GOVERMENT OF RAJASTHAN WATER RESOURCES DEPARTMENT GARARDA IRRIGATION PROJECT NAME OF WORK:A CONSTRUCTION OF SUPER PASSES AT R.D.

1000m of silor disty. Of GIP (Masonry linned canal) CANAL DATA :DRAIN DATA :Discharge 0.944 cumec Catchments area of Nalla. = 0.38 sqkm= 0.15 Sq mile Bed width 1.00 m Nalla Bed (N.S.L.) 261.760 m F.S.D. 0.80 m H.F.L. in Nalla 262.760 m Free Board 0.30 m F.S.D ( Nalla) 1.00 m Bed slope 1 in 5000 1in Free Board (nalla) 0.50 m C.B.L. 260.875 m F.S.L. 261.675 m 0.30 T.B.L. 261.975 m 0.80 M.W.D. 1.10 m 1.00

1 Canal section :Adopt section for superpasses =

1.00 x 1.00 x

1.10 m 1.10 m

2 Hydraulic Design for nalla section :Flood discharge as per dicken's formula. 3/2 Q = CxA 3/4 Q = 1800 x( 0.15 ) Q = 426.2 cusec Q = 12.06 Cumec Area required for passing required dicharge of nalla Assume Valocity of nalla limited to 2.00 meter/ sec A = Q/V = 12.06 / 2.00 = 6.10 sqm Size required for passing required dicharge of nalla= B x D = 6.10 x 1.00 m

NAME OF WORK:- CONSTRUCTION OF SUPER PASSES AT R.D.1000m of silor disty. Of GIP

* * *

* * * * * * * * * * * * * * * * * * * A
1.30 1.45 0.60 3.00 x-section on B-B 21.00 1.00 1.00 0.50 2.80 13.60 0.60

3.00

1.50

6.00

0 6.7

* * * * * * * * * * * * * *

0.30

1.30

* * * *

1.00

1.60

2.20

1.00

1.00 0.50 R.L. 263.260 0.50 1 1.50 0.30

1.45 2.90 1.10 D/S CBL 1.50 0.90 0.30

8.55

0.25

6.7 0

6.00

0.30

1.10

0.90

0.30 14.39 7.09 Nalla HFL 262.760 6.10 0.30

1.50

* * *

3.00

R.L. 261.760

261.675

CB.L. 260.875

R.L. 259.975

Nalla TBL 263.260 2.50 1 Nalla HFL 262.760 U/S TBL 261.975 261.675 U/S FSL U/S CBL 260.875 259.975 259.675 R.L. R.L.

FSL

Nalla B.L. 261.760

Canal Data

River data

* * * * * * * * * * * * *

* * * * * * *

0.33 1.10 260.575 CBL 260.875

:1

1.50

1 2 3 4 5 6 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

NSL CBL FSL TBL "Q" Bw

261.760

260.875

Bed level HFL

261.760

262.760

261.675 T.B.L. of nalla 263.260

261.975 Flood discharge 12.06

0.944

Cumec

1.00

6.10

Drawing Not to scale

R.L. 259.675 0.50

8.55

13.09

0.6

:1

1.45

x-section on A-A

0.50

2.50

:1

3.00

0.6

1.30

10

Top bars mm F 300 c/c 150 1688

Top &bttom Distribution bars 10mm F 300c/c 150

415

160

1960

0.24

0.3 Main reinforcement 12 mm F 85 c/c

2.00

0.3 Bottom Plain bars 10 mm F 250 c/c

Detail of Reinforcement in Super passes (for slab)

NAME OF WORK:-

GOVERNMENT OF RAJASTHAN WATER RESOURCES DEPARTMENT GARARDA IRRGATION PROJECT 0

DETAILED ESTIMATE Sno Perticulars 1 Earth work in excavation including loading disposal and dressing of excavate earth with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect
Hard soil mixed with kankar /boulder morrum

