low 771 B_Se B_Low 107_Se 109A 105_Low exo Tempe B_Se Tempe V exo Tempe 771 exo 105_Low B_Se Regene Tempe Tempe Regene exo Tempe ME 771 Tempe a Regene a exo u a102_Low Regene u ME u ea e Tempe F e a a Regene a o F u a F u 102_Low 771 u o a e a u LP e 771 e o e F LP C e a F F ME Tempe C F a C F o LP a osed a F ME osed u a e osed e e LP 102_Low a F e C o e Tempe C KO e KO a F osed 102_Low D KO F osed LP D KO a e a D a D u KO D e a F D n e aum e D n KO a D um n KO Pumps um F Tempe D um a e Pumps u a um a E n Tempe D KO um E D n e A e ec Pumps A D um F ec E um gn Assemb D Pumps A a gn Assemb um ec on a on e Ladde 1s um gn Pumps Ladde u a Sk on Ladde e u 2nd A Pumps F p e Assemb ng gn a A F ng P A P 1s e a E gn a P a gn E Accesso e e 2nd ec A e aec 2nd o Coup o e gn ng on m o m A on A m E gn gn ng y ec Coup ns on a a ngon U0771E U0771E U0771E U0771E U0771E U0771E ns ns U0771E U0771E U0771E a ns a U0771E U0771E a a ns aon Cab ns on a a ns Cab o a on o a e ns a F ns ns Cab on o Lay e a on e a Te a o a on F ng e o a a on gh Condu ecommun T m o on F on ench na o e ng E o o d ec Ea on Sys Pane L T s T gh ay & ca h ays ca ng Jo ng Cove Loca Hea on n & Sys L Sys gh s Sys Sa n ng JBS Sys U0771E U0771E U0771E U0771E ns ns U0771E ns aumen a a on ns U0771E on Cab o Ca em ao CAB a e b zed F U0771E on Te a eJBS ns d on o Cab mns Cab umen na LPS eumen ns Lay on eT Connec umen ng ench T Loop ays on Tes s U 771 U E 771 Eye E Wash Eye Wash & Sa e& ySa Showe e y Showe S a on Fac Founda es ns on a & Suppo a on U 771 E U0771E F e P oo Pa ng n ng U0771E U nsu 771 aE onPa on P ng_Touch p ng up U 771 E Un Mow C U U U0771E 771 U 771 U U 771 771 E 771 EE F Leak Re Loop E E ush Func Mechan ns Punch ng Tes a on B a Mo C Tes on ca ea ng o Runn & So PSSR o ng Run Tes

Piping Support Su Shop Fabrication Piping Support Su Field Erection Steam Tracing Tra Field Installation ME Mechanical EL Electrical IN Instrument HF HVAC & Fire Fir Fighting PS Painting, Insulation In & Fire Proofing PC Pre-commissioning Pre-commi Flare & Blowdown (U0771-Central) CV Civil SS Structural S Steel BD Architecture Architectur / Building PP Piping P ma y Base ne Ac ua Wo k Rema n ng Wo k C ca Rema n ng Wo k M es one

25 150 214 Wa C U A e U F 771 a Wa bon oca d ea Founda pe Eas O ack Wa ea A KO a C ack 771 ea A e oca 771 bon U P D m Hyd ea ack e KO Hyd ea m L C pe bon P Founda m 771 Hyd D um KO A F Founda qu C Wa bon L C pe F Wa F P um a ack Founda ea D oca qu a L oca on d Excava a C P D pe oca e P ack um qu e m Pumpou L Hyd d e pe m KO Lean pe Founda um Excava P qu bon KO ack Pumpou KO on bon F d F Founda bon Reba on pe ack ack a Pumpou D d oca Fo a on D Lean L Founda Conc D e Pumpou L ack Reba e on um qu L Founda um m KO Founda qu um Fo KO qu bon on Pumps on d Conc Founda Conc d Founda on Pumps Fo m D d e Pumpou Ancho D Conc Pumpou L Pumpou Pumps e um on Fo qu um m Founda Pumps on e on e Excava Ancho d m Conc Pedes e Back e on Lean Conc Pumpou P Bo on eFounda Pedes Reba Pumps o Back Pumps Founda Pumps Fo ec on eConc a e Bo on em e on a Pedes Pumps Conc on Pedes Fo Founda e Ancho on eme aa Pedes Conc e Back Bo on Founda eae Pedes on a 284 U 771 UC 771 UU 771 PU C U 771 pe 771 U C 771 P ack U 771 C pe U P 771 C C pe E P 771 ack C P pe a ec Sca C ack a P E C oack on Sca a o m ec E o Sca P m o F & d ec E a on e ng m & o adde ec o d o on & adde A Hand m ng E d on adde gnmen G ng ec & Hand F F ou Hand adde A e a on na d s gnmen ng G E a F Bo nspec ou a ec F s es na A d ng T on F E gnmen gh Bo na on ec nspec en T on nspec ng gh Bo on en on ng T gh en ng 0 175 Page 1 o 2 Da e 07 Dec 12

Rev s on Mon h y Upda ed Cu o by 29 Nov 2012

Checked Y Jeong

App oved S M Kwon

Activity ID

Activity Name

Start

Finish

Undergroun Piping Underground Aboveground Piping Abovegroun Piping Shop Sh Fabrication Piping Field Fie Erection 04CNS "U-771-C" Piping Field Erection-Erection/Assembling 04CNS 04CNS 04CNS 04CNS "U-771-C" Piping Field Erection-Welding "U-771-C" Piping Field Erection-NDT/PWHT "U-771-C" Piping Field Erection-Final Inspection "U-771-C" Piping Field Erection-Hydro-Test

17-Mar-12 17-Mar-12 09-Jun-12 09-Jun-12* 16-Jun-12* 23-Jun-12 02-Jul-12 08-Sep-12 30-Jun-12 12-Nov-12 26-Nov-11 24-Jul-12 22-Jul-12 01-Mar-12 02-Oct-11 02-Oct-11 21-Mar-12 11-Jan-12 11-Jan-12 31-May-12 31-May-12 01-Sep-12 01-Sep-12* 09-Sep-12* 19-Sep-12 25-Sep-12 29-Nov-12 29-Sep-12 30-Mar-13 10-Mar-12 15-Jan-13 13-Jan-13 29-Nov-12 28-Apr-12 18-May-13 15-Aug-11 21-Jul-11 09-Aug-11 15-Aug-11 13-Sep-12 28-Mar-13

16-Dec-12 01-Aug-12 12-Nov-12 03-Sep-12 11-Sep-12 15-Sep-12 25-Sep-12 12-Nov-12 25-Sep-12 16-Dec-12 29-Feb-12 28-Nov-12 20-Nov-12 21-Jan-13 08-Jul-13 27-Jun-13 05-Sep-12 05-May-13 04-Dec-12 05-May-13 25-Nov-12 30-Mar-13 05-Feb-13 23-Feb-13 03-Mar-13 12-Mar-13 30-Mar-13 12-Feb-13 05-May-13 22-Sep-12 11-May-13 18-May-13 17-Feb-13 06-Jun-13 08-Jul-13 08-Jun-13 15-Jun-13 02-May-13 20-Jul-13 07-May-13 03-Sep-14

Total Float b 2 0 175 197 173 173 174 174 173 173

Mar 23

Apr 24

May 25

2012 Jun Jul 26 27

Aug 28

Sep 29

Oct 30

Nov 31

Dec 32

Jan 33

Feb Mar 34 35

Apr 36

May 37

2013 Jun Jul 38 39

Aug 40

Sep 41

Oct 42

Nov 43

Dec 44

Jan 45

2014 Feb Mar 46 47

"U-771-C" "U-771-C" "U-771-C" "U-771-C" Piping Piping "U-771-C" Piping Piping Shop Shop Shop Fabrication-Beveling/Assembling Piping Shop Fabrication-Welding Fabrication-NDT/PWHT Fabrication-Identification Shop Fabrication-Handling Mark to Storage "U-771-C" Piping Field Erection-Erection/Assembling "U-771-C" Piping Field Erection-Welding "U-771-C" Piping Field Erection-NDT/PWHT "U-771-C" Piping Field Erection-Final Inspection

Piping Support Su Shop Fabrication Piping Support Su Field Erection Steam Tracing Tra Field Installation ME Mechanical EL Electrical IN Instrument HF HVAC & Fire Fir Fighting PS Painting, Insulation In & Fire Proofing PC Pre-commissioning Pre-commi Flare & Blowdown (U0771-West) CV Civil SS Structural S Steel BD Architecture Architectur / Building PP Piping Underground Piping Undergroun Abovegroun Piping Aboveground Piping Shop Sh Fabrication Piping Field Fie Erection 04CNS "U-771-W" Piping Field Erection-Erection/Assembling 04CNS 04CNS 04CNS 04CNS "U-771-W" Piping Field Erection-Welding "U-771-W" Piping Field Erection-NDT/PWHT "U-771-W" Piping Field Erection-Final Inspection "U-771-W" Piping Field Erection-Hydro-Test

