1
HistoricaIIy - Four generaI strategies for Maintenance
1. Reactive
2. Preventive
3. Predictive
4. ReIiabiIity Centered
How much savings if you move from Reactive to ReIiabiIity Centered?
2
BACKGROUND
2000 IndividuaI properties started impIementing portions of RC maintenance
2006 ReIiabiIity testing combined under one group
2008 Our pIanners requested a tooI to heIp evaIuate our eIectricaI equipment
2009 Our Asset Management group, aIong with our site pIanners evaIuated
avaiIabIe test equipment and seIected PdMA equipment for initiaI testing
2010 Partnered with FIanders to test our entire fIeet of dragIines and shoveIs
2011 - ResuIts
3
I
dE/dT
What tests do we perform on electric motors?
1. Resistance to Ground
2. DA or Dielectric Absorption
3. P or Polarization ndex
4. Capacitance to Ground
5. Circuit Resistance
6. Circuit nductance
C =
4
Megger Test Equipment
Remember
You must temperature
Correct this reading.
5
Winding Resistance
Test Set
6
nductance
Meter
7
This is NOT a good time to perform PdMA tests!
8
3500HP, 6600V Stator Connection
Must disconnect motor leads from all other equipment
9
3500HP, 6600V Stator Connection
Must disconnect motor leads from all other equipment
10
3500HP, 6600V Stator Connection
Must disconnect motor leads from all other equipment
11
3500HP, 6600V Rotor Connection
12
Synch Motor PdMA results
13
Preparation for Drop Test
location sync Mtr. 1 Sync Mtr. 2 Sync Mtr.3 Sync Mtr. 4
Test Date 2/3/2010 2/3/2010 2/3/2010 2/3/2010
Test Time 11:57:07 AM 10:32:41 AM 1:14:11 PM 9:54:30 AM
Test Location Slip Rings Slip Rings Slip Rings Slip Rings
User Administrator Administrator Administrator Administrator
Baseline Baseline
Frequency 300 1200 300 1200
Charge Time 600 600 600 600
Voltage 500 500 500 500
Motor Temp 24 27 25 28
Measured Mohm 11310 67.3 19660 5294
Corrected Mohm 3700 27.3 7000 2300
pF Ph 1 to Ground 19000 36000 33500 20250
Ph 1 to 2: Measured Ohms 0.7615 0.765 0.7665 0.3785
mH Ph 1 to 2
Ph 1 to 2: Corrected Ohms 0.81462 0.80966 0.81704 0.39918
1216 224.6
1258 6.78
14
Preparation for Drop Test
15
Preparation for Drop Test
16
121vac
Applied
5.5v
19.25v
26.62v
23.47v
26.9v
19.5v
CoiI 1 = 19.25v
CoiI 2 = 5.5v
CoiI 3 = 19.5v
CoiI 4 = 26.9v
CoiI 5 = 23.47v
CoiI 6 = 26.62v
Average = 20.21
(26.9 5.5) = 106% Dif
20.21
Synch #4 Drop Test
17
18
Need to repIace rotor; what about stator?
19
BAKER SURGE TESTER
20
0
2
4
6
8
10
12
14
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
AC Volt s DC Volt s
Coil
# AC Volts DC Volts
1 13.2 6.35
2 12.9 6.38
3 13.2 6.36
4 13.1 6.47
5 13 6.41
6 13.2 6.35
7 12.9 6.5
8 12.9 6.32
9 12.7 6.36
10 12.9 6.12
11 12.7 6.15
12 13.2 6.1
13 13.2 6.15
14 12.9 6.13
15 13.2 6.13
16 12.9 6.12
17 13.2 6.12
18 13.4 6.13
0
5
10
15
20
25
30
35
40
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
AC Volt s DC Volt s
Coil # AC Volts DC Volts
1 24.2 4.16
2 28.51 4.11
3 6.46 3.92
4 2.18 3.47
5 9.81 4.1
6 11.59 4.04
7 12.41 4.01
8 17.91 4.13
9 4.21 3.86
10 3.52 3.86
11 2.8 3.82
12 2.6 3.5
13 21.03 4.2
14 15.51 4.08
15 2.31 3.71
16 7.37 4.04
17 27.01 4.2
18 37.6 4.1
25