Project: 53 Benitez Subject: STP Specifications Submittal Evaluation Technical

Item No. Parameters Specifications Brahms Compliance

Type of Treatment Total Capacity Space Allocation Footprint

SBR 300 cubic meters 102.6 sq.m

SBR 300 cubic meters/ 230 cubic meters 94 sq.m

Influent Characteristics BOD5 Concentration COD Concentration TSS Concentration Oil and Grease pH Effluent Water Requirements BOD5 Concentration COD Concentration TSS Concentration Oil and Grease pH Total Coliform not >30 mg/L not >100 mg/L not >50 mg/L not >5 mg/L 6.0 - 9 up to 3000 MPN / 100 mL not >30 mg/L 100 mg/L not >50 mg/L not >5 mg/L 6.5 - 8 up to 3000 MPN / 100 mL 200 - 350 mg/L 250 - 800 mg/L 300 - 500 mg/L 150 mg/L 6.5 - 9 250 mg/L 750 mg/L 300 - 500 mg/L 150 mg/L 6.5 - 8.5

Equipment and Material Specification Collecting/ Equalization Tank Bar Screen Manual Bar Screen, Stainless Steel ANSI 304 w/ 20 mm opening Influent Transfer Pump complete with accessories, submersible type, Non Clog Rotary Piston Blower with silence hood Porous Disk EPDM type Manual Bar Screen, Stainless Steel ANSI 304 w/ 20 mm opening

Pumps

submersible type

Air Blowers Diffuser

Rotary Piston Blower with silence hood Porous Disk EPDM type

SBR System Waste Sludge Pumps Air Blowers Diffuser Decanter c/w motorized valve Submersible, Non clog Rotary Piston Blower with silence hood Fine Tube Bubble Diffusers Float Submersible, Non clog Rotary Piston Blower with silence hood Fine Tube Bubble Diffusers Float

Effluent Holding Tank Discharge pumps Chlorine Tank c/w pumps feeder Submersible, Non clog HDPE tank c/w variable speed displacement feed pump Submersible, Non clog HDPE with pump

Sludge Holding Tank sludge feed pump air blowers diffuser Submersible, Non clog Rotary Piston Blower with silence hood coarse air bubble diffusers Submersible, Non clog Rotary Piston Blower with silence hood coarse air bubble diffusers

7 8 9

Piping Control Panel Valves Other Items included in scope of Works Electrical power and water supply and tapping point for construction needs Detailed drawings that showing plan and section fitting to proposed location assistance in procuring permits mechanical ventilation of STP system warranty equipment warranty operations and maintenance completion date

HDPE/BI for waste; PVC for vent centralized PLC Non rising stem brass material @ 150 psig

BI for main header and PVC for branches centralized PLC Non rising stem brass material @ 150 psig

10

Must be provided

provided

Must be provided

comply

Must be provided Must be provided Must be provided Must be provided Must be provided

provided provided 5 years 1 year 1 year after startup 60 - 90 working days upon receipt of order

12 13

Training of Rockwell PMO/PMT Completed Projects

Must be provided

1 year provided