Dear Sir, PURPOSE: Engineering Department: Prepare and submit method statement for TRG/SAUDI ARAMCO review and

approval. Provide technical support to MMG site operation group. Provide latest revision of IFC drawings, procedures, material specification, standards, and technical specifications. V. LIST OF TOOLS & EQUIPMENT: VI. Crane with attached Man Basket / Man-lift Wrench/ Spud Wrench / Sledge & Ball Hammer Calibrated Tension Calibrator Impact Wrench Calibrated Torque Wrench

WORK SEQUENCE / PROCEDURE: A. Preparations: 1. Ensure that all relevant documents have been approved by TRG/SAUDI ARAMCO prior to commencement of the work, and that the latest revision of IFC drawings, specifications including, approved procedures are disseminated to concerned personnel who will carry out the work. 2. 3. 4. Secure work permit. Ensure that correct bolts & nuts / washers are used as per project specifications. When permission has been obtained from Saudi Aramco to use bolts that have been in service, all thread surfaces shall be cleaned. Ensure that bolt holes shall be standard holes with diameter 1/16 (1mm) larger than the nominal bolt diameter. When assembled, all joint surfaces including those adjacent to the bolt heads, nuts or washers, shall be free of burrs, dirt and other forging materials that would prevent solid seating of parts. Field connections for primary member and any member that are part of the lateral loads carrying system shall be bolted with high strength bolts conforming to ASTM A325-N, a bearing type connections with threads included in the shear plane. All high strength bolts shall be furnished with nuts & washers. Minimum size ofA325 bolts shall be 20mm or .

5. 6.

7.

Field connections for secondary structural member (e.g. purlin, girt, stair framing, stair tread, stair bracing, toe plate, handrail, ladders, small

To ensure that tensioning of bolted connection for Structural Steel & Equipment is carried out safely, and in accordance with good working practice, as per TRG/SAUDI ARAMCO Job Specifications. This procedure is intended to provide general application guidance and establish controls during preparation and execution. II. SCOPE: This Method Statement is applicable to all bolted connections in structural steel and equipment regardless of sizes and using ASTM A325 bolts, which are to be conducted in the Juaymah Fractionation & Treating NGL Center, Unit # 4 Project, Juaymah, Saudi Arabia. III. REFERENCES: : Erection of Miscellaneous structural : American Institute for Steel Construction : Saudi Aramco Typical Inspection Plan : Saudi Aramco Procedure Verification Testing of Wrench IV. RESPONSIBILITIES: Structural Steel Superintendent / Supervisor: Establish a Special Work Task Team intended only for bolt tensioning work. Ensure full compliance by the Special Work Task Team regarding execution of the work in accordance with TRG/SAUDI ARAMCO project requirements and specifications. Confirm the availability of all materials, tools, equipment, and required personnel who will carry out the work. Quality Control Inspector: Conducts inspection in accordance with this procedure and approved Quality Inspection Plan. Monitors daily torquing & tensioning activities, and verifies compliance with TRG/SAUDI ARAMCO Specifications. Prepare daily QC records and final acceptance documentation where required. Safety Supervisor: Check the work areas for any unsafe conditions. Ensure that all safety requirements have been adequately addressed and the work shall be carried out in accordance with TRG/SAUDI ARAMCO project safety procedures.

PIP STSS05130 AISC SATIP-M-001-01 SATR-M-2004 calibration