"U-771-C" Piping Field Erection-Hydro-Test 0 173 "U-771-C" "U-771-C" "U-771-C" Piping Piping Piping Support Support Support Field Field Field Erection-Assembly Erection-Welding/Bolting/Dimension Erection-NDT/Final in Position Inspection Check 197 "U-771-C" "U-771-C" "U-771-C" Steam Steam Steam Tracing Tracing Tracing Field Field Field Installation-Assembly Installation-Welding/Threading Installation-Final Inspection in Erection 2681-V-108_East V-108_East -P-110A/B_East 1-P-110A/B_East 771-V-108_East 771-P-110A/B_East Area Area Area Warm Area Warm Area Hydrocarbon Hydrocarbon Flare Area Flare Warm KO Hydrocarbon KO Flare Drum-Erection Liquid Drum-Align Liquid KO Pumpout Drum-Ladder/Plateform Pumpout Liquid Pumpout Pumps-Assembling/Erection Pumps-1st Pumps-2nd Align Align/Coupling 213 U0771C-Installation U0771C-Installation U0771C-Installation U0771C-Installation U0771C-Installation U0771C-Cable U0771C-Cable U0771C-Installation U0771C-Installation U0771C-Installation U0771C-Installation of ofFire Cable of Laying Telecommunication of Termination Fighting of Conduits Trench/Trays Field of of of of Earthing Sys. Panel/Local Lighting Tray Electrical & Joint Covers & Sys. Lightning Heat Sys. Stat/JBS Sys. Sys. 219 U0771C-Installation U0771C-Itemized U0771C-Installation U0771C-Instrument U0771C-Cable U0771C-Installation U0771C-Instrument U0771C-Instrument Cable Termination of Cable of Calibration of CAB/JBS/LPS Laying Field Connection Trench/Trays Loop Instrument Tests 0 167 U0771C-Fire Proofing U0771C-Painting U0771C-Insulation U0771C-Painting_Touch-up for Piping 0 29 37 W" Water Warm O _Blowdown Seal B_Seal Blowdown B_Blowdown erack 71-W" KO um-Excavation eal n Drain Drum-Excavation down B_Blowdown Warm owdown W" -771-W" 101_Warm 201_Warm 103_Water 203_Water 104A/B_Blowdown are 102_Warm 01_Warm P-103A/B_Seal P-203A/B_Seal P-104A/B_Blowdown arm A/B_Warm ater A/B_Oily rocarbon A/B_Hydrocarbon ain e Flare m -P-108A/B_Warm -P-112A/B_Oily -P-101A/B_Hydrocarbon -P-201A/B_Hydrocarbon rbon -P-105A/B_Hydrocarbon 201_Warm 203_Water wn -103A/B_Seal al /B_Seal -203A/B_Seal /B_Blowdown -104A/B_Blowdown are /B_Warm er y /B_Oily arbon drocarbon /B_Hydrocarbon 101_Warm 103_Water 104A/B_Blowdown 102_Warm _Blowdown A/B_Warm A/B_Oily A/B_Hydrocarbon rm arm ME-101_Warm 1-ME-101_Warm ME-201_Warm 1-ME-201_Warm P-103A/B_Seal P-203A/B_Seal P-104A/B_Blowdown Water Piperack rum-Lean ter ater P-108A/B_Warm P-112A/B_Oily P-101A/B_Hydrocarbon P-201A/B_Hydrocarbon P-105A/B_Hydrocarbon -ME-101_Warm -ME-201_Warm _Warm Drum-Rebar Drum-Lean Drum-Excavation 771-P-103A/B_Seal 771-P-203A/B_Seal 771-P-104A/B_Blowdown KO Drain Piperack Water 771-P-103A/B_Seal 771-P-203A/B_Seal 771-P-104A/B_Blowdown "U-771-W" Drum Flare Sump Drum-Form Drum-Lean Piperack Drum-Rebar Drum-Excavation 771-ME-101_Warm 771-ME-201_Warm Drain Flare Seal KO "U-771-W" 771-ME-101_Warm 771-ME-201_Warm Drain Drum Flare Sump Flare Seal Blowdown Liquid Drum-Lean Drum-Form Foundation-Excavation Flare "U-771-W" Seal Drain Drum-Rebar "U-771-W" Piperack Flare Liquid Blowdown Drum Sump "U-771-W" Drum-Form Drum-Rebar Water Sour Drain Drum Sump "U-771-W" Flare Piperack Drum-Concrete Overflow Water Pumps-Excavation Blowdown Liquid Drain KO Drum-Form Water Foundation-Lean Sour Drain Drum Drum-Form Flare Stack-Excavation Overflow Drain Concrete Drum-Anchor KO Pumps-Lean Blowdown Liquid "U-771-W" Flare Drum-Concrete Drain KO Foundation-Rebar Seal Drum Pumpout Flare Seal Stack-Lean Drum-Form Sour "U-771-W" Foundation-Form Drum-Anchor Concrete Overflow Pumpout Drum-Concrete Pumps-Rebar Water "U-771-W" Piperack Stack-Rebar Drum Sour Sump Drum-Form Overflow Concrete Drum-Anchor Pumps-Form Water Manhole/Valve Drum-Concrete (Foundation) Drum Sump Pumps-Excavation Foundation-Concrete Pumpout Drum Drain Water Stack-Form Pumps-Excavation Sump "U-771-W" Flare Drum-Form Drum-Concrete Liquid Drain Blowdown Piperack Drum-Backfill Drum-Anchor Flare KO Concrete Pumps-Lean Piperack Pumpout Drain KO "U-771-W" Flare Pumps-Lean (Foundation) Water Blowdown Liquid Foundation-Form Flare Pumps-Excavation Blowdown Liquid Drum-Concrete Catch Drum-Backfill "U-771-W" Water Pumps-Lean (Foundation) Pumps-Rebar Manhole/Valve Sour Piperack Pumps-Excavation Pumps-Rebar "U-771-W" Overflow Drum-Concrete Pumps-Concrete Pumps-Excavation Sour Drum-Backfill Pumps-Form Overflow Sour Drum (Foundation) Stack-Concrete Pumps-Lean Sump Pumps-Form (Pedestal) Overflow Drum Manhole/Valve Catch Sump Pumps-Rebar Pumps-Anchor Drum Pumps-Lean Stack-Form Drum-Concrete "U-771-W" Foundation-Anchor Pumpout Drum-Backfill Drum Drain Stack-Anchor Drain Concrete Flare Pumps-Form Manhole/Valve Flare Blowdown Pumpout Liquid "U-771-W" Pumps-Rebar Bolt (Pedestal) Liquid Blowdown (Foundation) Pumpout Catch Water Pumps-Rebar Basin/Sump-Excavation Pumps-Form Foundation-Concrete Water "U-771-W" Foundation-Protection (Pedestal) Water Concrete Bolt "U-771-W" Pumps-Form (Foundation) Pumps-Concrete Catch Sour Pumps-Concrete Sour Overflow (Foundation) Pumps-Form Overflow Pumps-Concrete (Pedestal) (Foundation) Manhole/Valve Pumps-Form Basin/Sump-Lean Pumps-Backfill Pumps-Anchor Bolt Drum (Foundation) "U-771-W" Foundation-Backfill Stack-Concrete Pumps-Anchor Drum Stack-Backfill Pumps-Concrete (Foundation) Concrete Manhole/Valve Box/Colle Pumpout Pumps-Form Bolt Pumpout (Foundation) Basin/Sump-Bottom Pumps-Anchor Catch Pumps-Concrete (Pedestal) Water Pumps-Concrete Concrete Pumps-Form Water Pumps-Anchor Basin/Sump-Bottom Pumps-Form Catch Pumps-Anchor Pumps-Concrete (Pedestal) Concrete Pumps-Concrete (Foundation) Pumps-Backfill Box/Colle (Pedestal) Pumps-Backfill Manhole/Valve Concrete (Pedestal) (Foundation) Pumps-Concrete (Foundation) Pumps-Backfill Box/Colle Bolt Manhole/Valve Basin/Sump-Wall Catch (Foundation) (Pedestal) Box/Colle Pumps-Concrete (Foundation) Pumps-Backfill Pumps-Concrete Ction Catch (Foundation) Pumps-Backfill Basin/Sump-Wall (Pedestal) Bolt Box/Colle (Pedestal) Bolt Basin/Sump-Paint/Protection (Foundation) Ction (Pedestal) (Pedestal) Box/Colle Sump (Pedestal) Bolt Concrete Basin/Sump-Backfill (Foundation) (Pedestal) Ction Bolt Ction (Foundation) Bolt (Foundation) Box/Colle Sump Rebar/Form (Pedestal) & Box/Colle Sump Ction Concrete (Pedestal) Valve Sump Ction Rebar/Form (Pedestal) & (Pedestal) Concrete Valve & Sump Ction Box-Excavation & Sump Valve Ction Valve Box-Lean & Sump Box-Bottom & Valve Sump Box-Bottom Valve &Box-Wall & Valve Concrete Box-Wall Valve Rebar/Form Box-Paint/Protection Concrete Box-Backfill Rebar/Form Concrete "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" Gravel "U-771-W" "U-771-W" "U-771-W" Concrete Gravel "U-771-W" Concrete Asphalt "U-771-W" "U-771-W" "U-771-W" Concrete Asphalt Concrete Gravel Surfacing Asphalt Asphalt Surfacing Asphalt Concrete Concrete (Heavy Concrete Concrete (Heavy (Light Surfacing Asphalt (Heavy Concrete (Heavy Asphalt (Light Concrete (125M/M (Heavy Duty) Duty-150M/M Duty-250M/M (125M/M (Heavy Duty) (Light (Heavy Duty-150M/M Duty-250M/M Duty) (Light (Heavy Duty) (125M/M (Heavy (Heavy Road Duty) (Light THK)-Gravel Road Duty-150M/M Duty-250M/M Road Road Duty-150M/M THK)-Levelling Duty-250M/M Duty) Paving-Earth Duty) Road Duty-150M/M Duty-250M/M Paving-Sub-base THK)-Compaction THK) Paving-Base Paving-Binder/Prime THK) Road Road Paving-Wearing/Tack Pouring Paving-Levelling THK) THK) Paving-Compac Paving-Road THK) Paving-Final THK) Work THK) THK) Paving-Pol Course Paving-Po Paving-F Paving-F Course Paving Paving Sh Co C 247 "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" Piperack Piperack "U-771-W" Piperack "U-771-W" Platform Piperack Platform Erection-Field Platform Scaffolding/Handrails-Field Erection-Alignment/Bolt Erection-Grouting Scaffolding/Handrails-Alignment/Bolt &Erection-Final & Scaffolding/Handrails-Final ladder-Field &ladder-Alignment/Bolt ladder-Grouting ladder-Final Erection Erection Inspection Inspection Tightening Erection Tightening Inspection Tightening 0 75 208 "U-771-W" "U-771-W" "U-771-W" "U-771-W" "U-771-W" AOC/COC "U-771-W" AOC/COC AOC/COC "U-771-W" "U-771-W" AOC/COC "U-771-W" "U-771-W" Line-Excavation AOC/COC Other Line-Laying/Assembling Line-Welding/Bonding Other Other Line-Hydro-test U/G Other Other Line-Backfill/AOC U/G Line "U-771-W" U/G "U-771-W" Line U/G (UW,PW,CW Line U/G "U-771-W" (UW,PW,CW Line "U-771-W" (UW,PW,CW Line Firewater (UW,PW,CW "U-771-W" (UW,PW,CW Firewater Trench Firewater & SE)-Excavation Firewater Line-Excavation && SE)-Laying/Assembling Line-Laying/Assembling w/Steel Firewater SE)-Welding/Bonding &Line-Welding/Bonding & SE)-Hydro-test SE)-Backfill Line-Hydro-test Grating Line-Backfill Cover 34 29 38 29 29 29 29 38 0 53 40

"U-771-W" "U-771-W" "U-771-W" "U-771-W" Piping Piping "U-771-W" Shop Piping Shop Piping Fabrication-Beveling/Assembling Shop Fabrication-Welding Piping Shop Fabrication-NDT/PWHT Fabrication-Identification Shop Fabrication-Handling Mark to Storage "U-771-W" Piping Field Erection-Erection/Assembling "U-771-W" Piping Field Erection-Welding "U-771-W" Piping Field Erection-NDT/PWHT "U-771-W" Piping Field Erection-Final Inspection "U-771-W" Piping Field Erection-Hydro-Test "U-771-W" "U-771-W" "U-771-W" PipingPiping Support Piping Support Support Field Erection-Assembly Field Field Erection-Welding/Bolting/Dimension Erection-NDT/Final in Position Inspection Check "U-771-W" "U-771-W" "U-771-W" Steam Steam Steam Tracing Tracing Tracing Field Field Field Installation-Assembly Installation-Welding/Threading Installation-Final Inspection in Erection

Piping Support Su Shop Fabrication Piping Support Su Field Erection Steam Tracing Tra Field Installation ME Mechanical EL Electrical IN Instrument HF HVAC & Fire Fir Fighting PS Painting, Insulation In & Fire Proofing PC Pre-commissioning Pre-commi TGTU Sour Water Stripper St (U772) Fire Protection (U773) Sewer Collection (U774) (U7 Waste Water Treating Treatin (U775) Others Commissioning & As-Built As-Bui Documentation 12%

