1000m of silor disty. Of GIP (Masonry linned canal) CANAL DATA :DRAIN DATA :Discharge 0.944 cumec Catchments area of Nalla. = 0.38 sqkm= 0.15 Sq mile Bed width 1.00 m Nalla Bed (N.S.L.) 261.760 m F.S.D. 0.80 m H.F.L. in Nalla 262.760 m Free Board 0.30 m F.S.D ( Nalla) 1.00 m Bed slope 1 in 5000 1in Free Board (nalla) 0.50 m C.B.L. 260.875 m F.S.L. 261.675 m 0.30 T.B.L. 261.975 m 0.80 M.W.D. 1.10 m 1.00
1.00 x 1.00 x
1.10 m 1.10 m
2 Hydraulic Design for nalla section :Flood discharge as per dicken's formula. 3/2 Q = CxA 3/4 Q = 1800 x( 0.15 ) Q = 426.2 cusec Q = 12.06 Cumec Area required for passing required dicharge of nalla Assume Valocity of nalla limited to 2.00 meter/ sec A = Q/V = 12.06 / 2.00 = 6.10 sqm Size required for passing required dicharge of nalla= B x D = 6.10 x 1.00 m
* * *
* * * * * * * * * * * * * * * * * * * A
1.30 1.45 0.60 3.00 x-section on B-B 21.00 1.00 1.00 0.50 2.80 13.60 0.60
3.00
1.50
6.00
0 6.7
* * * * * * * * * * * * * *
0.30
1.30
* * * *
1.00
1.60
2.20
1.00
8.55
0.25
6.7 0
6.00
0.30
1.10
0.90
1.50
* * *
3.00
R.L. 261.760
261.675
CB.L. 260.875
R.L. 259.975
Nalla TBL 263.260 2.50 1 Nalla HFL 262.760 U/S TBL 261.975 261.675 U/S FSL U/S CBL 260.875 259.975 259.675 R.L. R.L.
FSL
Canal Data
River data
* * * * * * * * * * * * *
* * * * * * *
:1
1.50
1 2 3 4 5 6 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
261.760
260.875
261.760
262.760
0.944
Cumec
1.00
6.10
8.55
13.09
0.6
:1
1.45
x-section on A-A
0.50
2.50
:1
3.00
0.6
1.30
10
415
160
1960
0.24
2.00
NAME OF WORK:-
DETAILED ESTIMATE Sno Perticulars 1 Earth work in excavation including loading disposal and dressing of excavate earth with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect
Hard soil mixed with kankar /boulder morrum
Detail
Qty
unit
2 Earth work in excavation including loading disposal and dressing of excavate rock with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect B. E/w in D/R rock C.H/R not required blasting D. E/w in phylites &other rock requaring nominal blasting 25 25 25 % of above = % of above = % of above = 59.00 for 1 59.00 for 1 59.00 for 1 cum Nos = cum Nos = cum Nos =
3 Cement concrete (1:3:6) M-10 well mixed and laid in - position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm Abutment bolck 1 x 14.39 x Wing Wall 4 x 4.70 x Return wall 4 x 3.00 x
for 4 R.R stone masonry (using R.R.stone where 75% stones to be lnot ess than 15cm in size in any directon and weighing not less than 23kg.) in Foundation including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level.etc complete in cement sand mortar 1:5 Abutment block 2 x 13.09 x 1.30 x 0.90 Wing Wall 4 x 4.70 + 3.95 x 1.50 x 0.90
Return wall
5 R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5 Abutment Wing Wall Return wall 2 x 8.09 + 7.44 x 1.30 + 0.6 x 0.90 = 13.28 cu m
2 2 4 x 4.70 + 3.20 x 1.50 + 0.50 x 2.90 = 45.82 cum 2 2 4 3.00 + 2.25 x 1.50 + 0.50 x 2.90 = 30.45 cum 2 2 total 89.55 cum for 1 Nos = 89.60 cum
6 Centring shuttring for slabs, beams, lintels, coloumns troughs, with or without caps and base including proping and removing. for slabe shuttring including proping 7 Side etc.complete (to achive finish 2)for block joints of foundation stillins basins, buckets aprons etc. (non suspeted horizentally laid mass concrete) side of slabe side of slabe side of bed block side of bed block 2 2 4 4 x x x x 8.09 1.60 8.09 0.60 x x x x 0.35 0.35 0.20 0.20 for 8 Cement concrete (1:1.5:3) M-10 well mixed and laid in - position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm 1 x slabe with wearing coat 2 x Bed Block bed concrete 1 x 9 Extra labour charges for obstructration in laying and placing the reinforced cement concrete due to reinforcement. (b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. = = = = Total 1 Nos = 5.70 1.10 6.50 0.50 13.80 13.80 sqm sqm sqm sqm sqm cum 1 x 8.09 x 1.60 for 1 Nos = 12.94 sqm 13.00 cum
= = = total = 1 Nos =
