Sunteți pe pagina 1din 2

HEALTH AND SAFETY INDUCTION CHECKLIST (Only for CNCEC new staff)

Name:

Job Title:

Department :

Start date:

HSE Induction should to be completed within three days of starting. When induction, health and safety training is completed, the relevant box (es) should be ticked. For Items not covered, comments should be recorded giving reasons and date for completion.

1. Health and Safety Policy & Information 1.1 Has the Health and Safety Policy been explained to the new starter? 1.2 Has given training for relevant Departmental Health and Safety Procedures? 1.3 Have they been made aware of the following HSE rules and regulations and how to contact them if advice is needed:
Health & Safety Team (tel. 0515-128-536) or email

Yes

No

Comments

arif@cncec.com.cn anwar.hossain@cncec.com.sa
1.4 Is the persons aware of the location of the nearest health and safety / fire safety notice board? 2. Emergencies and Fire Arrangements Yes No Comments

2.1 Has the new starter been informed of the procedure to follow on discovering a fire or hearing the fire alarm, including where the fire escape routes and fire exits are in the Site office? 2.2 Explained where the fire assembly point is and the role of Fire W ardens and what to do in-case of any Emergency? 2.3 Explained where the fire extinguishers & fire hose are positioned, how they operate and what type of fires they are suitable for extinguishing? 3. Responsibilities 3.1 Pointed out the rolls and responsibility of his Designation?

Yes

No

Comments

4.

Required PPE

Yes

No

Comments

4.1 Hard-Hate 4.2 Safety Shoes 4.3 Safety Glasses

4.4 Cover-all

Declaration I certify that the above health and safety induction subjects have been explained and please provide the required mentioned PPE to him : Induction conducted by: Date:../../20..

Md. Anwar Hossain CNCEC HSE Training Supervisor

S-ar putea să vă placă și