OTE Foundation Design

COBIT is a trademark of ISACA registered in the United States and other countries

COBIT 5 OTE Foundation Design 30th October 2012


Version 0.1 (Status - Draft) Aligned to Version 1.3 of the OTE Foundation Design Owner Chief Examiner

1 2

Introduction ........................................................................................................................................ 1 Foundation Examination Structure .................................................................................................... 1 2.1 Examination Structure ................................................................................................................. 1 2.2 Sizing ........................................................................................................................................... 1 2.3 Timings ........................................................................................................................................ 2 2.4 Pass Mark .................................................................................................................................... 2 3 Examination Content ......................................................................................................................... 3 3.1 Test Types Used ......................................................................................................................... 3 3.2 Question Styles ........................................................................................................................... 3 3.3 Formats and International Considerations .................................................................................. 4 3.4 Difficulty Assessment Model ....................................................................................................... 4 3.5 Profile of Content ......................................................................................................................... 4 4 Scoring System ................................................................................................................................. 4 4.1 Scoring Model.............................................................................................................................. 4 4.2 Scoring Correction Procedure ..................................................................................................... 4 5 Examination Administration ............................................................................................................... 4 5.1 Administration Documentation .................................................................................................... 4 5.2 Results Format and Content ....................................................................................................... 5 5.3 Feedback Format and Content.................................................................................................... 5 5.4 Results Timings ........................................................................................................................... 5 APPENDIX A FOUNDATION FORMAT ................................................................................................ 6 APPENDIX B ANALYSIS OF SYLLABUS TOPIC AND QUESTION STYLES ..................................... 7 APPENDIX C: THE EXAMINATION BOOKLET...................................................................................... .9 APPENDIX D: EXAMPLES OF COBIT 5 FOUNDATION QUESTION STYLES ................................... 10

COBIT 5 OTE Foundation Design 30th October 2012


Version 0.1 (Status - Draft) Aligned to Version 1.3 of the OTE Foundation Design Owner Chief Examiner

1 Introduction
The purpose of this document is to specify for the COBIT 5 Foundation examination, the structure, content and format of the examination as well as the examination timings and the requirements for test administration. It will be used: To communicate the qualifications examination design with the training community As an input to the configuration of the APMG examination system for this qualification

As an input to the development of Editorial Standards and supporting documentation for question developers. The OTE Foundation Design is under formal change control and any changes and any changes required should be raised with the Design Architect. For explanation of OTE examination terms see the OTE Glossary

2 Foundation Examination Structure


2.1 Examination Structure
The COBIT 5 Foundation examination is a closed-book examination and is intended to address the knowledge and skills that demonstrate proficiency in the COBIT 5 Business Framework for the Governance and Management of Enterprise IT and the Supplementary Guide on Process Capability which is based on the COBIT Process Assessment Model (PAM) using COBIT 5. It introduces the candidate to the five basic principles which are covered in detail and includes extensive guidance on enablers for governance and management of enterprise IT. Also included are the concepts of a process assessment model (PAM) based on the ISO 15504 approach which replaces the previous CMM (Capability Maturity Model). The knowledge and skills required at Foundation level are identified in the COBIT 5 Foundation syllabus. The Foundation design is based on testing the breadth of the syllabus using random generation of papers. There is no hidden importance to the topics. All topics are of equal importance, with an equal chance of appearing in the examination. A candidate is expected to meet the requirements of all the syllabus topics, although each examination will not necessarily examine all syllabus topics. Each examination consists of 50 questions covering all syllabus areas. The number of questions per syllabus area in each examination is in proportion to the number of topics within that syllabus area. In any one paper, the default design is no more than 1 question for each syllabus topic. The basis on which the number of questions is selected for each syllabus area is given in Appendix B. Out of the total number of questions in the examination 7 will test learning level 1. Whilst not all syllabus topics are tested in any one paper, each paper covers a minimum of 75% of the topics which means that all syllabus topics are tested on a regular basis. Questions appear in any order on the examination paper, they are not grouped according to syllabus area. The standard wording for the front cover of the examination booklet and an example of the answer sheet is at Appendix C.

