PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
DESCRIPTION
UNIT
QTY.
UNIT RATE
hr hr hr
#DIV/0!
hr. hr.
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob./Demob. VAT TOTAL INDIRECT COST 10% 10% 2% 10%
p p
#DIV/0!
#DIV/0!
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT CONCRETE FOUNDATION FOR LIGHTING POST EA 1 UNIT cum cum QTY. 0.7155 0.0845 UNIT RATE 3,720.18 1,312.91 AMOUNT (IN PESO) 2,661.79 110.94
Sub Total (Materials) B LABOR Conc. Found. w/ Formworks & Rebar Lean Concrete Excavation Backfill
2,772.73
Sub Total (Labor) C EQUIPMENTS Conc. Found. w/ Formworks & Rebar Lean Concrete Backfill
1,240.44
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
p p
1,410.51
5,790.98
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT A.3 PERIMETER LIGHTING AT STO. CRISTO GROUND RESERVOIR LOT 1 UNIT set lm ea cum set QTY. 5.0000 351.0000 37.3333 3.2368 5.0000 UNIT RATE 13,195.00 18.75 65.16 1,822.96 4,380.47 AMOUNT (IN PESO) 65,975.00 6,579.85 2,432.49 5,900.56 21,902.35
DESCRIPTION MATERIALS 250W, HPS Perimeter Lighting 8mm2 TW Wires 20mm x 3m PVC Conduit Concrete Encasement for PVC Concrete Foundation for Post
102,790.25
hr hr hr
11,012.21
hr. hr.
1,101.22
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
p p
36,998.98
151,902.65
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT A.3 PERIMETER LIGHTING AT CIUDAD REAL BOOSTER PUMP STATION LOT 1 UNIT set lm ea cum set QTY. 4.0000 207.0000 18.1667 1.5751 4.0000 UNIT RATE 13,195.00 18.75 65.16 1,822.96 4,380.47 AMOUNT (IN PESO) 52,780.00 3,880.42 1,183.67 2,871.26 17,521.88
DESCRIPTION MATERIALS 250W, HPS Perimeter Lighting 8mm2 TW Wires 20mm x 3m PVC Conduit Concrete Encasement for PVC Concrete Foundation for Post
78,237.22
hr hr hr
6,933.61
hr. hr.
693.36
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
p p
27,648.27
113,512.46
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output NO. A MATERIALS 20AT/50AF, 2P, ACB, Nema 3R Enclosed 20mm x 3m RSC 20mm RSC Elbow Entrance Cap Concrete Pedestal Kilowatt-hr Meter set ea ea ea ea ea 1.0000 2.0000 1.0000 1.0000 1.0000 1.0000 403.13 81.90 89.18 50.05 6,165.12 9,555.00 403.13 163.80 89.18 50.05 6,165.12 9,555.00 : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT F.8.5 POWER SUPPLY SYSTEM (TAPPING) LOT 1 UNIT QTY. UNIT RATE AMOUNT (IN PESO)
DESCRIPTION
16,426.28
hr hr hr
5,438.13
hr. hr.
543.81
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
p p
7,215.45
29,623.66
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT F.8.2 LEVEL ELECTRODES SET 0.375 UNIT set QTY. 1.0000 UNIT RATE 1,365.00 AMOUNT (IN PESO) 1,365.00
1,365.00
hr hr
2.6667 2.6667
44.12 32.57
117.65 86.85
204.50
hr. hr.
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
2,074.88
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT F.8.4 GENERATOR SET AT CIUDAD REAL BOOSTER PUMP STATION (75 KVA) SET 0.0350 UNIT set QTY. 1.0000 UNIT RATE 567,840.00 AMOUNT (IN PESO) 567,840.00
567,840.00
hr hr hr
Sub Total (Labor) C EQUIPMENTS Power Tools (if any) 10% of Labor 1 Truck-mounted Hydraulic Crane, 45mtons
2,953.85
hr
7.1429
2,045.00
295.38 14,607.14
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
p p
188,594.23
774,290.61
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT F.8.1 PANEL BOARD & TRANSFER SWITCH AT CIUDAD REAL BOOSTER PUMP STATIONS set 0.2 UNIT set QTY. 1.0000 UNIT RATE 58,877.23 AMOUNT (IN PESO) 58,877.23
DESCRIPTION MATERIALS MCP Panel Board : 200AT/225AF, 3P, 240V Branches : 2 - 150AT/225AF, 3P 1 - 30AT/100AF, 3P LP Main : Lugs only Branches : 6 - 20AT/50AF,2P Manual Transfer Switch, 225A, 230V 3PDT, 60Hz
set ser
1.0000 1.0000
1,627.35 7,944.30
1,627.35 7,944.30
68,448.88
hr hr
5.0000 5.0000
44.12 32.57
220.60 162.84
383.44
hr.
