WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)

Equiment ID: PL-101 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0101 Pipework to: D-0102

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration
Internal Corrosion

9
15

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 04/02/2009 04/02/2014 OnLine


60 13/11/2008 13/11/2013 OnLine

DVI/01
UT/01

Line list: 1.5-HC-01019-D3; 1.5-HC-01026-A2 ; 12-HC-01004-C3; 12-HC-01018-D3; 24-HC-01001-D3; 24-HC-01005-C3; 2-V-01020-D3

11 July 2011

Page 1 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-101-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0102 Pipework to: PL-1801

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

2 2

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 50% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 04/02/2009 05/08/2011 OnLine 0 01/01/1995 01/01/1995 OnLine

DVI/01 UT/01

Line list: 2-HW-01022-C3; 3-HC-01036-C3

11 July 2011

Page 2 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-102 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: Pipework to: D-0301

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

6 6

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 13/02/2009 13/02/2014 OnLine 10 28/11/2008 28/09/2009 OnLine

DVI/01 UT/01

Line list: 6-V-01013-C3; 6-V-01100-C3; 16-HC-1049-C3; 3-HC-1034-C3; 16-HC-01006-C3; 16-HC-03001-C3; 16-HC-03149-C3; 16-HC-03759-C3; 4-HC-22063-HC3; 3-V-03191-C3; 2-HC-03144-C3; 2-HC03143-C3; 2-V-03147-C3; 2-HC-03145-B3; 1-HC-01048-C3; 16-HC-03760-C3; 3-V-03761-C3; 2-HC-03762-C3; 2-HC-03763-B3; 2-HC-03764-C3; 2-PG-03836-C3; 2-HC-03146-B3; 2-HC-03757-B3

11 July 2011

Page 3 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-103 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0102 Pipework to: D-0201

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration
Internal Corrosion

2
2

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 50% of Potential locations by Location Category.

30 25/03/2009 25/03/2009 OnLine


6 10/11/2008 10/11/2008 OnLine

DVI/01
UT/01

Line list: 4-HC-01048-C3; 3-V-02073-C3; 3-HC-01003-C3; 3-HC-02008-B3; 3-HC-02009-B3; 3-HC-02070-C3; 4-LN-02310-D2

11 July 2011

Page 4 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-1801 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: Pipework to: PK-1801

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

18 22

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 04/03/2009 04/03/2019 OnLine 120 25/11/2008 25/11/2018 OnLine

DVI/01 UT/01

Line list: 8-V-06045-A1; 8-V-03643-A1; 6-V-22056-A1; 6-HC-07252-A1; 3-V-05065-A1; 3-V-02039-A1; 3-AG-04815-A1; 2-V-06081-A1; 2-V-06049-A1; 1-V-07313-A1; 1-V-01031-A1; 16-HC-18100-A1; 8V-07302-A1; 6-V-07328-A1; 1-V-07329-B1; 6-V-07331-A1; 1-V-07332-B1; 3-V-07334-A1; 1-V-07335-A5A; 8-V-07350-A5A; 1-V-07316-B1; 1-V-07354-B1; 1-V-08008-C1; 1.5-HC-01026-A2 ; 1.5HC-01019-A1; 0.75-V-02205-A1; 10-HC-07356-A1; 10-V-07255-A1; 10-V-07265-A1; 10-V-07266-A1; 10-V-18027-A1; 12-HC-07092-A1; 12-V-01101-A1; 12-V-03419-A1; 12-V-03501-A1; 12-V03604-HA1; 12-V-03609-HA1; 12-V-03660-HA1; 12-V-03661-HA1; 12-V-03700-HA1; 12-V-03702-HA1; 12-V-18080-A1; 14-HC-18100-A1; 14-V-02101-A1; 14-V-18063-A1; 14-V-18090-A1; 16HC-07095-A1; 16-V-03546-A1; 16-V-03662-HA1; 1-HC-02071-A1; 1-HC-02072-A1; 1-HC-07352-A1; 1-V-03203-A1; 1-V-03205-A1; 1-V-03207-A1; 1-V-03514-B3; 1-V-03516-C3; 1-V-03635-C3; 1-V-03671-A1; 1-V-03754-B3; 1-V-03756-C3; 1-V-05095-C1; 1-V-18051-A1; 1-V-18058-A1; 20-NI-07017-A1; 20-V-18001-A1; 20-V-18065-A1; 24-V-18007-A1; 2-HC-02062-A1; 2-HC-02068-A1; 2-HC-03543HA3; 2-HW-01010-A2; 2-HW-02017-A2; 2-HW-07243-A2; 2-HW-22004-A2; 2-V-01030-A1; 2-V-02093-A1; 2-V-03148-A1; 2-V-03195-A1; 2-V-03197-A1; 2-V-03755-A1; 2-V-03758A1; 2-V-05054-A1; 2-V-05056-A2; 2-V-06007-A1; 2-V-06011-A1; 2-V-06037-A1; 2-V-06039-A1; 2-V-06047-A1; 2-V-06249-A1; 2-V-18029-A1; 2-V-18049-A1; 2-V-22145-HA1; 2-V-22147-HA1; 3V-01021-A1; 3-V-03193-A1; 3-V-03679-A1; 3-V-03822-A1; 8-V-05066-A1; 3-V-05068-A1; 3-V-18062-HA1; 3-V-18073-HA1; 3-V-22146-HA1; 4-AM-03606-A5A; 4-V-02043-A1; 4-V-02055-A1; 4V-02095-A1; 4-V-02099-A1; 4-V-02112-A1; 4-V-03199-A1; 4-V-03201-A1; 4-V-03217-A1; 4-V-03417-A1; 4-V-03510-A1; 4-V-03611-HA1; 4-V-03617-HA1; 4-V-03675-HA1; 4-V-03677-HA1; 4-V03817-A1; 4-V-05090-A1; 4-V-05111-A1; 4-V-06061-HA1; 4-V-06067-HA1; 4-V-06077-A1; 4-V-07252-A1; 4-V-18021-A1; 4-V-18058-A1; 4-V-18081-A1; 4-V-22142-HA1; 6-HC-07252-A1; 6-V01025-A1; 6-V-02041-A1; 6-V-02097-A1; 6-V-03156-A1; 6-V-03209-A1; 6-V-03606-HA1; 6-V-03643-A1; 6-V-03659-HA1; 6-V-03684-HA1; 6-V-03685-HA1; 6-V-05064-A1; 6-V-07602-HA1; 6-V22005-A1; 6-V-22040-A1; 6-V-22073-HA1; 6-V-22074-HA1; 6-V-22078-HA1; 6-V-22079-HA1; 8-HC-06058-A1; 8-V-01014-A1; 8-V-01015-A1; 8-V-03674-A1; 8-V-05058-A1; 8-V-06041-A1; 8-V06043-A1; 8-V-06066-HA1; 8-V-07263-A1; 8-V-07264-A1; 8-V-07315-A1

11 July 2011

Page 5 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-1801-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0401 Pipework to: PL-1801

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

14 18

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 OnLine 60 01/01/1995 31/12/1999 OnLine

DVI/01 UT/01

Line list: 16-V-04026-DO

11 July 2011

Page 6 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-1802 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-1802 Pipework to: PL-210

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 4

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

30 28/10/2009 28/10/2019 OnLine

Internal Corrosion

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

30 01/09/2004 01/09/2014 OnLine

UT/01

Line list: 4-HC-18009-A2; 2-HC-18011-A2; 3-HC-18010-A2; 4-HC-18008-A2

11 July 2011

Page 7 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-1803 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Pipework to: PK-1801

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 04/08/2009 04/08/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 15/09/2008 15/09/2013 OnLine

UT/01

Line list: 1-V-07180-A1; 1-V-07181-A1; 1-V-07182-A1; 1-V-07183-A1; 1-V-07184-A1; 1-V-07185-A1; 1-V-07199-A1; 1-V-07308-A1; 2-HC-05028-A2; 4-HC-02100-A1

11 July 2011

Page 8 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-1803-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Analyser AH-1 Pipework to: PL-1803

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/01/1995 31/12/1999 OnLine

Internal Corrosion

18

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 OnLine

UT/01

Line list: 2-HC-18041-DO

11 July 2011

Page 9 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-1805 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Pipework to: E-1801

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 18

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 04/08/2009 04/08/2014 OnLine

Internal Corrosion

18

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 OnLine

UT/01

Line list: 6-HC-07619-A30D; 4-V-07659-A30D; 4-V-07661-A30D; 2-V-07279-N0; 4-V-07596-HN0; 4-V-07108-N0; 4-V-07594-HN0; 4-V-07150-N0; 4-V-07592-HN0; 4-V-07106-N0; 1-V-07273-N0; 3-V07277-N0; 1-HC-18068-N0; 1-HC-18054-N0; 1-V-18067-N0; 1-V-18071-N0; 2-V-07144-N0; 1-V-18074-N0; 4-V-18039-N0; 1-V-07203-N0; 1-V-07204-N0; 0.75-HC-07720-A1; 0.75-HC-18061N0; 0.75-V-18072-N0; 0.75-V-18073-N0; 1.5-HC-07018-N0; 1.5-HC-07019-N0; 1.5-V-07492-HN0; 1.5-V-07493-HN0; 1.5-V-07512-HN0; 10-V-07140-N0; 10-V-18035-N0; 10-V-18037-N0; 16-V07257-N0; 1-NI-18033-N0; 1-NI-18057-N0; 1-V-07145-N0; 1-V-07202-N0; 2-HC-07146-N0; 2-HC-07205-N0; 2-HC-07558-HN0; 2-HC-07573-HN0; 2-HC-07574-HN0; 2-HC-07575-HN0; 2-HC18053-N0; 2-V-07033-N0; 2-V-07125-N0; 2-V-07126-N0; 2-V-07201-N0; 2-V-18002-N0; 2-V-18070-N0; 30-V-18028-N0; 3-V-07247-N0; 3-V-07563-HN0; 3-V-07565-HN0; 3-V-07584-HN0; 3-V18038-N0; 4-HC-18046-N0; 4-V-07598-N0; 4-V-07600-HN0; 4-V-18004-N0; 4-V-18036-N0; 4-V-18044-N0; 6-V-07107-N0; 6-V-07120-N0; 6-V-18012-N0; 8-V-07132-N0

11 July 2011

Page 10 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2003 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: PK-2001A/B Pipework to: PL-2003-1

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 16

Insp. Method Extent of Inspection CUI InspectionVisual 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 31/05/2014 Shutdown

External Deterioration Internal Corrosion

11 11

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 04/10/2009 03/10/2014 OnLine 12 01/01/1995 01/01/1996 OnLine

DVI/01 UT/01 Frequency changed by the ICP. the interval can be increase after 3 inspections.

Line list: 2-PA-21004-B1; 2-PA-21011-B1; 2-PA-21012-B1; 3-PA-21005-B1

11 July 2011

Page 11 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2003-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: PL-2003 Pipework to: E2101

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 11

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

120 01/01/1995 29/12/2004 Shutdown

External Deterioration
Internal Corrosion

11
25

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 OnLine


120 01/01/1995 29/12/2004 OnLine

DVI/01
UT/01

Line list: 2-PA-20013-E0; 2-PA-20014-E0

11 July 2011

Page 12 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-201-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: PL-103 Pipework to: D-0207

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/06/2009 30/05/2019 Online

External Deterioration
Internal Corrosion

15
19

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine


60 01/03/2010 01/03/2015 OnLine

DVI/01
UT/01

Line list: 6-LN-02311-D2

11 July 2011

Page 13 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-202 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0207 Pipework to: PL-212

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/06/2009 30/05/2019 Online

External Deterioration
Internal Corrosion

15
15

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine


60 01/03/2010 01/03/2015 OnLine

DVI/01
UT/01

Line list: 4-GN-02312-B2

11 July 2011

Page 14 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-203 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0207 Pipework to: F-0201

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/06/2009 30/05/2019 Online

External Deterioration Internal Corrosion

15 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine 60 01/03/2010 01/03/2015 OnLine

DVI/01 UT/01

Line list: 6-LN-02341-B2; 6-LN-02344-B2; 6-LN-02346-B2

11 July 2011

Page 15 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-205 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0208 Pipework to: PL-212

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 01/03/2010 01/03/2020 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/03/2010 01/03/2020 OnLine

UT/01

Line list: 2-HC-02003-B1; 3-GC-02363-B1; 3-GC-02364-B1; 3-GF-02362-B1

11 July 2011

Page 16 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-206 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0208 Pipework to: PL-206-1

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/03/2010 01/03/2015 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine

UT/01

Line list: 2-HC-02365-B1

11 July 2011

Page 17 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-206-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-206 Pipework to: T-0202

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/03/2010 01/03/2015 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine

UT/01

Line list: 3-LN-02350-A2; 4-LN-02366-A2

11 July 2011

Page 18 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-207-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: PL-203 Pipework to: T-0202