149 771-P-101A/B_Hydrocarbon 771-P-201A/B_Hydrocarbon 771-P-105A/B_Hydrocarbon 771-P-101A/B_Hydrocarbon 771-P-201A/B_Hydrocarbon 771-P-105A/B_Hydrocarbon 771-P-112A/B_Oily 771-P-108A/B_Warm 771-P-101A/B_Hydrocarbon 771-ME-101_Warm 771-ME-201_Warm 771-P-201A/B_Hydrocarbon 771-P-105A/B_Hydrocarbon 771-V-103_Water 771-V-203_Water 771-V-104A/B_Blowdown 771-P-112A/B_Oily 771-V-102_Warm 771-V-201_Warm 771-V-101_Warm 771-P-108A/B_Warm 771-V-103_Water 771-V-203_Water 771-V-104A/B_Blowdown 771-V-201_Warm 771-V-102_Warm 771-P-203A/B_Seal 771-P-104A/B_Blowdown 771-ME-101_Warm 771-ME-201_Warm 771-P-103A/B_Seal 771-V-101_Warm 771-P-112A/B_Oily 771-P-103A/B_Seal 771-P-203A/B_Seal 771-P-104A/B_Blowdown 771-P-108A/B_Warm 771-V-103_Water 771-V-203_Water 771-V-104A/B_Blowdown 771-V-201_Warm 771-V-102_Warm 771-V-101_Warm 771-P-103A/B_Seal 771-P-203A/B_Seal 771-P-104A/B_Blowdown Water Seal Flare Flare Water Seal Flare Liquid Blowdown Flare Flare 771-ME-101_Warm 771-ME-201_Warm Drum Liquid Drum Flare Liquid Drum-Erection Sump Blowdown Water Drain KO Stack-Assembling/Erection 771-ME-101_Warm 771-ME-201_Warm Drum Drum-Align Seal Seal Drain Flare Drum-Erection Sump Drain KO Pumpout Flare Liquid KO Liquid Flare Blowdown Drum-Align Sour Drum-Erection Drain Overflow Stack-Skid Drum Overflow Pumpout Drum Pumpout Drum-Ladder/Plateform Pumps-Assembling/Erection Drum-Erection Drum-Align Sump Drum-Ladder/Plateform Drum-Align Sour Pumps-Assembling/Erection Overflow Drum Drain KO Drum-Align KO Pumps-1st Drain Drum-Ladder/Plateform Pumpout Water Pumpout Pumps-1st Drum Overflow Sour Drum-Ladder/Plateform Overflow Water Pumps-Assembling/Erection Drum-Ladder/Plateform Pumps-2nd Drum-Ladder/Plateform Pumps-Assembling/Erection Pumps-2nd Pumps-Assembling/Erection Pumps-1st Drum Pumps-1st Align Pumps-Assembling/Erection Pumps-1st Pumps-1st Water Flare Pumps-1st Pumps-2nd Pumps-2nd Align Pumps-2nd Flare Pumps-2nd Align Stack-Accessory Pumps-2nd Align/Coupling Align Stack-2nd Align/Coupling Align Align Align Align/Coupling Align/Coupling Align/Coupling Align/Coupling Align/Coupling Align Erection 73 U0771W-Installation U0771W-Installation U0771W-Installation U0771W-Installation U0771W-Installation U0771W-Cable U0771W-Cable U0771W-Installation U0771W-Installation of ofFire Cable of Laying of Telecommunication Termination Fighting of Electrical Conduits Trench/Trays Field of ofEarthing Sys. Panel/Local Tray Lighting Heat & Joint Covers Sys. & Sys. Lightning Sys. Stat/JBS Sys. 29 U0771W-Installation U0771W-Itemized U0771W-Installation U0771W-Instrument U0771W-Cable U0771W-Installation U0771W-Instrument U0771W-Instrument Cable Termination of Cable of Calibration of CAB/JBS/LPS Laying Field Connection Trench/Trays Instrument Loop Tests 144 U-771-W U-771-W Eye Wash Eye & Wash Safety & Safety Shower Shower StationFacilities Foundation Installation & Support 50 U0771W-Fire Proofing (Piperack) U0771W-Painting U0771W-Insulation for Mechanical U0771W-Insulation "U-771-W" Painting_Touch-up for Piping "U-771-W" Unit M/C 22 "U-771-W" U0771W-Reinstallation "U-771-W" "U-771-W" "U-771-W" "U-771-W" Flushing/Blowing Loop Leak Function Mechanical Punch Test/Motor Test Test Clear Running Solo & PSSR Run Test "U-772" Unit M/C 64 Water eed/Bottoms densate m TU 72-ME-311_TGTU WS A/B_TGTU GTU 311_TGTU x S 301_TGTU ME-301_TGTU r U _TGTU 772-ME-311_TGTU SWS /B_TGTU ur S eflux ME-311_TGTU P-107A/B_TGTU P-117A/B_TGTU P-301A/B_TGTU P-311A/B_TGTU P-302A/B_TGTU A/B_TGTU P-312A/B_TGTU d/Bottoms ux ter /B_TGTU Reflux SWS _TGTU Condensate U E-311_TGTU TU -301_TGTU -ME-301_TGTU P-107A/B_TGTU P-117A/B_TGTU P-301A/B_TGTU P-311A/B_TGTU P-302A/B_TGTU P-312A/B_TGTU 01_TGTU 11_TGTU ndensate Feed/Bottoms Steam SWS Water Drum-Excavation Steam Condensate SWS Feed/Bottoms Steam SWS 772-ME-301_TGTU Water SWS Drum-Lean Sour Stripper-Excavation 772-ME-301_TGTU SWS Steam Bottoms Reflux Sour 772-ME-301_TGTU Sour Stripper-Lean Drum-Rebar 772-ME-311_TGTU Bottoms Steam Reflux Reflux 772-ME-311_TGTU Reflux Drum-Form 772-ME-311_TGTU SWS Stripper-Rebar Condensate Drum-Excavation Reflux Steam Bottoms Feed/Bottoms SWS Water Condensate Steam Feed/Bottoms Water Stripper-Form Condensate SWS Bottoms Steam Reflux Feed/Bottoms 772-ME-301_TGTU Water SWS Drum-Lean 772-V-105_TGTU 772-V-115_TGTU 772-ME-301_TGTU SWS Condensate Sour Pumps Exchanger-Excavation SWS Sour 772-V-105_TGTU 772-V-115_TGTU Pumps Exchanger-Lean Condensate Drum-Rebar SWS Drum-Concrete 772-ME-311_TGTU Reflux 772-ME-311_TGTU Drum-Form SWS Reflux Pumps Drum-Form 772-ME-301/311_TGTU Concrete Drum-Anchor Pumps Exchanger-Rebar Condensate SWS Stripper-Concrete Reflux SWS Bottoms Feed/Bottoms Steam Condensate 772-V-301_TGTU 772-V-311_TGTU Water Stripper-Form Feed/Bottoms 772-V-105_TGTU 772-V-115_TGTU Water Exchanger-Form Bottoms Pumps Steam Reflux Condensate SWS Stripper-Anchor Pumps Corrosion 772-V-301_TGTU 772-V-311_TGTU SWS 772-E-301A/B_TGTU 772-E-311A/B_TGTU Steam Reflux Bottoms SWS SWS 772-E-301A/B_TGTU 772-E-311A/B_TGTU Pumps Corrosion 772-ME-301/311_TGTU Concrete (Foundation) T1-Excavation T2-Excavation Corrosion SWS Drum-Concrete Drum-Backfill Corrosion Drum-Form Corrosion T1-Excavation T2-Excavation T1-Lean T2-Lean 772-ME-301/311_TGTU Concrete Drum-Anchor -772-V-311_TGTU 772-V-301_TGTU Pumps Condensate Exchanger-Concrete Corrosion Stripper-Concrete SWS Steam 772-P-107A/B_TGTU 772-P-117A/B_TGTU 772-P-301A/B_TGTU 772-P-311A/B_TGTU 772-P-302A/B_TGTU 772-P-312A/B_TGTU Bottoms Stripper-Backfill Reflux Pumps 772-E-301A/B_TGTU 772-E-311A/B_TGTU Exchanger-Form T1-Lean T2-Lean Steam 772-V-302_TGTU 772-V-312_TGTU Bottoms Reflux Condensate (Foundation) SWS T1-Rebar T2-Rebar Pumps Corrosion Condensate Exchanger-Anchor Pumps 772-V-302_TGTU 772-V-312_TGTU SWS 772-P-107A/B_TGTU 772-P-117A/B_TGTU 772-P-301A/B_TGTU 772-P-311A/B_TGTU 772-P-302A/B_TGTU 772-P-312A/B_TGTU Pumps 772-ME-301/311_TGTU T1-Form T2-Form SWS Corrosion T1-Rebar T2-Rebar (Pedestal) Pumps -(Foundation) SWS Inhibitor SWS T1-Form T2-Form Pumps Drum-Concrete 772-P-107A/B_TGTU 772-P-117A/B_TGTU 772-P-301A/B_TGTU 772-P-311A/B_TGTU 772-P-302A/B_TGTU 772-P-312A/B_TGTU Drum-Backfill SWS Corrosion Bolt Inhibitor (Foundation) 772-ME-301/311_TGTU Pumps 772-V-302_TGTU 772-V-312_TGTU Concrete Corrosion SWS Inhibitor Condensate Pumps Exchanger-Concrete SWS Pumps Condensate (Pedestal) Concrete Exchanger-Backfill Corrosion SWS Inhibitor T1-Concrete T2-Concrete Inhibitor Corrosion Pumps Concrete Pumps T1-Excavation T2-Excavation T1-Form T2-Form Corrosion Inhibitor Bolt T1-Anchor T2-Anchor Corrosion T1-Concrete T2-Concrete SWS (Foundation) (Pedestal) SWS (Foundation) 772-Y-101/102_772-ME-301/302_Overhead Sour Inhibitor T1-Lean T2-Lean T1-Form T2-Form SWS Steam T1-Anchor T2-Anchor (Foundation) Pumps Sour -Package Steam Inhibitor Bolt Pumps Corrosion (Pedestal) (Foundation) Corrosion Pumps T1-Rebar T2-Rebar (Foundation) -Package --T2-Form T1-Form 772-E-314_TGTU Package SWS 772-E-304_TGTU Inhibitor T1-Concrete T2-Concrete Corrosion T1-Backfill T2-Backfill Water 772-E-314_TGTU Corrosion Package 772-E-304_TGTU Inhibitor SWS Package Steam Water Sour Inhibitor T1-Concrete T2-Concrete (Pedestal) T1-Backfill T2-Backfill Package Condensate SWS Inhibitor (Pedestal) Pumps Condensate SWS Package Inhibitor 772-Y-101/102_772-ME-301/302_Overhead Pumps SWS Concrete Inhibitor Bolt (Pedestal) (Foundation) -Bolt T1-Concrete T2-Concrete Package (Foundation) Corrosion SWS Feed/Bottoms 772-E-314_TGTU T1-Form T2-Form 772-E-304_TGTU "U-772" Water T1-Anchor T2-Anchor Feed/Bottoms SWS Bolt Stripper-Erection Inhibitor SWS T1-Excavation 772-E-105_TGTU 772-E-115_TGTU 772-E-302_TGTU 772-E-312_TGTU 772-E-303_TGTU 772-E-313_TGTU (Foundation) Inhibitor 772-Y-101/102_772-ME-301/302_Overhead Condensate Stripper-Align Package Reflux SWS (Foundation) T1-Lean Package Reflux Corrosion Package T2-Excavation Inhibitor SWS 772-E-105_TGTU 772-E-115_TGTU 772-E-302_TGTU 772-E-312_TGTU 772-E-303_TGTU 772-E-313_TGTU 772-Y-101/102_772-ME-301/302_Overhead Inhibitor Package T1-Rebar Bottoms Steam Reflux Feed/Bottoms T2-Lean (Pedestal) Package T1-Concrete T2-Concrete Package Corrosion T1-Form (Pedestal) T1-Backfill T2-Backfill Bottoms Steam Reflux Stripper-Ladder/Plateform "U-772" SWS T2-Rebar Reflux Drum-Erection Piping 772-V-313_TGTU (Pedestal) 772-V-303_TGTU "U-772" Drum-Erection (Pedestal) Inhibitor Package T2-Form Drum-Align 772-E-105_TGTU 772-E-115_TGTU 772-E-302_TGTU 772-E-312_TGTU 772-E-303_TGTU 772-E-313_TGTU 772-V-313_TGTU Package Bottoms Steam Reflux Corrosion 772-V-303_TGTU Drum-Align 772-ME-301_TGTU 772-ME-311_TGTU SWS Concrete SWS Bolt (Foundation) Pumps Condensate Package SWS "U-772" T1-Concrete 772-ME-301_TGTU 772-ME-311_TGTU Package -T1-Form Inhibitor Pumps Corrosion Condensate Exchanger-Erection Pumps Drum-Ladder/Plateform Concrete 772-V-313_TGTU T1-Anchor 772-V-303_TGTU Drum-Ladder/Plateform Exchanger-Align Shop Piping "U-772" T2-Concrete Pumps 772-E-105_TGTU 772-E-115_TGTU 772-E-302_TGTU 772-E-312_TGTU 772-E-303_TGTU 772-E-313_TGTU (Foundation) T2-Form Inhibitor Pumps Condensate Reboiler-Erection T2-Anchor Piping U0772-Painting Reboiler-Erection PKG-Excavation PKG-Lean SWS Reboiler-Align "U-772" Pumps 772-E-105_TGTU 772-E-115_TGTU 772-E-302_TGTU 772-E-312_TGTU 772-E-303_TGTU 772-E-313_TGTU (Foundation) SWS (Pedestal) "U-772" Exchanger-Ladder/Plateform Inhibitor T1-Concrete T1-Backfill Piping Fabrication-Beveling/Assembling T1-Assembling/Erection T2-Assembling/Erection 772-E-105_TGTU 772-E-115_TGTU 772-E-302_TGTU 772-E-312_TGTU 772-E-303_TGTU 772-E-313_TGTU -Shop PKG-Column SWS "U-772" T1-1st T2-1st T1-Assembling/Erection T2-Assembling/Erection (Pedestal) T2-Concrete 772-ME-301_TGTU 772-ME-311_TGTU T2-Backfill Piping "U-772" Inhibitor Shop Reboiler-Ladder/Plateform T1-1st T2-1st 772-ME-301_TGTU 772-ME-311_TGTU Pumps PKG-Ground Steam Condenser-Fan Bottoms Bolt (Foundation) "U-772" T1-2nd T2-2nd (Pedestal) Pumps 772-ME-301/311_TGTU SWS Piping 772-E-105_TGTU 772-E-115_TGTU 772-E-302_TGTU 772-E-312_TGTU 772-E-303_TGTU 772-E-313_TGTU Shop T1-2nd T2-2nd U0772-Installation SWS Fabrication-Welding "U-772" Bottoms Steam Condenser-Fin Piping Bolt PKG-Floor "U-772" U0772-Installation (Foundation) Concrete Pumps Fabrication-NDT/PWHT Align U0772-Installation Shop SWS Piping Align