(b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. 10 Couresd stone / kharanja masonry (using hammer dressed stone to be not less than 20 cm in any direction and at least 50 % stone to be more than 23 cm in depth ) for superstructure (upto 0.5m thickness) including curing etc.including all leads of all construction matarials complete.in cement sand mortar1:5 for parapet wall 2 x 21.0 x
11 Supply of M S .reinforcement including = 9.6 m labour charges for bending binding and Length of slabe = 1.60 m placing in position all reinfocement as per width of slabe = 0.3 m drawing including cost of binding wire and Depth of slabe all leads and lifts using.tor or ribed bars number required Tota (As per IRC SP 20) for clear span 2.00m weight/ Dia length = l x length c/c = Nos. m of cc space leng main crank bars bottom (cross) # 2.54 x 9.60 / 0.085 = 114 = 289 x 0.888 bottom plain bars (cross) # 9.60 x 1.60 / 0.25 = 6 = 58 x 0.785 top bars (cross) # 2.30 x 9.60 / 0.30 = 32 = 74 x 0.785 top bars (long) # 9.60 x 1.60 / 0.30 = 5 = 48 x 0.785 Botttom bars (long) # 9.60 x 1.60 / 0.30 = 5 = 48 x 0.785 Total weight (kg) = 5% for cutting wastage Total weight (kg.)= 457 Total weight (T) = 0.46 for 1 Nos = 0.50 12 Cement concrete (1:2:4) M-15 well mixed and laid in - position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of maximum size upto 20mm for nalla bed U/S & D/S wing wall Top 2 x 9.6 x 6.00 x 0.10 = 11.51 U/S & D/S return wallTop 2 x 13.09 x 3.00 x 0.10 = 7.85 U/S & D/S approch 2 x 13.60 + 2.80 x 3.00 x 0.10 = 4.92 2 24.29 for 1 Nos = 24.30 13 Plaster in cement sand mortar 1:4including raking of joinst smooth finishing & curing etc. including all leads of all construction materials complete of thiickness 20mm for abutment 2 x 7.09 x 1.10 = 15.60 U/S & D/S face 2 x 13.60 x 1.10 = 29.92 Total = 45.52 14 Flush and ruled pointing on stone masonry for 1 Nos = 45.60 including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3
ton
cum
Flush and ruled pointing on stone masonry including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3 for parapet wall 4 x 21.00 x for parapet end wall 4 x 1 x
= 126.00 sqm = 3.98 sqm Total 129.98 sqm 1 Nos = 130.00 cum
15 Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck. (Rate as per irrigation BSR2006Ch 5/8c)
50 % of item no 1
118.00 cum
sqm
GOVERNMENT OF RAJASTHAN WATER RESOURCES DEPARTMENT GARARDA IRRGATION PROJECT NAME OF WORK:0 (BSR 2008) Rate Unit 0
Sno Perticulars 1 Earth work in excavation including loading disposal and dressing of excavate earth with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect Hard soil mixed with kankar /boulder morrum (Rate as per irrigation BSR2008 Ch 5/1c) 2 Earth work in excavation including loading disposal and dressing of excavate rock with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect (Rate as per irrigation BSR2008 Ch 5/2 ) B. E/w in D/R rock C.H/R not required blasting D. E/w in phylites &other rock requaring nominal blasting 3 Cement concrete (1:3:6) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm (Rate as per irrigation BSR2008 Ch 7/6d) 4 R.R stone masonry (using R.R.stone where 75% stones to be lnot ess than 15cm in size in any directon and weighing not less than 23kg.) in Foundation including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level.etc complete in cement sand mortar 1:5 (Rate as per irrigation BSR2008 Ch 8/2e) 5 R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5 (Rate as per irrigation BSR2008 Ch 8/2e) 6 Centring shuttring for slabs, beams, lintels, coloumns troughs, with or without caps and base including proping and removing. (Rate as per irrigation BSR2008 Ch 10/2)
Qty
Amount
59.00 cum
47.00
p /cum
2773.00
34.00 cum
2105.00 p /cum
71570.00
68.30 cum
1618.00 p /cum
110510.00
89.60 cum
1660.00 p /cum
148736.00
13.00 sqm
131.00
P sqm
1703.00
