Sunteți pe pagina 1din 14

Ref Code

Rate
Mark
Up %
Supp
Code

Item Description

Unit

Last
Updated

Trade Heading:

P - Plant Rates
JADUAL KADAR SEWA LOJI 2003
P001
Air Compressor
P002
Pneumatic Jackhammers
P003
Excavator with face shovel
P004
Backhoe Excavator (bucket 0.35 m3)
P005
Welding Machine and accessories
P006
Lorry ( 5 tonne)
P007
Concrete mixer (10/7)
P008
Road Roller (under 6 tonnes)
P009
Road Roller ( 6 tonnes and over )
P010
Mobile Crane (10 tonnes)
P011
Mobile Crane (5 tonnes)
P012
Piling Frame (precast concrete)
P013
Piling Frame (timber)
P014
Bulldozer (CAT D6)
P015
Grader
P016
Pneumatic Cutter
P017
Lorry (10 ton)
P018
20 KVA Generator Set
P019
Compressor 175 CFM
P020
Vibrator 38mm
Backhoe (Case)
P021
Monthly rental w/o diesel
P022
Monthly rental with diesel
Excavator EX-400
P023
Monthly rental w/o diesel
P024
Mobilization fee
Excavator EX-400 c/w Breaker (40)
P025
Monthly rental w/o diesel
P026
Mobilization fee
P027
Daily
Ref Code
Rate
Mark
Up %
Supp
Code

21/07/2011

Item Description

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
month
month
buy

295.00
290.00
655.00
300.00
200.00
300.00
200.00
430.00
500.00
350.00
300.00
1,200.00
300.00
650.00
600.00
200.00
300.00
700.00
1,800.00
270.00

no
no

6,000.00
7,000.00

15/05/2008

mth
no

16,500.00
1,200.00

26/02/2009

mth
no
no

21,000.00
1,200.00
1,150.00

05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
26/04/2011
26/04/2011
26/04/2011

15/05/2008

26/02/2009

26/02/2009
26/02/2009
26/02/2009

Unit

Last
Updated

Trade Heading:

P - Plant Rates
Excavator EX-300 c/w Breaker (35)
P028
Monthly rental w/o diesel
P029
Mobilization fee
P030
Daily
P031
Paver
P032
Tandem roller

(Continued)

mth
no
no
day
day

16,500.00
1,000.00
900.00
800.00
600.00

26/02/2009
26/02/2009
26/02/2009
04/03/2009
04/03/2009

Tyre roller
P034
Colpave pump
P035
Colpave oil
Crawler crane, 80 tonnes
P036
Monthly rental with operator but w/o diesel
P037
Diesel consumption per month
P038
Mobilization & demobilization costs
P039
Overtime & public holiday charges
Crawler crane, 100 tonnes
P040
Monthly rental with operator but w/o diesel
P041
Diesel consumption per month
P042
Mobilization & demobilization costs
P043
Overtime & public holiday charges
Mobile crane, 45 tonnes
P044
Monthly rental with diesel
P045
Daily
P046
Overtime rate
P047
Sunday
P048
Public holiday
P049
Monthly rental w/o diesel
P050
Daily
P051
Overtime rate
P052
Sunday
P053
Public holiday
P033

Ref Code
Rate
Mark
Up %
Supp
Code

Item Description

day
day
drum

600.00
80.00
320.00

04/03/2009
26/11/2008
26/11/2008

mth
mth
LS
hr

30,000.00
1,800.00
30,000.00
145.00

07/03/2009

mth
mth
LS
hr

45,000.00
1,800.00
30,000.00
145.00

07/03/2009

mth
day
hr
day
day
mth
day
hr
day
day

21,000.00
1,500.00
220.00
1,800.00
1,850.00
18,500.00
1,300.00
180.00
1,500.00
1,600.00

07/03/2009
07/03/2009
07/03/2009

07/03/2009
07/03/2009
07/03/2009

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

Unit

Last
Updated

Trade Heading:

P - Plant Rates
Mobile crane, 35 tonnes
P054
Monthly rental with diesel
P055
Daily
P056
Overtime rate
P057
Sunday
P058
Public holiday
P059
Monthly rental w/o diesel
P060
Daily
P061
Overtime rate
P062
Sunday
P063
Public holiday
Mobile crane, 25 tonnes
P064
Monthly rental with diesel
P065
Daily
P066
Overtime rate
P067
Sunday
P068
Public holiday
P069
Monthly rental w/o diesel
P070
Daily
P071
Overtime rate
P072
Sunday