U0772-Installation U0772-Itemized Piping U0772-Instrument Condensate-Fan Cranes-Erect PKG-Steel SWS Reboiler (Pedestal) Fabrication-Identification Support U0772-Cable Align/Coupling U0772-Installation Bottoms SWS Reboiler T1-Assembling/Erection T2-Assembling/Erection Steam Condenser-Align Cooler-Fan Piping "U-772" U0772-Installation Field Condensate-Fin Align/Coupling U0772-Installation T1-1st T2-1st Foundation U0772-Cable (Pedestal) Fabrication-Handling Piping Corrosion Piping Cooler-Fin SWS -Support U0772-Instrument "U-772" Reboiler T1-2nd T2-2nd Corrosion Beam Field U0772-Installation U0772-Cable Slab SWS Steam Bottoms Condenser-Bundle U0772-Installation Erection-Erection/Assembling U0772-Instrument Field Condensate-Align "U-772" U0772-Installation & Cranes-Main Condensate Field Condensate Cooler-Align Piping Align Support Steam Bottoms Condenser-Align Motor SWS Cooler Structure Field "U-772" U0772-Insulation Erection-Welding SWS & Cranes-Crane SWS Bottoms Steam Condenser-Roundness & Field Erection-NDT/PWHT of Align/Coupling Rail Steam Inhibitor Condensate-Bundle U0772-Insulation Core of Condensate Termination Erection-Assembly Motor Cranes-Align Cooler "U-772" Cable of U0772-Fire Cooler-Bundle Inhibitor Fire Erection-Final Corrosion & Field Steam "U-772" Erection Cable Condensate-Align Laying of Calibration Erection Corrosion SWS Frame Structure Cable Bottoms Motor Steam Condenser-Tube Field "U-772" Cooler Erection-Welding/Bolting/Dimension Cooler-Align Steam of Condensate-Roundness Telecommunication of Termination CAB/JBS/LPS Fighting "U-772" Tracing Drum-Erection of Erection Cooler-Roundness Laying Frame Erection-Hydro-Test Field Package Drum-Align Erection Structure Conduits "U-772" Trench/Trays Connection "U-772" Flushing/Blowing Tracing Field Corrosion Erection-NDT/Final Package to Trench/Trays of Reinstallation Erection Mark Condensate-Tube of Assembly Loop Erection Structure Inhibitor Tracing of Drum-Ladder/Plateform Storage Leak Loop Electrical Cooler-Tube Fan Install Proofing Instrument Cooler Inhibitor for Earthing Field Function Install Sys. Panel/Local Lighting Tray Assembly Inspection Mechanical for Painting_Touch-up Tests Field Fan Piping Punch & Cooler & Test/Motor Test T1-Assembling/Erection T2-Assembling/Erection in Motor Inhibitor Assembly Installation-Assembly Field Joint Covers Mechanical Package T1-Skip T2-Skip Fan Connection Cooler & Position Check (Piperack Package Heat Installation-Welding/Threading & Sys. Test Motor Clear Lightning & Sys. Installation-Final Connection Check Stat/JBS Motor Sys. PKG-Cladding Running Align Inspection Connection Solo Check &T2-Accessory T1-Accessory -& PSSR T1-2nd T2-2nd Mechanical) Run Sys. Test Align Check in Inspection (Roof Erection Installation & Siding) "U-773" "U-773" Fire "U-773" Water Unit Fire Water M/C Fire (Storage Fighting (Storage & Pump) (Spray & Pump) System-Water &Foam) Foam) System-Unit System-Unit Receiving M/C M/C 241 Water B/C_Fire B_Fire orage ater 773-TK-101A_Fire 3-TK-101B_Fire athodic B/C_Fire Jockey 73-P-101A/B/C Water er r 102A/B_Fire -101A/B/C e re _Fire ge Pumps-Rebar e -101A/B/C nk-Excavation ank-Rebar Fire _Fire r 1A_Fire mps-Lean ps-Excavation torage ater ge -Lean xcavation 02A/B_Fire Tank-Lean Water Jockey 773-P-101A/B/C Water Pumps-Form Tank-Form Water Storage Water Tank-Rebar Tank-Anchor Jockey Storage Water 773-P-101A/B/C Storage 773-TK-101B_Fire Jockey Tank-Form Water Water Storage Concrete Protection 773-TK-101A_Fire Pumps-Excavation Tank-Anchor Pumps-Concrete Storage Water Pumps-Lean 773-P-101A/B/C Pumps-Form Water Pumps-Anchor & Tank-Concrete & Concrete Jockey 773-TK-101B_Fire Storage Pumps-Rebar Concrete Water Tank-Backfill Jockey 773-P-102A/B_Fire Water Storage 773-P-102A/B_Fire Jockey Pumps-Form 773-TK-101A_Fire Tank-Concrete Tank-Backfill & Pumps-Concrete Storage (Foundation) Pumps-Backfill Water 773-P-102A/B_Fire Tank-Preparation 773-TK-101B_Fire 773-P-102A/B_Fire Bolt 773-Y-101_Overhead 773-TK-101A_Fire & Water 773-P-102A/B_Fire Jockey Pumps-Concrete Jockey Tank-Preparation Pumps-Form 773-P-102A/B_Fire Pumps-Anchor Bolt 773-TK-101B_Fire Tank-Erection & Concrete 773-TK-101A_Fire 773-P-102A/B_Fire (Pedestal) Storage 773-P-102A/B_Fire Tank-Erection 773-TK-101B_Fire 773-Y-101_Overhead Water Bolt 773-TK-101A_Fire Storage (Foundation) & Water Pumps-Concrete (Foundation) Pumps-Backfill 773-P-102A/B_Fire 773-Y-101_Overhead 773-Y-101_Overhead Water Storage Tank-Erection Water Water Storage (Pedestal) Tank-Erection (Pedestal) & Water Bolt (Foundation) Water Storage Welding 773-P-101A/B/C_Fire Water & Pumps-Excavation Storage Tank-Erection Pumps-Lean Cranes-Erect Water Welding 773-P-101A/B/C_Fire Water Tank-Erection Water Storage Water Jockey Pumps-Column Storage "U-773" Water (Pedestal) 773-P-101A/B/C_Fire Jockey Tank-Erection & Cranes-Main "U-773" Pumps-Ground 773-P-101A/B/C of Storage Water Tank-Erection "U-773" Storage Welding & "U-773" Jockey Bottom of "U-773" Storage Cranes-Crane Pumps-Floor Welding Pumps-Assembling/Erection Storage Tank-Erection Cranes-Align Bottom Tank-Erection Piping Concrete Pumps-1st Rail Pumps-Steel & 773-AS-001_Analyzer Piping "U-773" Tank-NDT, Piping & Welding Tank-NDT, Pumps-2nd of Piping Plate 773-AS-001_Analyzer "U-773" Piping Welding Tank-Drainage Frame Shop of Annular Tank-Drainage Foundation Frame Plate Water U0773-Installation & "U-773" U0773-Installation U0773-Painting Shop Annular & Welding Shop Water Beam Piping U0773-Itemized Slab Shop & Support U0773-Installation Welding U0773-Installation Align U0773-Instrument Shop Install of Fabrication-Beveling/Assembling 773-P-102A/B_Fire & U0773-Cable Piping U0773-Installation Water U0773-Installation & Pumps-Assembling/Erection of Install Fabrication-Welding Fill Roof Plate Structure Welding U0773-Installation Fill Align/Coupling Fabrication-NDT/PWHT U0773-Cable Welding & Piping U-773 Fabrication-Identification Roof Pumps-1st Support Plate Fabrication-Handling & "U-773" Core of & U0773-Cable Field U0773-Installation Plate Hydro-test Support of Pumps-2nd "U-773" U0773-Installation & Shell Hydro-test "U-773" U0773-Installation U0773-Instrument & Plate "U-773" U-773 Shell Cleaning Field Eye Shelter "U-773" of Cleaning of Erection-Assembly "U-773" U0773-Installation Field (Incl. "U-773" of Accessory "U-773" Plate of Piping Shelter Cable Termination Accessory "U-773" (Incl. Wash U0773-Instrument Align Plate "U-773" Erection-Erection/Assembling Erection-Welding Erection-NDT/PWHT Erection-Final Field Fire Gravel Cable Eye Concrete Laying "U-773" of of Calibration Asphalt Erection-Welding/Bolting/Dimension Concrete "U-773" Support) -of Gravel Steam Asphalt Water out of Concrete "U-773" Telecommunication Align/Coupling Termination CAB/JBS/LPS "U-773" Foundation Laying Support) Fighting "U-773" out Field Concrete "U-773" of Asphalt Wash & "U-773" U0773-Painting_Touch-up Erection-NDT/Final Asphalt Field Steam Conduits "U-773" Gravel Trench/Trays Steel Safety Surfacing Field Asphalt U0773-Insulation Concrete of Erection-Hydro-Test (Heavy Pumps-Cladding to (Heavy Surfacing of Concrete Tracing Steam of Connection Instrument & (Heavy (Light Concrete Fire Earthing Fire Storage Fire Mark Works Sys. Panel/Local Lighting (Heavy Asphalt Tracing Fire Safety Concrete Tray (Heavy Asphalt Surfacing "U-773" Shower Inspection (Light Concrete of in "U-773" Works (Heavy & Water Water "U-773" Water "U-773" (125M/M Electrical Loop Position Duty) Water Tracing Duty-250M/M Duty-150M/M Joint Field Covers (Heavy "U-773" Duty) "U-773" (Light Shower (Heavy "U-773" (125M/M Duty-150M/M Duty) Duty-250M/M & Field Duty) (Heavy Sys. (Light "U-773" (Heavy Station Fire "U-773" (Storage Lightning Tests (Heavy (Storage Sys. Road (Storage Duty) Installation-Assembly (125M/M Fire (Light (Storage Inspection Stat/JBS Road Fire Fire for Field Duty-150M/M Installation-Welding/Threading Duty-250M/M Road THK)-Gravel Water Heat Road (Roof Fire Duty-150M/M Fire Duty-250M/M Facilities Water Fire Piping Duty) Paving-Earth Duty) Water Road Foundation Fire THK)-Levelling Water Duty-150M/M Fire Duty-250M/M Paving-Sub-base Installation-Final Fighting THK) & Sys. Fighting Paving-Base & & Paving-Binder/Prime Fighting THK)-Compaction & (Storage Pump) Fighting THK) Pump) Road Pump) Fighting (Storage Siding) Road Paving-Wearing/Tack Pump) (Storage (Storage Installation Paving-Levelling Check Pouring (Spray THK) Paving-Compaction Paving-Road (Spray Paving-Final System-Flushing/Blowing & (Spray THK) System-Reinstallation System-Leak System-Loop & (Spray System-Function Work Support (Spray & THK) Pump) & in & Course Paving-Polyethylene/Wire Pump) & Pump) Paving-Form Pump) & Erection Inspection & Course Foam) Foam) & Paving-Concrete & Foam) System-Mechanical Foam) System-Reinstallation-Ma Coat Shoulder/Curb Check System-Flushing-Mainin System-Punch Test Test/Motor System-Reinstallation System-Flushing/Blow System-Leak Coat System-Loop System-Function System-Punch Test & Slope Solo Pouring Alignmen Clear Test Test/M Runnin Mesh Run Cle & Te U0774E-Unit U0774C-Unit U0774W-Unit M/C M/C M/C 78 West OC/COC C-P-303A/B_Condensate C/COC m Manhole-Backfill _Condensate E-201_Control W" First West 4-E" om B_Condensate ndation-Excavation 4-C" U-774-C" Control AOC/COC 74A-P-102A/B_West OC 4-W" anhole-Paint/Protection 4C-P-303A/B_Condensate al 201A/B_Central ation-Lean on-Excavation k ck st A/B_West 102A/B_West OC/COC 74-E" A/B_Condensate /COC 774-E" Foundation-Rebar perack ot _Central anhole-Wall -W" est 02A/B_West ncrete C-P-303A/B_Condensate " hole-Excavation C" ontrol Control Central ndation-Form erack A/B_West _West e-Wall 3A/B_Condensate 74-C" m oom Room -201_Control Plot AOC/COC dation-Rebar n on "U-774-W" Flush st 102A/B_West ottom Bottom hole-Wall _Central 01A/B_Central -C" "U-774-C" Manhole-Lean " Wall AOC/COC undation-Lean First "U-774-C" Line-Excavation Plot AOC/COC Foundation-Form First "U-774-W" Sanitary Foundation-Concrete Piperack "U-774-E" Rebar/Form Plot Piperack "U-774-C" Concrete Flush "U-774-C" First Foundation-Form Plot "U-774-E" 774C-P-303A/B_Condensate Sanitary Manhole-Paint/Protection Manhole-Bottom Concrete 774C-P-303A/B_Condensate 774B-ME-201_Control Line-Excavation Sump-Excavation Sump-Lean Plot Line-Laying/Assembling "U-774-W" Plot AOC/COC Piperack Flush Manhole-Backfill Manhole-Bottom First Plot AOC/COC Piperack "U-774-W" Sanitary Rebar/Form "U-774-C" Oily Flush Line-Welding/Bonding Piperack Foundation-Anchor Room Line-Excavation 774B-ME-201_Control Flush Pumps-Excavation First "U-774-E" Foundation-Concrete Piperack Line-Hydro-test Line-Laying/Assembling Rebar/Form Sanitary "U-774-C" First Plot Oily Room Piperack Other Foundation-Form Concrete Flush 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance Plot Room First Pumps-Lean Concrete Line-Laying/Assembling First Plot "U-774-C" Line-Welding/Bonding 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance Manhole-Wall Oily Plot Piperack Flush Plot "U-774-W" Lift Water Line-Welding/Bonding Plot Pumps-Rebar Concrete Rebar/Form 774B-ME-201_Control Foundation-Anchor Foundation-Excavation Manhole-Wall Foundation-Concrete "U-774-C" Line-Hydro-test Oily "U-774-E" Flush Sump-Bottom Water Sump-Excavation Lift 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance Line-Backfill Pumps-Excavation Line-Hydro-test Flush First Piperack Pumps-Form Concrete Plot Other Sump-Lean "U-774-C" 774B-ME-201_Control Sanitary Flush Hydrotreater Sump-Bottom Piperack 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance First Pumps-Lean U/G Station Flush Room Foundation-Lean Plot (Foundation) First Water Sanitary Room Lift First Foundation-Backfill Sanitary Plot Hydrotreater "U-774-E" First Sump-Bottom Station Concrete Foundation-Rebar Other Line-Backfill Plot Lift Plot Water Foundation-Concrete Pumps-Rebar "U-774-W" Line-Backfill Manhole-Paint/Protection Foundation-Form Sump Sump-Bottom Piperack Hydrotreater Oily Flush Pumps-Form Station Manhole-Backfill Sump-Wall "U-774-E" "U-774-W" Line Pumps-Concrete Oily Sump Flush Hydrotreater (Foundation) Foundation-Backfill Flush Pumps-Form U/G "U-774-E" Oily 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance Station 774B-P-201A/B_Central 774C-P-303A/B_Condensate Flush Pumps-Anchor Sump-Wall First Flush (Pedestal) 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance First Rebar/Form Plot Sanitary "U-774-E" "U-774-W" 774A-P-102A/B_West Sump Sanitary 774A-P-101A/B_West 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance "U-774-C" Package-Excavation Sump-Wall "U-774-C" "U-774-W" Concrete Water Foundation-Concrete Lift U/G "U-774-E" 774C-P-303A/B_Condensate 774B-P-201A/B_Central Sump-Paint/Protection Piperack 774A-P-102A/B_West Foundation-Form Lift Sump (UW,PW,CW Water Package-Lean (Foundation) "U-774-E" "U-774-C" 774A-P-101A/B_West Pumps-Excavation Lift "U-774-W" Pumps-Concrete Sump-Backfill Line Water "U-774-E" Rebar/Form U-774-C U-774-W Pumps-Form Hydrotreater Oily Concrete (Pedestal) Flush Pumps-Lean Pumps-Anchor Station 774B-P-201A/B_Central "U-774-W" Piperack "U-774-E" Package-Rebar Flush 774A-P-102A/B_West Hydrotreater Bolt Pumps-Concrete Concrete Room (Foundation) Oily Rebar/Form Station 774C-P-303A/B_Condensate Line Pumps-Backfill Foundation-Anchor 774A-P-101A/B_West Hydrotreater Station 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance "U-774-E" Concrete Package-Form Pumps-Rebar Sump-Wall 774C-ME-301_Office/Warehouse 774C-P-301A/B_East 774C-P-302A/B_Maintainance U-774-C U-774-W Concrete "U-774-E" "U-774-C" Oily (Foundation) (UW,PW,CW Sump Other Room Lift Pumps-Form Water Plot Sump-Paint/Protection U-774-C U-774-W Sump Lift Rebar/Form Other "U-774-E" Oily Sump Bolt Water U-774-C U-774-W (UW,PW,CW Plot Concrete Sump-Excavation "U-774-W" Pumps-Concrete (Foundation) Foundation-Concrete Pumps-Backfill Concrete U-774-E Oily Other Sump-Backfill "U-774-E" Water Hydrotreater Other Hydrotreater Sanitary Station (Pedestal) Other Package-Concrete Station Room Rebar/Form Plot Platform Scaffolding/Handrails-Field Sump-Lean "U-774-E" Piperack Other Package-Form First U-774-E Platform Scaffolding/Handrails-Field (Foundation) 774C-ME-301_Office/Warehouse Piperack Package-Anchor Piping Water Foundation-Backfill Other U/G Pumps-Concrete Plot 774C-P-302A/B_Maintainance Room Bolt "U-774-C" "U-774-W" First Sanitary 774C-P-301A/B_East (Foundation) Sump-Bottom U/G Pumps-Form Sump "U-774-E" Water Platform Piperack Scaffolding/Handrails-Alignment/Bolt Other U-774-E "U-774-E" Pumps-Anchor & Sump Scaffolding/Handrails-Alignment/Bolt Piperack Platform Sump-Bottom Piping (Pedestal) "U-774-E" 774C-ME-301_Office/Warehouse Oily Concrete First Other U/G U-774-E Shop Concrete (Pedestal) "U-774-W" Piperack Platform U/G 774C-P-301A/B_East 774C-P-302A/B_Maintainance Oily Sump SE)-Excavation Flush Concrete Piperack Platform U/G Line First Oily "U-774-E" Shop Platform Scaffolding/Handrails-Final "U-774-C" "U-774-W" Sanitary Piperack U/G (Pedestal) Package-Concrete Piping Platform Scaffolding/Handrails-Final Line Flush Scaffolding/Handrails-Field Piperack Bolt Package-Backfill Piperack Plot (Foundation) U/G Sump Sanitary Shop Lift "U-774-W" Plot Sanitary "U-774-C" "U-774-W" Water Shop (Foundation) & Sump-Wall Other Pumps-Concrete Plot & "U-774-E" Line Sump Sanitary Pumps-Backfill 774C-ME-301_Office/Warehouse U/G (Foundation) Flush Plot Piperack Platform Scaffolding/Handrails-Alignment/Bolt Line Water Erection-Field & (Foundation) (Pedestal) 774C-P-301A/B_East Plot Pumps-Excavation 774C-P-302A/B_Maintainance U0774E-Painting "U-774-W" Line Erection-Field Shop "U-774-E" Water "U-774-C" (UW,PW,CW Oily Plot Lift Piping Sump-Wall "U-774-W" SE)-Excavation U/G ladder-Field Flush Line Pumps-Excavation Station 774C-ME-301_Office/Warehouse & (UW,PW,CW Oily Pumps-Lean ladder-Field Plot Sanitary & First Piperack Platform Line Oily Erection-Alignment/Bolt Bolt Concrete Plot & Piping First Erection-Alignment/Bolt Pumps-Lean Sump-Paint/Protection Piping Sanitary SE)-Excavation Fabrication-Beveling/Assembling Shop Platform Scaffolding/Handrails-Final Oily Firewater First Piperack (UW,PW,CW "U-774-W" Line ladder-Alignment/Bolt First & Pumps-Rebar Plot Station (UW,PW,CW Erection-Grouting Oily First ladder-Alignment/Bolt Firewater & "U-774-E" Sump-Backfill (UW,PW,CW Plot (Pedestal) Erection-Grouting U0774W-Painting Water Oily Sump Lift & U/G Pumps-Rebar Hydrotreater Line Plot (Pedestal) Pumps-Form Erection-Final & (UW,PW,CW "U-774-W" ladder-Grouting (Pedestal) Sump Water Oily Shop Piping First Erection-Final Lift Fabrication-Welding "U-774-E" Water Erection-Field Piping ladder-Grouting (UW,PW,CW Rebar/Form "U-774-C" First Flush Piping Sump Pumps-Form Shop Lift ladder-Final Hydrotreater Piping ladder-Final Shop Flush Bolt Lift Water ladder-Field "U-774-C" U0774C-Painting Concrete "U-774-E" & (Foundation) (UW,PW,CW Oily Station Bolt Flush Erection-Alignment/Bolt (Foundation) Water Package-Assembling/Erection Flush Sanitary Shop Piping First (Pedestal) Fabrication-NDT/PWHT "U-774-E" Water Flush Firewater Line Shop First Station "U-774-E" (UW,PW,CW First "U-774-C" Sanitary ladder-Alignment/Bolt Lift Station Water Rebar/Form Firewater & Sanitary Piping Erection-Grouting Flush Sump Pumps-Concrete Station "U-774-E" "U-774-W" Hydrotreater Package-Skip U0774E-Installation Flush Oily Lift Firewater "U-774-W" Concrete & "U-774-E" U0774E-Installation "U-774-C" Sump Pumps-Form Pumps-Concrete Shop ladder-Grouting Oily Sump Water Erection-Final Fabrication-Identification Shop "U-774-C" Pumps-Anchor Erection Line-Excavation Plot Shop Oily Pumps-Form Erection Station "U-774-W" Shop (UW,PW,CW Flush Line-Laying/Assembling ladder-Final & Pumps-Anchor Erection Sump Concrete "U-774-W" Pumps-Assembling/Erection Fabrication-Beveling/Assembling Firewater Flush Flush Piping U0774E-Installation Sump "U-774-C" & Pumps-Assembling/Erection Station Fabrication-Beveling/Assembling (Pedestal) Shop U0774E-Installation "U-774-C" U0774E-Instrument Sump Package-Accessory "U-774-C" Concrete Water (Pedestal) SE)-Laying/Assembling Plot Sanitary Piping Sump Firewater Erection Sanitary Pumps-1st Water Package-Excavation Piping SE)-Welding/Bonding U0774E-Installation & Shop Erection Lift Pumps-Excavation Pumps-1st First U0774E-Installation & Water Oily Package-2nd U-774-W Fabrication-Welding Firewater Piping & Lift "U-774-C" Fabrication-Handling Package-Lean Pumps-Concrete (Foundation) Oily Inspection Fabrication-Welding Pumps-Backfill Line-Welding/Bonding U0774E-Installation "U-774-W" Pumps-Lean Sump Lift Line-Excavation & SE)-Laying/Assembling Piping U0774E-Cable Inspection Fabrication-NDT/PWHT Oily SE)-Welding/Bonding Pumps-Concrete Erection SE)-Hydro-test Oily Pumps-2nd Piping & (Foundation) Inspection Line-Hydro-test SE)-Laying/Assembling Erection Firewater "U-774-C" "U-774-W" Pumps-Backfill First Pumps-Assembling/Erection U0774C-Installation U0774W-Installation Pumps-2nd Plot Package-Rebar Station Fabrication-NDT/PWHT SE)-Hydro-test Pumps-Rebar Fabrication-Identification Field Line-Laying/Assembling "U-774-C" U0774C-Installation "U-774-W" U0774W-Installation Shop Piping & Station U-774-E SE)-Welding/Bonding Water Pumps-1st Sump Piping Firewater U0774E-Cable Flush Package-Form Inspection Station U0774C-Installation U0774W-Installation Support Piping U-774-C Pumps-Form Fabrication-Identification Sump Water Inspection Fabrication-Handling Piping U0774E-Installation & Shop Sanitary Erection SE)-Hydro-test Water U0774E-Installation Sump Oily Water Line-Backfill Line-Welding/Bonding U0774E-Installation U0774C-Installation U0774W-Installation U-774-W Lift Field Piping U0774E-Installation U0774C-Instrument U0774W-Installation Shop U0774W-Instrument Tightening Align Lift First SE)-Backfill (Pedestal) Tightening Flush Piping Firewater U0774C-Installation Pumps-2nd Support Piping U0774E-Itemized U0774E-Cable U0774E-Instrument Inspection Tightening Firewater Line-Hydro-test "U-774-E" U0774C-Installation Piping Field U0774W-Installation U0774W-Itemized Inspection Erection-Erection/Assembling Sanitary U0774C-Installation U0774W-Installation (Pedestal) Oily U0774C-Itemized U0774C-Cable Eye & Line-Excavation Align Bolt Support (Foundation) Pumps-Assembling/Erection Station Package-Concrete U-774-E U0774C-Installation U0774W-Installation Sump Water "U-774-E" U0774E-Installation U0774C-Cable U0774W-Cable Align Pumps-Concrete Station Tightening Piping Field "U-774-E" U-774-C Fabrication-Handling U0774W-Cable Package-Form Bolt Support Tightening SE)-Backfill