Detail

Qty

unit

Abutment block Wing Wall Return wall

1 x 14.39 x 4 x 4.70 x 4 x 3.00 x 25

3.90 x 2.10 1.80 x 2.10 1.80 x 2.10 % of above =

= = = Total = 59.00 cum for 1 Nos =

117.90 71.10 45.40 234.40 cum 59.00 cum

2 Earth work in excavation including loading disposal and dressing of excavate rock with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect B. E/w in D/R rock C.H/R not required blasting D. E/w in phylites &other rock requaring nominal blasting 25 25 25 % of above = % of above = % of above = 59.00 for 1 59.00 for 1 59.00 for 1 cum Nos = cum Nos = cum Nos =

59.00 cum 59.00 cum 59.00 cum

3 Cement concrete (1:3:6) M-10 well mixed and laid in - position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm Abutment bolck 1 x 14.39 x Wing Wall 4 x 4.70 x Return wall 4 x 3.00 x

3.90 x 0.30 1.80 x 0.30 1.80 x 0.30

for 4 R.R stone masonry (using R.R.stone where 75% stones to be lnot ess than 15cm in size in any directon and weighing not less than 23kg.) in Foundation including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level.etc complete in cement sand mortar 1:5 Abutment block 2 x 13.09 x 1.30 x 0.90 Wing Wall 4 x 4.70 + 3.95 x 1.50 x 0.90

16.90 10.20 6.50 33.60 1 Nos = 34.00

cum cum cum cum cum

= 30.70 cum = 23.36 cum

Return wall

2 4 x 3.00 x 2.25 x 1.50 x 0.90 2 for

= 14.18 cum total 68.23 cum 1 Nos = 68.30 cum

5 R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5 Abutment Wing Wall Return wall 2 x 8.09 + 7.44 x 1.30 + 0.6 x 0.90 = 13.28 cu m

2 2 4 x 4.70 + 3.20 x 1.50 + 0.50 x 2.90 = 45.82 cum 2 2 4 3.00 + 2.25 x 1.50 + 0.50 x 2.90 = 30.45 cum 2 2 total 89.55 cum for 1 Nos = 89.60 cum

6 Centring shuttring for slabs, beams, lintels, coloumns troughs, with or without caps and base including proping and removing. for slabe shuttring including proping 7 Side etc.complete (to achive finish 2)for block joints of foundation stillins basins, buckets aprons etc. (non suspeted horizentally laid mass concrete) side of slabe side of slabe side of bed block side of bed block 2 2 4 4 x x x x 8.09 1.60 8.09 0.60 x x x x 0.35 0.35 0.20 0.20 for 8 Cement concrete (1:1.5:3) M-10 well mixed and laid in - position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm 1 x slabe with wearing coat 2 x Bed Block bed concrete 1 x 9 Extra labour charges for obstructration in laying and placing the reinforced cement concrete due to reinforcement. (b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. = = = = Total 1 Nos = 5.70 1.10 6.50 0.50 13.80 13.80 sqm sqm sqm sqm sqm cum 1 x 8.09 x 1.60 for 1 Nos = 12.94 sqm 13.00 cum

8.09 x 8.09 x 8.09 x

1.60 x 0.35 0.60 x 0.20 2.00 x 0.10 for

= = = total = 1 Nos =

2.80 3.30 0.90 7.00 7.00

cum cum cum cum cum

as per item Nos 8 for 1 Nos =

7.00 cum 7.00 cum

(b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. 10 Couresd stone / kharanja masonry (using hammer dressed stone to be not less than 20 cm in any direction and at least 50 % stone to be more than 23 cm in depth ) for superstructure (upto 0.5m thickness) including curing etc.including all leads of all construction matarials complete.in cement sand mortar1:5 for parapet wall 2 x 21.0 x