7 Side shuttring including proping etc.complete (to achive finish F2 Top or intermidiate bed platein between masonry of piers,abutments sluice well etc. (Rate as per irrigation BSR2008 Ch 10/1b) 8 Cement concrete (1:1.5:3) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm (Rate as per irrigation BSR2008 Ch 7/4d) 9 Extra labour charges for obstructration in laying and placing the reinforced cement concrete due to reinforcement. (b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. (Rate as per irrigation BSR2008 Ch 10/11b) 10 Couresd stone / kharanja masonry (using hammer dressed stone to be not less than 20 cm in any direction and at least 50 % stone to be more than 23 cm in depth ) for superstructure (upto 0.5m thickness) including curing etc.including all leads of all construction matarials complete.in cement sand mortar1:5
13.80 sqm
90.00
P sqm
1242.00
7.00 cum
2951.00 p /cum
20657.00
7.00 cum
111.00
p /cum
777.00
47.10 cum
2003.00 p /cum
94342.00
11 Supply of M S .reinforcement including labour charges for bending binding and placing in position all reinfocement as per drawing including cost of binding wire and all leads and lifts using.tor or ribed bars (As per IRC SP 20) for clear span 2.00m
500.00 kg
55.00
P /Kg
27500.00
12 Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of maximum size upto 20mm (Rate as per irrigation BSR2008Ch 7/5d) 13 Plaster in cement sand mortar 1:4including raking of joinst smooth finishing & curing etc. including all leads of all construction materials complete of thiickness (Rate as per irrigation BSR2008 Ch 9/4b) 14 Flush and ruled pointing on stone masonry including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3 (Rate as per irrigation BSR2008 Ch 9/15) 15 Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck.
24.30 cum
2509.00 p /cum
60969.00
45.52 sqm
94.00
P sqm
4279.00
130.00 sqm
52.00
P sqm
6760.00
Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck. (Rate as per irrigation BSR2006Ch 5/8c)
118.00
29.00
p /cum
3422.00
Total 576775.00 3 % contengency 17303.25 G total 594078.25 Say Rs. 5.95 lacs
SCHEDULE "G" 0 1 NIT No. 2 NIT Amount 3 Earnest money 4 5 6 7 8 9 Tender cost Date of Selling Tender Date of Receiving Tender Date of Opening Tender Time of completion B.S.R. 0 7/2008-09 S.No.32 Rs. 0 lacs 1.Regd. Contractor @1/2%Rs. 2.Other Contractor @ 2%Rs. Rs. 200 15.09.08 to 22.09.08 24.09.08 upto 3.00 PM 24.09.08 At 4.00 PM 4 Month Irrigation BSR 2008 Qty Rate Unit
0.00 0.00
Sno. Item 1 Earth work in excavation including loading disposal and dressing of excavate earth with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect Hard soil mixed with kankar /boulder morrum 2 Earth work in excavation including loading disposal and dressing of excavate rock with in initial leads of 50m and lift 1.5 m in dry and moist including dressing of excavated area, dewatering wherever required and all applicable taxes and levies etc. complete in all respect B. E/w in D/R rock C.H/R not required blasting D. E/w in phylites &other rock requaring nominal blasting 3 Cement concrete (1:3:6) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm 4 R.R stone masonry (using R.R.stone where 75% stones to be lnot ess than 15cm in size in any directon and weighing not less than 23kg.) in Foundation including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level.etc complete in cement sand mortar 1:5
Amount
59.00 cum
47.00
p /cum
2773.00
34.00 cum
2105.00
p /cum
71570.00
68.30 cum
1618.00
p /cum
110510.00
5 R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5
