This Bill-11th IPC

Selgar Construction

THIS BILL - IPC 12


Bill No:- Eleventh Running Bill Description Item AND REMOVALS Section 2 CLEARING, Clearing andGRUBBING grubbing including uprooting of vegetations and trees of girth < 300 mm, disposal within 50 m of the 2.01 site [500] Cutting trees including removal of stumps and their roots 2.02 and backfilling to required compaction [100] Girth above 300 to 600 m [100] a Girth above 600 to 1200 m [100] b Girth above 1200 to 2400 m [100] c Section 3 EARTHWORKS General excavation for new drainage, channels and 3.01 culverts including hauling 50 m- all kinds of soil [600] General excavation for new drainage, channels and 3.02 culverts including hauling 50 m - all kinds of rock [600] General excavation for structures including hauling 50 m 3.03 -all kinds of soil [600] General excavation for structures including hauling 50 m 3.04 all kinds of rock [600] General excavation for road formation, pavement widening 3.05 etc- all kinds of soil [600] General excavation for road formation, pavement widening 3.06 etc - all kinds of rock [600] General excavation for road formation, pavement widening 3.06 (a) etc - all kinds of rock [600] Earthworks in filling for road embankment and shoulder 3.07 [600, 800] Transportation and handling of excess disposable material 3.08 with lead beyond 50 m up to 200m [600] Transportation and handling of excess disposable material 3.09 with lead beyond 200 up to 500 m [600] Transportation and handling of excess disposable material 3.10 beyond 500 m up to 1000 m [600] Backfilling behind structures with suitable material [600] 3.11 graded filter material [600] 3.12 Section 4 SUBGRADES Preparation of formation (subgrade) [700, 800] 4.01 Section 5 PAVEMENT WORKS Supply and place sub base material [800, 900] 5.01 BOQ QUANTITIES Unit Revised Quantity Rate(Nu.)

Sq.m

183,983.00

1.07

Each Each Each

540.00 900.00 360.00 Sub - Total

160.13 267.79 375.01

Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m

9,535.00 502.00 11,230.00 592.00 239,826.00 41,196.25 155,248.75 17,034.00 158,970.00 82,184.00 16,831.00 9,202.00 1,449.00 Sub - Total 70,323.00 Sub - Total 17,581.00 Sub - Total Sub - Total

64.21 64.20 53.43 53.56 30.70 424.81 395.07 82.70 25.80 43.54 74.96 157.97 803.47

Sq.m.

10.70

Cu.m

482.19

Section 7 STONE MASONRY WORKS Supply and place random rubble masonry in MM 5 grade 7.01 cement mortar in road side drainage, channels including pointing and backfilling [1300] Supply and place random rubble masonry in MM 5 grade 7.02 cement mortar in walls including pointing [1300] Supply and place stone soling [1300] 7.03 Section 9 CONCRETE WORKS Supply and place concrete class M10 [1600] 9.01

Cu.m Cu.m Cu.m

1,645.00 11,640.00 151.00 Sub - Total 783.00

2,111.82 2,048.09 925.58

Cu.m

2,145.11

Prepared By: Contract Manager, RNP/FR/FR-08

Verified and Checked By: SI,ADB,RNP/FR/FR-08

This Bill-11th IPC

Selgar Construction

9.02 9.04

Supply and place plum concrete class M15 [1600] Supply and place formwork including removal [1600]

Cu.m Sq.m

1,867.00 1,135.00

2,577.39 252.82 Total Amount Nu:

Contract Manager Selgar Construction(Bhutan Builders), Rigsar Construction, ( JV). Kharungla Growanchu Feeder Road (RNP/FR/FR-08)

Prepared By: Contract Manager, RNP/FR/FR-08

Verified and Checked By: SI,ADB,RNP/FR/FR-08

This Bill-11th IPC

Selgar Construction

12
Revised Estimated Amount (Nu.) This Bill-12th IPC Quantity Amount(Nu.) Remarks

196,861.81

86,470.20 241,011.00 135,003.60 659,346.61

612,242.35 32,228.40 600,018.90 31,707.52 7,362,658.20 17,500,578.96 61,334,123.66 1,408,711.80 4,101,426.00 3,578,291.36 1,261,651.76 1,453,639.94 1,164,228.03 100,441,506.88 752,456.10 752,456.10 8,477,382.39 8,477,382.39 #NAME?

1,531.88 -

81,848.13 -

786.70 -

124,274.53 206,122.66 -

#NAME?

3,473,943.90 23,839,767.60 139,762.58 27,453,474.08 1,679,621.13

1,872.47 57.12

3,834,978.30 52,867.96 3,887,846.26 233,497.86

108.85

Prepared By: Contract Manager, RNP/FR/FR-08

Verified and Checked By: SI,ADB,RNP/FR/FR-08

This Bill-11th IPC

Selgar Construction

4,811,987.13 286,950.70 #NAME?