Sump Pumps-Form Shop (Foundation) Field Inspection Erection-Welding Package-Anchor Line-Laying/Assembling Piping "U-774-W" Flush Sump Pumps-Anchor Oily Sump Eye of Piping Align Pumps-1st Field of Piping Tightening Water "U-774-E" U0774C-Cable U0774W-Cable U0774W-Installation Align/Coupling Wash Concrete Erection-NDT/PWHT Sanitary Tightening Eye Piping Support Lift Line-Backfill Line-Welding/Bonding Field "U-774-W" Support Piping Align/Coupling U0774C-Installation U0774W-Installation "U-774-E" Field Concrete Align "U-774-C" Fire U0774C-Installation U0774W-Installation Sanitary Eye Cable U0774C-Installation U0774C-Instrument "U-774-W" U0774W-Installation of Field Laying Erection-Final "U-774-E" U0774W-Insulation Sump Pumps-Assembling/Erection of Water Calibration Wash "U-774-E" U0774C-Installation "U-774-W" Erection-Erection/Assembling Lift Line-Backfill Support Oily Installation Field Tightening "U-774-E" (Pedestal) Station Package-Concrete "U-774-C" Line-Hydro-test "U-774-E" "U-774-W" Pumps-2nd Pumps-Concrete Package-Backfill Wash "U-774-C" (Foundation) Field of Erection-Assembly Erection-Erection/Assembling Piping "U-774-C" "U-774-W" Pumps-Backfill Telecommunication of Eye Pumps-1st U0774W-Instrument (Pedestal) Mark Align/Coupling Termination Support "U-774-E" "U-774-W" CAB/JBS/LPS (Foundation) Erection-Welding Fighting Field Sump & Support Eye "U-774-E" "U-774-C" Wash Erection-Welding of Field U0774E-Instrument "U-774-C" Station "U-774-E" "U-774-W" Gravel Field to Concrete "U-774-W" Erection-Welding/Bolting/Dimension Conduits Water "U-774-C" Safety Trench/Trays of U0774E-Insulation "U-774-C" Field Lift "U-774-E" U0774C-Instrument Termination Field Erection-NDT/PWHT of Piping U0774E-Flushing/Blowing U0774E-Loop Pumps-2nd Sump Wash & Storage of "U-774-E" U0774E-Reinstallation Erection-NDT/Final Gravel Erection-NDT/PWHT "U-774-C" U0774C-Insulation "U-774-W" Concrete "U-774-E" Termination Lift of Wash & Align of Fire "U-774-C" (Pedestal) Package-Assembling/Erection U0774E-Leak U0774E-Function Erection-Assembly Field Concrete of Fire Gravel U0774C-Flushing/Blowing U0774W-Instrument Safety Cable U0774E-Painting_Touch-up "U-774-W" Field of Erection-Final Laying Piping to Station of Cable Pumps-Assembling/Erection Laying (Pedestal) Erection-Final Calibration & Safety "U-774-C" of Instrument U0774E-Mechanical Asphalt Cable Termination of Concrete Calibration "U-774-E" U0774W-Painting_Touch-up Earthing Connection Gravel Bolt Cable "U-774-E" Mark Concrete Erection-Welding/Bolting/Dimension Field "U-774-C" U0774C-Loop U0774W-Flushing/Blowing (Foundation) Surfacing of Station Cable Sump Erection-Assembly Sys. Package-Skip Gravel "U-774-E" U0774E-Punch Asphalt Panel/Local Lighting Storage Field Safety U0774C-Reinstallation "U-774-W" Telecommunication of Tray Shower Termination Concrete Bolt Asphalt "U-774-W" U0774W-Reinstallation U0774W-Loop Telecommunication (Foundation) Fighting of Termination U0774C-Leak U0774C-Function Mark CAB/JBS/LPS "U-774-C" "U-774-W" Pumps-1st Concrete Field Fighting & U0774W-Leak U0774W-Function of Asphalt Align/Coupling Align Inspection Asphalt "U-774-C" Field of & U0774C-Painting_Touch-up U0774C-Mechanical Erection-Hydro-Test U0774W-Mechanical Surfacing (Heavy Erection-Welding/Bolting/Dimension Concrete Conduits Gravel & Field U0774C-Punch U0774W-Punch Laying Trench/Trays Conduits Safety to Gravel Asphalt Shower Field Trench/Trays Surfacing Asphalt Safety Electrical Laying Asphalt Concrete Erection-NDT/Final Trench/Trays Field Shower Joint Package-Accessory Covers (Heavy Trench/Trays Erection-NDT/Final of Concrete Trench/Trays Storage of Surfacing Concrete Gravel Pumps-2nd (Light (Heavy of Align/Coupling Asphalt Erection-Hydro-Test Concrete Surfacing Shower (Pedestal) Package-2nd of for Connection Instrument & (Heavy of Sys. (Pedestal) Electrical (Light Station Instrument of Concrete Earthing (Heavy Test/Motor (Light in Sys. Concrete Earthing Erection-Hydro-Test Lighting (125M/M Panel/Local (Heavy Asphalt Lightning Sys. Surfacing (Light Concrete Tray Lighting (Heavy Duty-250M/M Panel/Local Shower Asphalt Surfacing Test Piping Tray (Light (Heavy Connection Electrical Shower Concrete Position Inspection Loop Stat/JBS (Heavy Asphalt Station (Heavy Inspection Asphalt for Align (125M/M (Light & Duty-150M/M (Heavy Concrete Station Duty-250M/M & Surfacing Test/Motor Heat Align (125M/M Duty) Loop Test (Light for Duty-150M/M Joint (Heavy Inspection Facilities Covers Duty-150M/M Test (Heavy Joint Clear Test/Motor Duty) in Piping Covers Foundation (Light (125M/M Duty-150M/M Duty) Test (Light (125M/M Tests Duty-150M/M Duty) Loop & Sys. Heat Piping Duty) (Heavy Position (Light & Align/Coupling Sys. Facilities (Heavy Running Duty-250M/M Clear in Duty-150M/M THK)-Gravel Test (Light Sys. Facilities Clear Foundation Duty) Lightning Tests (Light Duty) (Heavy (125M/M Road Test Sys. Duty-250M/M Lightning Solo Duty) Foundation (Heavy Heat Sys. Duty-150M/M (125M/M Align (Light Position & Road Stat/JBS THK)-Levelling Duty-150M/M Stat/JBS Road Duty) (Light Running Duty-150M/M Tests Duty-250M/M Sys. PSSR Road (125M/M THK)-Gravel Running Road THK) Installation Inspection Duty-150M/M & Solo Inspection Duty-150M/M Installation & Run THK)-Compaction Road Duty) Road Sys. Paving-Earth Duty-150M/M Duty) THK)-Levelling THK)-Gravel Road THK) PSSR THK) Solo PSSR Duty-150M/M Paving-Sub-base Test & Duty) Installation Paving-Earth Duty) Road Installation THK) Duty-150M/M Check Sys. THK) Paving-Base THK)-Levelling Paving-Binder/Prime Support Paving-Sub-base Sys. Paving-Levelling Run THK)-Compaction THK) & THK) Paving-Base Road Test Paving-Binder/Prime Pouring Run Road Paving-Wearing/Tack & Paving-Levelling THK) Test Paving-Compaction THK)-Compaction Support Road THK) Road Support Paving-Wearing/Tack Paving-Levelling THK) Paving-Compaction Check THK) Paving-Levelling Pouring THK) Paving-Compaction Paving-Road Paving-Final THK) Paving-Polyethylene/Wire Paving-Compaction Check THK) Pouring Paving-Road Work Paving-Form THK) Paving-Final Paving-Polyethylene/Wire THK) Work Paving-Form Course Paving-Polyethylene/Wire THK) Paving-Concrete Paving-Form Paving-Polyethylene/Wi Course Paving-Concrete Course Paving-Form Paving-Concrete Course Paving-Concrete Coat Shoulder/Curb Check Coat Shoulder/Curb Check & Coat Slope & Coat Slope && Slope Pouring Slope Alignm Pourin Align Pou Mes Po Al M A Sanitary Water "U-775" "U-775" Treatment Oily Unit Sour Water M/C Water System-Unit Treatment Treatment M/C System-Unit System-Unit M/C M/C 20 Water Manhole-Wall U-775" Oily A/B_Sour A/B_Slop OC AOC/COC Drum-Excavation Sour Biocide Foundation-Form oundation-Rebar 75" Lean vation ole-Bottom Excavation 5-F-101A/B_Waste our 775-ME-201A/B_Sewage nitary 775-ME-203A/B_Sanitary 775-ME-101A/B/C_Oily B_Sour E-301A/B_Sour e 775-ME-102_Biocide ation A/B_Irrigation Oily A/B/C_Oily Pumps-Excavation Water ank-Lean ater F-101A/B_Waste um-Excavation ash 01A/B_Sewage 202_Tertiary _Oily er ocide 204_Chlorination 5-ME-302_Caustic 5-ME-303_Sour 5-ME-304_Scale ntral 205_Central njection ur Waste Tank-Rebar ction ection U-775" K-301A_Sour e-Bottom -775" Sump-Bottom e pe pper-Excavation cess 75-V-101_Slop Drum-Lean Sour A/B_Sewage 75-ME-201A/B_Sewage -202_Tertiary 75-ME-202_Tertiary _Sanitary E-203A/B_Sanitary 775-ME-203A/B_Sanitary /C_Oily E-101A/B/C_Oily 775-ME-101A/B/C_Oily /B_Sour E-102_Biocide 775-ME-102_Biocide ation -204_Chlorination 75-ME-204_Chlorination ME-302_Caustic ME-303_Sour ale ME-304_Scale al -205_Central 75-ME-205_Central gation /B_Irrigation Water /B/C_Oily A/B_Sour A/B_Slop P-103A/B_Slop ater A/B/C_Oily 5-P-101A/B/C_Oily 5-ME-102/302/303/304-Excavation 775" r n 775-TK-301A_Sour 5-TK-301B_Sour rack " Sleeper 5" "U-775" our Oil p 01_Slop B_Sewage 5-ME-201A/B_Sewage ry tiary ertiary anitary B_Sanitary B/C_Oily de ustic _Caustic -ME-302_Caustic _Sour -ME-303_Sour _Scale -ME-304_Scale A/B_Irrigation P-201A/B_Irrigation P-101A/B/C_Oily reatment Oily er ter nk-Excavation 1_Slop 102_Biocide ack mp-Lean per tripper-Lean 75-V-101_Slop 201A/B_Sewage 75-ME-202_Tertiary 203A/B_Sanitary nation orination hlorination 75-ME-204_Chlorination cale entral 75-ME-205_Central ipper A/B_Sour l B_Slop P-103A/B_Slop Treatment A/B/C_Oily Waste on ater TK-201A_Irrigation ation _Irrigation TK-201B_Irrigation athodic 101A/B/C_Oily 1A/B_Waste -102_Biocide ter er ur h -203A/B_Sanitary -101A/B/C_Oily P-201A/B_Irrigation sh lash P-101A/B/C_Oily Sanitary -301A/B_Sour ndation-Lean ion-Excavation 5-P-101A/B/C_Oily 5-ME-102/302/303/304-Lean n ess austic 2_Caustic 3_Sour 4_Scale -202_Tertiary -204_Chlorination -205_Central tripper Oil y 01_Slop Piperack Water 01A/B_Waste Filter Manhole-Wall Drum-Lean Pumps-Excavation 775-TK-101A_Oily "U-775" Tank-Form Tank-Excavation Dosing Pumps-Lean Piperack Sump-Bottom Water Flash Stripper Injection Stripper-Rebar Sleeper Oil Tank-Lean Sanitary Drum-Rebar "U-775" Water Hydrocyclone Tank-Anchor Pumps-Lean 775-TK-201A_Irrigation 775-TK-201B_Irrigation Filter 775-F-101A/B_Waste Injection Treatment Pipe 775-ME-302_Caustic 775-ME-303_Sour 775-ME-304_Scale "U-775" Sleeper Line-Excavation Stripper Water Injection Flash Stripper-Form Dosing Drum-Rebar Inhibitor "U-775" 775-ME-302_Caustic 775-ME-303_Sour 775-ME-304_Scale Tank-Rebar Piperack Water Drum Pipe Flash 775-F-101A/B_Waste 775-P-101A/B/C_Oily 775-ME-102/302/303/304-Column 775-TK-301B_Sour Pumps-Rebar Drum-Form Water Hydrocyclone Injection Foundation-Excavation "U-775" Foundation-Concrete Treatment Water 775-F-101A/B_Waste Sanitary Sour Flash Injection Inhibitor Concrete Filter Pumps-Rebar Tank-Form Other Foundation-Form Water Drum Package-Excavation Sour Drum-Form 775-ME-201A/B_Sewage Dosing Pumps-Form Flash "U-775" Water Sludge Manhole-Paint/Protection Bottoms 775-TK-101A_Oily 775-TK-101B_Oily 775-P-101A/B/C_Oily 775-ME-102/302/303/304-Ground Tank-Anchor Injection Sanitary Pumps-Excavation Pumps-Form Water Sump-Wall Package-Excavation Hydrocyclone Package-Lean Filter Dosing AOC/COC Water Bottoms Inhibitor Sludge 775-TK-201A_Irrigation 775-TK-201B_Irrigation Injection Drum Oil Water Sleeper Pumps-Lean Protection Water Package-Lean Hydrocyclone Tank-Concrete Foundation-Lean Sump-Wall Pipe "U-775" Sleeper 775-TK-301A_Sour Oil