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/06/2009 30/05/2019 Online

External Deterioration
Internal Corrosion

18
22

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 01/03/2010 01/03/2020 OnLine


120 01/03/2010 01/03/2020 OnLine

DVI/01
UT/01

Line list: 8-LN-02347-B2

11 July 2011

Page 19 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-208 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: T-0202 Pipework to: E-0205

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 31/05/2014 OnLine

External Deterioration Internal Corrosion

19 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/06/2009 31/05/2014 OnLine 60 01/06/2009 31/05/2014 OnLine

DVI/01 UT/01

Line list: 4-HC-02023-A3; 6-HC-02354-A1

11 July 2011

Page 20 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-208-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: E-0205 Pipework to: E-0204

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection Profile RT 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments

External Deterioration Internal Corrosion

19 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine 60 01/03/2010 01/03/2015 OnLine

DVI/01 UT/01

Line list: 6-HC-02355-A1; 6-HC-02356-A1; 6-HC-02357-A1

11 July 2011

Page 21 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-209 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: T-0202 Pipework to: H-0203

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection Profile RT 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments

External Deterioration Internal Corrosion

19 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine 60 01/03/2010 01/03/2015 OnLine

DVI/01 UT/01

Line list: 10-HC-02349-A1; 8-HC-02351-B1; 8-HC-02352-B1

11 July 2011

Page 22 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-210 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: T-0202 Pipework to: H-0203

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

External Deterioration Internal Corrosion

19 19

VI-EXT UT - Offline

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine 60 01/06/2009 31/05/2014 OnLine

DVI/01 UT/01

Line list: 10-HC-02353-A1

11 July 2011

Page 23 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2101 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PK-2103 Pipework to: Plant air to dist header

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 22/10/2009 22/10/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 2-IA-21276-SO; 2-IA-21103-SO; 1-IA-21179-SO; 1.5-HW-21050-SO; 1.5-IA-07535-HSO; 1.5-IA-07538-HSO; 1.5-IA-21139-SO; 1.5-IA-21140-SO; 1-IA-01040-SO; 1-IA-20001-SO; 1-IA-20009-SO; 1IA-20024-SO; 1-IA-21043-SO; 1-IA-21044-SO; 1-IA-21090-SO; 1-IA-21095-SO; 1-IA-21138-SO; 1-IA-21148-SO; 1-IA-21158-SO; 1-IA-21159-SO; 1-IA-21162-SO; 1-IA-21189-SO; 1-IA-21190-SO; 1IA-21191-SO; 1-IA-21192-SO; 1-IA-21193-SO; 1-IA-21194-SO; 1-IA-21196-SO; 1-IA-21206-SO; 1-IA-21210-SO; 1-IA-21211-SO; 1-IA-21212-SO; 1-IA-21213-SO; 1-IA-21214-SO; 1-IA-21222-HSO; 1-IA-21248-SO; 1-IA-21249-SO; 1-IA-21250-SO; 1-IA-21251-SO; 2-IA-21300-SO; 1-IA-21311-SO; 2-IA-07546-HSO; 2-IA-21048-SO; 2-IA-21049-SO; 2-IA-21079-SO; 2-IA-21080-SO; 2-IA-21081SO; 2-IA-21089-SO; 2-IA-21091-SO; 2-IA-21092-SO; 2-IA-21093-SO; 2-IA-21094-SO; 2-IA-21098-SO; 2-IA-21099-SO; 2-IA-21125-SO; 2-IA-21126-SO; 2-IA-21128-SO; 2-IA-21146-SO; 2-IA-21147SO; 2-IA-21163-SO; 2-IA-21179-SO; 2-IA-21185-SO; 2-IA-21186-SO; 2-IA-21197-SO; 2-IA-21229-HSO; 2-IA-21230-SO; 2-IA-21235-A023; 2-IA-21243-SO; 2-IA-21244-SO; 2-IA-21260-SO; 2-IA21266-SO; 2-IA-21267-SO; 2-IA-21268-SO; 2-IA-21275-SO; 2-IA-21310-SO; 3-IA-21009-SO; 3-IA-21010-SO; 3-IA-21164-SO; 3-IA-21218-S0

11 July 2011

Page 24 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2102 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Pipework to: Plant air to dist header

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 13/04/2009 13/04/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 1-PA-21058-L1; 1-PA-21063-L1; 1-PA-21174-L1; 1-PA-21221-L1; 1.5-HW-21013-L1; 1.5-PA-21117-L1; 1.5-PA-21118-L1; 1-PA-21055-L1; 1-PA-21057-L1; 1-PA-21059-L1; 1-PA-21062-L1; 1-PA21065-L1; 1-PA-21068-L1; 1-PA-21069-L1; 1-PA-21070-L1; 1-PA-21073-L1; 1-PA-21075-L1; 1-PA-21076-L1; 1-PA-21078-L1; 1-PA-21096-L1; 1-PA-21097-L1; 1-PA-21110-L1; 1-PA-21112-L1; 1PA-21113-L1; 1-PA-21115-L1; 1-PA-21116-L1; 1-PA-21121-L1; 1-PA-21122-L1; 2-PA-21123-L1; 1-PA-21145-L1; 1-PA-21157-L1; 1-PA-21161-L1; 1-PA-21166-L1; 1-PA-21168-L1; 1-PA-21169-L1; 1-PA-21171-L1; 1-PA-21172-L1; 1-PA-21175-L1; 1-PA-21176-L1; 1-PA-21177-L1; 1-PA-21178-L1; 1-PA-21183-L1; 1-PA-21209-L1; 1-PA-21239-L1; 1-PA-21240-L1; 1-PA-21253-L1; 1-PA-21254L1; 1-PA-21255-L1; 1-PA-21304-L1; 2-PA-21001-L1; 2-PA-21052-L1; 2-PA-21053-L1; 2-PA-21056-L1; 2-PA-21060-L1; 2-PA-21061-L1; 2-PA-21064-L1; 2-PA-21067-L1; 2-PA-21074-L1; 2-PA21106-L1; 2-PA-21107-L1; 2-PA-21108-L1; 2-PA-21111-L1; 2-PA-21114-L1; 2-PA-21119-L1; 2-PA-21120-L1; 2-PA-21137-L1; 2-PA-21144-L1; 2-PA-21165-L1; 2-PA-21167-L1; 2-PA-21173-L1; 2PA-21228-HL1; 2-PA-21242-L1; 2-PA-21252-L1; 2-PA-21259-L1; 2-PA-21262-L1; 2-PA-21263-L1; 2-PA-21264-L1; 2-PA-21265-L1; 2-PA-21269-L1; 2-PA-21270-L1; 2-V-21002-L1; 3-PA-21006-L1; 3-PA-21007-L1; 3-PA-21051-L1; 3-PA-21066-L1; 3-PA-21070-L1; 3-PA-21071-L1; 3-PA-21182-L1; 3-V-21003-L1

11 July 2011

Page 25 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2103 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PK-2103 Pipework to: H P nitrogene to dist header

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 14/04/2009 14/04/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 1.5-NI-07533-HA1; 1.5-NI-07576-HA1; 1-NI-07534-HA1; 8-NI-07607-HA1; 8-NI-07608-HA1; 8-NI-07609-HA1; 3-V-07603-HA1; 1.5-NI-07536-HA1; 1-NI-07537-HA1; 1.5-NI-07577-HA1; 3-V07604-HA1; 1.5-NI-07539-HA1; 1-NI-07540-HA1; 1.5-NI-07578-HA1; 3-V-07605-HA1; 1-NI-18055-A1; 2-NI-03260-A1; 2-NI-03336-A1; 3-NI-03329-A1; 4-NI-03337-A1; 4-NI-03104-A2; 1.5-NI03101-A2; 1.5-NI-03102-A2; 1-NI-05037-A2; 1-NI-21305-A1; 2-NI-21306-A1; 1-NI-23167-A1; 1-NI-23168-A1; 1-NI-23169-A1; 1-NI-23170-A1; 1-NI-23171-A1; 1-V-23180-A1; 2-V-23181-A1; 1NI-01037-A1 ; 0.5-HW-21207-A1; 0.75-HW-21215-A1; 1.5-HW-21136-A1; 1.5-NI-21025-A1; 1.5-NI-21026-A1; 12-NI-03158-A1; 12-NI-03358-A1; 16-NI-07115-A1; 16-NI-07116-A1; 1-NI07533-HA1; 1-NI-07536-HA1; 1-NI-07539-HA1; 1-NI-18043-A1; 1-NI-18054-A1; 1-NI-18056-A1; 1-NI-18091-A1; 1-NI-21014-A1; 1-NI-21017-A1; 1-NI-21019-A1; 1-NI-21022-A1; 1-NI-21023A1; 1-NI-21024-A1; 1-NI-21030-A1; 1-NI-21031-A1; 1-NI-21032-A1; 1-NI-21033-A1; 1-NI-21034-A1; 1-NI-21035-A1; 1-NI-21045-A1; 1-NI-21134-A1; 1-NI-21141-A1; 1-NI-21150-A1; 1-NI21151-A1; 1-NI-21152-A1; 1-NI-21153-A1; 1-NI-21154-A1; 1-NI-21155-A1; 1-NI-21180-A1; 1-NI-21181-A1; 1-NI-21188-A1; 1-NI-21198-A1; 1-NI-21199-A1; 1-NI-21200-A1; 1-NI-21201-A1; 1NI-21202-A1; 1-NI-21203-A1; 1-NI-21205-A1; 1-NI-21220-A1; 1-NI-21256-A1; 1-NI-21257-A1; 1-NI-21258-A1; 1-NI-21301-A1; 1-NI-21303-A1; 20-NI-07013-A1; 20-NI-07510-HA1; 2-NI--03060A1; 2-NI-03136-A1; 2-NI-07562-HA1; 2-NI-21015-A1; 2-NI-21016-A1; 2-NI-21028-A1; 2-NI-21042-A1; 2-NI-21100-A1; 2-NI-21127-A1; 2-NI-21128-A1; 2-NI-21129-A1; 2-NI-21130-A1; 2-NI21131-A1; 2-NI-21132-A1; 2-NI-21133-A1; 2-NI-21135-A1; 2-NI-21143-A1; 2-NI-21149-A1; 2-NI-21160-A1; 2-NI-21195-A1; 2-NI-21217-A1; 2-NI-21245-A1; 2-NI-21246-A1; 2-NI-21247-A1; 2NI-21261-A1; 2-NI-21305-A1; 2-NI-27010-A1; 2-V-21208-A1; 3-NI-03129-A1; 3-NI-03816-A1; 3-NI-03817-A1; 3-NI-03891-A1; 3-NI-21020-A1; 3-V-25016-A2; 3-V-25017-A2; 4-NI-07014-A1; 4NI-21014-A1; 4-NI-21021-A1; 4-NI-21027-A1; 4-NI-21039-A1; 2-UT-35116-CS-; 0.5-UT-35330-SST-; 10-UT-35331-SST-; 10-UT-35332-SST-; 2-UT-35333-CS-

11 July 2011

Page 26 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-211 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: T-0202 Pipework to: PL-2204

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/06/2009 30/05/2019 Online

External Deterioration
Internal Corrosion

18
22

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 01/03/2010 01/03/2020 OnLine


120 01/03/2010 01/03/2020 OnLine

DVI/01
UT/01

Line list: 6-GN-02359-A2; 6-GN-02360-A2

11 July 2011

Page 27 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-212 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: PL-205/PL202 Pipework to: PL-2213

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/06/2009 30/05/2019 Online

External Deterioration
Internal Corrosion

15
15

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/03/2010 01/03/2015 OnLine


60 01/03/2010 01/03/2015 OnLine

DVI/01
UT/01

Line list: 4-GN-02370-B1

11 July 2011

Page 28 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2204 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: PL 207 Pipework to: D-1804

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

4 4

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

30 15/06/2009 14/12/2011 OnLine 12 14/01/2009 14/01/2010 OnLine

DVI/01 UT/01 Inspect annually for 3 years. Then detemine corrosion rate based on the 3 inspections.