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
90,996.33
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT F.8.3 CONDUITS, WIRES & CABLES, LIGHTING FIXTURES, OUTLETS, BOXES, RELAYS & ETC. (CIUDAD REAL BOOSTER PUMP STATION) LS 1 UNIT set lm lm lm lm lm lm lm ea ea ea ea ea ea pc pc pc pc pc pc set set ea lot p QTY. 2.0000 300.0000 228.0000 20.0000 60.0000 50.0000 15.0000 15.0000 38.0000 10.0000 6.0000 4.0000 2.0000 18.0000 4.0000 5.0000 2.0000 1.0000 4.0000 1.0000 2.0000 2.0000 1.0000 1.0000 UNIT RATE 4,368.00 8.19 18.75 28.21 69.25 120.94 12.37 18.43 157.43 201.11 409.50 89.18 101.92 65.16 8.74 7.74 18.56 152.84 108.58 634.20 800.80 227.50 278.46 5,000.00 AMOUNT (IN PESO) 8,736.00 2,457.00 4,274.09 564.20 4,155.06 6,046.95 185.50 276.41 5,982.34 2,011.10 2,457.00 356.72 203.84 1,172.81 34.94 38.68 37.13 152.84 434.32 634.20 1,601.60 455.00 278.46 5,000.00 47,546.19
DESCRIPTION MATERIALS Magnetic Starter, NEMA Size 1 3.5mm2 TW Wires 8.0mm2 TW Wires 14mm2 THW Wires 30mm2 THW Wires 80mm2 THW Wires 8mm2 Bare Copper Wires 14mm2 Bare Copper Wires 25mm x 3m RSC 32mm x 3m RSC 50mm x 3m RSC 32mm RSC Elbow 50mm RSC Elbow 20mm x 3m PVC 4" Octagonal Junction Box 2" x 4" Utility Box 4" Square junction Box Toggle Switch, 3-Gang Duplex C.O. Weatherproof C.O. 2-40W Industrial Type Fluorescent 50W Incandescent Bulb w/ Guard Ground Rod, 20mm x 3m Miscellaneous Item (pullwire, etc.) Sub Total (Materials)
hr hr
233.0000 466.0000
44.12 32.57
10,279.98 30,353.89
Sub Total (Labor) C EQUIPMENTS Power Tools (if any) 10% of Labor Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
40,633.87
hr. p p
29,702.39
121,945.84
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT F.8.7 OBSTRUCTION LIGHT COMPLETE WITH CONNECTION AND CIRCUIT LOT 1 UNIT lm ea ea QTY. 175.0000 29.0000 1.0000 UNIT RATE 8.19 42.41 1,543.59 AMOUNT (IN PESO) 1,433.25 1,229.77 1,543.59
4,206.61
hr hr
35.0000 70.0000
44.12 32.57
1,544.20 4,559.60
Sub Total (Labor) C EQUIPMENTS Power Tools (if any) 10% of Labor
6,103.80
hr.
610.38
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
p p
3,516.49
14,437.29
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT RIGID STEEL CONDUIT (RSC), 15MM X 3M PC 1 UNIT pc QTY. 1.0000 UNIT RATE 71.44 AMOUNT (IN PESO) 71.44
71.44
hr hr
1.0000 1.0000
44.12 32.57
44.12 32.57
76.69
hr. hr.
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
195.82
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT RIGID STEEL CONDUIT (RSC), 25MM X 3M PC 0.726 UNIT pc QTY. 1.0000 UNIT RATE 157.43 AMOUNT (IN PESO) 157.43
157.43
hr hr
1.3774 1.3774
44.12 32.57
60.77 44.86
105.63
hr. hr.
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
347.77
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT RIGID STEEL CONDUIT (RSC), 32MM X 3M PC 0.635 UNIT pc QTY. 1.0000 UNIT RATE 201.11 AMOUNT (IN PESO) 201.11
201.11
hr hr
1.5748 1.5748
44.12 32.57
69.48 51.29
120.77
hr. hr.
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
425.52
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT RIGID STEEL CONDUIT (RSC), 40MM X 3M PC 0.565 UNIT pc QTY. 1.0000 UNIT RATE 242.97 AMOUNT (IN PESO) 242.97
242.97
hr hr
1.7699 1.7699
44.12 32.57
78.09 57.64
135.73
hr. hr.
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10.0%
500.64
152830324.xls.ms_office 6/19/2013
Unit Cost Analysis as of April 2003 Project Owner Item No. Description Unit Output/Hr. NO. A : : : : : :
PROPOSED IMPROVEMENT AND EXPANSION OF SAN JOSE DEL MONTE WATER SUPPLY SYSTEM
SAN JOSE DEL MONTE WATER DISTRICT RIGID STEEL CONDUIT (RSC), 50MM X 3M PC 0.508 UNIT pc QTY. 1.0000 UNIT RATE 409.50 AMOUNT (IN PESO) 409.50
409.50
hr hr
1.9685 1.9685
44.12 32.57
86.85 64.11
150.96
hr. hr.
Sub Total (Equipments) D E F G H I TOTAL DIRECT COST OCM Contractor's Profit Mob/Demob VAT TOTAL INDIRECT COST 10% 10% 2% 10%
740.93
152830324.xls.ms_office 6/19/2013