2.2

Sizing

Within the question booklet there are 3 questions per page to allow for varying question lengths, translations and dual language papers for non-English candidates. No question is split across 2 pages.

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 1 Owner Chief Examiner

2.3

Timings

The Foundation examination will be 40 minutes duration.

2.4

Pass Mark

The pass mark is 50% or more of the marks, i.e. 25 or more marks out of 50.

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 2 Owner Chief Examiner

3 Examination Content
3.1 Test Types Used

Only one test type is used the Classic test type which presents four options from which one option is selected. Distracters or wrong answers are options that candidates with incomplete knowledge or skill would be likely to choose. These should be generally plausible responses relating to the syllabus area being examined.

3.2

Question Styles

Several question styles will be adopted, as per the following table: Question Style Format The most commonly used style. A standard question usually beginning with What, Who, In which process, Why, How often or When. E.g.: Standard When is the..? Which is a characteristic of...? How often does..? What role . This uses a negative word in the question stem which is in bold and capitals to emphasize the meaning and make it less likely the candidate will overlook these words e.g.: Which statement is NOT a..? Which statement is FALSE? Identifying the correct order of 3 actions or events. Sequencing- 3 In what order would..? Which sequence correctly represents..? Constraints Four options are presented. The answers can be presented in any order. Note: an alphabetic order is not maintained when translated and a logical order may give clues to the answer.

Do not use more than 10% in any one paper.

Negative

Sequencing - 4

As above but sequencing four actions or events. Identify the missing word/words/word(s)/phrase/ product in the following sentence. .text[ ? ] text Do not ask for the words to complete the beginning or end of a sentence. Write instead as a closed question. Do not use more than 10% in any one paper.

Missing Word(s)

Table A: Question Styles to be used in the Foundation Examination Examples of these styles and the information held about them within the database are at Appendix D.
COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 3 Owner Chief Examiner

3.3

Formats and International Considerations

The following formats are supported by the database and are to be used in Word templates. Arial 10pt for all text Two character spaces between number for question stem and text of question stem One character space between sentences Options to align with beginning of the question stem Italics for certain qualification specific terms One line space between question stem and options 3pt spacing before and after each option Double line spacing between each question No full stops to be used for the options Certain words may be presented in capitals and/or bold.

The Editorial standards detail specific guidance on use of italics and bold. Answers are to be recorded in on an answer sheet. An example of this is provided at Appendix C.

3.4

Difficulty Assessment Model

All questions are initially assigned a difficulty category of Medium. Papers are balanced by ensuring that papers are generated on the basis of a certain number of questions per syllabus area, learning level and question style. Question performance in live use is monitored and a questions difficulty category may then be revised in light of performance statistics.

3.5

Profile of Content

Each paper will also contain a certain profile of question styles. This is detailed at Appendix B.

4 Scoring System
4.1 Scoring Model

All questions gain one mark for a correct answer. There is no negative marking.

4.2

Scoring Correction Procedure

Questions are pre-tested through rigorous quality reviews. Where exceptionally there is a need for a score correction, the question(s) involved will be removed from the paper and the total marks and required pass mark adjusted accordingly.

5 Examination Administration
5.1 Administration Documentation

Any candidate sitting the COBIT 5 Foundation Examination receives the following documentation at the time of their examination, either in a paper based or electronic format:

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 4 Owner Chief Examiner

Candidate Number allocated on the candidate list summary sent to the invigilator, who will inform the candidate or the candidate will be allocated a number at the point of logging into an online examination Candidate Details Form records the relevant contact information, contact preferences and identification information for all candidates Feedback Form for the candidate to provide feedback to APMG on any comments they may wish to make on their examination paper Question Paper the examination for the candidate to use Candidate Answer Sheet to be used by the candidate to indicate their answers to the examination questions.