(Continued)

mth
day
hr
day
day
mth
day
hr
day
day

15,000.00
1,200.00
170.00
1,300.00
1,350.00
13,000.00
1,000.00
120.00
900.00
950.00

mth
day
hr
day
day
no
day
hr
day

12,000.00
550.00
70.00
600.00
650.00
10,800.00
690.00
77.92
500.00

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

Public holiday
Mobile crane, 20 tonnes
P074
Monthly rental with diesel
P075
Daily
P076
Overtime rate
P077
Sunday
P078
Public holiday
P079
Monthly rental w/o diesel
P080
Daily
P081
Overtime rate
P082
Sunday
P083
Public holiday
P073

Ref Code
Rate
Mark
Up %
Supp
Code

Item Description

day

600.00

mth
day
hr
day
day
mth
day
hr
day
day

9,800.00
450.00
60.00
500.00
550.00
8,000.00
532.86
68.33
400.00
500.00

18/12/2008

17/12/2008
18/12/2008
17/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

Unit

Last
Updated

Trade Heading:

P - Plant Rates
Mobile crane, 16 tonnes
P084
Monthly rental w/o diesel
P085
Daily
P086
Overtime rate
Schwing BP2000 mobile concrete pump
P087
Minimum volume per operation day = 100m3
P088
100m3 or less per operation day
P089
101m3 and above per operation day
Schwing BP2000 static concrete pump
(monthly rental w/o diesel)
P090
Minimum volume per operation month =
1000m3

(Continued)

mth
day
hr

7,000.00
492.50
66.25

17/12/2008
17/12/2008
17/12/2008

27/02/2009

day
m3

1,500.00
15.00

mth
m3
Item
mth

12,000.00
12.00
1,200.00
6,000.00

mth
day
hr
day
day

8,500.00
400.00
60.00
400.00
450.00

mth
mth

2,700.00
2,800.00

day
day

330.00
560.00

27/02/2009
27/02/2009

27/02/2009
P091
P092
P093
P094

1000m3 or less per operation month


1001m3 and above per operation month
Mobilization (2 way) (to & from)
Provisional 100m concrete pipeline accessories

27/02/2009
27/02/2009
27/02/2009
27/02/2009

Skylift
Monthly rental with diesel
Daily
P097
Overtime
P098
Sunday
P099
Public holiday
Plastering Mortar Machine
P100
Plastering machine NM 430, rental per month
P101
Plastering machine NM 303, rental per month
P102
Plastering machine NM 303, selling complete
set
P103
Plastering machine NM 820, selling complete set
set
55,000.00
22/10/2008
set
65,000.00
22/10/2008
P104
Lorry 6 wheeler, rental per day
P105
Lorry 10 wheeler, rental per day
P095
P096

Ref Code

Item Description

Unit

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

22/10/2008
22/10/2008

13/01/2009
13/01/2009

Rate
Mark
Up %
Supp
Code
Last
Updated

Trade Heading:

P - Plant Rates

(Continued)

Low Loader
P106
P107
P108
P109
P110
P111
P112
P113

36 tonnes
26 tonnes
Rubbish Bin Rental
size 12'(L) x 6.5'(W)x4'(H) - large
size 12'(L) x 6.5'(W)x2'(H) - medium
size 12'(L) x 6.5'(W)x1.5'(H) - small
size 18'(L) x 8'(W)x6'(H) - extra large
size 18'(L) x 8'(W)x3'(H)

trip
trip

1,200.00
1,000.00

18/12/2008

trip
trip
trip
trip
trip

180.00
170.00
160.00
320.00
280.00

24/10/2008

Dozer D8N, 300H.P


Dozer D7G
Dozer D6H, 200H.P
Motor Grader 12G, 140H.P
Wheel Loader 988B, 135H.P
Wheel Loader CAT 950E, 3.4m3
Tracked Loader CAT 973, 2.2m3
Hydraulic Excavator CAT EL200B, 2.5m3
Dozer Compactor CAT 815B, 0.9m3
Vibrating Roller Dynapac CA251, 170H.P
Vibrating Roller Dynapac CA301, 125H.P
Vibrating Roller SAKAI/TAIYOKU, 1 ton
Backhoe Loader 416, 125H.P
Mobile Crane, 67H.P
Dump Truck 8T, 20T
Vibrating Plate Dynapac LG250, 10H.P
Paver 11011R
Pneumatic Tyred Roller CP 201W

day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day

1,800.00
1,600.00
1,300.00
960.00
1,500.00
850.00
1,100.00
850.00
900.00
850.00
750.00
38.46
480.00
560.00
600.00
150.00
780.00
780.00