Line list: 2-V-22148-HA3; 1-V-03111-A3; 1-V-03311-A3; 2-FG-22024-A3; 2-FG-22027-A3; 2-FG-22047-A3; 2-FG-22048-A3; 2-FG-22151-A3; 2-FG-22052-A3; 2-FG-22084-A3; 2-FG-22143-HA3; 2-FG35161-CS 150-; 2-FG-35164-CS 150-; 2-HC-22042-A3; 3-FG-22026-A3; 3-FG-22029-A3; 3-FG-22031-A3; 3-FG-22053-A3; 3-FG-22087-A3; 3-FG-22088-A3; 3-FG-22089-A3; 3-FG-22090-A3; 4-FG22019-A3; 4-FG-22021-A3; 4-FG-22025-A3; 4-FG-22049-A3; 6-FG-22068-A3; 4-FG-22069-A3; 4-FG-22085-A3; 4-FG-22086-A3; 4-FG-35161-CS 150-; 4-HC-22043-A3; 4-HC-22062-HA3; 4-HC22081-HA3; 6-FG-22014-A3; 6-FG-22023-A3; 6-FG-22071-HA3; 6-FG-22072-HA3; 6-FG-22076-HA3; 6-FG-22077-HA3; 6-FG-22083-HA3; 8-FG-22003-A3; 8-FG-22017-A3; 8-FG-22041-A3; 8-HC22001-A3; Unkn0wn size--35163--

11 July 2011

Page 29 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2213 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-606 Pipework to: TURBINE B

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 15/06/2009 15/06/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/10/2008 01/10/2013 OnLine

UT/01

Line list: 2-FG-22066-HA3; 2-FG-22144-HB3; 2-FG-22149-HA3; 2-FG-22154-HA3; 2-V-22150-HA3; 3-FG-22013-B3; 3-FG-22067-HB3; 3-V-22039-B3; 3-V-22055-B3; 4-FG-22015-B3; 4-FG-22016-B3; 4HC-22012-B3; 4-HC-22051-B3; 6-FG-22008-B3; 8-FG-22036-B3; 8-HC-22007-B3

11 July 2011

Page 30 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2213A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-2202 Pipework to: PL-203

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 4

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

30 15/06/2009 14/12/2011 OnLine

Internal Corrosion

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

30 14/01/2009 15/07/2011 OnLine

UT/01

Line list: 2-HC-22010-B3; 2-HC-22153-B3

11 July 2011

Page 31 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2221 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: H-2203 Pipework to: PK-1803

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection CUI InspectionVisual 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 31/05/2014 OnLine

Environmental Cracking External Deterioration


Internal Corrosion

15

Shear Wave UT VI-EXT


UT

Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.) 100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/01/2007 29/12/2016 Online

15
15

60 01/01/2007 31/12/2011 OnLine


60 01/06/2009 31/05/2014 OnLine

DVI/01
UT/01

Line list: 3-HC-22140-HB3-1"-H; 4-HC-22064-HC3-1"-H; 4-HC-22065-HB3-1"-H; 3-HC-22141-HB3; 3-HC-22082-HB3

11 July 2011

Page 32 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2301 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Water treating pakage Pipework to: TK-2302

Material: PP Exam Spec:


Freq. Last insp. (months) date

PP

Nace: Insulated (Y/N): Y

Insp. Priority 16

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 04/06/2009 04/06/2019 OnLine

Internal Corrosion

16

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

0 01/01/1995 01/01/1995 OnLine

UT/01

Line list: 4-TW-23024-G1; 4-TW-23016-G1; 3-TW-23110-HDPE; 2-TW-23252-G1; 2-TW-23200-G1; 2-TW-23131-G1; 2-TW-23091-G1; 2-TW-23060-G1; 1-V-23070-S0; 1-V-23068-S0; 1-TW-23165-G1; 1TW-23069-S0; 1-TW-23067-S0; 1-TW-23030-S0; 1-TW-23031-S0; 1-TW-23085-G1; 1-TW-23090-G1; 1-TW-23092-G1; 1-TW-23093-G1; 1-TW-23094-G1; 1-TW-23095-G1; 1-TW-23098-G1; 1TW-23099-G1; 1-TW-23101-G1; 1-TW-23105-G1; 1-TW-23106-G1; 1-TW-23107-G1; 1-TW-23109-G1; 1-TW-23117-HDPE; 1-TW-23118-HDPE; 1-TW-23126-G1; 1-TW-23127-G1; 1-TW-23189HDPE; 1-TW-23191-HDPE; 1-TW-23194-G1; 1-TW-23196-G1; 1-TW-23197-G1; 1-TW-23198-G1; 1-TW-23199-G1; 1-TW-23201-G1; 1-TW-23202-G1; 1-TW-23203-G1; 1-TW-23204-G1; 1-TW23205-G1; 1-TW-23220-G1; 1-TW-23221-G1; 1-TW-23222-G1; 1-TW-23223-G1; 1-TW-23229-G1; 1-TW-23230-G1; 1-TW-23235-G1; 1-TW-23273-HDPE; 1-TW-23279-S0; 1-TW-23280-S0; 1TW-23281-S0; 1-TW-23300-G1; 2-TW-23022-AL0; 2-TW-23029-HDPE; 2-TW-23033-HDPE; 2-TW-23050-D0; 2-TW-23064-G1; 2-TW-23084-G1; 2-TW-23097-G1; 2-TW-23100-G1; 2-TW-23102G1; 2-TW-23104-G1; 2-TW-23115-HDPE; 2-TW-23116-HDPE; 2-TW-23121-HDPE; 2-TW-23122-HDPE; 2-TW-23147-HDPE; 2-TW-23156-G1; 2-TW-23157-HDPE; 2-TW-23164-G1; 2-TW-23166G1; 2-TW-23195-G1; 2-TW-23209-H2; 2-TW-23219-G1; 2-TW-23226-HDPE; 2-TW-23236-HDPE; 2-TW-23239-G1; 2-TW-23251-HDPE; 2-TW-23253-G1; 2-TW-23275-HDPE; 2-TW-23278-S0; 2TW-23284-S0; 2-TW-23287-G1; 2-TW-23287-S0; 2-TW-23288-S0; 2-TW-23289-S0; 2-TW-23290-S0; 3-TW-23002-AL0; 3-TW-23015-HDPE; 3-TW-23016-HDPE; 3-TW-23021-G1; 3-TW-23021HDPE; 3-TW-23022-HDPE; 3-TW-23023-HDPE; 3-TW-23025-HDPE; 3-TW-23026-HDPE; 3-TW-23027-HDPE; 3-TW-23028-HDPE; 3-TW-23032-HDPE; 3-TW-23033-HDPE; 3-TW-23034-HDPE; 3TW-23087-HDPE; 3-TW-23103-HDPE; 3-TW-23110-HDPE; 3-TW-23111-HDPE; 3-TW-23112-HDPE; 3-TW-23113-HDPE; 3-TW-23185-HDPE; 3-TW-23228-HDPE; 3-TW-23247-HDPE; 4-TW23017-H2PE; 4-TW-23018-G1; 4-TW-23019-HDPE; 4-TW-23020-HDPE; 4-TW-23057-G1; 4-TW-23151-HDPE

11 July 2011

Page 33 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2302 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: TK-2304 Pipework to: Distribution

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 23

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 04/06/2009 04/06/2019 OnLine

Internal Corrosion

23

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 0.75-TW-23193-D0; 1-TW-23231-D0; 1-TW-23232-D0; 1-TW-23233-D0; 1-TW-23234-D0; 1-TW-23240-D0; 1-TW-23255-D0; 2-TW-03513-HF0; 2-TW-03633-HF0; 2-TW-03634-HF0; 2-TW03678-HF0; 2-TW-03693-HD0; 2-TW-03694-HD0; 2-TW-03695-HD0; 2-TW-03696-HD0; 3-TW-23051-D0; 2-TW-23054-D0; 2-TW-23055-D0; 2-TW-23063-D0; 2-TW-23075-D0; 2-TW-23076-D0; 2-TW-23077-D0; 2-TW-23079-D0; 2-TW-23096-D0; 2-TW-23108-D0; 2-TW-23125-D0; 2-TW-23150-D0; 2-TW-23210-D0; 2-TW-23254-HD0; 2-TW-23256-D0; 2-TW-23261-A023; 2-TW-23262A023; 2-TW-23277-ND0; 3-TW-23052-D0; 3-V-03680-HD0; 3-V-03681-HD0; 3-V-03682-HD0; 3-V-03683-HD0; 2-TW-03054-D0; 2-TW-23159-D0; 2-TW-23001-D0; 1-TW-03897-D0; 1-TW20002-D0; 1-TW-20010-D0; 1-TW-23124-D0; 1-TW-23192-D0

11 July 2011

Page 34 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2303 Const Code : ASME B31.3 Inspection plan Damage mechanisms External Deterioration Internal Corrosion Pipework from: SEA Pipework to: Water treating pakage / TK 2301 Material: HDPE Exam Spec: PE3408 Nace: Insulated (Y/N): N

Insp. Priority 23 23

Insp. Method Extent of Inspection VI-EXT UT 100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

Freq. Last insp. (months) date

Next insp. Due date

Availability Guideline Comments DVI/01 UT/01

120 04/06/2009 04/06/2009 OnLine 0 01/01/1995 01/01/1995 OnLine

Line list: 10-SW-23132-H2PE; 10-SW-23133-H2; 12-SW-23011-H2; 1-SW-23013-H2; 1-SW-23272-H2; 4-SW-23128-H2; 4-SW-23238-H2; 4-SW-23248-G1; 6-SW-23007-H2; 6-SW-23008-H2; 6-SW23009-H2; 6-SW-23010-H2; 8-SW-23006-H2; 8-SW-23134-HDPE; 8-SW-23237-H2; 8-SW-23241-H2; 8-SW-23242-H2; 8-SW-23243-H2; 8-SW-23135-HDPE; 8-SW-23016-H2; 2-SW-23208-H2; 2SW-23245-H2; 3-SW-23246-H2; 1-SW-23271-H2

11 July 2011

Page 35 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2401 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: TK-2302 Pipework to: LOOP

Material: HDPE Exam Spec:


Freq. Last insp. (months) date

PE3408

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 02/11/2009 02/11/2014 OnLine

Internal Corrosion

18

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 26/11/2008 26/11/2013 OnLine

UT/01

Line list: 1.5-FW-24069-G1; 10-FW-24005-G1; 10-FW-24059-G1; 12-FW-24001-G1; 12-FW-24002-G1; 12-FW-24008-G1; 12-FW-24009-G1; 12-FW-24010-G1; 12-FW-24011-G1; 12-FW-24016-G1; 12TW-23066-G1; 1-FW-24036-G1; 1-V-24037-G1; 1-V-24064-G1; 2-FW-24067-G1; 3-FW-24007-G1; 3-FW-24032-G1; 3-TW-23019-G1; 4-FW-24003-G1; 4-FW-24006-G1; 4-FW-24015-G1; 4-FW24017-G1; 4-FW-24021-G1; 4-FW-24022-G1; 4-FW-24025-G1; 4-FW-24029-G1; 4-FW-24034-G1; 4-FW-24041-G1; 4-FW-24042-G1; 4-FW-24044-G1; 4-FW-24045-G1; 4-FW-24047-G1; 4-FW24048-G1; 4-FW-24051-G1; 4-FW-24055-G1; 4-FW-24058-G1; 4-FW-24072-G1; 4-FW-24073-G1; 4-FW-24075-G1; 4-FW-24076-G1; 4-FW-24103-G1; 4-FW-24104-G1; 4-FW-24105-G1; 4-FW24106-G1; 6-FW-24013-G1; 6-FW-24014-G1; 6-FW-24018-G1; 6-FW-24019-G1; 6-FW-24020-G1; 6-FW-24023-G1; 6-FW-24024-G1; 6-FW-24026-G1; 6-FW-24028-G1; 6-FW-24030-G1; 6-FW24031-G1; 6-FW-24035-G1; 6-FW-24038-G1; 6-FW-24050-G1; 6-FW-24054-G1; 6-FW-24056-G1; 6-FW-24057-G1; 6-FW-24063-G1; 6-FW-24100-HSO; 6-V-24065-G1; 8-FW-24060-G1; 2-FW24012-G1; 2-FW-24033-G1; 1-FW-24068-G1; 10-FW-24004-G1; 6-FW-24071-G1; 4-FW-24052-G1

11 July 2011

Page 36 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2501-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Pipework to: D-2501

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 24

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 04/07/2009 02/07/2019 OnLine

Internal Corrosion

24

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 29/12/2004 OnLine

UT/01

Line list: 1-AM-03528-HD0; 1-AM-03685-HD0; 0.75-AM-03523-HD0; 0.75-AM-03520-HD0; 0.75-AM-03524-HD0; 1.5-AM-03076-HD0; 1.5-AM-03157-D0; 1.5-AM-03547-HD0; 1.5-AM-03576-HD0; 1AM-03139-D0; 1-AM-03141-D0; 1-AM-03183-D0; 1-AM-03184-D0; 1-AM-03185-D0; 1-AM-03188-D0; 1-AM-03189-D0; 1-AM-03341-D0; 1-AM-03383-D0; 1-AM-03384-D0; 1-AM-03385-D0; 1AM-03388-D0; 1-AM-03389-D0; 1-AM-03533-HD0; 1-AM-03620-HD0; 1-AM-03624-HD0; 2-AM-03063-D0; 2-AM-03072-D0; 2-AM-03114-D0; 2-AM-03115-D0; 2-AM-03116-D0; 2-AM-03127D0; 2-AM-03140-D0; 2-AM-03142-D0; 2-AM-03186-D0; 2-AM-03187-D0; 2-AM-03190-D0; 2-AM-03263-D0; 2-AM-03272-D0; 2-AM-03327-D0; 2-AM-03340-D0; 2-AM-03342-D0; 2-AM-03386D0; 2-AM-03387-D0; 2-AM-03390-D0; 4-AM-03182-D0; 4-AM-03382-ND0

11 July 2011

Page 37 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2501A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Pipework to: D-2501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 17

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 07/04/2009 06/04/2014 OnLine

Internal Corrosion

17

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 05/09/2008 04/09/2013 OnLine

UT/01

Line list: 1.5-AM-03295-A2; 1.5-AM-03495-A2; 1-AM-03171-A2; 1-AM-03172-A2; 1-AM-03612-A2; 1-AM-03668-HA2; 1-AM-03669-HA2; 2-AM-03173-A2; 1-AM-03319-A2; 1-AM-03173-A2; 1-AM03174-A2; 2-AM-03175-A2; 1-AM-03176-A2; 1-AM-03177-A2; 1-AM-03178-A2; 1-AM-03179-A2; 1-AM-03180-A2; 1-AM-03750-HA2; 2-AM-03112-A2; 2-AM-03113-A2; 2-AM-03165-A2; 2AM-03169-A2; 2-AM-03170-A2; 2-AM-03181-A2; 2-AM-04008-A2; 3-AM-25042-A2; 3-AM-25047-A2; 4-AM-25012-A2

11 July 2011

Page 38 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2501U Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Amine sumps Pipework to:

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 17

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/01/1995 31/12/1999

Internal Corrosion

17

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 OnLine

UT/01

ICP recommends that BGT should ensure the external condition of the wrapping is effective, otherwise a CP system should be installed."

