HAND OVER REPORT

DATE SHIFT TIME: PROJECT (S): 19/9/2012 DAY 8:00hrs-17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

Mobillazation of workers & equipment to the site Barricading of construction site site clearing & evacuation of waste out of the plant

WORK SCOPE SAFE HOURS CIVIL: TOTAL

15 120

TOTAL FROM SEPT 19= 120

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Personnelloading Tipper without wearing hard hat 2 Tools & equipment were not adequately arranged on site ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

ssed closed

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 20/9/2012 DAY 8:00hrs-17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

Excavation of the foundation waste removal from the site

SAFE HOURS CIVIL: TOTAL

18 144

TOTAL FROM SEPT 19= 264

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Personnel loading Tipper without wearing hard hat 2 Tools & equipment were not adequately arranged on site ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

SHIFT TIME:

DAY 8:00 - 17hrs

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 21/9/2012 DAY 8:00 hrs- 17hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

continuation of Excavation of the foundation waste removal from the site Constuction of laydawn area & bending of iron rods

SAFE HOURS CIVIL: TOTAL

16 128

TOTAL FROM SEPT 19= 392

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Personnel loading Tipper without wearing hard hat 2 Tools & equipment were not adequately arranged on site ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 22/9/2012 DAY 8:00hrs- 17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

continuation of Excavation of the foundation waste removal from the site Constuction of laydawn area & bending of iron rods

SAFE HOURS CIVIL: TOTAL

13 96

TOTAL FROM SEPT 19= 488

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Personnel loading Tipper without wearing hard hat 2 Tools & equipment were not adequately arranged on site ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

of iron rods

essed closed

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 23/9/2012 DAY 8:00hrs-17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

Blinding of foundation

SAFE HOURS CIVIL: TOTAL

9 72

TOTAL FROM SEPT 19= 560

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Personnel loading Tipper without wearing hard hat 2 Tools & equipment were not adequately arranged on site ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

essed closed

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 24/9/2012 DAY 8:00hrs-17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

Completion of Foundation blinding Construction work on laydown area is ongoing

SAFE HOURS CIVIL: TOTAL

9 136

TOTAL FROM SEPT 19= 696

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Personnel loading Tipper without wearing hard hat 2 Tools & equipment were not adequately arranged on site ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

essed closed

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 25/9/2012 DAY 8:00hrs - 17:00 hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

Setting of reiforcement Evacuation of debrils Completion of construction of Ladown Area .

SAFE HOURS CIVIL: TOTAL

12 98

TOTAL FROM SEPT 19= 794

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 1 Obstruction of Access into construction site with debrils evacuated from foundation ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

essed closed

HAND OVER REPORT


DATE SHIFT: TIME : PROJECT (S): CONTRACTOR(S): 26/9/2012 DAY 8:00-17hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

S&R

WORK SCOPE CIVIL: (S&R) work done

Setting of reinforcement continue Evacuation of debris Completion of construction of Ladown Area .

SAFE HOURS CIVIL: TOTAL

12 98

TOTAL FROM SEPT 19= 892

Unsafe behavior / unsafe Condition observed : 1 Obstruction of Access into construction site with debrils evacuated from foundation ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

essed closed

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 27/9/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R) work done

S&R

Setting of reinforcement continue Casting of concrete

SAFE HOURS CIVIL: TOTAL

17 136

TOTAL FROM SEPT 19=1028

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 1 Obstruction of access route with mixer machine. ACTIONS: All observed unsafe behaviors & conditions were adequately addressed closed out before end of the shift . OWNER: Richard Jagunna BACK-UP: Isaac Balogun

OM SEPT 19=1028

essed closed

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 28/9/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA

CONTRACTOR(S): WORK SCOPE CIVIL: (S&R)


work done

S&R

1 2 3

Continuation of concrete casting Excavation of foundation Evacuation of debris from the work area

SAFE HOURS CIVIL: TOTAL

18 144

TOTAL FROM SEPT 19=1172

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Working tools were scattered on construction site 2 Poor housekeeping in Lay down Area ACTIONS: Feedback was given to the Site Contractor Safety Officer on both Unsafe Conditions He stopped the work briefly and ensured adequate housekeeping in the two locations OWNER: BACK-UP: Richard Jagunna Isaac Balogun