Package-Excavation Tank-Backfill Injection Inhibitor Flash Water Stripper-Concrete Stripper Drum Waste Biocide Oil Concrete Package-Rebar Pipe Other Dosing Water Pumps-Excavation Feed Rebar/Form Water Flash Drum-Concrete Injection Concrete Sludge Bottoms Stripper Foundation-Anchor Foundation-Rebar Hydrocyclone Line-Laying/Assembling Stripper-Form Water Treatment 775-F-101A/B_Waste Injection Pumps-Rebar Package-Lean Sump-Paint/Protection Package-Rebar 775-F-101A/B_Waste Stripper-Anchor Water Flash Drum-Form Injection Foundation-Concrete Foundation-Protection Waste Biocide Stripper Package-Form Drum-Concrete Dosing Concrete "U-775" Treatment Other Flash Foundation-Form Pipe Water Pumps-Lean 775-TK-101B_Oily 775-TK-201A_Irrigation 775-TK-201B_Irrigation Pumps-Concrete Shelter-Excavation Feed Bottoms Treatment Sludge Shelter-Lean Drum-Anchor Concrete Manhole-Backfill Tank-Excavation Water Sump-Backfill Flash Hydrocyclone Drum-Form Pumps-Form Dosing 775-P-101A/B/C_Oily 775-ME-102/302/303/304-Floor Treatment Sanitary Tank-Lean Tank-Preparation Pumps-Concrete 775-TK-301B_Sour Package-Form Drum-Anchor Other Filter Foundation-Backfill Concrete Pumps-Anchor Package-Excavation Tank-Concrete Dosing Package-Rebar Dewatering Concrete Treatment Sanitary Waste Biocide Water Injection Rebar/Form Sleeper Pumps-Form 775-TK-201A_Irrigation 775-TK-201B_Irrigation Pumps-Rebar Dosing Filter Tank-Rebar Tank-Backfill Well Feed Concrete Sanitary Other Injection Dosing Water AOC/COC Pumps-Anchor Hydrocyclone Rebar/Form Filter Sleeper Package-Lean 775-V-302_Process Package-Form Concrete 775-TK-101A_Oily Pumps-Excavation Dosing Inhibitor Dewatering Water Biocide 775-P-101A/B/C_Oily 775-ME-102/302/303/304-Steel Drum Waste Tank-Form Hydrocyclone 775-TK-201A_Irrigation 775-TK-201B_Irrigation Pumps-Form Oil Well Feed Water Pumps-Excavation Concrete Treatment Oil Shelter-Column Hydrocyclone Concrete Drum Water Bolt 775-V-302_Process 775-TK-301A_Sour Inhibitor (Foundation) Dosing Foundation-Concrete Sleeper Packages-Excavation Water Tank-Anchor Injection Pumps-Lean Flash Stripper-Concrete Stripper Inhibitor Other Injection Drum Flash Package-Concrete Dosing Package-Rebar Foundation-Form Stripper Pumps-Lean Water (Foundation) Stripper-Backfill Treatment Tank-Erection Drum-Concrete Injection Dewatering Sludge Bottoms Shelter-Ground (Foundation) Dosing Water Treatment Well Drum-Backfill Package-Form Pumps-Concrete Packages-Lean Injection Dosing Bottoms 775-ME-101A/B/C_Oily Line-Welding/Bonding Treatment Rebar/Form Sludge Package-Concrete Drum-Concrete Package-Anchor Package-Form 775-F-101A/B_Waste Pumps-Form Pumps-Concrete Dosing Pumps-Rebar Pumps-Excavation 775-ME-301A/B_Sour 775-P-104A/B/C_Oily Drum-Backfill Dewatering U/G Pumps-Backfill Sludge 775-P-302A/B_Sour Bottoms Water (Foundation) Well AOC/COC Package-Form 775-ME-204_Chlorination Pumps-Rebar Water Package-Excavation Bolt 775-P-103A/B_Slop Pumps-Anchor Waste Cartridge Sanitary Package-Anchor Pumps-Concrete 775-TK-101B_Oily 775-TK-301B_Sour Concrete Injection 775-F-101A/B_Waste Shelter-Floor Filter Sanitary (Foundation) Pumps-Backfill Pumps-Lean 775-P-104A/B/C_Oily Water Pumps-Form Package-Concrete Packages-Rebar Filter Dosing Biocide 775-V-302_Process 775-TK-301A_Sour Pumps-Form Waste 775-ME-101A/B/C_Oily 775-P-302A/B_Sour Pumps-Concrete Feed Concrete Package-Lean Dosing 775-P-103A/B_Slop Cartridge Package-Form Hydrocyclone Water Foundation-Anchor Concrete 775-TK-101A_Oily 775-ME-301A/B_Sour Biocide Pumps-Form Waste Feed Hydrocyclone Water Plant Tank-Concrete Packages-Form Package-Anchor Inhibitor Drum Waste Biocide (Pedestal) Foundation-Concrete Foundation-Protection Dosing Hydrocyclone Tank-Backfill 775-ME-204_Chlorination 775-P-201A/B_Irrigation Pumps-Rebar Inhibitor Drum Pumps-Anchor (Pedestal) Concrete Shelter-Steel Lift Water Feed Treatment 775-P-301A/B_Sour Concrete 775-P-303A/B_Sour 775-P-104A/B/C_Oily Water Line Dosing Package-Rebar 775-V-301A/B_Sour Hydrocyclone Injection 775-V-101_Slop Cartridge Plant Packages-Excavation Treatment Injection "U-775" 775-P-302A/B_Sour (Pedestal) Concrete Package-Concrete Pumps-Form Dosing 775-TK-301A_Sour 775-P-201A/B_Irrigation Foundation-Backfill Package-Excavation 775-TK-301B_Sour Lift Waste Package-Backfill Dewatering Water 775-P-103A/B_Slop Bottoms Dosing Packages-Excavation Treatment Line-Hydro-test 775-F-101A/B_Waste 775-P-301A/B_Sour 775-P-303A/B_Sour Sludge Package-Form Bottoms Well Water Pumps-Concrete Dosing 775-V-301A/B_Sour Sludge Bolt Injection Concrete Cartridge (Foundation) Pumps-Backfill Dewatering Packages-Lean Water 775-V-101_Slop Package-Concrete (Pedestal) Tank-Erection 775-ME-101A/B/C_Oily Injection Well Package-Anchor Water Package-Lean Plant Package-Backfill Pumps-Concrete (Foundation) 775-TK-101B_Oily Station Dewatering Water Bolt Pumps-Concrete Packages-Lean 775-TK-101A_Oily 775-TK-301A_Sour Well (Foundation) Pumps-Form Lift (Pedestal) 775-ME-301A/B_Sour 775-P-201A/B_Irrigation Pumps-Form (Foundation) Water Package-Excavation Plant Packages-Concrete 775-ME-204_Chlorination (UW,PW,CW Pumps-Anchor Station Package-Concrete Water Packages-Rebar 775-TK-301B_Sour 775-P-301A/B_Sour 775-P-303A/B_Sour Biocide Waste Bolt Pumps-Concrete Package-Rebar Dosing Package-Backfill Feed 775-TK-301A_Sour 775-ME-101A/B/C_Oily Biocide Pumps-Anchor (Foundation) "U-775" Lift Waste Pumps-Backfill Packages-Form Water Tank-Preparation Feed Concrete Packages-Rebar Bolt Filters-Excavation Hydrocyclone Package-Lean Packages-Anchor Water Dosing Packages-Form (Foundation) Hydrocyclone Waste 775-ME-301A/B_Sour Injection Concrete Package-Form Line-Backfill/AOC Pumps-Concrete Dosing Station 775-V-101_Slop 775-V-301A/B_Sour 775-TK-301B_Sour Treatment Packages-Form 775-TK-101A_Oily Package-Concrete Water Dosing 775-TK-101B_Oily 775-ME-204_Chlorination Filters-Lean Pumps-Form Cartridge Dosing Water Foundation Injection & Package-Concrete Pumps-Anchor 775-Y-101/102/103, Package-Rebar Water Package-Form "U-775" (Pedestal) 775-TK-301B_Sour Cartridge Package-Backfill Station Dewatering Other Well Tank-Erection Tank-Preparation Water 775-AS-001_Analyzer Package-Anchor Dewatering Well Cartridge Beam (Pedestal) Injection Waste Filters-Rebar Slab "U-775" 775-TK-101A_Oily Concrete Package-Form (Foundation) Water Pumps-Concrete Welding Concrete Plant Pumps-Backfill Package-Excavation Pumps-Concrete Injection (Pedestal) Well "U-775" (Foundation) Sour Lift Pumps-Backfill Water Injection Plant Tank-Erection Well Bolt 775-TK-101B_Oily Filters-Form 775-TK-101A_Oily (Foundation) Packages-Concrete Water (Pedestal) 775-Y-101/102/103, Bolt Plant Packages-Concrete Lift Package-Lean Concrete Packages-Backfill Water (Foundation) Package-Concrete Sour Dosing U0775-Fire Structure Lift "U-775" (Pedestal) Water Dosing Packages-Concrete Packages-Form "U-775" Water (Pedestal) Bolt Package-Form Other (Foundation) (Pedestal) Tank-Erection Packages-Anchor Foundation Pumps-Concrete Packages-Form (Foundation) 775-TK-101B_Oily Package-Anchor Pumps-Backfill Station Package-Rebar Injection Bolt Packages-Anchor Package-Concrete (Foundation) Water Waste Injection Cartridge U/G Tank-Erection Package-Backfill Station Cartridge Water Package-Concrete Oil Bolt Pumps-Excavation & "U-775" (Foundation) Station 775-TK-101B_Oily Beam Water Package-Form Pumps-Lean Injection Oil Water (Foundation) Piperack 775-Y-101/102/103, (Pedestal) & Waste Package-Form Well Water Sour Filters-Concrete "U-775" Water Concrete 775-ME-205_Central (Pedestal) Oil Bolt Package-Anchor Tank-Erection Plant Core Water Other Water Concrete Filters-Form & Injection Tank-Preparation "U-775" 775-ME-203A/B_Sanitary Lift Oil 775-ME-201A/B_Sewage of Welding Lift Pumps-Assembling/Erection Concrete (Pedestal) Filters-Anchor Other 775-ME-202_Tertiary Injection Well Bolt Line Slab Water (Foundation) Concrete Packages-Concrete U/G Drum-Erection (Pedestal) Injection Package-Concrete Tank-NDT, (Foundation) Tank-Erection Water "U-775" Packages-Backfill Bolt SE)-Excavation Package-Backfill (Foundation) Water 775-ME-205_Central Concrete (Pedestal) Packages-Concrete Pumps-1st Piperack (Pedestal) Oil Packages-Backfill "U-775" Bottom Water Package-Assembling/Erection Platform Tank-Drainage Waste (Pedestal) Drum-Align (Foundation) Water Waste "U-775" 775-ME-203A/B_Sanitary Station Pumps-Column 775-Y-101/102/103, Package-Concrete Injection (Pedestal) Station Structure Water & "U-775" 775-ME-201A/B_Sewage (Foundation) Stripper-Erection Treatment Package-Form Pumps-Assembling/Erection Injection Water 775-ME-202_Tertiary Cartridge Tank-Erection Package-Concrete (Pedestal) (Foundation) Oil & Bolt Tank-Preparation Package-Backfill Water Package-Anchor Hydrocyclone (Foundation) Tank-Erection Injection Bolt Water Proofing Firewater "U-775" (UW,PW,CW Line Pumps-2nd Stripper-Align (Foundation) U/G Hydrocyclone Pumps-Ground Water Core Treatment Trench Filters-Concrete Package-Skip Pumps-1st Cartridge (Foundation) Filters-Backfill Well U/G 775-ME-205_Central Water Welding Piperack & Platform Waste Erection-Field "U-775" Bolt Flash (Foundation) 775-ME-203A/B_Sanitary Stripper Water Drum-Ladder/Plateform Flash Platform 775-ME-201A/B_Sewage Concrete Hydrocyclone Injection (Pedestal) Water Hydrocyclone Injection Tank-Erection of 775-ME-202_Tertiary 775-ME-205_Central Welding Treatment Pumps-2nd (Pedestal) Stripper 775-ME-102/302/303/304 Well Flash Water & Piperack Waste Flash Platform Injection Tank-Erection (Pedestal) Water "U-775" 775-P-101A/B/C_Oily (UW,PW,CW Line Plate Stripper-Ladder/Plateform 775-ME-203A/B_Sanitary Injection Firewater 775-ME-201A/B_Sewage 775-ME-102_Biocide 775-ME-304_Scale (Pedestal) Concrete & Package-Concrete Cartridge 775-ME-303_Sour Line Package-Accessory Annular 775-ME-302_Caustic Package-Backfill Erection-Alignment/Bolt Waste Piping & Pumps-Floor (Pedestal) Welding Injection 775-P-101A/B/C_Oily "U-775" Injection Scaffolding/Handrails-Field 775-ME-202_Tertiary (Pedestal) Pumps-Assembling/Erection Shelter Injection Stripper Flash Bolt Tank-Erection (Pedestal) (Foundation) Fill Welding 775-ME-102/302/303/304 (Pedestal) Bolt & Tank-Erection w/Steel Hydrocyclone ladder-Field Drum (Foundation) Scaffolding/Handrails-Alignment/Bolt Align 775-ME-102_Biocide Drum-Erection Waste