Line list: 6-AM-25036-A2; 6-AM-25018-A2; 6-AM-25009-A2; 6-AM-25007-A2; 6-AM-25003-A2; 6-AM-25001-A2; 6-AM-20624-A2; 4-AM-25046-HA2; 4-AM-25040-A2; 4-AM-25037-A2; 4-AM-25035A2; 4-AM-25034-A2; 4-AM-25010-A2; 4-AM-25004-A2; 3-AM-25011-A2; 2-AM-25043-A2

11 July 2011

Page 39 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2502A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: glycol sumps Pipework to: TK-2501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 11

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 08/04/2009 07/04/2014 OnLine

Internal Corrosion

11

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category.

0 25/12/2008 25/12/2008 OnLine

UT/01

Line list: 0.5-V-05086-A1; 0.5-V-05087-A1; 0.75-GL-05101-A2; 0.75-GL-05102-A1; 1-HC-05063-A1; 1-HC-05077-A1; 1-HC-05078-A1; 1-HC-05083-A1; 1-HC-05084-A1; 1-V-05060-A2; 1-V-05062-A2; 1-V05074-A2; 1-V-05075-A2; 1-V-05097-HA1; 6-GL-05069-A2; 2-GL-05089-A2; 2-HW-25023-A2; 2-HW-25041-A2; 2-V-05096-HA1; 4-V-25027-A2; 4-V-25028-A2; 4-V-25033-A2

11 July 2011

Page 40 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2502U Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: glycol sumps Pipework to:

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 11

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/01/1995 31/12/1999 OnLine

Internal Corrosion

11

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

0 01/01/1995 01/01/1995 OnLine

UT/01

ICP recommends that BGT should ensure the external condition of the wrapping is effective, otherwise a CP system should be installed."

Line list: 6-HW-25026-A2; 6-HW-25025-A2; 6-HW-25022-A2; 6-HW-25021-A2; 6-HW-25020-A2; 6-HW-25019-A2; 6-HC-25032-A2; 4-HW-25044-A2; 4-HW-25024-A2; 4-HC-25031-A2; 4-HC-25029-A2

11 July 2011

Page 41 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2701 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Pipework to: PL-2702

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 11

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 21/05/2009 20/05/2014 OnLine

Internal Corrosion

11

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 14/11/2008 13/11/2013 OnLine

UT/01

Line list: 2-HW-06009-C1; 1-HW-05026-A2; 1-HW-27015-A2; 2-AM-25038-A2; 2-HC-03118-A2; 2-HC-03318-A2; 2-HW-06010-A1; 2-HW-06054-A1; 2-HW-06055-A1; 2-HW-27014-A2; 3-HC-18031-A2

11 July 2011

Page 42 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-2702 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: waste water drains Pipework to: TK-2701

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 23

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 21/05/2009 21/05/2019 OnLine

Internal Corrosion

23

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 1-HW-23158-D0; 1-CD-35114-SST-; 1-CD-35115-SST-; 1-CD-35119-SST-; 1-CD-35120-SST-; 1-HW-23254-D0; 1-HW-27003-D0; 1-HW-27004-D0; 1-HW-27005-D0; 2-HW-03734-D0; 2-HW04011-D0; 2-HW-23149-D0; 2-HW-27001-D0; 2-HW-27002-D0; 2-HW-27006-D0; 2-HW-27007-D0; 3-HW-27008-D0; 3-HW-27009-D0

11 July 2011

Page 43 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-301A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0301 Pipework to: PL-0103

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

4 4

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 50% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine 12 01/01/1995 01/01/1996 OnLine

DVI/01 UT/01 Frequency changed by the ICP. the interval can be increase after 3 inspections.

Line list: 2-HC-03003-C3; 2-HC03004-B3

11 July 2011

Page 44 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-302 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: E-0301 Pipework to: F-0301

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

6 6

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 02/02/2009 01/02/2014 OnLine 12 03/10/2008 03/10/2009 OnLine

DVI/01 UT/01 Frequency changed by the ICP. the interval can be increase after 3 inspections.

Line list: 16-HC-03006-C3; 4-V-03155-C3; 2-V-03196-C3; 16-HC-03751-C3; 3-V-03824-C3; 2-PG-03838-C3; 16-HC-03752-C3; 2-HC-03765-B3; 2-HC-03753-B3; 2-HC-03152-B3; 2-HC-03153-B3

11 July 2011

Page 45 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-302A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: HC-03025 Pipework to: T-0301A

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

2 2

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 02/04/2009 01/10/2011 OnLine 12 22/10/2008 22/10/2009 OnLine

DVI/01 UT/01 Original frq is 0. it 's recommended from the ICP to Inspect annually for 3 years. Then detemine corrosion rate based on the 3 inspections.

Line list: 12-HC-03026-C3

11 July 2011

Page 46 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-302B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: HC-03025 Pipework to: T-301B

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

2 2

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 02/04/2009 02/04/2009 OnLine 12 25/10/2008 25/10/2008 OnLine

DVI/01 UT/01 Original frq is 0. it 's recommended from the ICP to Inspect annually for 3 years. Then detemine corrosion rate based on the 3 inspections.

Line list: 12-HC-03027-C3; 16-HC-03025-C3

11 July 2011

Page 47 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-303 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: HC-03019 Pipework to: E-0301

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

6 6

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 02/08/2009 01/08/2014 OnLine 60 21/10/2008 20/10/2013 OnLine

DVI/01 UT/01

Line list: 16-HC-03007-C1

11 July 2011

Page 48 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-303-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: E-0301 shell Pipework to: D-0302

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

9 15

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 02/08/2009 01/08/2014 OnLine 60 10/10/2008 09/10/2013 OnLine

DVI/01 UT/01

Line list: 16-HC-03008-C1

11 July 2011

Page 49 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-303A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: T-0301A Pipework to: HC-03007

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

6 6

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 17/02/2009 16/02/2014 OnLine 60 21/10/2008 20/10/2013 OnLine

DVI/01 UT/01

Line list: 2-V-03198-C1; 12-HC-03018-C1

11 July 2011

Page 50 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-303B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: T-0301B Pipework to: HC-03007

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

9 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 17/02/2009 16/02/2014 OnLine 60 15/10/2008 14/10/2013 OnLine

DVI/01 UT/01

Line list: 2-V-03200-C1; 12-HC-03019-C1

11 July 2011

Page 51 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-304 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: Pipework to: F-0501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

9 15

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 16/02/2009 15/02/2014 OnLine 60 11/09/2008 10/09/2013 OnLine

DVI/01 UT/01

Line list: 16-HC-03009-C1; 1.5-V-03194-C1; 16-HC-05001-C1; 1-V-05053-C1; 2-AM-05002-C2; 2-AM-05003-C2; 12-HC-05049-C1

11 July 2011

Page 52 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-304-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: F-0501 Pipework to: PL-306A

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 OnLine

External Deterioration Internal Corrosion

8 14

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 OnLine 60 01/08/2008 31/07/2013 OnLine

DVI/01 UT/01

Line list: 2-AM-HC-05005-A2; 2-AM-HC-05004-A2; 2-AM-03575-HA2

11 July 2011

Page 53 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-306A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: T-0301A Pipework to: D-0303A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 9

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

120 01/01/2003 29/12/2012 Shutdown

External Deterioration
Internal Corrosion

6
6

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/06/2009 31/05/2014 OnLine


47 01/01/2003 12/12/2006 OnLine

DVI/01
UT/01

Line list: 12-AM-03028-F0; 12-AM-03030-D0; 12-AM-03541-HD0; 6-HC-03655-HDO; 16-V-03656-HDO; 6-V-03658-HDO; 2-AM-03597-HDO; 2-AM-03697-HDO; 12-V-03699-HDO; 12-V-03663-HDO

11 July 2011

Page 54 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-306B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: T-0301A Pipework to: D-0303A/B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 9

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

120 01/01/2003 29/12/2012 Shutdown

External Deterioration
Internal Corrosion

9
15

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/2003 31/12/2007 OnLine


60 04/09/2008 03/09/2013 OnLine

DVI/01
UT/01

Line list: 12-AM-03029-F0; 12-AM-03031-DO; 12-AM-03552-HD0; 12-V-03664-HDO; 12-V-03701-HDO; 16-AM-03032-DO; 16-V-03608-HDO; 2-AM-03698-HDO; 6-HC-03655A-HDO; 6-V-03607-HDO

11 July 2011

Page 55 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-307 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0303A/B Pipework to: D-2201

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y Y

Insp. Priority 18

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

120 01/01/2003 29/12/2012 Online

External Deterioration
Internal Corrosion

4
4

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 50% of Potential locations by Location Category.

60 16/02/2009 16/02/2009 OnLine


0 19/11/2008 19/11/2008 OnLine

DVI/01
UT/01

Line list: 2-HC-18074-HA3; 2-V-18075-HA3; 4-FG-18076-HA3; 6-FG-03654-HA3; 6-FG-22070-HA3; 8-FG-03545-HA3

11 July 2011

Page 56 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-308 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-03003A/B Pipework to: F-0302A/B/C

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 2

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

2
6

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine


60 01/01/1995 31/12/1999 OnLine

DVI/01
UT/01

Line list: 1.5-AM-03690-HDO; 16-AM-03034-D0; 16-AM-03542-HD0; 8-AM-03150-D0; 1.5-AM-03157-D0; 10-AM-03036-D0; 10-AM-03039-D0; 10-AM-03037-D0; 10-AM-03040-D0; 10-AM-03038-D0; 10-AM-03041-D0; 1-V-03202-D0; 1-V-03204-D0; 1-V-03206-D0; 16-AM-03042-D0; 24-AM-03653-HD0; 4-AM-03689-HD0; 1.5-AM-03691-HDO

11 July 2011

Page 57 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-308A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: Pipework to: AM-03244

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 2

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

2
6

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/09/2006 01/03/2009 OnLine


60 01/01/1995 31/12/1999 OnLine

DVI/01
UT/01

Line list: 12-AM-03044-D0; 1-AM-03135-A2; 1-AM-03211-A2; 1-AM-03192-DO; 12-AM-03529-HD0; 1-AM-03684-HD0; 4-AM-03610-HD0; 0.75-AM-03519-HD0; 4-AM-03674-HD0; 0.75-AM-03670-HD0

11 July 2011

Page 58 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-308B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0303A/B Pipework to: E-0302B/D

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 9

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

120 01/01/2003 29/12/2012 Shutdown

External Deterioration
Internal Corrosion

6
9

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60

OnLine

DVI/01
UT/01

60 01/01/2003 31/12/2007 OnLine

Line list: 0.75-AM-03523-HD0; 0.75-AM-03671-HD0; 12-AM-03244-D0; 12-AM-03534-HD0; 1-AM-03335-A2; 1-AM-03411-A2; 1-AM-03392-D0; 4-AM-03616-HD0; 1-AM-03685-HD0; 4-AM-03676HD0; 0.75-AM-03523-HD0

11 July 2011

Page 59 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-309 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: TK-0302 Pipework to: P-0303A/B/C/D

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 4

Insp. Method Extent of Inspection Shear Wave UT Scan 100% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

60 01/01/1995 31/12/1999 Online

External Deterioration Internal Corrosion

4 8

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category.