ENT STORAGE AREA

TOTAL FROM SEPT 19=1172

r on both Unsafe Conditions usekeeping in the two locations

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 29/9/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. Charity
Nil

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

1 2 3

Preparation of the wall for painting ( sand paper & brushing ) priming of wall Painting of wall

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 0 28 28

TOTAL FROM SEPT 19=1200

ACTIONS: Feedback was given to the Site Contractor Safety Officer on both Unsafe Conditions He stopped the work briefly and ensured adequate housekeeping in the two locations OWNER: BACK-UP: Richard Jagunna Isaac Balogun

GE AREA &

aper & brushing )

Unsafe Conditions in the two locations

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 30/9/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. Charity

WORK SCOPE CIVIL: (S&R)


work done

1 2 1 2 3

Continuation of concrete casting Excavation of foundation Preparation of the wall for painting ( sand paper & brushing ) priming of wall Painting of wall

CIVIL:

P.Charity

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 96 54 150

TOTAL FROM SEPT 19=1350

ACTIONS:

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

ENT STORAGE AREA &

ng ( sand paper & brushing )

TOTAL FROM SEPT 19=1350

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 1/10/1900 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. Charity
1 2 3 Continuation of concrete casting Excavation of foundation Block laying

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

1 2

priming of wall Painting of wall

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 120 12 132 Debris

1 ACTIONS:

removed from excavation yet to be evacuated out of si

Permit for waste evacuation will be renew on Tuesday morning. immediately waste permit is renewed deris will be evacuated out Richard Jagunna Isaac Balogun

OWNER: BACK-UP:

EQUIPMENT STORAGE AREA & M & STRUCTURES

TOTAL FROM SEPT 19=1482

ion yet to be evacuated out of site

be renew on Tuesday morning. wed deris will be evacuated out of site

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/2/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. Charity
1 2 3 Casting of the wall Excavation of deris from the site Block laying Nil

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

SAFE HOURS CIVIL: S&R 15 CIVIL: p. Charity 0 TOTAL 120 TOTAL FROM SEPT 19=1602 Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Improper arrangement of tools on site 2 poor housekeeping removed in from the lay excavation down area yet to be evacuated out of site

ACTIONS: The safety officer was given a feed back, he promised to close the two issues immediatel on checking back about an hour later the has been closed OWNER: BACK-UP: Richard Jagunna Isaac Balogun

NT STORAGE AREA &

TOTAL FROM SEPT 19=1602

120

e evacuated out of site

close the two issues immediately

3-Oct

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/3/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. Charity
1 2 3 Block laying on the wall Compaction of the floor preparation for casting of the concrete Nil 16 0 128

WORK SCOPE CIVIL: (S&R)


work done

CIVIL: P.Charity SAFE HOURS CIVIL: S&R CIVIL: p. Charity TOTAL

TOTAL FROM SEPT 19=1730

Near Miss Nil Unsafe behavior / unsafe Condition observed : 3 1 poor housekeeping ( off cuts woods ) 2 tools were not properly stored on site 3 caution tape use for brrication was lowered ACTIONS: site safety officer & engineer were informed to immediately ensured that good housekeeping are maintained on construction site always . The team closed up the issues before the end of the shfi.t OWNER: Richard Jagunna BACK-UP: Isaac Balogun

NT STORAGE AREA &

TOTAL FROM SEPT 19=1730

tely ensured that

OCT

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/4/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. Charity
1 2 Continuation of wall casting Compaction of the floor Nil 17 0 136

WORK SCOPE CIVIL: (S&R)


work done

CIVIL: P.Charity SAFE HOURS CIVIL: S&R CIVIL: p. Charity TOTAL

TOTAL FROM SEPT 19=1886

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Access route was obstructed with wooden materials 2 cement bags scattered on construction site ACTIONS: the Carpenter was informed to remove the plant from access route immediately casting crew were informed to always stored used bags of cement together The issues were closed up immediately OWNER: Richard Jagunna BACK-UP: Isaac Balogun

NT STORAGE AREA &

TOTAL FROM SEPT 19=1886

ccess route immediately of cement together

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/5/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. Charity
1 2 3 1 Building casting form welding of reinforcement ( Hot work ) setting of reinforcement Scaffold erection