1.00 + 0.50 x 1.50 = 47.10 cum 2 for 1 Nos = 47.10 cum

11 Supply of M S .reinforcement including = 9.6 m labour charges for bending binding and Length of slabe = 1.60 m placing in position all reinfocement as per width of slabe = 0.3 m drawing including cost of binding wire and Depth of slabe all leads and lifts using.tor or ribed bars number required Tota (As per IRC SP 20) for clear span 2.00m weight/ Dia length = l x length c/c = Nos. m of cc space leng main crank bars bottom (cross) # 2.54 x 9.60 / 0.085 = 114 = 289 x 0.888 bottom plain bars (cross) # 9.60 x 1.60 / 0.25 = 6 = 58 x 0.785 top bars (cross) # 2.30 x 9.60 / 0.30 = 32 = 74 x 0.785 top bars (long) # 9.60 x 1.60 / 0.30 = 5 = 48 x 0.785 Botttom bars (long) # 9.60 x 1.60 / 0.30 = 5 = 48 x 0.785 Total weight (kg) = 5% for cutting wastage Total weight (kg.)= 457 Total weight (T) = 0.46 for 1 Nos = 0.50 12 Cement concrete (1:2:4) M-15 well mixed and laid in - position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of maximum size upto 20mm for nalla bed U/S & D/S wing wall Top 2 x 9.6 x 6.00 x 0.10 = 11.51 U/S & D/S return wallTop 2 x 13.09 x 3.00 x 0.10 = 7.85 U/S & D/S approch 2 x 13.60 + 2.80 x 3.00 x 0.10 = 4.92 2 24.29 for 1 Nos = 24.30 13 Plaster in cement sand mortar 1:4including raking of joinst smooth finishing & curing etc. including all leads of all construction materials complete of thiickness 20mm for abutment 2 x 7.09 x 1.10 = 15.60 U/S & D/S face 2 x 13.60 x 1.10 = 29.92 Total = 45.52 14 Flush and ruled pointing on stone masonry for 1 Nos = 45.60 including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3

Tot al wei 257 45 58 38 38 435 22

ton

cum cum cum

cum

sqm sqm sqm sqm

Flush and ruled pointing on stone masonry including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3 for parapet wall 4 x 21.00 x for parapet end wall 4 x 1 x

1.50 1.50 for

= 126.00 sqm = 3.98 sqm Total 129.98 sqm 1 Nos = 130.00 cum

15 Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck. (Rate as per irrigation BSR2006Ch 5/8c)

50 % of item no 1

118.00 cum

sqm

GOVERNMENT OF RAJASTHAN WATER RESOURCES DEPARTMENT GARARDA IRRGATION PROJECT NAME OF WORK:0 (BSR 2008) Rate Unit 0

Sno Perticulars 1 Earth work in excavation including loading disposal and dressing of excavate earth with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect Hard soil mixed with kankar /boulder morrum (Rate as per irrigation BSR2008 Ch 5/1c) 2 Earth work in excavation including loading disposal and dressing of excavate rock with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect (Rate as per irrigation BSR2008 Ch 5/2 ) B. E/w in D/R rock C.H/R not required blasting D. E/w in phylites &other rock requaring nominal blasting 3 Cement concrete (1:3:6) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm (Rate as per irrigation BSR2008 Ch 7/6d) 4 R.R stone masonry (using R.R.stone where 75% stones to be lnot ess than 15cm in size in any directon and weighing not less than 23kg.) in Foundation including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level.etc complete in cement sand mortar 1:5 (Rate as per irrigation BSR2008 Ch 8/2e) 5 R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5 (Rate as per irrigation BSR2008 Ch 8/2e) 6 Centring shuttring for slabs, beams, lintels, coloumns troughs, with or without caps and base including proping and removing. (Rate as per irrigation BSR2008 Ch 10/2)

Qty

Amount

59.00 cum

47.00

p /cum

2773.00

59.00 cum 59.00 cum 59.00 cum

78.00 121.00 166.00

p /cum p /cum p /cum

4602.00 7139.00 9794.00

34.00 cum

2105.00 p /cum

71570.00

68.30 cum

1618.00 p /cum

110510.00

89.60 cum

1660.00 p /cum

148736.00

13.00 sqm

131.00

P sqm

1703.00

7 Side shuttring including proping etc.complete (to achive finish F2 Top or intermidiate bed platein between masonry of piers,abutments sluice well etc. (Rate as per irrigation BSR2008 Ch 10/1b) 8 Cement concrete (1:1.5:3) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm (Rate as per irrigation BSR2008 Ch 7/4d) 9 Extra labour charges for obstructration in laying and placing the reinforced cement concrete due to reinforcement. (b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. (Rate as per irrigation BSR2008 Ch 10/11b) 10 Couresd stone / kharanja masonry (using hammer dressed stone to be not less than 20 cm in any direction and at least 50 % stone to be more than 23 cm in depth ) for superstructure (upto 0.5m thickness) including curing etc.including all leads of all construction matarials complete.in cement sand mortar1:5