In addition, on booking an examination, Candidate Guidance explaining the format of the question papers, and the different styles of question asked is issued to the candidate. In addition to the information provided to the candidate, a booklet named Notes to Invigilators is issued to the nominated invigilator for the examination to help them run the session. This booklet contains information on the rules and regulations which will be in place whilst the candidate sits their paper. The invigilator will read out this information to candidates before the examination. The booklet also provides the invigilator with guidance on how to provide feedback on questions which the invigilator believes to be unfair, confusing, poorly worded or misleading and how to deal with major issues arising that may subsequently require a change to the marking scheme.

5.2

Results Format and Content

Provisional results for the Foundation examination are fed back to candidates either orally by the invigilator or via email for candidates sitting the examinations at APMG public centres. Results are issued as the total number of marks achieved by the candidate on their paper.

5.3 5.4

Feedback Format and Content Results Timings

No additional feedback is to be provided for the Foundation examination.

In normal circumstances, papers are marked immediately after the examination has taken place and candidates are informed of their results by the invigilator who marked their paper. At open centre examinations there may not be time to mark the paper immediately afterwards and so candidates will be emailed their results within 5 working days of the examination. If a candidate is sitting a paper within the pilot phase of its launch then they may have their results deadline extended and should be informed of this at the time of booking the examinations. In exceptional circumstances results may be withheld until payment has been received from the candidate.

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 5 Owner Chief Examiner

APPENDIX A FOUNDATION FORMAT


1. a. 50 questions (0.8 minute per question) b. 40 minutes duration c. Pass mark of 25 (50%)

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 6 Owner Chief Examiner

APPENDIX B ANALYSIS OF SYLLABUS TOPIC AND QUESTION STYLES


Analysis of Syllabus Topics Ref Syllabus Area No of Foundation Syllabus Topics 1 2 Total No of questions in a paper No LL1 per paper 0 3 1 1 2 7 No LL2 per paper 2 12 20 3 6 43 No per paper 2 15 21 4 8 50

Learning Level

OV PR EN IM PC

Overview and Key Features of COBIT 5 The COBIT 5 Principles The COBIT 5 Enablers Introduction to COBIT 5 Implementation Process Capability Assessment Model Total Number of Topics

0 5 1 1 4 11

2 15 25 4 8 54

2 20 26 5 12 65

The inclusion of 50 question items in every paper represents 75% of the syllabus. 14% of the 50 questions are at Learning Level 1.

Profile of Question Styles

Question Style Standard Negative Missing Word Sequencing 3 Sequencing 4 Total

Number of each style Any number Max 5 per paper Max 5 per paper Any number Any number Maximum 50 questions

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 7 Owner Chief Examiner

APPENDIX C: THE EXAMINATION BOOKLET


(i). Standard wording for the Candidate Instructions from the front cover of the Examination Booklet

Instructions 1. All 50 questions should be attempted. 2. All answers are to be marked on the answer sheet provided. 3. Please use a pencil and NOT ink to mark your answers on the Answer sheet provided. There is only one correct answer per question. 4. You have 40 minutes for this paper. 5. You must get 25 or more correct answers to pass.

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 8 Owner Chief Examiner

(ii). Example Answer sheet

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 9 Owner Chief Examiner

APPENDIX D: EXAMPLES OF COBIT 5 FOUNDATION QUESTION STYLES


PRINCE2 & MSP Examples are shown below if necessary replace with COBIT 5 detail once good examples are available. N.B the subject matter in these examples may not be current. ID: 9 Ver By: Emma Jones