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

SAFE HOURS CIVIL: S&R CIVIL: p. Charity TOTAL

136 12 148

TOTAL FROM SEPT 19=2034

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 the site carpenter was not properly stored his tools has planned 2 off cuts wooden materials with nails not stored as required ACTIONS: the Carpenter was given a feed back , ask to stop working and observe housekeeping He maintained good housekeeping before the continuation of his task OWNER: BACK-UP: Richard Jagunna Isaac Balogun

NT STORAGE AREA &

TOTAL FROM SEPT 19=2034

s tools has planned ed as required

g and observe housekeeping on of his task

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/6/2012 DAY 18:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 3 1 2 3 Building casting form welding of reinforcement ( Hot work ) setting of reinforcement Preparation of the structure for painting ( sand paper & brushing ) Painting of Tanks , pipes & structures Painting of MCAS fan exhaust

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 136 72 208

TOTAL FROM SEPT 19=2242

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 poor house keeping in the lay down area 2 gravel parked in lay down area are not barricaded ACTIONS: The site safety officer was informed immediately to ensure adequate housekeeping is maintained in the lay down area always. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

GE AREA &

nd paper & brushing )

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/7/2012 DAY 8:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 Compaction of construction site Setting of the reinforcement bar

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 56 0 56

TOTAL FROM SEPT 19=2298

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 poor house keeping in the lay down area

ACTIONS: The site safety officer was informed immediately to ensure adequate housekeeping is maintained in the lay down area always. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

NT STORAGE AREA &

OM SEPT 19=2298

ure adequate

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/8/2012 DAY 8:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 Filling of the site base with hardcore Welding of the structure base

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

NIL

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 114 0 114

TOTAL FROM SEPT 19=2412

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 2 personnel not wearing gloves when handling iron rods

ACTIONS: The personnel were corrected site immediately and safety officer wasinstructed to prov hand gloves for them. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

NT STORAGE AREA &

OM SEPT 19=2412

ng iron rods

ety officer wasinstructed to provide

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/9/2012 DAY 8:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 Preparation of the formwork Casting of the pillar

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

Nil

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 96 0 96

TOTAL FROM SEPT 19=2508

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 Personnel removed caoution tape around the pile of hardcore granite in lay area while working there. 2 The debris in work are is piling up and due for evacuation. ACTIONS: The personnel were corrected, and coached immediately on the importance of cordonin off work area. The safety officer was also informed. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

NT STORAGE AREA &

OM SEPT 19=2508

e pile of hardcore granite in lay down

r evacuation. y on the importance of cordoning

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/10/2012 DAY 8:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 3 Preparation of the formwork Movind hardcore granite to foundation area Block setting. Nil

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 96 0 96

TOTAL FROM SEPT 19=2700

Near Miss Nil Unsafe behavior / unsafe Condition observed : 4 1 Personnel clothes were not neatly arranged in the laydown area- poor house 2 No functional first aid box on site 3 Tools litter the work area, because there are no tool boxes 4 The debris in work are is piling up and due for evacuation.

ACTIONS: The contractor safety officer was informed and coached on the importance of housekeep need for 1st aid box , and provision of tool boxes for personnel. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

T STORAGE AREA &

OM SEPT 19=2700

n the laydown area- poor housekeeping

o tool boxes evacuation.

on the importance of housekeeping,

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/11/2012 DAY 8:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 3 Evacuation of debris from work area Preparation of form work for casting Filling of foundation area with hardcore Nil

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 120 0 120

TOTAL FROM SEPT 19=2,820

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 A person walked to site without hard hat 2 No functional first aid box on site ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for his site. The person that entered the area without hard hat was confronted & coached immediately. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

Aid box for his site. coached immediately.

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/12/2012 DAY 8:00hrs -17:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 Removal of formwork mould from casted concrete wall Filling of foundation area with hardcore

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

Nil

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 112 0 112

TOTAL FROM SEPT 19=2,932

Near Miss Nil Unsafe behavior / unsafe Condition observed : 2 1 A truck boy was seen at laydown area without wearing safety boot, while the truck was ofloading granite. 2 No functional first aid box on site ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for his site. The truck boy was confronted & coached immediately by contractor safety officer. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

afety boot, while the truck

Aid box for his site. safety officer.