30 26/10/2009 25/04/2012 OnLine 60 01/09/2008 31/08/2013 OnLine

DVI/01 UT/01

Line list: 1.5-AM-03896-A2; 10-AM-03123-A2; 16-AM-03074-A2; 16-AM-03075-A2; 16-AM-03076-A2; 16-AM-03120-A2; 16-AM-03517-HA2; 16-AM-03601-A2; 16-AM-03605-A2; 18-AM-03073-A2; 1AM-03132-A2; 1-AM-03133-A2; 1-AM-03511-A2; 1-AM-03512-A2; 3-AM-03099-A2; 2-AM-03700-A2; 1-AM-03614-HA2; 1-V-03222-A2; 1-V-03223-A2; 1-V-03224-A2; 1-V-03225-A2; 1-V03226-A2; 1-V-03227-A2; 1-V-03613-A2; 1-V-03615-HA2; 2-AM-03126-A2; 2-AM-03151-A2; 2-AM-03296-D0; 2-AM-03676-A2; 2-AM-03708-A023; 2-AM-03709-A023; 2-AM-03710-A023; 2AM-03711-A023; 2-AM-03712-A023; 2-AM-03713-A023; 2-AM-O3699-A2; 3-AM-03083-A2; 3-AM-03084-A2; 3-AM-03085-A2; 3-AM-03089-A2; 3-AM-03090-A2; 3-AM-03091-A2; 3-AM03100-A2; 3-AM-03231-A2; 3-AM-03628-A2; 3-AM-03673-A2; 3-AM-03686-HA2; 3-AM-03687-HA2; 3-AM-03688-HA2; 3-AM-03703-HA2; 4-AM-03097-A2; 4-AM-03098-A2; 4-AM-03131-A2; 6-AM-03081-A2; 6-AM-03082-A2; 6-AM-03095-A2; 6-AM-03096-A2; 6-AM-03121-A2; 6-AM-03122-A2; 6-AM-03154-A2; 6-AM-03516-HA2; 6-AM-03544-HA2; 6-AM-03651-HA2; 6-AM-03652HA2; 6-AM-03665-HA2; 6-AM-03666-HA2; 6-AM-03667-HA2

11 July 2011

Page 60 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-309-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: P-0303A/B/C/D Pipework to: P-0304A/B/C/D

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 26/10/2009 26/10/2014 OnLine

Internal Corrosion

18

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 02/09/2008 02/09/2013 OnLine

UT/01

Line list: 10-AM-03077-HD0; 10-AM-03078-HD0; 10-AM-03079-HD0; 10-AM-03518-HD0; 12-AM-03068-HD0; 12-AM-03069-HD0; 12-AM-03070-HD0; 12-AM-03514-HD0; 16-AM-03071-HD0

11 July 2011

Page 61 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-310 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: AM-03065 Pipework to: AM-03023

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

14 22

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 02/04/2009 01/04/2014 OnLine 120 01/01/1995 29/12/2004 OnLine

DVI/01 UT/01

Line list: 10-AM-03065-HF0; 10-AM-03066-HF0; 10-AM-03515-HF0; 10-AM-03067-HF0; 16-AM-03022-HF0

11 July 2011

Page 62 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-310A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: AM-03022 Pipework to: T-0301A

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

14 22

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 19/05/2009 18/05/2014 OnLine 120 09/10/2008 07/10/2018 OnLine

DVI/01 UT/01

Line list: 12-AM-03023-C2

11 July 2011

Page 63 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-310B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: AM-03022 Pipework to: T-0301B

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

14 22

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 19/05/2009 18/05/2014 OnLine 120 09/10/2008 07/10/2018 OnLine

DVI/01 UT/01

Line list: 12-AM-03024-C2

11 July 2011

Page 64 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-311 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: E-0305 Pipework to: E-0301

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N):

Y N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

6 9

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 50% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 13/02/2009 12/02/2014 OnLine 60 04/09/2008 03/09/2013 OnLine

DVI/01 UT/01

Line list: 16-HC-03002-C3

11 July 2011

Page 65 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-312A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: E-0302A Pipework to: T-0302A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 9

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

120 01/01/2003 29/12/2012 Shutdown

External Deterioration
Internal Corrosion

6
9

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/2003 31/12/2007 OnLine


60 01/01/2003 31/12/2007 OnLine

DVI/01
UT/01

Line list: 18-AM-03045-HD0; 20-AM-03766-ND0; 12-AM-03527-HD0; 16-AM-03831-NDO

11 July 2011

Page 66 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-312B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: E-0302D/B Pipework to: T-0302B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 9

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

120 01/01/2003 29/12/2012 Shutdown

External Deterioration
Internal Corrosion

6
9

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/2003 31/12/2007 OnLine


60 01/01/2003 31/12/2007 OnLine

DVI/01
UT/01

Line list: 12-AM-03532-HD0; 18-AM-03245-ND0; 16-AM-03833-ND0; 20-AM-03744-ND0

11 July 2011

Page 67 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-313A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: AM-03059 Pipework to: H-0301A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 4

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

4
18

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine


60 01/01/1995 31/12/1999 OnLine

DVI/01
UT/01

Line list: 12-AM-03892-NDO; 18-AM-03059-D0; 12-AM-03056-D0; 12-AM-03057-D0; 12-AM-03619-HD0; 12-AM-03058-D0; 12-AM-03061-D0; 12-AM-03106-D0; 14-AM-03783-ND0; 2-AM-03840ND0; 12-AM-03531-ND0

11 July 2011

Page 68 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-313B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: P-0301D/E/F/H Pipework to: H-0301B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 4

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

4
18

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine


60 01/01/1995 31/12/1999 OnLine

DVI/01
UT/01

Line list: 6"-AM-03794-ND0; 6"-AM-03795-ND0; 12-AM-03256-D0; 12-AM-03257-D0; 12-AM-03258-D0; 12-AM-03261-D0; 12-AM-03306-D0; 12-AM-03536-HD0; 12-AM-03623-HD0; 12-AM-03893ND0; 14-AM-03785-ND0; 18-AM-03259-D0; 2-AM-03841-ND0

11 July 2011

Page 69 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-317A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0302A/C Pipework to: E-0304A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 14

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 18/02/2009 17/02/2014 OnLine

External Stress Corrosion Cracking


Internal Corrosion

14
18

Remove ins and dye pen


UT

External Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 Shutdown


60 01/01/1995 31/12/1999 OnLine

DP/01
UT/01

Line list: 12-AM-03062-HD0; 12-AM-03530-HD0; 1-AM-03134-HD0; 1-AM-03210-HD0; 8-AM-03086-D0; 8-AM-03087-D0; 8-AM-03088-D0

11 July 2011

Page 70 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-317B Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0302B/D Pipework to: E-0304B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 14

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 02/10/2009 01/10/2014 OnLine

External Stress Corrosion Cracking


Internal Corrosion

14
18

Remove ins and dye pen


UT

External Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 Shutdown


60 01/01/1995 31/12/1999 OnLine

DP/01
UT/01

Line list: 12-AM-03262-HD0; 12-AM-03535-HD0; 1-AM-03334-HD0; 1-AM-03410-HD0; 8-AM-03286-D0; 8-AM-03287-D0; 8-AM-03288-D0

11 July 2011

Page 71 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-318A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0304A Pipework to: PK-1801

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 21

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 02/03/2009 28/02/2019 OnLine

Internal Corrosion

21

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

120 01/01/1995 29/12/2004 OnLine

UT/01

Line list: 12-AG-03506-D0; 16-AG-03125-D0; 4-V-03214-D0; 4-V-03215-D0

11 July 2011

Page 72 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-318B Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0304B Pipework to: PL-318A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 21

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 02/02/2009 31/01/2019 OnLine

Internal Corrosion

21

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

120 01/01/1995 29/12/2004 OnLine

UT/01

Line list: 12-AG-03506-D0; 16-AG-03325-D0; 4-V-03414-D0; 4-V-03415-D0

11 July 2011

Page 73 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-319A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: PL-319A-1 Pipework to: PL-309

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 4

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

60 01/01/1995 31/12/1999 Online

External Deterioration
Internal Corrosion

4
18

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

30 18/02/2009 19/08/2011 OnLine


60 09/05/2008 08/05/2013 OnLine

DVI/01
UT/01

Line list: 12-AM-03119-A2

11 July 2011

Page 74 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-319A-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0304A Pipework to: PL-319A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 20/02/2009 20/02/2014 OnLine

Internal Corrosion

18

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 OnLine

UT/01

Line list: 8-AM-03092-D0; 8-AM-03093-D0; 8-AM-03094-D0

11 July 2011

Page 75 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-319B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: PL-319B-1 Pipework to: PL-309

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 4

Insp. Method Extent of Inspection Shear Wave UT Scan 50% of potential locations defined in the corrosion study.

Next insp. Due date

Availability Guideline Comments

60 01/01/1995 31/12/1999 Online

External Deterioration
Internal Corrosion

4
14

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

30 20/02/2009 21/08/2011 OnLine


60 09/05/2008 08/05/2013 OnLine

DVI/01
UT/01

Line list: 2-AM-03381-A2; 12-AM-03319-A2

11 July 2011

Page 76 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-319B-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0304B Pipework to: PL-319B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 18

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 20/02/2009 20/02/2014 OnLine

Internal Corrosion

18

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 OnLine

UT/01

Line list: 8-AM-03292-D0; 8-AM-03293-D0; 8-AM-03294-D0

11 July 2011

Page 77 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-320 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0302 Pipework to: PL-306A

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 11

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 19/10/2009 18/10/2014 OnLine

Internal Corrosion

11

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 05/09/2008 04/09/2013 OnLine

UT/01

Line list: 2-HW-03014-A2; 2-HC-03631-C2; 2-HW-03015-A2; 2-HW-03657-HA2

11 July 2011

Page 78 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-321A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-0302A Pipework to: E-0303A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 8

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 02/03/2009 01/03/2014 OnLine

External Stress Corrosion Cracking


Internal Corrosion

14
14

Remove ins and dye pen


UT

External Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 Shutdown


60 01/01/1995 31/12/1999 OnLine

DP/01
UT/01

Line list: 24-AG-03046-D0; 16-AG-03160-D0; 16-AG-03159-D0; 16-AG-03161-D0; 24-AG-03769-D0; 14-V-03767-ND0; 12-V-03818-ND0; 10-V-03819-NDO; 12-V-03768-NDO; 10-V-03213-D0

11 July 2011

Page 79 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-321A-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-0302A Pipework to: D-0304A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 02/03/2009 28/02/2019 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/01/1995 29/12/2004 OnLine

UT/01

Line list: 12-AG-03162-D0; 12-AG-03163-D0; 12-AG-03164-D0; 20-AG-03047-D0

11 July 2011

Page 80 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-321B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: T-0302B Pipework to: E-0303B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 4

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

4
22

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine


120 01/01/1995 29/12/2004 OnLine

DVI/01
UT/01

Line list: 10-V-03413-DO; 10-V-03821-NDO; 12-V-03776-NDO; 12-V-03820-ND0; 14-V-03775-ND0; 16-AG-03359-D0; 16-AG-03360-D0; 16-AG-03361-D0; 20-AG-03247-D0; 24-AG-03246-D0; 24-AG03777-ND0

11 July 2011

Page 81 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-321B-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0303B Pipework to: D-0304B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 02/03/2009 02/03/2019 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 12-AG-03362-D0; 12-AG-03363-D0; 12-AG-03364-D0

11 July 2011

Page 82 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-324A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: T-0302A Pipework to: AM-03056

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 4

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

4
4

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 50% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine


0 01/01/1995 01/01/1995 OnLine

DVI/01
UT/01

Line list: 20-AM-03052-D0; 20-AM-03773-ND0; 4-AM-031772-ND0; 16-AM-03053-D0; 16-AM-03054-D0; 16-AM-03618-HD0; 16-AM-03055-D0; 1-V-03228-D0; 1-V-03229-D0; 1-V-03230-D0; 1-V03621-HD0

11 July 2011

Page 83 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-324B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: P-0301D/E/F/H Pipework to: T-0302B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 4

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

4
8

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine


60 01/01/1995 31/12/1999 OnLine

DVI/01
UT/01

Line list: 16-AM-03253-D0; 16-AM-03254-D0; 16-AM-03255-D0; 16-AM-03622-HD0; 1-V-03428-D0; 1-V-03429-D0; 1-V-03430-D0; 1-V-03627-HD0; 20-AM-03252-D0; 20-AM-03781-ND0; 4-AM033780-ND0

11 July 2011

Page 84 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-330A Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: H-0301A Pipework to: T-0302A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 2

Insp. Method Extent of Inspection Remove ins and dye pen Chloride Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/01/1995 31/12/1999 Shutdown

External Deterioration
Internal Corrosion

2
19

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

30 01/01/1995 01/07/1997 OnLine


60 01/01/1995 31/12/1999 OnLine

DVI/01
UT/01

Line list: 24-AM-03108-D0; 3-V-03216-D0; 36-AM-03064-D0; 24-AM-03782-ND0; 10-AM-03790-ND0; 10-AM-03791-ND0; 36-AM-03771-ND0

11 July 2011

Page 85 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-330B Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: H-0301B Pipework to: T-0302B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 9

Insp. Method Extent of Inspection Remove ins and dye pen Change External SCC to Chloride SCC

Next insp. Due date

Availability Guideline Comments DP/01

120 01/01/2003 29/12/2012 Shutdown

External Deterioration
Internal Corrosion

9
19

VI-EXT
UT

100% Coverage
Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/2003 31/12/2007 OnLine


60 01/01/2003 31/12/2007 OnLine

DVI/01
UT/01

Line list: 10-AM-03792-ND0; 10-AM-03793-ND0; 24-AM-03308-D0; 24-AM-03784-ND0; 36-AM-03266-ND0; 36-AM-03779-ND0; 3-V-03416-D0

11 July 2011

Page 86 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-332A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0304A Pipework to: T-0302A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 11

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 02/03/2009 02/03/2019 OnLine

Internal Corrosion

11

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 3-HW-03050-D0; 3-HW-03051-D0; 3-HW-03770-D0; 4-HW-03048-D0; 4-HW-03049-D0

11 July 2011

Page 87 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-332B Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0304B Pipework to: T-0302B

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 11

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 02/02/2009 02/02/2019 OnLine

Internal Corrosion

11

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category.