#NAME?

Prepared By: Contract Manager, RNP/FR/FR-08

Verified and Checked By: SI,ADB,RNP/FR/FR-08

Name of the Bidder: M/s Rigsar Construction,Trasigang.

Construction of Nagar - Ura Highway.

Bill of Quantity

SN Descriptions of Items 1 CLEARING, GRUBBING AND REMOVALS 1.1 trees of girth < 300 mm, disposal within 50 m of the site [500]
Cutting trees including removal of stumps and their roots and backfilling to required compaction [100] Girth above 300 to 600 m [100] Girth above 600 to 1200 m [100] 1.2 Girth above 1200 to 2400 m [100] 2 EARTHWORKS General excavation for new drainage, channels and culverts 2.1 including hauling 50 m- all kinds of soil [600] General excavation for new drainage, channels and culverts 2.2 including hauling 50 m - all kinds of rock [600] General excavation for structures including hauling 50 m -all 2.3 kinds of soil [600] General excavation for structures including hauling 50 m - all 2.4 kinds of rock [600] General excavation for road formation, pavement widening etc2.5 all kinds of soil [600] General excavation for road formation, pavement widening etc 2.6 - all kinds of rock [600] General excavation for road formation, pavement widening etc 2.7 - all kinds of rock [600] Earthworks in filling for road embankment and shoulder [600, 2.8 800] Transportation and handling of excess disposable material with lead beyond 50 m up to 200m [600] Transportation and handling of excess disposable material with lead beyond 200 up to 500 m [600] Transportation and handling of excess disposable material beyond 500 m up to 1000 m [600] Backfilling behind structures with suitable material [600] Backfilling behind structures with graded filter material [600] 3 SUBGRADES 3.1 Preparation of formation (subgrade) [700, 800] 4 PAVEMENT WORKS 4.1 Supply and place sub base material [800, 900] and making Consolidation of sub-grade with road roller, Clearing and grubbing including uprooting of vegetations and

Unit

Quantity

Rate(Nu.)

Sq.m

Each Each Each

Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Cu.m Sq.m. Cu.m

good the undulation with earth and rerolling the sub 4.2 grade. sq.m Supply Collection and stacking of stone aggregates at site. 63-40 mm Cu.m 4.3 50-20 mm Cu.m
Laying wearing course including screening, sorting, spreading to template and consolidation (Payment to be made for the 4.4 quantity of aggregate used, excluding the blinding materials). Providing and Laying hammer dressed stone edging of size (150X250)mm, including excavation, refilling and disposal of 4.5 surplus earth to a lead of 30 m. Scarifying metalled road (WBM) surface, disposal of rubbish up to 50 m lead and consolidation of aggregate received from 4.6 scarifying.

Sq.m.

Sq.m.

Name of the Bidder: M/s Rigsar Construction,Trasigang.

Construction of Nagar - Ura Highway.

Bill of Quantity

SN

Descriptions of Items

Unit

Quantity

Rate(Nu.)

Premix Carpet with 64 kg of bitumen 80/100 per cu.m of aggregate including a tack coat with bitumen of same quality @ 0.75 kg per sq.m of road surface,25 mm thick 3.0 cu.m,10mm aggregate per 100 sq.m by deploying SMP & 4.7 bitumen boiler and laying carpet manually. Providing seal coat of premix sand with Bitumen 80/100 using 128 kg of bitumen per cu.m of sand and 0.75 kg of coarse sand per 100 sq.m of road surface by deploying Bitumen boiler & 4.8 SMP & laying premix carpet manually. 5 STONE MASONRY WORKS Supply and place random rubble masonry in MM 5 grade cement mortar in road side drainage, channels including 5.1 pointing and backfilling [1300] Supply and place random rubble masonry in MM 5 grade 5.2 cement mortar in walls including pointing [1300] 5.3 Supply and place stone soling [1300] 6 CONCRETE WORKS 6.1 Supply and place concrete class M10 [1600] 6.2 Supply and place plum concrete class M15 [1600] 6.3 Supply and place formwork including removal [1600]

sq.m

Sq.m.

Cu.m Cu.m Cu.m Cu.m Cu.m Sq.m

Name of the Bidder: M/s Rigsar Construction,Trasigang.

Construction of Nagar - Ura Highway.

Bill of Quantity

SN

Descriptions of Items

Unit

Quantity

Rate(Nu.)

Name of the Bidder: M/s Rigsar Construction,Trasigang.

Construction of Nagar - Ura Highway.

Amount(Nu.)

Remarks

Name of the Bidder: M/s Rigsar Construction,Trasigang.

Construction of Nagar - Ura Highway.

Amount(Nu.)

Remarks

Name of the Bidder: M/s Rigsar Construction,Trasigang.

Construction of Nagar - Ura Highway.

Amount(Nu.)

Remarks