Sunteți pe pagina 1din 12

PAIRWISE WEIGHTING Complete the 3 sheets IN ORDER (i.e.

1, 2, 3)

Instructions for this sheet: 1. Enter your Specifications in this column (they will popluate throughout the sp - ONE ROW for each specification. If a need or stakeholder has multiple specifi 2. If you need less than all 50 Specifications (a likely case), delete the unneeded r 3. For each comparison enter 0, 1, or 2 in the blue box.

Specification Valu Stakeholder(s) Need(s) Units Nicole Sugerman Low Installation Cost $ Nicole Sugerman Less Time to water the beds Hours Nicole Sugerman Low Maintenance costs $/ Year Nicole Sugerman High percentage of useable water $ Nicole Sugerman Water the beds regularly Times/ Week Nicole Sugerman System will not be stolen yes/ no Local Users Low training time for local residents hours Local Users A durable system Years Local Users A system that can be dismantled in a short time Min Community System does not intrude in current open space Feet^2 Community System does not block entrances Entrances Consumers High vegatable yield % Nicole Sugerman Low amount of excess physical labor min Community Environmentally tons of friendly carbon (aproximate)

Pairwise Weights

hroughout the spreadhseet) s multiple specifications, simply repeat that need/stakeholder in multiple rows te the unneeded rows and columns (delete the whole row/column ( not just the cell contents), but

pecification Values Ideal 300 0.5 20 100 4 yes 0.5 7 15 20 2 100 0 Low IMPORATANCE Marginal REFERNCES 800 Interview 1 Interview 70 Estimation of need 85 Interview 2 Interview yes Interview 1 Estimation of need 2 Interview 25 Estimation of need 100 Interview 1 Interview 80 Interview/ Apparent need 20 Estimation of need Medium Estimation of need

hat need/stakeholder in multiple rows e the whole row/column ( not just the cell contents), but NOT the statistics columns!)
Is THIS (in the ROW) 0: less important 1: equally important 2: more important than THIS (in the column)? Cost

Time it takes for the bed to be watered 2 1 0 0 1 2 0 0 0 0 0 2 2 0

Cost Time it takes for the bed to be watered Annual Maintaniece cost Percentage of usable water How often the beds are watered Security Time for training MTBF Dismantling time Space system occupies Leave the garden entrances open Percent vegetable yield Physical labor time Gobal Warming Potential

1 0 0 0 0 0 0 0 0 0 0 0 0 0

tatistics columns!)

Annual Maintaniece cost 2 2 1 0 1 2 0 2 1 0 0 2 2 0

Percentage of usable water 2 2 2 1 1 1 0 0 0 1 1 2 2 0

How often the beds are watered 2 1 1 1 2 0 0 0 0 0 1 2 0

Security 2 0 1 0 1 0 0 0 0 0 1 1 0

Time for training 2 2 2 2 2 1 2 0 1 0 2 2 1

0 2 VALUES 1 NEEDED ONLY IN LOWER LEFT SECTION

MTBF 2 2 0 2 2 2 0 1 1 0 0 2 2 0

Dismantling time 2 2 1 2 2 2 2 1 1 0 0 2 2 0

Space system occupies 2 2 2 1 2 2 1 2 2 1 1 2 2 1

Leave the garden entrances open 2 2 2 1 2 2 2 2 2 1 1 2 2 1

Percent vegetable yield 2 0 0 0 1 1 0 0 0 0 0 1 1 0

LEFT SECTION

Physical labor time 2 0 0 0 0 1 0 0 0 0 0 1 1 0

Gobal Warming Raw Totals Potential 2 2 2 2 2 2 1 2 2 1 1 2 2 1 26 17 12 12 16 21 6 11 8 4 3 21 22 3

Raw Pcts. 14.3% 9.3% 6.6% 6.6% 8.8% 11.5% 3.3% 6.0% 4.4% 2.2% 1.6% 11.5% 12.1% 1.6%

Normalized Totals 5.0 3.4 2.5 2.5 3.2 4.1 1.4 2.3 1.7 1.0 0.8 4.1 4.3 0.8

MAX MIN

14.3% 2.2%

CONCEPT RATINGS

Instructions 1. Enter Concept titles in row 11 2. Delete unneeded rows (metrics) and columns (concepts) 3. Choose a rating for each metric for each concept on a scale of 1 - 5: (5 is BEST, 1
ID: Concept 1 Concept 2