13.80 sqm

90.00

P sqm

1242.00

7.00 cum

2951.00 p /cum

20657.00

7.00 cum

111.00

p /cum

777.00

47.10 cum

2003.00 p /cum

94342.00

11 Supply of M S .reinforcement including labour charges for bending binding and placing in position all reinfocement as per drawing including cost of binding wire and all leads and lifts using.tor or ribed bars (As per IRC SP 20) for clear span 2.00m

500.00 kg

55.00

P /Kg

27500.00

12 Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of maximum size upto 20mm (Rate as per irrigation BSR2008Ch 7/5d) 13 Plaster in cement sand mortar 1:4including raking of joinst smooth finishing & curing etc. including all leads of all construction materials complete of thiickness (Rate as per irrigation BSR2008 Ch 9/4b) 14 Flush and ruled pointing on stone masonry including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3 (Rate as per irrigation BSR2008 Ch 9/15) 15 Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck.

24.30 cum

2509.00 p /cum

60969.00

45.52 sqm

94.00

P sqm

4279.00

130.00 sqm

52.00

P sqm

6760.00

Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck. (Rate as per irrigation BSR2006Ch 5/8c)

118.00

29.00

p /cum

3422.00

Total 576775.00 3 % contengency 17303.25 G total 594078.25 Say Rs. 5.95 lacs

SCHEDULE "G" 0 1 NIT No. 2 NIT Amount 3 Earnest money 4 5 6 7 8 9 Tender cost Date of Selling Tender Date of Receiving Tender Date of Opening Tender Time of completion B.S.R. 0 7/2008-09 S.No.32 Rs. 0 lacs 1.Regd. Contractor @1/2%Rs. 2.Other Contractor @ 2%Rs. Rs. 200 15.09.08 to 22.09.08 24.09.08 upto 3.00 PM 24.09.08 At 4.00 PM 4 Month Irrigation BSR 2008 Qty Rate Unit

0.00 0.00

Sno. Item 1 Earth work in excavation including loading disposal and dressing of excavate earth with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect Hard soil mixed with kankar /boulder morrum 2 Earth work in excavation including loading disposal and dressing of excavate rock with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect B. E/w in D/R rock C.H/R not required blasting D. E/w in phylites &other rock requaring nominal blasting 3 Cement concrete (1:3:6) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm 4 R.R stone masonry (using R.R.stone where 75% stones to be lnot ess than 15cm in size in any directon and weighing not less than 23kg.) in Foundation including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level.etc complete in cement sand mortar 1:5

Amount

59.00 cum

47.00

p /cum

2773.00

59.00 cum 59.00 cum 59.00 cum

78.00 121.00 166.00

p /cum p /cum p /cum

4602.00 7139.00 9794.00

34.00 cum

2105.00

p /cum

71570.00

68.30 cum

1618.00

p /cum

110510.00

5 R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5

R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5 6 Centring shuttring for slabs, beams, lintels, coloumns troughs, with or without caps and base including proping and removing. 7 Side shuttring including proping etc.complete (to achive finish F2 Top or intermidiate bed platein between masonry of piers,abutments sluice well etc. 8 Cement concrete (1:1.5:3) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm 9 Extra labour charges for obstructration in laying and placing the reinforced cement concrete due to reinforcement. (b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. 10 Couresd stone / kharanja masonry (using hammer dressed stone to be not less than 20 cm in any direction and at least 50 % stone to be more than 23 cm in depth ) for superstructure (upto 0.5m thickness) including curing etc.including all leads of all construction matarials complete.in cement sand mortar1:5 11 Supply of M S .reinforcement including labour charges for bending binding and placing in position all reinfocement as per drawing including cost of binding wire and all leads and lifts using.tor or ribed bars

89.60 cum

1660.00

p /cum

148736.00

13.00 sqm

131.00

P sqm

1703.00

13.80 sqm

90.00

P sqm

1242.00

7.00 cum

2951.00

p /cum

20657.00

7.00 cum

111.00

p /cum

777.00

47.10 cum

2003.00

p /cum

94342.00

500.00 kg 12 Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of maximum size upto 20mm 13 Plaster in cement sand mortar 1:4including raking of joinst smooth finishing & curing etc. including all leads of all construction materials complete of thiickness 14 Flush and ruled pointing on stone masonry including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3

55.00

P /Kg

27500.00

24.30 cum

2509.00

p /cum

60969.00

45.52 sqm

94.00

P sqm

4279.00

130.00

52.00

P sqm

6760.00

sqm 15 Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck.