120 01/01/1995 01/01/2005 OnLine

UT/01

Line list: 3-HW-03250-D0; 3-HW-03251-D0; 3-HW-03778-ND0; 4-HW-03248-D0; 4-HW-03249-D0

11 July 2011

Page 88 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3501 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: F-3510A/B Pipework to: E-3551 / E-3556

Material: SA-240 Exam Spec:


Freq. Last insp. (months) date 60

316Ti

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Internal Corrosion

19

UT

Random location. Internal DVI recommended if possible

60 01/04/2009 31/03/2014 Offline

UT/01

Line list: 30-AG-35003-SST-H; 68-AG-35104-SST-H; 48-AG-35105-SST-H; 48-AG-35106-SST-H; 38-AG-35117-SST-H; 38-AG-35118-SST-H

11 July 2011

Page 89 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3502 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-3551 / E-3556 Pipework to: R-3520

Material: SA-240 Exam Spec:


Freq. Last insp. (months) date

316Ti

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/04/2009 31/03/2014 OnLine

External Stress Corrosion Cracking


Internal Corrosion

19
19

Remove ins and dye pen


UT

External Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.
Int DVI recommended if entry is possible

60 01/04/2009 31/03/2014 Shutdown


60 01/04/2009 31/03/2014 OnLine

DP/01
UT/01

Line list: 58-AG-35107-SST-H; 58-AG-35108-SST-H; size unknown-AG-35109-SST-; Size unknown-AG-35110-SST-

11 July 2011

Page 90 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3503 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Stress Corrosion Cracking

Pipework from: R-3520 Pipework to: PL-3504

Material: SA-240 Exam Spec:


Freq. Last insp. (months) date

316Ti

Nace: Insulated (Y/N): Y

Insp. Priority 24

Insp. Method Extent of Inspection Remove ins and dye pen External Stress Corrosion Cracking expected on Circuit - consult with Materials Engineer.

Next insp. Due date

Availability Guideline Comments DP/01

60 01/04/2009 31/03/2014 Shutdown

Internal Corrosion
internal corrosion

24
24

UT - Offline
VI-EXT

Internal DVI recommended if possible. UT scanning on areas near to PL-3504


Inspection on insulation. Do not remove the insulation while the plant is running.

12 01/04/2009 01/04/2010 OnLine


1 01/04/2009 30/01/2010 OnLine

UT/01
DVI/01

Line list: 48-35202-SST-H

11 July 2011

Page 91 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3504 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Lining failure

Pipework from: Circuit ID 3503 Pipework to: T-3550 / T-3555

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 12

Nace: Insulated (Y/N): Y

Insp. Priority 7

Insp. Method Extent of Inspection UT - Offline Int DVI recommended if entry is possible. Susceptible to lining failure

Next insp. Due date

Availability Guideline Comments OffLine UT/01

Lining failure

VI-EXT

Check for any leak due to lining failure

DVI/01

Line list: 62-AG-35203-CS(PFA)-; 62-AG-35203-CS(PFA)-

11 July 2011

Page 92 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3505 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Lining failure

Pipework from: T-3550 / T-3555 Pipework to: E-3560

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): N

Insp. Priority 16

Insp. Method Extent of Inspection UT - Offline UT scanning on areas near to the concentration column.

Next insp. Due date

Availability Guideline Comments OffLine UT/01

Lining failure

16

VI-EXT

Any internal lining failure can be checked from the external

60

DVI/01

Line list: 2-AC-35502-CSL150-; 2-CD-35503-CSL150; 2-AC-35552-CSL150-; 2-CD-35553-CSL150-

11 July 2011

Page 93 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3506 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Lining failure

Pipework from: E-3560 Pipework to: E-3561

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

11 July 2011

Page 94 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3507 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-3560 / E-3561 Pipework to: E-3540

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments OnLine DVI/01

Internal Corrosion internal corrosion

25 25

UT Water quality monitoring

Use high temp probe Refer to table 1 of WSOE (report no 8167) for list of items to be monitored

120 01/04/2009 30/03/2019 OnLine 24

UT/01

Line list: 3-CW-35404-CS 150-PP; 3-CW-35405-CS 150-PP; 1.5-CW-35409-CS 150-; 1.5-CW-35411-CS 150-; 1.5-CW-35422-CS 150-

11 July 2011

Page 95 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3508 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-3540 Pipework to: D-3541

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/04/2009 30/03/2019 Offline

UT/01

Line list: 4-CW-35401-PP 150-; 3-CW-35402-PP 150-; 3-CW-35403-CS 150-; 3-CW-35406-CS 150-; 1.5-CW-35407-PP 150-; 1.5-CW-35410-CS 150-; 4-CW-35412-PP 150-; 3-CW-35413-PP 150-; 4-CW35414-CS 150-; 1.5-CW-35417-CS 150-; 1-CD-35421-CS 150-

11 July 2011

Page 96 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3509 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-3543 Pipework to: E-3561

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/04/2009 30/03/2019 Offline

UT/01

Line list: 1.5-CW-35408-CS 150-C; 1.5-CW-35418-CS 150-; 1.5-CW-35419-CS 150-C

11 July 2011

Page 97 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-351 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: H-0305A/B Pipework to: E-0307 & Sulphuric Acid Plant

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

External Deterioration Internal Corrosion

19 19

VI-EXT UT - Offline

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 23/02/2009 23/02/2014 OnLine 60 01/03/2010 01/03/2015 OffLine

DVI/01 UT/01

Line list: 12-HO-35327-CS150; 2"-HO-35328-CS150; 18-H0-03787-A1; 18-HO-03860-A1; 20-HO-03807-A1; 24-HO-03787-A1; 2-HO-03861-A1; 3-V-03868-A1; 3-V-03869-A1; 8-HO-03808-A1; 12-HO35327-CS 150-H; 2-HO-35328-CS 150-H

11 July 2011

Page 98 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3510 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: E-3545 - loop Pipework to: E-3543 - loop

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): Y

Insp. Priority 25

Insp. Method Extent of Inspection CUI InspectionVisual Susceptible area

Next insp. Due date

Availability Guideline Comments DVI/01

External Deterioration Internal Corrosion

25 25

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 120 01/04/2009 30/03/2019 Offline

DVI/01 UT/01

Line list: 4-CW-35415-CS 150-C; 3-CW-35416-CS 150-C; 4-CW-35420-CS 150-C

11 July 2011

Page 99 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3514 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-3561 Pipework to: TK-3562

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT Also check for leak due to lining failure

Next insp. Due date

Availability Guideline Comments DVI/01

Line list: 3-AC-35603-CSL150-

11 July 2011

Page 100 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3515 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: TK-3562 Pipework to: Circuit ID 3516

Material: PVDF Exam Spec:


Freq. Last insp. (months) date 120

PVDF

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Line list: 2-AC-35604-PVDF150-; 2-AC-35605-PVDF150-; 1.5-AC-35606-PVDF150-; 1.5-AC-35607-PVDF150-; 1.5-AC-35609-PVDF150-; 0.5-AC-35612-PVDF150-; 3-AC-35614-PVDF150-; 1-CD-35615PVDF150-; 1.5-CD-35616-PVDF150-; 1-CD-35617-PVDF150-; 1-CD-35625-PVDF150-; 1.5-CD-35633-PVDF150-

11 July 2011

Page 101 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3516 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-3515 Pipework to: D-3564

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 01/04/2009 30/03/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/04/2009 30/03/2019 OnLine

UT/01

Line list: 2-AC-35620-CSL150-; 3-AC-35621-CSL150-; 3-AC-35623-CSL150-; 2-AC-35626-CSL150-; 3-AC-35624-CSL150-; 1-CD-35627-CSL150-; 3-AC-35622-CSL150-

11 July 2011

Page 102 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3517 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-3516 Pipework to: Lorry

Material: SA-240 Exam Spec:


Freq. Last insp. (months) date 120

316Ti

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/04/2009 30/03/2019 Offline

UT/01

Line list: 3-AC-35629-SST-

11 July 2011

Page 103 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3518 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-3515 Pipework to: PL-3519A/B

Material: PVDF Exam Spec:


Freq. Last insp. (months) date 120

PVDF

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Line list: 1-CD-35558-PVDF150-; 1.5-AC-35610-PVDF150-; 1-AC-35611-PVDF150-`

11 July 2011

Page 104 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3519A Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: PL-3518 Pipework to: T-3550

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 25

Insp. Method Extent of Inspection CUI InspectionVisual Susceptible areas near to the concentration column

Next insp. Due date

Availability Guideline Comments DVI/01

Lining failure

16

UT

Lining failure expected on Circuit - consult with Materials Engineer.

60

UT/01

Line list: 1.5-AC-35505-CSL150-H

11 July 2011

Page 105 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3519B Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: PL-3518 Pipework to: T-3555

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 25

Insp. Method Extent of Inspection susceptible areas near to the concentration column

Next insp. Due date

Availability Guideline Comments

Lining failure

16

Scan areas near to the concentration column

60

Line list: 1.5-AC-35555-CSL150-H

11 July 2011

Page 106 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3520A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-3555 Pipework to: F-3575

Material: PP Exam Spec:


Freq. Last insp. (months) date 120

PP

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Line list: 50-AG-35501-PP-

11 July 2011

Page 107 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3520B Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-3555 Pipework to: F3575

Material: PP Exam Spec:


Freq. Last insp. (months) date 120

PP

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Line list: 50-AG-35551-PP-

11 July 2011

Page 108 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3521 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: C3552 A/B Pipework to: Vent

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/04/2009 30/03/2019 Offline

UT/01

Line list: 46-AA-35145-CS-; 46-AA-35245-CS-; 46-AA-35507-CS-; 64-AA-35560-CS-; 64-AA-35561-CS-; 64-AA-35562-CS-

11 July 2011

Page 109 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3522 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: F-3570/3575 Pipework to: PL-3523

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 23

Insp. Method Extent of Inspection Susceptible areas

Next insp. Due date

Availability Guideline Comments

60 01/04/2009 31/03/2014 OnLine

Line list: 3-AC-35570-CSL150-H; 2-AC-35702-CSL150-H; 2-CD-35705-CSL150-; 2-AC-35752-CSL150-H

11 July 2011

Page 110 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3523 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-3522 Pipework to: PL3525A/B

Material: PVDF Exam Spec:


Freq. Last insp. (months) date

PVDF

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 01/04/2009 30/03/2019 OnLine

Line list: 1-AC-35506-PVDF150-; 1-CD-35508-PVDF150-; 1-AC-35556-PVDF150-; 3-AC-35572-PVDF150-; 3-AC-35573-PVDF150-; 1.5-AC-35574-PVDF150-; 1.5-AC-35575-PVDF150-; 1.5-AC-35576PVDF150-; 1-CD-35577-PVDF150-; 1-CD-35578-PVDF150-

11 July 2011

Page 111 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3524 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-3523 Pipework to: F3570

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Line list: 1.5-AC-35571-CSL150-H

11 July 2011

Page 112 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3525A Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: PL-3523 Pipework to: T-3550

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 23

Insp. Method Extent of Inspection CUI InspectionVisual Susceptible areas

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/04/2009 31/03/2014 OnLine

Line list: 1.5-AC-35504-CSL150-H

11 July 2011

Page 113 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3525B Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: PL-3523 Pipework to: T-3555

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 23

Insp. Method Extent of Inspection CUI InspectionVisual No CUI Inspection Recommended.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/04/2009 31/03/2014 OnLine

Line list: 1.5-AC-35554-CSL150-H

11 July 2011

Page 114 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3526 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-3523 Pipework to: F3570/3575

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 120

Nace: Insulated (Y/N): N

Insp. Priority 23

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

Line list: 1-AC-35703-CSL150-; 1-AC-35753-CSL150-

11 July 2011

Page 115 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-352A Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: PL-351 Pipework to: E-0306A/B