Piling Frame
BG11 Drilling Plant
UBW05 Drilling Rig

day
day
day

450.00
600.00
800.00

18/12/2008

24/10/2008
24/10/2008
24/10/2008
24/10/2008

Earthwork
P114
P115
P116
P117
P118
P119
P120
P121
P122
P123
P124
P125
P126
P127
P128
P129
P130
P131

16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
23/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008

Others
P132
P133
P134

Ref Code
Rate
Mark
Up %
Supp
Code

Item Description

16/12/2008
16/12/2008
16/12/2008

Unit

Last
Updated

Trade Heading:
P135
P136
P137
P138
P139
P140

P - Plant Rates
Hydraulic Excavator CAT EI1200B & Breaker
Backhoe Loader CASE580, 70H.P
Dragline Excavator
Farm Tractor with Auger Drill
Tracked Launching Crane
Crawler Crane, 35T

(Continued)

day
day
day
day
day
day

950.00
450.00
800.00
400.00
900.00
600.00

16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008

Gantry Crane
P142
Trailer c/w fencing, 20T
P143
Trailer Kana 42, 30T
P144
Gunite Machine with Hose
P145
Air Compressor 600 cfm, 100H.P
P146
Air Compressor 375 cfm, 50H.P
P147
Water Truck, 165H.P
P148
Generator Set, 50KVA
P149
Generator Set, 16KVA
P150
Pressure Distributor
P151
Hydrograsser
P152
Concrete Truck Mixer
P153
Concrete Mixer with diesel engine, 7TM
P154
Compressed Air Blower
P155
Water Jet
P156
Down The Hole Hammer
P157
Power Broom
P158
Water Pump, 6 inches
P159
Welding Set
P160
Vibrating Plate
P161
Winch
P162
Cutting Set
P163
Jackhammer
P164
Chainsaw
P165
Concrete Vibrator
'CONCUT' Poker Vibrator - UK hose
P166
1" Diameter
P167
1 3/8" Diameter

day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day

P141

Ref Code
Rate
Mark
Up %
Supp
Code

no
no

Item Description

950.00
1,000.00
680.00
690.00
650.00
500.00
600.00
600.00
300.00
400.00
450.00
680.00
19.23
300.00
250.00
200.00
250.00
350.00
350.00
200.00
250.00
250.00
300.00
300.00
150.00

16/12/2008
17/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
23/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008

330.00
230.00

17/12/2008

230.00
240.00

17/12/2008
17/12/2008

17/12/2008

Unit

Last
Updated

Trade Heading:
P168
P169

P - Plant Rates
1 3/4" Diameter
2" Diameter

no
no

FSP 3A, 12m

day

3.80

16/12/2008

Rental Per Month


Open end frame, 1219 x 1700
Ladder end frame, 1219 x 914
Cross brace, 1829 x 1219
Cross brace, 1829 x 610
U-head
Jack base
Joint pin
Mighty swivel clamp
Galvanise pipe, 6m
Walking platform
Step ladder

no
no
no
no
no
no
no
no
no
no
no

1.50
1.20
0.60
0.60
0.85
0.80
0.10
0.30
3.50
4.00
10.00

17/12/2008

(Continued)

Sheet Pile Rental


P170

Scaffolding
PP01
P171
P172
P173
P174
P175
P176
P177
P178
P179
P180
P181

17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008

P182
PP02
P183
P184
P185
P186
P187
P188
P189
P190
P191
P192
P193
P194

5.1m
pcs
P195
PP03

Safety netting, 1.83m x 5.1m


Sales - New
Main frame, 1219 x 1700mm
Ladder frame 1219 x 914mm
Cross brace 1219 x 1829mm (A14)
Cross brace 1829 x 610mm (A08)
Joint pin 225mm - G.I
Jack base 600mm
U head 600mm
Galvanise pipe 48.6mm diameter x 6m
Fixed / Swivel clamp
Walking board 1829 x 500mm
Staircase galvanise 1829 x 1725mm
Safety netting c/w top & bottom eyelet 1.83m x
16.00
Wall tie
Sales - Recond