Water 775-ME-304_Scale Pumps-1st Bolt Package-2nd (Piperack) Filters-Erection 775-ME-303_Sour Pumps-Steel (Foundation) Injection 775-P-101A/B/C_Oily "U-775" 775-ME-302_Caustic (UW,PW,CW Bolt (Pedestal) (Foundation) Flash Feed Line-Excavation "U-775" Drum of Welding Firewater & Scaffolding/Handrails-Final (UW,PW,CW Bolt Drum-Align Filters-Align "U-775" (Foundation) Bottoms Hydrocyclone Waste Erection-Grouting Injection 775-P-101A/B/C_Oily & Water Injection Feed & U0775-Painting Tank-Erection Pumps-2nd Align Bottoms of Align/Coupling Welding 775-ME-102/302/303/304 Roof ladder-Alignment/Bolt & Shop Hydro-test Water Piping "U-775" Drum Tank-Erection & Packages-Assembling/Erection Erection-Final ladder-Grouting 775-ME-102_Biocide & Foundation 775-ME-303_Sour 775-ME-304_Scale Plate & Tank-NDT, (Pedestal) Packages-Assembling/Erection Pumps-Assembling/Erection Sanitary 775-ME-302_Caustic Feed Bottom Cleaning Piping (Pedestal) of Align Tank-Erection Line-Laying/Assembling Filters-Ladder/Plateform Injection ladder-Final Bottoms Pumps-Assembling/Erection Tank-Erection Water Welding Drum-Ladder/Plateform Align/Coupling (Pedestal) Tank-Drainage Grating "U-775" SE)-Laying/Assembling Beam Pumps-1st Erection Welding of Filter 775-ME-102_Biocide Bolt Packages-Skip (Pedestal) 775-ME-304_Scale (Foundation) Packages-Skip Pumps-1st (Pedestal) Sanitary Shell "U-775" 775-ME-303_Sour & Water Firewater 775-ME-302_Caustic Plate 775-ME-102/302/303/304 Tank-NDT, Injection Piping (Pedestal) Fabrication-Beveling/Assembling & Bottom of Other & Pumps-2nd 775-ME-102/302/303/304-Cladding "U-775" Pumps-Assembling/Erection Welding Tank-Drainage Shop Injection Slab Tank-Erection Sludge Line-Welding/Bonding Treatment Align Pumps-2nd Tank-Erection "U-775" Erection Filter SE)-Welding/Bonding Welding of Pumps-1st Accessory Piping "U-775" Shop & Packages-Accessory Package-Assembling/Erection Sanitary Injection & Plate Structure Align Waste Plate Sludge "U-775" & Annular (Incl. Welding Treatment Cover Align/Coupling out Water Tank-Erection Piping Injection & of Pumps-2nd (Pedestal) Core Welding Sanitary Packages-2nd Inhibitor Shop of Filter Shelter-Cladding U0775-Installation SE)-Hydro-test Fabrication-Welding "U-775" Fill Piping Waste Installation & "U-775" U0775-Installation Plate Package-Skip SE)-Backfill Water Dosing Bottom Tank-NDT, U-775 Annular Fabrication-NDT/PWHT Dosing Dewatering Line-Hydro-test Water U0775-Installation Align & Sludge Inspection Firewater Water Shop Welding Treatment Inhibitor Filter of Tank-Erection Piping Align Tank-Drainage Support) & U0775-Installation U0775-Itemized & Fill Piping U0775-Instrument of Welding Dosing & Tightening Water Package-Accessory Sludge Water Fabrication-Identification Dewatering Treatment Roof Dosing Plant Waste Biocide Support U0775-Cable & Hydro-test Tank-NDT, "U-775" U0775-Installation Align/Coupling Others_Overhead Welding Piping Plate U0775-Installation Welding Align Bottom Align/Coupling Water of Field Align Injection & "U-775" U0775-Installation Water Cleaning of Tank-Drainage Waste Dosing Inhibitor "U-775" U0775-Cable U-775 Erection Fabrication-Handling Eye Piping "U-775" Package-2nd Package-Assembling/Erection & Biocide Injection Tightening Piping "U-775" Plate Plant & Roof Package-Assembling/Erection Dosing Hydro-test Others_Overhead Support Dewatering "U-775" U0775-Instrument U0775-Insulation Plate Shell Annular Dosing U0775-Installation Plate Water Field Welding "U-775" Inhibitor Align/Coupling Package-Assembling/Erection Welding "U-775" U0775-Cable Lift of Cleaning Dosing Injection Package-Skip Inspection Dosing Line-Backfill U0775-Installation Erection-Erection/Assembling U0775-Instrument & Water Dewatering Field Wash Package-Skip of Fill "U-775" U0775-Installation & Injection Dosing Plant Accessory Packages-Assembling/Erection Biocide "U-775" Shell Field Piping Align Lift Plate Others_Overhead "U-775" Station Package-Skip of Eye Water Align Support of Welding Package-Assembling/Erection Annular Field Plate Asphalt Plant Concrete Well (Incl. Erection-Welding "U-775" & Dosing (Roof Gravel "U-775" Package-Accessory out Packages-Skip Roof Fill Asphalt Biocide & Accessory "U-775" Station Well Installation Package-Accessory & Steam "U-775" Field Erection-NDT/PWHT of & Plate Hydro-test "U-775" Package-Skip Concrete of Package-Accessory & Asphalt Lift Termination Wash Gravel Dosing of Erection-Assembly Welding Asphalt "U-775" Tightening Package-2nd Plate of Others_Overhead "U-775" Cable (Incl. Cleaning of "U-775" Well out Field & Package-Assembling/Erection Fire "U-775" Package-2nd Erection-Final Safety Pumps-Assembling/Erection Steam "U-775" Lift Dosing Packages-Accessory Support) Cable U0775-Insulation Package-2nd Laying Roof Align of Asphalt "U-775" Well Shell Package-Assembling/Erection Plate Calibration & Station Hydro-test Pumps-1st Steam Cable Gravel U0775-Painting_Touch-up Field Erection-Welding/Bolting/Dimension Plate Surfacing of (Heavy Package-Accessory Package-Skip of Cranes-Erect Packages-2nd Concrete Telecommunication Siding) of "U-775" Cleaning Termination Concrete Sanitary Station CAB/JBS/LPS Installation Dosing Tracing Fighting (Heavy Package-Skip & Pumps-2nd Support) (Heavy Concrete of (Light Align Erection-Hydro-Test Concrete Accessory Surfacing Shell Laying Sanitary Field Package-2nd Align Sanitary Asphalt Plate (Heavy Pumps-Cladding for Conduits (Heavy Safety Asphalt Cranes-Main Trench/Trays Plate Shower of (Incl. Connection Sanitary "U-775" Tracing Field (Heavy Concrete of (Light (Roof Align Erection-NDT/Final Package-Accessory Concrete "U-775" to Trench/Trays Sanitary out Tracing Mark Surfacing (Heavy Sanitary Package-Accessory "U-775" Mechanical Accessory of Loop of Electrical "U-775" Duty) Storage "U-775" Plate "U-775" Instrument Duty-150M/M Align Package-2nd Cranes-Crane (Incl. Sanitary Align Duty) "U-775" Field Earthing Align Duty-250M/M Water Support) (125M/M Sys. Panel/Local Tray Lighting out (Heavy Align Shower Align (Light "U-775" Duty) & (Heavy Duty-150M/M Align Duty) Water Inspection (Heavy Water "U-775" (Light Station Tests Field Duty-250M/M (125M/M Oily Siding) Installation Water "U-775" & Sour Road Align/Coupling Oily Installation Duty) Field Cranes-Align Rail Water Support) Align (Heavy in Installation-Assembly Sour (Light Oily Road Installation Water Covers for Align Joint Align Oily Sour Oily Treatment (125M/M Align Sour Road Duty-150M/M Heat Position Road Water Sour Frame Water Installation-Welding/Threading Duty-250M/M Treatment Water & Duty-150M/M Sys. Treatment Piping Facilities Frame Water Duty) Installation Oily THK)-Gravel Duty-250M/M Water Paving-Earth Installation-Final Foundation Duty) Road Treatment Water Installation Oily Sour Lightning (Roof Sys. Water Paving-Sub-base Treatment Duty-150M/M Sour Water Treatment Water Stat/JBS THK)-Levelling Duty-250M/M Align Sys. THK) Water Paving-Base Paving-Binder/Prime Water THK) Install Treatment Treatment Install Inspection Water Road THK) Installation Treatment Water Road Paving-Wearing/Tack THK)-Compaction Treatment THK) & Installation Treatment Water System-Flushing/Blowing Treatment Installation Treatment Paving-Levelling Siding) Treatment System-Reinstallation System-Punch Treatment Paving-Levelling Sys. Treatment System-Loop Paving-Road THK) Paving-Compaction Treatment & Paving-Final System-Leak THK) Paving-Compaction Pouring Treatment THK) System-Function Work THK) Support Treatment System-Flushing/Blowing THK) System-Mechanical System-Reinstallation Check Course THK) System-Flushing/Blowing in Inspection Paving-Polyethylene/Wire System-Loop System-Reinstallation System-Leak Paving-Polyethylene/Wir Paving-Form System-Function Erection Course System-Loop Paving-Form System-Leak System-Function System-Mechanical Paving-Concrete Paving-Concrete System-Punch System-Mechanica Clear Test/Motor System-Punch Shoulder/Curb Coat Check Test Coat Test & Test/Motor Test & PSSR Test/Moto & Test Slope Slope Runnin Test Solo Clea Test Pou Cle Po A R A 73 774A-GH-01_Structure 774A-GH-01_Structure 774A-GH-01_Structure 774A-GH-01_Structure 774A-GH-01_Structure Work-Excavation 774A-GH-01_Structure Work-Foundation 774A-GH-01_Structure Work-Back 774A-GH-01_Finishing Work-Ground 774A-GH-01_Finishing 774A-GH-01_Finishing Work-Ground Filling 774A-GH-01_Finishing Work-Wall Beam Work-Roof Slab Work-Roof Work-Doors Work-Masonry Work-Wall Slab Work-Final Waterproofing & Windows Floor & Plastering Finishing Finishing (Floor, Wall, Ceiling "U-777" "U-765" Desalinated Sales Gas Water Butback at F01.Receive F02.Provide Battery "U-762" for Start-up Limit Boiler F03.Provide PA/IA/PW/UW/FW at Fuel Battery Fire-in "U-762" F04.Provide "U-777" Gas Limit, Cooling Ready Ready Fuel Steam supply Water for Gas for Se S 0 "U-777" "U-765" "U-777" Operational "U-766" "U-766" "U-765" Inerting Ready "U-766" N2 "U-774" "U-769" "U-773" UW for MP/LP Leak for Chemicals 761-ME-101_Chlorination Service to Purging "U-771" CW "U-761" Test Sanitary "U-761" FW Diesel Fuel Surge Network "U-771" "U-774" Gas & to "U-745" "U-725" System Inerting PW Inerting UW Commissioning "U-762" CW "U-767" "U-772" "U-762" "U-777" Drum "U-768" "U-767" (U0765) "U-762" "U-766" Activation Activation for Commissioning Atmospheric System "U-775" "U-762" NGL Propane Inerting "U-770" "U-762" "U-762" U&O CW "U-777" & Oxygen Phosphate Morpholine Put "U-777" "U-762" Inerting UW Caustic/Sulphuric "U-767" Comm. Preparation Put Demin. to Chilled Strorage System into "U-777" Light Chemical PKG_Hypochlorite from Refractory (Central "U-762" (Central into Vapor "U-762" Storage BFW Steam "U-777" Scavenger operation Steam Reinstallation "U-762" & CW Water operation Boiler Header (ME-104) Domestic (ME-111) of Inerting to Inerting Recovery "U-765" switch Steam & "U-762" Plant) Flare Drum Demin. Blowing Boilers Sewer Inerting "U-762" Blowing Punch Eyewash Drying-out to MP East/We from Boilers "U-770" (ME-105 "U-762" System (Desal Passiv to Blowin Sewer Treate Steam to HP Wate Clea "U-7 Unit Dea LP for Dea "USto for "US "U S ( S

Primary Baseline Actual Work

Remaining Work Critical Remaining Work

Milestone

Page 2 of 2

Date 07-Dec-12

Revision Monthly Updated Cut-off by 29-Nov-2012

Checked Y.I.Jeong

Approved S.M.Kwon