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2008 31/05/2013 OnLine

External Deterioration Internal Corrosion

19 19

VI-EXT UT - Offline

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/09/2009 31/08/2014 OnLine 60 01/03/2010 28/02/2015 OffLine

DVI/01 UT/01

Line list: 18-HO-03787-A1; 2-HO-03811-A1; 2-HO-03839-A1

11 July 2011

Page 116 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-352B Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: H-0305A/B Pipework to: E-0306B

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

External Deterioration Internal Corrosion

19 15

VI-EXT UT - Offline

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 02/09/2009 02/09/2014 OnLine 60 01/03/2010 01/03/2015 OffLine

DVI/01 UT/01

Line list: 18-HO-03814-A1; 2-HO-03812-A1; 2-HO-03830-A1

11 July 2011

Page 117 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3531 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: E-3538 Pipework to: E-3519

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Susceptible areas, especially dead legs

Next insp. Due date

Availability Guideline Comments DVI/01

Internal Corrosion

19

UT - Offline

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 29/04/2009 28/04/2014 OffLine

UT/01

Line list: 2-HO-35112-CS 150-H; 6-HO-35301-CS 150-H; 6-HO-35305-CS 150-H; Unknown size--35306--; 6-HO-35307-CS 150-H; 6-HO-35308-CS 150-H; 6-HO-35309-CS 150-H; 3-HO-35314-CS 150-; 1.5HO-35316-CS 150-PP; 1.5-HO-35317-CS 150-PP; 6-HO-35318-CS 150-H; 6-HO-35319-CS 150-H; 0.75-HO-35321-CS 150-PP; 6-HO-35324-CS 150-H; 6-HO-35325-CS 150-H; 4-HO-35334-CS 150-

11 July 2011

Page 118 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3532 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: E-3532 Pipework to: E-3538

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Susceptible areas. Deadlegs

Next insp. Due date

Availability Guideline Comments DVI/01

Internal Corrosion

19

UT - Offline

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 29/04/2009 28/04/2014 OffLine

UT/01

Line list: 2-HO-35113-CS 150-H; 6-HO-35302-CS 150-H; 6-HO-35303-CS 150-H; 6-HO-35304-CS 150-H; 6-HO-35310-CS 150-H; 1.5-HO-35311-CS 150-; 4-HO-35312-CS 150-; 3-HO-35313-CS 150-; 3-HO35315-CS 150-; 6-HO-35322-CS 150-H

11 July 2011

Page 119 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-354A Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: E-0306A Pipework to: PL-355

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

External Deterioration Internal Corrosion

19 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 03/09/2009 03/09/2014 OnLine 60 01/03/2010 01/03/2015 Offline

DVI/01 UT/01

Line list: 18-HO-03801-A1

11 July 2011

Page 120 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-354B Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: E-0306A Pipework to: PL-355

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

External Deterioration Internal Corrosion

19 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 04/09/2009 04/09/2014 OnLine 60 01/03/2010 01/03/2015 Offline

DVI/01 UT/01

Line list: 18-HO-03813-A1

11 July 2011

Page 121 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-355 Const Code : ASME B31.3 Inspection plan Damage mechanisms CUI Pipework from: PL354A/B Pipework to: H-0305A/B & sulphuric acid plant Material: SA-53 Exam Spec: B Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual


VI-EXT

Freq. Last insp. (months) date 60

Next insp. Due date

Availability Guideline Comments DVI/01

Strip 10% of potential CUI Locations by category.


100% Coverage

External Deterioration

19

60 05/09/2009 05/09/2014 OnLine

DVI/01

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/03/2010 01/03/2015 Offline

UT/01

Line list: 12-HO-35326-CS150; 2-HO-35329-CS150; 12-HO-03805-A1; 20-HO-03809-A1; 0.75-HO-03852-A1; 12-HO-03803-A1; 12-HO-03804-A1; 18-HO-03786-A1; 18-HO-03859-A1; 1-HO-03865-A1; 1HO-03894-A1; 24-HO-03786-A1; 24-HO-03801A-A1; 24-HO-03802-A1; 24-HO-03854-A1; 24-HO-03855-A1; 2-HO-03858-A1; 2-HO-03829-A1; 2-HO-03845-A1; 2-HO-03846-A1; 2-HO-03847A1; 2-HO-03848-A1; 2-HO-03849-A1; 2-HO-03851-A1; 2-HO-03856-A1; 2-HO-03857-A1; 2-HO-03862-A1; 2-HO-03863-A1; 2-HO-03864-A1; 2-HO-03866-A1; 2-HO-03867-A1; 3-HO-03796-A1; 3-V-03823-A1; 6-HO-03809-A1; 8-HO-03798-A1; 8-HO-03799-A1; 8-HO-03800-A1; 12-HO-03803-A1; 8-HO-03810-A1; 2-HO-03842-A1; 2-HO-03843-A1; 2-HO-03844-A1; 12-HO-35326-CS 150H; 2-HO-35329-CS 150-H

11 July 2011

Page 122 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3P1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PL-3P2 Pipework to: C-0350

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 15/04/2003 15/04/2013 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/2000 01/01/2010 OnLine

UT/01

Line list: 1-V-03644-B1; 4-V-03642-B1

11 July 2011

Page 123 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-3P2 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: C-0350 Pipework to: PL-3P1

Material: SA-106 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 01/06/2014 OnLine

External Deterioration Internal Corrosion

15 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 15/04/2003 15/04/2008 OnLine 60 01/01/2000 01/01/2005 OnLine

DVI/01 UT/01

Line list: 10-RF-03648-B1; 10-RF-03649-B1; 14-RF-03667-B1; 1-V-03647-B1; 1-V-03675-B1; 2-RF-03615-B1; 2-RF-03672-B1; 2-V-03669-A1; 4-RF-03650-B1; 4-RF-03651-B1; 4-RF-03652-B1; 4-RF-03653B1; 4-RF-03654-B1; 4-RF-03655-B1; 4-RF-03656-B1; 4-RF-03657-B1; 4-RF-03658-B1; 4-RF-03659-B1; 4-RF-03660-B1; 4-RF-03661-B1; 4-RF-03662-B1; 4-RF-03663-B1; 4-RF-03664-B1; 4-RF03665-B1; 6-RF-03668-A1; 8-V-03645-B1; 14-RF-03668-B1

11 July 2011

Page 124 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-401 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: Pipework to: PK-1802 / PK-1803

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 08/04/2009 06/04/2019 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/01/1995 29/12/2004 OnLine

UT/01

Line list: 24-AG-04005-DO; 2-HW-18066-DO; 24-AG-18064-DO; 10-AG-18079-DO; 24-AG-18071-HDO; 18-AG-18077-HDO; 2-AG-18069-HDO; 24-AG-04001-DO; 2-AG-18078-HDO

11 July 2011

Page 125 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-401-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: Pipework to:

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 14

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

8 8

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 04/08/2009 03/08/2014 OnLine 60 01/01/1995 31/12/1999 OnLine

DVI/01 UT/01

Line list: 30-AG-04816-A1; 1.5-AG-04819-A1

11 July 2011

Page 126 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-502 Const Code : ASME B31.3 Inspection plan Damage mechanisms
Environmental Cracking

Pipework from: D-0501 Pipework to: F-0601

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 9

Insp. Method Extent of Inspection Shear Wave UT Scan 25% of potential locations defined in the corrosion study. (Date In Service was used as last inspection date.)

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 29/12/2004 Online

External Deterioration Internal Corrosion

9 15

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 24/02/2009 23/02/2014 OnLine 60 28/11/2008 27/11/2013 OnLine

DVI/01 UT/01

Line list: 16-HC-05007-C1; 16-HC-05006-C1; 12-HC-05049A-C1; 2-V-05055-C1

11 July 2011

Page 127 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-503 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-0501 Pipework to: LV-05006

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 13

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 14/02/2009 13/02/2014 OnLine

Internal Corrosion

13

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 16/09/2008 15/09/2013 OnLine

UT/01

Line list: 4-GL-05010-C1; 4-GL-05011-A1; 1-GL-05012-C1; 1-GL-05013-A1

11 July 2011

Page 128 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-504 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: P-0502A Pipework to: T-0501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 13

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 25/02/2009 24/02/2014 OnLine

Internal Corrosion

13

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 11/09/2008 10/09/2013 OnLine

UT/01

Line list: 4-GL-05009-C1; 3-GL-05051-C1; 4-GL-05008-C1; 3-GL-05052-A1; 3-GL-05009-C1

11 July 2011

Page 129 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-506 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0502 Pipework to: D-02201

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 25/02/2009 25/02/2019 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 17/09/2008 17/09/2018 OnLine

UT/01

Line list: 2-HC-5014-A1; 6-V-05057-A1

11 July 2011

Page 130 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-507 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0502 Pipework to: E-0501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 25/02/2009 25/02/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 15/09/2008 15/09/2018 OnLine

UT/01

Line list: 1.5-V-05095-HA1; 2-HC-05016-A1; 4-GL-05015-A1

11 July 2011

Page 131 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-508 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0503 Pipework to: P-O502A/B

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 03/03/2009 03/03/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/09/2008 01/09/2018 OnLine

UT/01

Line list: 0.75-GL-05096-A1; 0.75-GL-05097-A1; 0.75-GL-05098-A1; 1-V-05059-A1; 1-V-05061-A1; 4-GL-05072-A1; 4-GL-05073-A1; 6-GL-05044-A1; 6-GL-05045-A1; 6-GL-05046-A1; 6-GL-05047-A1; 6GL-05048-A1

11 July 2011

Page 132 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-509 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: T-0502 Pipework to: E-0502

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 13

Insp. Method Extent of Inspection Profile RT 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments

120 01/01/1995 01/01/2005 OnLine

External Deterioration Internal Corrosion

13 24

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

60 03/04/2009 03/04/2019 OnLine 120 14/11/2008 14/11/2018 OnLine

DVI/01 UT/01

Line list: 0.75-HC-05094-A2; 6-HC-05020-A2; 6-V-05063-A2

11 July 2011

Page 133 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-509-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0502 Pipework to: D-0503

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 25

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 03/02/2009 03/02/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 25/11/2008 25/11/2018 OnLine

UT/01

Line list: 0.75-HC-05093-A2; 3-HC-05021-A2

11 July 2011

Page 134 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-510 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0503 Pipework to: PK-1802

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 03/02/2009 03/02/2019 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/09/2008 01/09/2018 OnLine

UT/01

Line list: 6-HC-05099-HA2; 6-HC-05100-HA2

11 July 2011

Page 135 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-511 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-503 Pipework to: TK-0201A/B/C

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 21

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 03/04/2009 03/04/2019 OnLine

Internal Corrosion

24

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

120 01/01/1995 29/12/2004 OnLine

UT/01

Line list: 1-HC-05081-A2; 2-HC-05029-A2; 2-HC-05030-A2; 2-HC-05031-A2; 2-HC-05032-A2

11 July 2011

Page 136 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-512 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-0502 Pipework to: P-0501A/B

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 20

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 03/02/2009 01/02/2019 OnLine

Internal Corrosion

25

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/1995 29/12/2004 OnLine

UT/01

Line list: 1-HV-05079-A2; 1-HW-05022-A2; 1-HW-05023-A2; 1-HW-05024-A2; 1-HW-05025-A2

11 July 2011

Page 137 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-515 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: P-0503A/B Pipework to: H-0501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 24

Insp. Method Extent of Inspection CUI InspectionVisual To strip potential locations assigned by the inspection engineer

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 01/06/2014 OnLine

External Deterioration Internal Corrosion

24 24

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 03/03/2009 03/03/2019 OnLine 120 19/09/2008 19/09/2018 OnLine

DVI/01 UT/01

Line list: 6-GL-05035-A1; 6-GL-05036-A1; 8-GL-05018-A1; 8-GL-05034-A1

11 July 2011

Page 138 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-516 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: H-0501 Pipework to: T-0502

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 22

Insp. Method Extent of Inspection CUI InspectionVisual To strip potential locations assigned by the inspection engineer

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 01/06/2014 OnLine

External Deterioration Internal Corrosion

22 22

VI-EXT UT - Offline

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 03/04/2009 03/04/2019 OnLine 120 01/01/1995 01/01/2005 OnLine

DVI/01 UT/01

Line list: 2-V-05065-A1; 8-GL-05019-A1

11 July 2011

Page 139 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-517 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: T-0502 Pipework to: E-0501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 24

Insp. Method Extent of Inspection CUI InspectionVisual To strip potential locations assigned by the inspection engineer

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 01/06/2014 OnLine

External Deterioration Internal Corrosion

24 24

VI-EXT UT - Offline

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 27/03/2009 27/03/2019 OnLine 120 18/09/2008 18/09/2018 OnLine

