SENGKANG LNG TERMINAL

Technical Interface Register - LNG Tank

9/17/2009

Issued By: Revision Date B 17-Sep-09 Document 210427-TAN-PR5-PG-001

Tim Wiley

Approved By: John Powell

Item No.

Query / Description

Source

Date Opened

Action By

Response Required by Date 9/25/2009 9/25/2009 9/25/2009 9/25/2009

Status

No. of Days until Due Date Closed Closed 9 9

Date Closed

Comments Is tank base elevated on plinths or seismic isolators?

1 2 3 4

Tank Base - Underbase heating required? Tank Base Slab - If required, will GTT be designing underbase heating system? Tank Base Slab - Pump tower base support reactions are needed for use in design Tank Base Slab - Total weight of built-up insulation panels, secondary barriers, and membranes needed for weight takeoff Tank Base Slab - Insulation panels attachments and necessary embedments need definition for use in design Tank Base Slab - Insulation panels placed over mastic strips? Does this result in non-uniform base slab loading? Tank Wall - Exterior liquid dome piping reactions on side of tank need definition for use in design Tank Wall - Total weight of built up insulation panels, secondary barriers, and membranes needed for weight takeoff Tank Wall - Insulation panel attachments and necessary embedments need definition for use in design Tank Wall - Size and location of temporary wall penetrations during construction to be defined Tank Roof - Roof mounted piping and rack reactions are needed for use in design Tank Roof - Thickness of carbon steel liner needed for weight takeoff Tank Roof - Weight of suspended deck and insulation needed for weight takeoff LNG Min and Max Fill Heights - Confirm fill heights contained in GTT document Txxx TANK ANA 1.1.1 are current Confirm basis for determining wall loads associated with non-static hydrostatic loads (seismic sloshing) Update of roof pipework drawings for larger tank (position of pentrations, size of piping etc..) Platform Structural Design: Pipe support positions, holding down arangements Clarification of responsibility for roof pipe work stress analysis (support selection)

N/A N/A N/A N/A

9/11/2009 9/11/2009 9/11/2009 9/11/2009

EWI EWI GTT GTT

Closed Closed Open Open

14/9/2009 Yes will investigate voided slab. Base heating is not in GTT scope. 14/9/2009 Arup scope Reference GST-PR-00-R0 in Receipt 022 Reference GST-PR-00-R0 in Receipt 022

N/A

9/11/2009

GTT

9/25/2009

Open

Reference GST-PR-00-R0 in Receipt 022 See slide 17 of 28 in Receipt 019. Does moisture barrier on inside face of concrete require special surface treatment to concrete? Reference GST-PIP-DWG-00020 R0 in Receipt 022 Reference GST-PR-00-R0 in Receipt 022

6 7 8

N/A N/A N/A

9/11/2009 9/11/2009 9/11/2009

GTT GTT GTT

9/25/2009 9/25/2009 9/25/2009

Open Open Open

9 9 9

9 10 11 12 13

N/A N/A N/A N/A N/A

9/11/2009 9/11/2009 9/11/2009 9/11/2009 9/11/2009

GTT EWI GTT ARUP EWI

9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009

Open Open Open Open Open

9 9 9 9 9

Reference GST-PR-00-R0 in Receipt 022 Reference GST-PR-00-R0 in Receipt 022 Reference GST-PIP-DWG-00010 R0 in Receipt 022 Reference GST-AUX-TS010 R0 in Receipt 022 Reference GST-PR-00-R0 in Receipt 022 Document shows low level (unpumpable) at 2.39m over membrane Document shows MDLL (max design liquid level) at 34.54m Does this document need updating based on revised panel width of 8.188m?

14

N/A

9/11/2009

GTT

9/25/2009

Open

15 16 17 18

N/A N/A N/A N/A

9/11/2009 9/14/2009 9/14/2009 9/14/2009

ARUP GTT GTT EWI

9/25/2009 9/25/2009 9/25/2009 9/25/2009

Open Open Open Open

9 9 9 9 Sheet 1 of 2

210427-TAN-PR5-PG-001 Rev B.xls

SENGKANG LNG TERMINAL


Technical Interface Register - LNG Tank

9/17/2009

Issued By: Revision Date B 17-Sep-09 Document 210427-TAN-PR5-PG-001

Tim Wiley

Approved By: John Powell

Item No. 19 20 21 22 23 24 25 26 27 28 29 30

Query / Description Platform Structural Design: Access requirements Platform Structural Design: Maintenance loading, laydown areas etc. Platform : Fire protection of structural steel work Platform : Spill containment philosophy, requirement for drip trays and drainage Maximum internal design pressure for tank Basis for designing base heating system (eg 5degC isotherm 300mm below TOC) Required base heat input for specificed insulation system (eg 10W/m2) Definition of any requirement for base slab and wall concrete tolerances Requirement and responsibility for external firewater deluge system Requirement and responsibility for nitrogen snuffing system to vent valves External access (and emergency escape) requirement

Source N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Date Opened 9/14/2009 9/14/2009 9/14/2009 9/14/2009 9/14/2009 9/14/2009 9/14/2009 9/14/2009 9/14/2009 9/14/2009 9/14/2009

Action By GTT EWI CH-IV CH-IV CH-IV GTT GTT GTT CH-IV GTT CH-IV

Response Required by Date 9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009 9/25/2009

Status Open Open Open Open Open Open Open Open Open Open Open

No. of Days until Due Date 9 9 9 9 9 9 9 9 9 9 9

Date Closed

Comments

210427-TAN-PR5-PG-001 Rev B.xls

Sheet 2 of 2

S-ar putea să vă placă și