R.R stone masonry (using R.R.stone where 75% stones to be not less than 15 in size in any directon and weighing not less than 23kg.)in superstrucuture including curing all leads of construction materials & all taxes and with initial lift \delift of 5m from ground level etc complete in cement sand mortar 1:5 6 Centring shuttring for slabs, beams, lintels, coloumns troughs, with or without caps and base including proping and removing. 7 Side shuttring including proping etc.complete (to achive finish F2 Top or intermidiate bed platein between masonry of piers,abutments sluice well etc. 8 Cement concrete (1:1.5:3) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of (a) Maximum size up to 20mm 9 Extra labour charges for obstructration in laying and placing the reinforced cement concrete due to reinforcement. (b) Colomns, Slabs, Cantilevers projections staircase, lintels , beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. 10 Couresd stone / kharanja masonry (using hammer dressed stone to be not less than 20 cm in any direction and at least 50 % stone to be more than 23 cm in depth ) for superstructure (upto 0.5m thickness) including curing etc.including all leads of all construction matarials complete.in cement sand mortar1:5 11 Supply of M S .reinforcement including labour charges for bending binding and placing in position all reinfocement as per drawing including cost of binding wire and all leads and lifts using.tor or ribed bars
89.60 cum
1660.00
p /cum
148736.00
13.00 sqm
131.00
P sqm
1703.00
13.80 sqm
90.00
P sqm
1242.00
7.00 cum
2951.00
p /cum
20657.00
7.00 cum
111.00
p /cum
777.00
47.10 cum
2003.00
p /cum
94342.00
500.00 kg 12 Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of maximum size upto 20mm 13 Plaster in cement sand mortar 1:4including raking of joinst smooth finishing & curing etc. including all leads of all construction materials complete of thiickness 14 Flush and ruled pointing on stone masonry including raking of joints and curring etc complete including all leads of all construction materials in mortar ratio cement sand mortar 1:3
55.00
P /Kg
27500.00
24.30 cum
2509.00
p /cum
60969.00
45.52 sqm
94.00
P sqm
4279.00
130.00
52.00
P sqm
6760.00
sqm 15 Rehandling of excaveted matrial inlcuding loading unloading and dressing within inial lead of 50 m and lift 1.5 m with cost of dewatering wherever required and all applicable taxes and lavies etc. complete in all respect mixed strata muck.
118.00
29.00
p /cum Total
3422.00 576775.00
62 nos main bars Distribution bars 12mm F 120 c/c 8mm F 160 c/c 1256
150 150
o o o o o o o o
300 506
400 790
5.00 m span 6.00 m span NOTES:1 Concrete:- M-25 2 Steel:- HSDY as per IS-1786 3 Cover:- 20mmat bottom & 40mm at side 4 In 1.5M, 2.0M &3.0M span only one Bar is to be crankedin each side in four bars in all other span crank alternative bars. 5 All bars cranked one end only these are placed with crank on left side and right side alternatively 6 Surface steel at top longitudinal -10mm @300mm c/c length a shown in sketh & transverse -10mm @300c/c all through out in logitudinal provided steel in the Zone where main steel is not available plus 150mm on either side
450
150
o o o
o o o
o o
o o o
o o o
o o o
240
o o o
o o o
o o
Cross section of culvert 300 375 300 300 416 2000 1960 300 130 160
o o o o
3330
o o o o o o o o o o
300
o o o
o o o
o o o
o o o
o o
300
290
o o o
o o
o o o
o o o
o o o
o o o
o o o
o o
400
400 890
400
400
o o o
400 1120
400
150
o o o o o o
o o
o o
400 1260
400
670
10.00 m span
Main Reinforcement Bottonm reinforcement Top reinfrocement top steel where main not available Dia Center to Dia Length Center Center to Center thickness Dia meter Dia meter Span Bed blok meter of center top meter of to center to center center of slab crank bottom of bars of bars (M) length(m) bars distance porsion bars center distance distance Length (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) distance (mm) (mm) x - side y - side y - side x - side 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1.5 0.21 0.3 12 120 375 130 1575 8 160 10 300 10 300 1256 2 0.24 0.3 12 85 415 160 1960 10 250 10 300 10 300 1688 3 0.3 0.3 16 125 506 220 2810 10 175 10 300 10 300 2508 4 0.37 0.3 16 105 590 290 3650 12 200 10 300 10 300 3330 5 0.43 0.4 20 140 790 320 4570 12 175 10 300 10 300 4040 6 0.48 0.4 20 115 890 400 5360 12 150 10 300 10 300 4840 8 0.6 0.4 20 90 1120 520 7280 12 125 10 300 10 300 6680 10 8400 0.75 0.4 25 120 12 670 7280 12 125 10 300 10 300