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/13/2012 DAY 8:00hrs -19:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 2 Preparation of the formwork for fooundation casting Filling of foundation area with hardcore

WORK SCOPE CIVIL: (S&R)


work done

CIVIL:

P.Charity

Painting of new day tanks room

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 96 72 168

TOTAL FROM SEPT 19=3,100

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 Hand tools litter work area 2 No functional first aid box on site

2 (P. Charity) ( S&R , P.Charity)

ACTIONS: The contractor safety officers were asked to provide functional First Aid boxes for their sites.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Aid boxes for their sites.

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): CONTRACTOR(S): 10/14/2012 DAY 8:00hrs -19:00hrs

CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA & PAINTING OF NEW TANK ROOM & STRUCTURES

S&R P. CHARITY
1 Casting of floor

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.Charity

Re-spraying & painting of pipes, beams, tank room, and electric motors

SAFE HOURS CIVIL: CIVIL: TOTAL S&R p. Charity 232 70 302

TOTAL FROM SEPT 19=3,402

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 No functional first aid box on site

ACTIONS: The contractor safety officer was asked to provide a functional First Aid box for his site. The truck boy was confronted & coached immediately by contractor safety officer. OWNER: BACK-UP: Richard Jagunna Isaac Balogun

oom, and electric motors

Aid box for his site. safety officer.

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/15/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Setting of block wall Clearing of the site

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

Nil Nil

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 80 0 0 80

TOTAL FROM SEPT 19= 3,482

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 2 ACTIONS: No functional first aid box on site Poor housekeeping in laydown area.

OWNER: BACK-UP:

The contractor safety officer was asked to provide a functional First Aid box for his site. The safety officer was given a feedback about the housekeeping status of his laydown area, and it was closed out. Richard Jagunna Isaac Balogun

Y TANK SITE

Aid box for his site. us of his laydown

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/16/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Setting of block wall Erection of scaffold

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

Nil Nil

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 80 0 0 80

TOTAL FROM SEPT 19= 3,562

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 2 ACTIONS: No functional first aid box on site Poor housekeeping in laydown area.

OWNER: BACK-UP:

The contractor safety officer was asked to provide a functional First Aid box for his site. The safety officer was given a feedback about the housekeeping status of his laydown area, and it was closed out. Richard Jagunna Isaac Balogun

Y TANK SITE

Aid box for his site. us of his laydown

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/17/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Casting of Ramp Completion of scaffold erection

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

Nil Nil

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 80 0 0 80

TOTAL FROM SEPT 19= 3,642

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 2 3 ACTIONS:

Handtools litter work area unlabelled jerry can containing diesel placed close to a working concrete mixer No functional first aid box on site

The contractor safety officer was asked to provide a functional First Aid box for his site. The safety officer was given a feedback about unlabelled jerrycan, and he replaced the tattered label with a new one Richard Jagunna Isaac Balogun

OWNER: BACK-UP:

Y TANK SITE

orking concrete mixer

Aid box for his site. d he replaced

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/18/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Removal of formwork from castingCasting of Ramp Erection of another scaffold General housekeeping Nil Nil

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 48 0 0 48

TOTAL FROM SEPT 19= 3,690

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 2 ACTIONS:

Some Handtools found on the pavement in work area No functional first aid box on site

The contractor safety officer was asked to provide a functional First Aid box for his site. The deadline is 48hrs.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

Aid box for his site.

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/19/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Removal of formwork from castingCasting of Ramp Erection of 3rd scaffold General housekeeping Nil Nil

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 48 0 0 48

TOTAL FROM SEPT 19= 3,738

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 2 ACTIONS:

A worker carried planks without wearing cotton hand gloves No functional first aid box on site

The personnel was given a feedback and coached immediately.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/20/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Nil

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

Apply body filler on pipes, tanks, machine pars and structure Painting: Spraying brush work Nil

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL

54 0 54

TOTAL FROM SEPT 19= 3,792

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 2 ACTIONS:

trailing cable and hose from from spraying machine No functional first aid box on site

The personnel was given a feedback and coached immediately.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

and structure

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/22/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Offloading of stanchion beams to site Welding/cutting/grinding of stanchion base Nil Nil

