BSEN14351
BSEN14351 - FPC
BSEN14351 - FPC
BSEN14351 - FPC
Current Fabrication Manuals. Current Wallcharts. Current Manufacturing procedures issued from System Supplier. Current ITT results of System Supplier products.
BSEN14351 - FPC
1.2
1.2.3
1.3
Manuals
BSEN14351 - FPC
1.4
Control of Documents
1.5
Standards
1.8
Product Literature
1.9 1.9.1
1.9.2
Communication
2.2
2.2.1 Training
2.3
Management Commitment
3.0 3.1
3.2
Measuring Tapes
3.3
Steel Rule
BSEN14351 - FPC 4.0 4.1 RAW MATERIALS AND COMPONENTS (Reference 7.3.4 - BSEN14351) Material Specification
4.2
Purchase Orders
Rating A
Product Description
Rating 1 2
Quality Description
B C D E
not
F
4.3
4.4
Goods Inwards
4.5
Stores
4.6
Screws
BSEN14351 - FPC 5.0 5.1 PRODUCTION PROCESS (Reference 7.3.5 - BSEN14351) General
5.3
Inspection Forms
6.0 6.1
6.2
Final Inspection
7.0 7.1
7.2
7.3
BSEN14351 - FPC 8.0 8.1 NON CONFORMING PRODUCT (Reference 7.3.8 BSEN14351) Non Conforming Product Procedure
8.2
Quarantine
BSEN14351 - FPC 9.0 9.1 CORRECTIVE ACTION (Reference 7.3.9 BSEN14351) Corrective Action Procedure
9.2
Preventative Action
BSEN14351 - FPC 10.0 10.1 INITIAL INSPECTION OF FACTORY AND FPC (Reference 7.4 BSEN14351) Provision of Resources
10.1.1
Human Resources
10.3
Work Environment
10.4 10.4.1
10.4.2
Responsibilities
10.5 10.5.1
10.5.2
10.6
Customer Communication
BSEN14351 - FPC 10.7 10.7.1 Production and Service Provision Control of Production and Service Provision
10.7.2
10.8
Customer Property
10.9
Preservation of Product
BSEN14351 - FPC
10.10
10.10.1
BSEN14351 - FPC 11.0 11.1 CONTINUOUS SURVEILLANCE, ASSESSMENT AND APPROVAL OF FPC (REFERENCE 7.5 BSEN14351) Internal Audit (Reference 7.5 BSEN14351)
11.3 11.3.1
11.3.2
Responsibility
11.4 11.4.1
11.5
QM 7 APPENDIX Introduction
(FPC)
Workstation Descriptions
Inspection o o o o o o o Check Delivery Book at 4pm each day and Report any outstanding Purchase Orders to author of Order immediately.
Date: 01/02/10
Date: 01/02/10
Wall charts
Date: 01/02/10
Fabrication Manual
Inspection
Date: 01/02/10
Fabrication Manual
Inspection
Date: 01/02/10
Date: 01/02/10
Date: 01/02/10
o o o
Date: 01/02/10
Fabrication Manual
Inspection
Date: 01/02/10
Green Sticker If the Window Fails, stick on Red Sticker, raise Non Conformity, inform Factory Manager and place in Quarantine area.
Inspection
Date: 01/02/10
Date: 01/02/10
Date: 01/02/10
Wall charts
Fabrication Manual
Inspection
Date: 01/02/10
Date: 01/02/10
(FPC)
Form Templates
Corrective Action Taken Date Immediate action taken to rectify product/process Action taken by
Preventative Action Taken Date Long term action required to prevent reoccurrence of non-conformity Action taken by
CUSTOMER COMPLAINT
CUSTOMER COMPLAINT
Date CC No Job No REASON COMPLETION DATE
VENDOR RATING
Supplier Name:
Rating A
Product Description
Notes
C D E
Rating 1 2 3
Quality Description
Signed: Dated:
NEF No:
NEW ENQUIRY
Customer Name
Contact
EMPLOYMENT RECORD
Work Station
Competence Level
PROFILE C UTTING
- ALUMINIUM
Tolerance +/- 1mm
Date
Job Number
Profile
Actual Dimensions
Pass / Fail
Signed
01/02/10
Date
Job Number
Handle Code
Handle Colour
Handle Side
Signed
01/02/10
INTERNAL AUDIT
INTERNAL AUDIT
General
2.4.1
Manuals
2.4.2.1
Manuals
2.4.3.1
Standards
2.4.3.2
Company Documents
2.4.3.3
2.4.3.4 2.4.4
Review Input
3.3.6.1
Review Output
3.3.6.2
4.3.1
4.3.2
Infrastructure
4.3.3
Planning Realization
5.3.1
5.3.2.2
Customer Communication
5.3.2.3
Purchasing Process
5.3.4.1
Purchase Information
5.3.4.2
5.3.4.3
Control of Production
5.3.5.1
Validation Process
5.3.5.2
Traceability
5.3.5.3
Customer Property
5.3.5.4
5.3.5.5 5.3.6
Customer Satisfaction
6.3.2.1
Internal Audit
6.3.2.2
Monitoring of Product
6.3.2.4
6.3.3
Analysis of Data
6.3.4
Continual Improvement
6.3.5.1
Corrective Action
6.3.5.2
Preventative Action
6.3.5.3
WORK STATION
Form No Description Work Station Issuer Frequency Work Station Route
Page 1 of 3
Record Location
N C R
WORK STATION
Page 2 of 3
WORK STATION
Page 3 of 3