Ref Code
Rate
Mark
Up %
Supp
Code

pcs

14.50

no
no
no
no
no
no
no
no
no
no
no

48.00
30.00
8.50
8.50
1.50
19.00
20.00
60.00
5.00
100.00
160.00

no

7.00

05/01/2009

40.00
26.00
7.00
7.00
1.00
14.00
15.00
48.00
3.60
70.00
110.00

05/01/2009

17/12/2008

05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009

05/01/2009

Item Description

Unit

Last
Updated

Trade Heading:
P196
P197
P198
P199
P200
P201
P202
P203
P204
P205
P206
P207

P - Plant Rates
Main frame, 1219 x 1700mm
Ladder frame 1219 x 914mm
Cross brace 1219 x 1829mm (A14)
Cross brace 1829 x 610mm (A08)
Joint pin 225mm - G.I
Jack base 600mm
U head 600mm
Galvanise pipe 48.6mm diameter x 6m
Fixed / Swivel clamp
Walking board 1829 x 500mm
Staircase galvanise 1829 x 1725mm
Safety netting c/w top & bottom eyelet 1.83m x

no
no
no
no
no
no
no
no
no
no
no

Wall tie

no

Flushing toiler w/o hand wash

mth

600.00

17/12/2008

Demarcation survey
Transfer level from bench mark & height

Item

3,500.00

17/12/2008

Item
Item
Item
Item

2,800.00
1,200.00
600.00
1,250.00

17/12/2008

(Continued)

05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009

5.1m
pcs
P208

Portable Toilet
P209

Land Survey
P210
P211

control
Item

450.00
17/12/2008
P212
Existing building & detail survey
P213
Piling points & ecentricity plan preparation
P214
Building gridline setting out
P215
Building as built including borang C
CSR AAC Tools & Accessories

17/12/2008
17/12/2008
17/12/2008

P216
P217
P218
P219
P220
P221
P222
P223

Ref Code
Rate
Mark
Up %
Supp
Code

Levelling Plane
Teeth for Levelling Plane
Stirrer
Sanding Float
Rubber Mallet
Hand Router
Trowels - 100mm
Trowels - 125mm

no
no
no
no
no
no
no
no

Item Description

32.70
87.10
12.10
38.50
20.00
11.95
11.40
12.20

16/02/2009
16/02/2009
16/02/2009
31/12/2008
16/02/2009
31/12/2008
16/02/2009
16/02/2009

Unit

Last
Updated

Trade Heading:
P224
P225
P226
P227
P228
P229
P230
P231
P232

P - Plant Rates
Trowels - 150mm
Trowels - 200mm
Steel Square
Handsaw
Steel Bracket FB1
Steel Bracket FB2
Steel Bracket FB6
V - Nail
Fibremesh, white, 160mm x 300m - 48m2/roll

(Continued)

no
no
no
no
no
no
no
no
roll

13.00
22.00
19.25
207.00
0.80
0.80
1.04
0.60
314.00

16/02/2009
16/02/2009
31/12/2008
16/02/2009
16/02/2009
16/02/2009
31/12/2008
16/02/2009
16/02/2009

05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
05/07/2005
26/04/2011
26/04/2011
26/04/2011

15/05/2008
15/05/2008

26/02/2009
26/02/2009

26/02/2009
26/02/2009
26/02/2009

(Continued)

26/02/2009
26/02/2009
26/02/2009
04/03/2009
04/03/2009

04/03/2009
26/11/2008
26/11/2008

07/03/2009
07/03/2009
07/03/2009
07/03/2009

07/03/2009
07/03/2009
07/03/2009
07/03/2009

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

(Continued)

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

18/12/2008

17/12/2008
18/12/2008
17/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

(Continued)

17/12/2008
17/12/2008
17/12/2008

27/02/2009
27/02/2009
27/02/2009

27/02/2009
27/02/2009
27/02/2009
27/02/2009

18/12/2008
18/12/2008
18/12/2008
18/12/2008
18/12/2008

22/10/2008
22/10/2008

13/01/2009
13/01/2009

(Continued)

18/12/2008
18/12/2008

24/10/2008
24/10/2008
24/10/2008
24/10/2008
24/10/2008

16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
23/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008

16/12/2008
16/12/2008
16/12/2008

(Continued)

16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008

16/12/2008
17/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
23/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008
16/12/2008

17/12/2008
17/12/2008

(Continued)

17/12/2008
17/12/2008

16/12/2008

17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008
17/12/2008

17/12/2008

05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009

05/01/2009

(Continued)

05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009
05/01/2009

17/12/2008

17/12/2008

17/12/2008
17/12/2008
17/12/2008
17/12/2008

16/02/2009
16/02/2009
16/02/2009
31/12/2008
16/02/2009
31/12/2008
16/02/2009
16/02/2009

(Continued)

16/02/2009
16/02/2009
31/12/2008
16/02/2009
16/02/2009
16/02/2009
31/12/2008
16/02/2009
16/02/2009