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 48 0 0 48

TOTAL FROM SEPT 19= 3,840

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 trailing cable from junction box 2 No functional first aid box on site ACTIONS:

The safety officer was given a feedback and coached immediately.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/23/2012 DAY 8:00hrs -18:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Welding/cutting/grinding of stanchion base Erection of stanchion beams using HIAB Nil Nil

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 64 0 0 64

TOTAL FROM SEPT 19= 3,904

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 trailing cable from junction box 2 No functional first aid box on site ACTIONS:

The safety officer was given a feedback and coached immediately.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/24/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Closing up of opened section of work area perimeter fence Setting of z poline sheets for roof Welding/cutting & grinding of z poline sheets for accurate size Housekeeping Nil Nil

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 58 0 0 58

TOTAL FROM SEPT 19= 3,962

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 trailing cable from junction box 2 No functional first aid box on site ACTIONS:

The safety officer was given a feedback and coached immediately.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

imeter fence

or accurate size

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/25/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Continuation of Setting of z poline sheets for roof Welding/cutting & grinding of z poline sheets for accurate size Housekeeping Nil Nil

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL Near Miss 72 0 0 72

TOTAL FROM SEPT 19= 4034

1 An uninspected /approved electric welding machine with open guard found on S&R site 2

Unsafe behavior / unsafe Condition observed : 1 trailing cable from junction box 2 No functional first aid box on site ACTIONS:

The safety officer was given a feedback and coached immediately. An MCA shall be conducted on the near miss. Richard Jagunna Isaac Balogun obstruction of access route with H-Beam profile in S&R site

OWNER: BACK-UP: 2 3 ACTIONS:

The safety officer was given a feedback and coached immediately. An MCA shall be conducted

on the near miss.

Other unsafe behaviors/ conditions observed were addressed & close out

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

or accurate size

d found on S&R site

n MCA shall be conducted

shall be conducted

addressed & close out

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/26/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

Nil Nil

ELECTRICAL: SAM ELECTRIC

SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric TOTAL 0 0 0 0

TOTAL FROM SEPT 19=

Near Miss Nil Unsafe behavior / unsafe Condition observed : 1 trailing cable from junction box 2 No functional first aid box on site ACTIONS:

The personnel was given a feedback and coached immediately.

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

HAND OVER REPORT


DATE SHIFT TIME: PROJECT (S): 10/29/2012 DAY 8:00hrs -17:00hrs

1.CONSTRUCTION OF MAMBILLA EQUIPMENT STORAGE AREA 2.PAINTING OF NEW TANK ROOM & STRUCTURES 3.ELECTRICAL CONSTRUCTION WORKS (OLD MSG DAY TANK SITE & BOILER PANEL RELOCATION)

CONTRACTOR(S):

S&R P. CHARITY
SAM ELECTRIC Continuation of Setting of z poline sheets for roof Welding/cutting & grinding of z poline sheets for accurate size Housekeeping Painting of pumps & Surports Laying of electrical cables on cable tray Removal part of existing cage (carding) of the compressor shed Installation of extraction fan rain covers

WORK SCOPE CIVIL: (S&R)

CIVIL:

P.CHARITY

ELECTRICAL: SAM ELECTRIC RIGGS MICOE SAFE HOURS CIVIL: S&R CIVIL: P. Charity ELECTRICAL: Sam Electric CIVIL: RIGGS CIVIL: MICOE TOTAL

124 54 3410 15 140 3743

TOTAL FROM SEPT 19= 7777

Near Miss 3 i An uninspected /approved electric welding machine with open guard found on S&R site ii working on a scafold without the use of harness full harness belt iii sub standard oxyacetylene gas used in S&R site ( without flashback arestor & weak hose ) Unsafe behavior / unsafe Condition observed : 2 1 trailing cable on access way in SAM electric site 2 obstruction of access route with H-Beam profile in S&R site 3 ACTIONS: The safety officer was given a feedback and coached immediately. An MCA shall be conducted

on the near miss.

Other unsafe behaviors/ conditions observed were addressed & close out

OWNER: BACK-UP:

Richard Jagunna Isaac Balogun

Y TANK SITE

or accurate size

compressor shed

d found on S&R site

restor & weak hose )

shall be conducted

addressed & close out