Syllabus CS020300 - Controlling a Stage Process Ver Date: 27/3/2009 Area: Ver No: 2.1 Status: L Style: Standard Use: Sample1 Difficulty: Medium Correct A Answer: Question What role is responsible for authorizing and monitoring work to be Question: completed and for taking corrective action within a stage? Option A: Project Manager Rationale LL2 - The responsibilities within the Test Controlling a Stage process Objective: understand the responsibility of the Project Manager Correct. The Project Manager is Rationale: responsible for controlling the day-today activities of the stage. Ref 15.3 Incorrect. Project Support provides administrative support to the Project Rationale: Manager, but is not responsible for authorizing the work. Ref 5.3.2.8 Incorrect. Project Assurance reviews the activities of the stage, but is not Rationale: responsible for authorizing the work. Ref 5.3.2.3 Incorrect. The Team Manager agrees work with the Project Manager to be Rationale: delivered as part of a Work Package Ref 5.3.2.7 Master Section 15.3 Ref: Review A-Accepted Status:

Option B: Project Support

Option C: Project Assurance

Option D: Team Manager

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 10 Owner Chief Examiner

ID: 85 Syllabus IP020400 - Initiating a Project Process Area: Ver No: 2.0 Status: A Style: Sequencing-3 Use: Exam Difficulty: Medium Correct B Answer: Question In what sequence would the following occur in the Initiating a Project process? Question: 1. Create the Project Plan 2. Prepare the project strategies 3. Refine the Business Case

Ver By: Elaine Sharkey Ver Date: 12/3/2009 Master Section 14.4 Ref: : Review A-Accepted Status:

Rationale

Test LL2 - Understand the activities within the Objective: Initiating a Project process.

Option A: 1, 2, 3

Incorrect. The strategies are input to the Project Plan and are created before the Rationale: Project Plan. Ref 14.4.6

Option B: 2, 1, 3

Correct: Once the strategies for quality, risk, configuration and communication management have been produced, they are then incorporated Rationale: into the Project Plan where project costs and times are forecast followed by Refinement of the Business Case. Ref 14.4.7 Incorrect. The Business Case is refined with project costs after the Project Plan Rationale: had been created using information from the strategies. Ref 14.4.7 Incorrect. The Business Case is refined with project costs after the Project Plan Rationale: had been created using information from the strategies. Ref 14.4.7

Option C: 3, 1, 2

Option D: 3, 2, 1

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 11 Owner Chief Examiner

ID: 85 Syllabus IP020400 - Initiating a Project Process Area: Ver No: 2.0 Status: A Style: Sequencing-4 Use: Exam Difficulty: Medium Correct B Answer: Question If a product is to be changed, when there is no Change Budget available, in what order would the following occur? 1. A Work Package is created or amended 2. An Exception Report is raised 3. An Issue Report is raised 4. The Project Board approve the change

Ver By: Emma Jones Ver Date: 12/3/2009 Master Section 15.4 Ref:

Review A-Accepted Status:

Rationale

Question:

LL2 - Understand the correct sequence Test of events in order to implement a Objective: Request for Change.

Option A: 1, 2, 4, 3

Incorrect. Work should not commence on implementing any change unless the Rationale: request has been through formal change control and gained the appropriate approval. Ref 15.4.7 Correct. An Exception Report is created Rationale: as a result of a Project Issue, not the other way around. Ref 15.4.7 Incorrect. Work should not commence on implementing any change unless the Rationale: request has been through formal change control and gained the appropriate approval. Ref 15.4.8 Incorrect. A Request for Change would be raised as a Project Issue and examined for its impact. It is then escalated for a decision via an Rationale: Exception Report for approval by the Project Board (or Change Authority). If approved, a Work Package is created or amended to commence work. 15.4.7

Option B: 2, 3 ,4, 1

Option C: 3, 1, 2, 4

Option D: 3, 2, 4, 1

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 12 Owner Chief Examiner

ID: 8 Syllabus OV080 - Overview and Principles Area: Ver No: 2.2 Status: L Style: Negative Use: Sample1 Difficulty: Medium Correct C Answer: Question Which statement does NOT define a Question: characteristic of a project? Has a higher degree of risk than Option A: business as usual