118.00

29.00

p /cum Total

3422.00 576775.00

7500 6600 Wearing coat 75mm thick

62 nos main bars Distribution bars 12mm F 120 c/c 8mm F 160 c/c 1256
150 150
o o o o o o o o

86 nos main bars 12mm F 85 c/c


150

Distribution bars 10mm F 250 c/c 1688


o

60 nos main bars 16mm F 125 c/c


150
o o o o o o o o o o o o

300 506

53 nos main bars 20mm F 140 c/c


150
o o o o o o o o o o o o o o o

400 790

5.00 m span 6.00 m span NOTES:1 Concrete:- M-25 2 Steel:- HSDY as per IS-1786 3 Cover:- 20mmat bottom & 40mm at side 4 In 1.5M, 2.0M &3.0M span only one Bar is to be crankedin each side in four bars in all other span crank alternative bars. 5 All bars cranked one end only these are placed with crank on left side and right side alternatively 6 Surface steel at top longitudinal -10mm @300mm c/c length a shown in sketh & transverse -10mm @300c/c all through out in logitudinal provided steel in the Zone where main steel is not available plus 150mm on either side

450 220 320

450

150

210 1500 1575

o o o

o o o

o o

o o o

o o o

o o o

240

o o o

o o o

o o

Cross section of culvert 300 375 300 300 416 2000 1960 300 130 160

Distribution bars 10mm F 175 c/c


150

1.50 m span 71 nos main bars 16mm F 105 c/c


150

2.00 m span Distribution bars 12mm F 200 c/c


150

2508 300 3000 2810


o o o o o o o o o

o o o o

3330
o o o o o o o o o o

300

370 4000 3650

o o o

o o o

o o o

o o o

o o

300 590 3.00 m span

300

290

4.00 m span Distribution bars 12mm F 175 c/c


150 150

65 nos main bars 20mm F 115 c/c 4840


o o o o o o o o o o o o o o o

Distribution bars 12mm F 150 c/c


150

4040 430 5000 4570


o o o o o o o o o o o o

o o o

o o

480 6000 5360

o o o

o o o

o o o

o o o

o o o

o o

400

400 890

400

400

93 nos main bars 20mm F 90 c/c


150
o o o o o o o o o o o o o o o o o o

Distribution bars 12mm F 125 c/c


150

6680 600 8000 7280


o o o o o o o o o o o o o o o

o o o

400 1120

400

520 62 nos main bars 25mm F 120 c/c


o o o o o o o o o o o o o o o o o o o o

8.00 m span Distribution bars 12mm F 110 c/c


150

150
o o o o o o

8400 750 10000 8990


o o o o o o o o o o o o o o o o o o o o o o

o o

o o

400 1260

400

670

10.00 m span

Main Reinforcement Bottonm reinforcement Top reinfrocement top steel where main not available Dia Center to Dia Length Center Center to Center thickness Dia meter Dia meter Span Bed blok meter of center top meter of to center to center center of slab crank bottom of bars of bars (M) length(m) bars distance porsion bars center distance distance Length (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) distance (mm) (mm) x - side y - side y - side x - side 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1.5 0.21 0.3 12 120 375 130 1575 8 160 10 300 10 300 1256 2 0.24 0.3 12 85 415 160 1960 10 250 10 300 10 300 1688 3 0.3 0.3 16 125 506 220 2810 10 175 10 300 10 300 2508 4 0.37 0.3 16 105 590 290 3650 12 200 10 300 10 300 3330 5 0.43 0.4 20 140 790 320 4570 12 175 10 300 10 300 4040 6 0.48 0.4 20 115 890 400 5360 12 150 10 300 10 300 4840 8 0.6 0.4 20 90 1120 520 7280 12 125 10 300 10 300 6680 10 8400 0.75 0.4 25 120 12 670 7280 12 125 10 300 10 300