Watering Above Can + Ground Water DripCatchment unattached Title:

Cost Time it takes for the bed to be watered Annual Maintaniece cost Percentage of usable water How often the beds are watered Security Time for training MTBF Dismantling time Space system occupies Leave the garden entrances open Percent vegetable yield Physical labor time Gobal Warming Potential

3.5 1 5 5 4 5 5 5 5 5 5 4 1 3

2 5 3 5 4 5 2 4 3 4 5 5 3.5 2.5

Concept Ratings

scale of 1 - 5: (5 is BEST, 1 is WORST with respect to all the available concepts)


Concept 3 Concept 4 Concept 5 Concept 6 Concept 7 Concept 8

Undergrou nd Drip

Current System

Rain

Sprinkler

Above Hose + ground drip Water attached Catchment

2 5 2 5 4 4 2 3 4 4 5 5 4 2.5

4 2 3 5 5 5 1 2 3 5 4 4 2 4

5 1 5 1 1 5 5 5 5 5 5 1 5 5

2.5 2 4 2 5 5 1 4 3.5 4 5 3 3.5 2.5

1 5 3 5 4 5 2 4 4 4 5 5 4 2.5

3 4 3.5 5 4 5 3.5 4.5 4 4 5 5 2.75 2.5

FINAL SUMMARY Instructions 1. Delete unneeded rows (metrics) and columns (concepts), but NOT the statistics sections 2. Analyze the results for signficant differences, surprising results, te max total ("winner"), etc.
ID: Concept 1 Concept 2 Weighted Ratings (original ratings from sheet 2) Concept 3 Concept 4 Concept 5

Weight from \Sheet 1 normalized to a 1 - 5 scale -->

Watering Above Can + Ground Undergrou Water Dripnd Drip Catchmen unattached t Weight

Current System

Rain

Cost Time it takes for the bed to be watered Annual Maintaniece cost Percentage of usable water How often the beds are watered Security Time for training MTBF Dismantling time Space system occupies Leave the garden entrances open Percent vegetable yield Physical labor time Gobal Warming Potential Concept Ratings

5.0 3.4 2.5 2.5 3.2 4.1 1.4 2.3 1.7 1.0 0.8 4.1 4.3 0.8

17.5 3.4 12.3 12.3 12.7 20.5 6.8 11.4 8.6 5.0 4.1 16.4 4.3 2.5

10.0 16.8 7.4 12.3 12.7 20.5 2.7 9.1 5.2 4.0 4.1 20.5 15.0 2.0

10.0 16.8 4.9 12.3 12.7 16.4 2.7 6.8 6.9 4.0 4.1 20.5 17.1 2.0

20.0 6.7 7.4 12.3 15.9 20.5 1.4 4.5 5.2 5.0 3.3 16.4 8.5 3.3

25.0 3.4 12.3 2.5 3.2 20.5 6.8 11.4 8.6 5.0 4.1 4.1 21.4 4.1

TOTAL

137.6

142.2

137.2

130.3

132.2

Concept Statistics Max Min Average Standard Deviation

146.8 124.2 136.4 7.3

al ratings from sheet 2) Concept 6

Concept 7

Concept 8

Metric Statistics

Sprinkler

Above Hose + ground drip Water attached Catchment


Max Min Average St. Dev

12.5 6.7 9.8 4.9 15.9 20.5 1.4 9.1 6.0 4.0 4.1 12.3 15.0 2.0

5.0 16.8 7.4 12.3 12.7 20.5 2.7 9.1 6.9 4.0 4.1 20.5 17.1 2.0

15.0 13.5 8.6 12.3 12.7 20.5 4.8 10.2 6.9 4.0 4.1 20.5 11.8 2.0

25.0 16.8 12.3 12.3 15.9 20.5 6.8 11.4 8.6 5.0 4.1 20.5 21.4 4.1

5.0 3.4 4.9 2.5 3.2 16.4 1.4 4.5 5.2 4.0 3.3 4.1 4.3 2.0

14.4 10.5 8.7 10.1 12.3 19.9 3.7 8.9 6.8 4.4 4.0 16.4 13.8 2.5

6.4 6.1 2.6 4.0 4.0 1.4 2.2 2.3 1.3 0.5 0.3 5.8 5.4 0.8

124.2

141.0

146.8

S-ar putea să vă placă și