Batch Mix Skid Equipment #


Record PM Meter reading (Verify meter functions properly)

CL-GL-HAL-IEM-PM-G09A Shop DATE

MO#

" = OK

= Fail (Create

RPM order)

N/A

= not

applicable

Test emergency shutdown devices if equipped. A. With engine water temperature at least 1000 F, and engine operating at 1000 RPM, activate emergency kill switch. Engine should stop and rig savers should close. Diagnose and repair savers if they fail to operate properly. For ECM controlled CAT engines use the CAT ET diagnostic software to perform the following test: Activate the engine over speed function in the CAT ET Slowly increase engine rpm until rig saver activates B. Ensure rig savers are properly latched in the open position after the test.

Process Owner: Global Equipment Maintenance Manager Approver: Larry Dew~ese Page 1 of 4

Preventive Maintenance Check Sheet Revision Date: OS/22/2013

HALLIBURTON
Batch Mix Skid ENGINE INSPECTION (cont) 21 22 23 24 25 26 27 28 29 30 31 Check coolant level and record concentration Check SCA level and record. SCA units per gallon. (non ELC coolant only) ,pH . Replenish SCA if below 3 CL-GL-HAL-IEM-PM-G09A AUX
6'1.(

Check all hoses, lines and connections. Tighten as needed. Check engine coolant system for leaks while under pressure. Pressure test radiator and cap to correct working pressure. Check fan hub, fan assembly and idler assembly. Check radiator, shroud and guard for damage or corrosion. Check belts; adjust or change as necessary. GEARBOX Check oil level and condition of oil. Change if necessary. Clean and inspect vents. Check for leaks.

~ 'Il..
Olf..

ott

ok..
lItt. ol1... AUX
N~

Oli
e>(;._

AIR SUPPL Y SYSTEM 32 .Check air compressor and hoses for leaks. 33 Check volume tank and safety pop-off valve condition. 34 Verify air pressure build-up and governor cut-off at 125 psi. 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 HYDRAULIC SYSTEM Check hydraulic oil level and condition. Replace hydraulic oil or filters, if necessary. Check hydraulic oil reservoir for leaks or damage. Check all hydraulic pumps for leaks and proper operation. Check all motors for leaks and proper operation. Check all hydraulic hoses and fittings for leaks and corrosion. TANKS Check for excessive rust or damage to tank internal/external. Check all tank supports for rust or damage. Check hatches for safety devices. Check mixing bowl Ensure safety railings are in place and work on top of tank. Check safety ladder to tank is in good shape. Ensure all grating on top of tank is in place and in good shape. Ensure the hatch safety kits have been installed as per tech bulletin CEQ-11-001 BLENDER Check centrifugal pumps for leaks, wear and damage. Check drive couplings for cracks and wear. Inspect blender tanks for damage or cracks. Check blender paddles and shaft for damage and operation. Circulate water through system, check pump output. Check for leaks and monitor charge and loop pressure. Apply 120-day inspection sticker on unit.

AUX

'""<

e,1<:..
elf

AUX 81ft.
~{(

off.
t!J{f_ QI(.t

oR

AUX

CCL

nt,
('lJ((.

e
et
OIl

dil. 061.. CH
(0 Ie

Ct.<!.. Cl.t...
(3~

0'"

0<.,.

e,

Process Owner: Global Equipment Maintenance Manager Approver: Larry Deweese Page 2 of 4

Preventive Maintenance Check Sheet Revision Date: OS/22/2013

HALLIBURTDN
Batch Mix Skid CL-GL-HAL-IEM-PM-G09A CH FRAME 56 Repair all structural damage. 57 Repair all excessively corroded mounts, brackets, etc. 58 Inspect all ISO boxes for wear or damage. 59 Visually inspect all lifting points and welds on frame. If repairs are required have NDE performed after repairs are made. ATTACH COpy OF INSPECTION REPORT TO THIS CHECK SHEET. 60 Touch up paint as necessary to Halliburton specifications. 61 Verify lifting sling certificates are up-to-date with certification tags in place. Record: (all should be noted on certification tag). Invoice/Cert# Test Date f / 5~/ :2.01..:\ Sling Capacity Unit# 62 Verify all lifting shackles, pins, and nuts are secure and meet 'appropriate location regulations.

Gk
btL

~
~l(_

dA..

O~

C!:>k....

ENVIRONMENTAL 63 64 65 Dispose of all waste properly. Ensure all spills are cleaned up and properly contained. REQUIRED PAPER WORK Check regulatory documents and decals per State and/or Country Requirements (DOT, CVIP, MMS Coast Guard, etc.) Verify that proper company logos and decals are installed as per the Branding initiative. Verify that the SAP equipment number is clearly marked on the unit (see the ESG Branding web page for guidelines). a
b

CH
blC..

f)tt.. tJ'<._ 0"Date

66

Record date of DOT/CVIP and/or state annual inspection sticker (if applicable). Replace sticker if within 90 days of expiration date.

67 68 69

Was a new DOTICVIP sticker applied? (Circle response) Signature: Install new sticker to indicate when the next PM is due Record date when next PM is due. Record hours/miles/km when next PM is due. c

I
I I

Yes

No Date

~
Date

Hour/Miles/KM

Process Owner: Global Equipment Maintenance Manager Approver: Larry Deweese Page 3 of 4

Preventive Maintenance Check "Sheet Revision Date: 05/22/2013

HALLIBURTDN
Batch Mix Skid

CL GL HAL IEM PM G09A

- -

- -

LIST ALL REPAIRS THA T WERE FOUND DURING THE INSPECTION. THIS LIST WILL BE USED AS A TOOL TO RESCHEDULE ANY REPAIRS THAT WERE FOUND DURING PM INSPECTION. 1 Mechanic name: Repair date: 2 Mechanic name: Repair date: 3 Mechanic name: Repair date:
4

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Mechanic name: Repair date: 5 Mechanic name: Repair date: 6 Mechanic name: Repair date: 7 Mechanic name: Repair date: 8 Mechanic name: Repair date:
9

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:


,

Mechanic name: Repair date: 10 Mechanic name: Repair date: Report any errors found on check sheet to supervisor

Approval acquired: Maintenance order #:

Approval acquired: Maintenance order #:

Process Owner: Global Equipment Maintenance Manager Approver: Larry Deweese Page 4 of 4

Preventive Maintenance Check Sheet Revision Date: OS/22/2013