Front Elevation
Details of CSM Tower See Drawing No. 20D con 70
Section A-A
15 Bulldog Grips 16 25 40
10 12 13 11
Erection Hook 3 Stirrups 10 each Anchor Rods 25 Inner Drum Outer Drum each cable end to be wound once around the drum and clamped with second cable
65
100
300
Form work for Drum is done with a bamboo mat (Chitra) lined with a plastic sheet.Use binding wire around the drum for fixing.
14 Bulldog Grips
Plan View
Double Drum
20
Hard Rock
Anchor Rods Ribbed Tor steel 25mm drill holes as shown in table volume per hole = 0.002m3
diameter of rod holes
Cable [mm]
Stirrups 10 mm outer drum for inner drum for Total Required handrail cable walkway cable Volume Anchor RCC for Rods RCC for of cutting bending weight Drum rod holes Drum rod holes Drum 25 mm nos length dia kg/pc [cm] [cm] [mm] [mm] [kg] [nos] [cm] [cm] [m3] 3 3 3370 5250
for inner drum
Scale 1 : 50
All Dimensions are in Centimeter
Related Steel Drawing is : 60D2
See drawing no. 20Dcon 70 or 20Dcon106 6.99 2.02 * 0.50 5.42 2.20 10.50
880
2.08
1480
3.24
Construction Drawing:
or
Hand Rail 26 Walkway 32 180 165 125 110 1.30 20 3 3
4150 5880
1130 1680
2.56 3.63
13 26 32
3 5 6
10 15 20
........... 46