INTRODUCTION
Preventive maintenance of boilers is required to maintain then in good working condition and to ensure safety. The primary objective of any P M system is to provide for managing maintenance and maintenance support in a manner which will ensure maximum equipment readiness. The intermediate objectives of the PM is as follows: a) Documenting information relating to maintenance and maintenance support actions b) Improvement of maintainability and reliability of systems and equipment by provision of documented maintenance information for analysis. c) Provide the means to schedule,plan,manage and track maintenance. d) Provide data on which to base improvements in the system.
Adequate precautions should be taken while maintenance is being performed to protect personnel performing the job,occupants of the building housing the boiler and occuoants of buildings in viscinity of the buiding and last but not the least the equipment itself.
INTENTION
It is not intended that this manual serve as operating instructions manual for any specific boiler or plant. Due to the wide variety , types and makes of equipments used the guide should be supplemented with manufacturers recommendations concerning the maintenance and care of of the system. Therefore specific operating and maintenance instructions as recommended by the manufacturer should be supplied to the incharge to complement the PM manual.
ENGINEERING MANAGER
RESPONSIBLE FOR IMPLEMENTATION OF PM PROGRAM
MAINTENANCE SUPERVISOR
SHIFT OPERATOR
SHIFT OPERATOR
SHIFT OPERATOR
REPAIR PROGRESSION
OPERATER PERFORM PM
YES
NO
MAINTENANCE SUPERVISOR REVIEW
YES
NO
OPERATER REPAIR
YES
ENTER STATUS IN LOG BOOK
NO
IS PROBLEM A SYSTEM MODIFICATION
YES
NO YES
IS ENGINEERING QUALIFIED TO DO JOB
NO
HIRE CONSULTANT IF NECESSARY 6
Note: The above check list should also refer to specific written procedures. In all cases the equipment manufacturers recommendation should be followed. This check off list uses ASME section VI and ASME CSD-1 for its specific written instructions.
WEEKLY CHECKLIST
CHECK FLAME SIGNAL STRENGTH FOR BOTH PILOT AND MAIN FLAME CHECK PILOT AND MAIN FUEL VLAVE SHUTOFF VALVES CLOSING CHECK IGNITOR AND BURNER OPERATION CHECK LEVEL IN CHEMICAL TREATMENT TANK
Note: The above check list should also refer to specific written procedures. In all cases the equipment manufacturers recommendation should be followed. This check off list uses ASME section VI and ASME CSD-1 for its specific written instructions
MONTHLY CHECKLIST
CHECK BOILER WATER TREATMENT TEST RESULTS AND ADJUST IF NECESSARY. LUBRICATE MOTORS AND EQUIPMENT BEARINGS CHECK MAIN FUEL SAFETY SHUT OFF VALVE FOR LEAKAGES CHECK LOW FIRE START INTERLOCK CHECK HIGH PRESSURE/TEMPERATURE INTERLOCKS CHECK HIGH AND LOW PRESSURE INTERLOCKS ON GAS TRAIN MANUALLY LIFT SAFETY VALVE BY HAND
Note: The above check list should also refer to specific written procedures. In all cases the equipment manufacturers recommendation should be followed. This check off list uses ASME section VI and ASME CSD-1 for its specific written instructions
Note: The above check list should also refer to specific written procedures. In all cases the equipment manufacturers recommendation should be followed. This check off list uses ASME section VI and ASME CSD-1 for its specific written instructions
10
ANNUAL CHECKLIST
PERFORM THE SIX MONTHLY CHECKS CHECK ALL EQUIPENT COILS AND DIAPRHRAGM PERFORM A PILOT TURN DOWN TEST RECONDITION OR REPLACE LOW WATER CUT OFF ASSEMBLY CHECK GAS DRIP LEG AND GAS STRAINER CLEAN BOILER FIRESIDE DRAIN BOILER OPOEN HAND HOLES AND MANHOLES AND CLEAN WATER SIDE HAVE BOILER INSPECTED BY AN COMPETANT & AUTHORISED BOILER INSPECTION AGENT CLEAN BURNER BLOWER PRIMARY AND SECCONDRY FANS REPLACE ALL GASKETS LEAK TEST ALL FUEL VALVES TEST OPERATION OF ALL CONTROLS AND SAFETY DEVICES ADJUST COMBUSTION PARAMETERS FOR LOW AND HIGH FIRE CONDITIONS RETEST AND RE CERTIFY BOILER MONITORING SYSTEM
Note: The above check list should also refer to specific written procedures. In all cases the equipment manufacturers recommendation should be followed. This check off list uses ASME section VI and ASME CSD-1 for its specific written instructions
11
BOILER LOG
MAINTENANCE TESTING AND INSPECTION BOILER NO. PRESSURE RATING CAPACITY PERSON TO NOTIFY IN AN EMERGENCY EMERGENCY TEL. NO.
1 OBSERVE WATER LVL. RECORD PRESSURE RECORD FUEL GAS TEMP. DAILY CHKS. 2 3 4 5 6 7 8 9 10 11 12 13 14
WEEK 4
ANNAUL CHECKS
12
13
14
RECORD OF REVISIONS
REVISION NO.
DATED REVISED
A COPY OF THIS DOCUMENT WILL BE WITH THE ENGINEERING MANAGER,MAINTENANCE SUPERVISOR AND THE BOILER RECORD ROOM 15
16