Ver By: Emma Jones Ver Date: 31/3/2009 Master Section 1.3 Ref: Review A-Accepted Status:

Rationale Test LL2 - Understand the characteristics of a Objective: project Incorrect. Projects introduce threats and opportunities over and above those we Rationale: typically encounter in the course of stable business operations. Projects are more risky. Ref 1.3

Incorrect. The project environment involves a temporary team of people Rationale: with different skills working together to introduce change within the business environment. Ref 1.3 Correct. These are characteristics of a Has a lifespan that usually covers the programme. Whilst projects do deliver delivery of the desired outcomes and the Option C: Rationale: outcomes and benefits, many will not be realization of the expected benefits realized until after the project has closed. Ref 19.4 Involves people with different skills Option B: introducing a change that will impact others outside of the team A temporary management structure Option D: created for the implementation of business products Incorrect. Projects are temporary in nature. Once the change has been Rationale: implemented the need for the project is removed. Ref 1.3

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 13 Owner Chief Examiner

ID: 234 Syllabus SB010 - Managing a Stage Boundary Area: Process Ver No: 2.2 Status: L Style: Missing Word(s) Use: Sample1 Difficulty: Medium Correct C Answer: Question Identify the missing words in the following sentence. Question:

Ver By: Emma Jones Ver Date: 31/3/2009 Master Section 17.1 Ref: Review A-Accepted Status:

Rationale

LL1 - Recall the stated purpose of A purpose of the Managing a Stage Test the Managing a Stage Boundary process is to provide the Objective: Boundary process Project Board with sufficient information so that it can approve the [ ? ] for the next stage. Incorrect. Work Packages are approved Work Packages Option A: Rationale: by the Project Manager during the Controlling a Stage process. Ref 15.4.1 Option B: Exception Report Incorrect. An Exception Report may trigger the Managing a Stage Boundary Rationale: process if an Exception Plan is required. Ref 15.4.7 Correct. A purpose of the Managing a Stage Boundary process is to provide sufficient information to the Project Rationale: Board, so that it can review the success of the current stage and approve the next Stage Plan. Ref 17.1 Incorrect. The Project Brief is approved by the Project Board following the Rationale: Starting up a Project process, and before the Initiating a Project process. Ref 13.4.1

Option C: Stage Plan

Option D: Project Brief

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 14 Owner Chief Examiner

ID: 578 Syllabus QU070 - Quality Theme Area: Ver No: 2.1 Status: L Style: Select (List) Use: Sample1 Difficulty: Medium Correct C Answer: Question Which of the following are included in a Product Description?

Ver By: Emma Jones Ver Date: 29/3/2009 Master Section A.17.2 Ref: Review A-Accepted Status:

Rationale

Question:

1. A breakdown of the individual parts that make up the product 2. The management stage in Test LL2 - Understand the purpose and which the product is to be Objective: composition of a Product Description created 3. The reviewer(s) for the product 4. Any allowable deviation from the specified quality criteria Incorrect. (4) Quality Tolerance: details of any range in the quality criteria within Rationale: which the product would be acceptable. Ref A.17.2 Incorrect. (3). Quality responsibilities: defines those people who are to be Rationale: involved in quality checking the product: approvers(s). Ref A.17.2 Correct. (2). The Product Description does not contain details of the stage in Rationale: which the product is to be created. Ref A.17.2 Incorrect. (1). Composition: shows the content or parts that need to be Rationale: assembled to make the product complete. Ref A.17.2

Option A: 1, 2, 3

Option B: 1, 2, 4

Option C: 1, 3, 4

Option D: 2, 3, 4

COBIT 5 OTE Foundation Design 30 October 2012 Version 1.0 (Status - Live) Aligned to Version 1.3 of the OTE Foundation Design Page 15 Owner Chief Examiner