DVI/01 UT/01

Line list: 1-GL-05098-HA1; 2-GL-02053-A1; 6-GL-02052-A1; 6-GL-05017-A1; 6-GL-05033-A1; 6-GL-05041-A1; 6-GL-05042-A1; 6-GL-05069-A1

11 July 2011

Page 140 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-519 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: E-0501 Pipework to: E-0503

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 24

Insp. Method Extent of Inspection CUI InspectionVisual To strip potential locations assigned by the inspection engineer

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 01/06/2014 OnLine

External Deterioration Internal Corrosion

24 24

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 03/06/2009 03/06/2019 OnLine 120 23/12/2008 23/12/2018 OnLine

DVI/01 UT/01

Line list: 4-GL-05070-A1; 4-GL-05071-A1; 4-V-05067-A1; 6-GL-05043-A1

11 July 2011

Page 141 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-520 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: P-0504A/B Pipework to: E-0501

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date 60

Nace: Insulated (Y/N): Y

Insp. Priority 25

Insp. Method Extent of Inspection CUI InspectionVisual To strip potential locations assigned by the inspection engineer

Next insp. Due date

Availability Guideline Comments DVI/01

External Deterioration Internal Corrosion

25 25

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 22/10/2009 22/10/2019 OnLine 120 24/12/2008 24/12/2018 OnLine

DVI/01 UT/01

Line list: 2-GL-05039-A1; 2-GL-05082-A1; 3-GL-05027-A1; 3-GL-05038-A1; 3-GL-05085-A1; 4-GL-05040-A1

11 July 2011

Page 142 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-602 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0501 Pipework to: F-0601

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 17/03/2009 17/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 09/09/2008 09/09/2013 OnLine

UT/01

Line list: 16-HC-06001-C1; 16-HC-06068-C1; 2-GL-06071-A1; 2-GL-06073-A1; 2-GL-06005-A1; 2-GL-06004-A1; 2-GL-06072-A1; 16-HC-06069-C1; 2-GL-06070-A1; 2-V-06076-C1

11 July 2011

Page 143 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-602-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: PL-0602 Pipework to: D-0601A/B/C

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 31/05/2014 OnLine

External Deterioration Internal Corrosion

VI-EXT

100% Coverage

60 17/03/2008 16/03/2013 OnLine

DVI/01

Inspection could be carried out during the adsorption period

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 25% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 25/09/2008 24/09/2013 OnLine

UT/01

Thermal Fatigue

Crack Thermal Fatigue expected on Circuit detection consult with Materials Engineer. (MPI, TOFD & UT compression scanning)

60 01/01/1995 31/12/1999 OnLine

Line list: 10-HC-06017-C1; 10-HC-06018-C1; 10-HC-06019-C1; 10-HC-06026-C1; 10-HC-06027-C1; 10-HC-06028-C1; 6-V-06040-C1; 6-V-06042-C1; 6-V-06044-C1; 6-HC-06021-C1; 6-HC-06020-C1; 6-HC06022-C1

11 July 2011

Page 144 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-603 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: HC-06026 Pipework to: F-602A

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 16/03/2009 16/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 13/11/2008 13/11/2013 OnLine

UT/01

Line list: 16-HC-06029-C1; 16-HC-06078-C1; 16-HC-06079-C1; 6-HC-06033-C1; 16-HC-06031-C1; 2-V-06080-C1; 16-HC-06032-C1; 6-HC-06059-HC1; 3-HC-06056-HC1

11 July 2011

Page 145 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-604 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: H-0601 Pipework to: D-0601 A/B/C

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 9

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 31/05/2014 OnLine

External Deterioration Internal Corrosion

9 19

VI-EXT UT - Offline

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 16/03/2009 15/03/2014 OnLine 60 14/11/2008 13/11/2013 OnLine

DVI/01 UT/01

Line list: 6-HC-06020-C1; 6-HC-06022-C1; 6-HC-06023-C1; 2-V-06050-C1; 6-HC-06060-HC1; 2-V-06062-HC1; 6-HC-06024-C1; 6-HC-06025-C1; 6-HC-06034-C1

11 July 2011

Page 146 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-604-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0601 Pipework to: D-0602

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 16/03/2009 16/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 14/01/2009 14/01/2014 OnLine

UT/01

Line list: 6-HC-06008-C1

11 July 2011

Page 147 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-605 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: F-0602A Pipework to: HC-07001

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 27/03/2009 27/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 14/11/2008 14/11/2013 OnLine

UT/01

Line list: 4-HC-06057-C1; 8-HC-07001-C1; 6-HC-07002-C1; 10-HC-07304-C1; 10-HC-07566-HC1; 10-HC-07567-HC1; 16-HC-07499-HC1; 18-PG-201-6BB; 2-V-07333-C1; 4-V-07327-B1; 16-HC-06031-C1; 8-HC-06057-C1

11 July 2011

Page 148 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-606 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0602 Pipework to: H-2202

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 18/03/2009 18/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 09/09/2008 09/09/2013 OnLine

UT/01

Line list: 2-V-06038-C1; 3-HC-06064-HC1; 3-HC-06065-HC1; 4-HC-06012-HC1; 4-HC-06013-C1; 4-HC-06014-C1; 4-HC-22057-C1; 4-HC-22058-C1; 4-HC-22061-HC1; 6-HC-06063-HC1

11 July 2011

Page 149 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-608 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: C-0601A/B/C Pipework to: 16"-HC-05007

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 17/03/2009 17/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 24/09/2008 24/09/2013 OnLine

UT/01

Line list: 4-HC-06015-C1; 4-HC-06016-C1

11 July 2011

Page 150 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-702 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0712A/B Pipework to: D-0202

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 25/03/2009 25/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 24/01/2009 24/01/2014 Shutdown

UT/01

Line list: 3-V-07601-HB1; 4-HC-07016-B1; 4-HC-07508-HB1; 4-PX-216-3BB; 4-HC-02361-B1

11 July 2011

Page 151 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-703 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0711 Pipework to: E-0305

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 23/03/2009 23/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 25/11/2008 25/11/2013 Shutdown

UT/01

Line list: 10-HC-07089-C1; 16-HC-03005-C1; 16-HC-07088-C1; 16-HC-07149-C1; 16-HC-08003-C1; 16-HC-08008-C1; 3-HC-08007-C1; 6-V-07262-C1

11 July 2011

Page 152 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-718 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PK-0722 Pipework to: PK-0721

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 24/03/2009 23/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 Shutdown

UT/01

Line list: 14-PL-206-6BB; 0.75-D-256-6BB; 0.75-HC-07505-HNO; 14-HC-07519-HR0; 14-PL-106-6BB

11 July 2011

Page 153 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-720 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: C-0701A/B Pipework to: E-0709

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 01/06/2014 OnLine

External Deterioration Internal Corrosion

19 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 19/03/2009 19/03/2014 OnLine 60 25/11/2008 25/11/2013 Shutdown

DVI/01 UT/01

Line list: 12-HC-07074-B1; 12-HC-07075-B1

11 July 2011

Page 154 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-720-1 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0709 Pipework to: C-0702A/B

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 24/03/2009 24/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 27/01/2009 27/01/2014 Shutdown

UT/01

Line list: 12-HC-07077-B1; 10-HC-07117-B1; 12-HC-07076-B1; 12-HC-07082-B1; 16-HC-07118-A1; 1-HC-07168-C1; 1-HC-07172-C1; 2-HC-07251-B1; 2-HC-07267-C1; 3-V-07701-B1

11 July 2011

Page 155 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-721 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: C-0702A/B Pipework to: E-0710

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/06/2009 01/06/2014 OnLine

External Deterioration Internal Corrosion

19 19

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 18/03/2009 18/03/2014 OnLine 60 01/01/1995 01/01/2000 Shutdown

DVI/01 UT/01

Line list: 10-HC-07078-C1; 10-HC-07079-C1

11 July 2011

Page 156 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-722 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0710 Pipework to: C-0760

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 27/03/2009 27/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 04/11/2008 04/11/2013 Shutdown

UT/01

Line list: 10-HC-07080-C1; 10-HC-07309-C1; 10-HC-07353-C1; 1-HC-07169-C1; 1-HC-07173-C1; 2-HC-07268-C1; 4-V-07261-C1; 8-HC-07081-C1; 8-HC-07347-C1

11 July 2011

Page 157 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-723 Const Code : ASME B31.3 Inspection plan Damage mechanisms
CUI

Pipework from: C-0703A/B Pipework to: E-0711

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection CUI InspectionVisual Strip 10% of potential CUI Locations by category.

Next insp. Due date

Availability Guideline Comments DVI/01

60 01/01/1995 01/01/2000 OnLine

External Deterioration Internal Corrosion

15 15

VI-EXT UT

100% Coverage Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 23/03/2009 23/03/2014 OnLine 60 14/11/2008 14/11/2013 Shutdown

DVI/01 UT/01

Line list: 16-HC-07086-C1; 16-HC-07087-C1; 16-HC-07147-C1

11 July 2011

Page 158 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-730 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0721 Pipework to: T-0701

Material: SA-358 Exam Spec:


Freq. Last insp. (months) date

304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 04/01/2009 04/01/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/2003 01/01/2008 Shutdown

UT/01

Line list: 16-HC-07530-HPO; 0.75-HC-07544-HNO; 0.75-HC-07545-HNO; 12-HC-07531-HPO; 12-PL-132-3BB; 16-PX-133-3BB

11 July 2011

Page 159 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-732 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: P-0701A/B/C Pipework to: E-0707

Material: SA-358 Exam Spec:


Freq. Last insp. (months) date

304L

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 30/03/2009 30/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Shutdown

UT/01

Line list: 12-HC-07053-P0; 1-V-07280-NO; 2-HC-07275-NO; 3-HC-07066-PO; 3-V-07109-NO; 3-V-07110-NO; 3-V-07111-NO; 3-V-07591-HPO; 3-V-07593-HPO; 3-V-07595-HPO; 4-HC-07052-PO; 4-HC07133-PO; 4-HC-07134-PO; 4-HC-07135-PO; 6-HC-07105-PO; 8-HC-07056-PO; 8-HC-07057-PO; 8-HC-07058-PO; 1.5-HC-07018-NO

11 July 2011

Page 160 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-733 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0715 Pipework to: D-0724

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 04/01/2009 04/01/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Shutdown

UT/01

Line list: 2-HC-07625-A30D; 2-HC-07626-A30D; 6-HC-07623-A30D; 3-HC-07672-A30D; 4-HC-07624-A30D; 0.5-HC-07692-A30D; 0.5-HC-07693-A30D; 0.5-HC-07688-A30D; 0.5-HC-07689-A30D; 1-V07662-A30D; 10-HC-07068-NO; 14-HC-07524-HNO; 14-PX-134-1BB; 1-V-07699-A30D; 1-V-07700-A30D; 2-HC-07556-HNO; 2-HC-07648-A3OD; 2-V-07143-NO; 3-HC-07586-HNO; 3-V-07658A30D; 3-V-07660-A30D; 4-V-07119-NO

11 July 2011

Page 161 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-735 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-0701 Pipework to: T-702

Material: SA-358 Exam Spec:


Freq. Last insp. (months) date

304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 30/03/2009 30/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Shutdown

UT/01

Line list: 8-HC-07682-B30D; 8-HC-07683-B30D; 10-HC-07049-PO; 1.5-HC-07019-NO; 1.5-HC-07551-HPO; 1.5-V-07123-PO; 1.5-V-07124-PO; 1.5-V-07564-HNO; 10-HC-07069-PO; 12-HC-07050-PO; 12HC-07062-PO; 1-HC-07239-NO; 1-V-07200-NO; 1-V-07240-NO; 2-HC-07049-PO; 2-HC-07121-PO; 2-HC-07122-PO; 2-HC-07307-P0; 2-HC-07557-HNO; 2-HC-07580-HNO; 2-V-07127-NO; 2-V07218-PO; 3-HC-07618-B30D; 4-HC-07051-PO; 6-HC-07070-PO; 6-HC-07071-PO; 6-V-07131-PO; 6-V-07265-PO; 8-HC-07620-SS2; 8-HC-07621-B3OD; 8-HC-07622-SS2; 8-HC-07684-B30D; NBR RQD

11 July 2011

Page 162 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-751 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0721 Pipework to: C-0701A/B

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 23/03/2009 23/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 25/11/2008 25/11/2013 Shutdown

UT/01

Line list: 20-HC-07043-A1; 10-HC-07585-HA1; 14-V-07254-A1; 16-HC-07009-A1; 16-HC-07073-A1; 16-HC-07238-A1; 16-HC-07280-A1; 16-HC-07509-HA1; 16-NI-07012-A1; 16-PG-224-1BB; 8-HC-07192A1

11 July 2011

Page 163 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-753 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0724 Pipework to: E-0721A

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 04/02/2009 04/02/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/2003 01/01/2008 Shutdown

UT/01

Line list: 0.75-D-151-1BB; 0.75-D-152-1BB; 0.75-D-257-1BB; 0.75-HC-07506-HNO; 0.75-HC-07526-HNO; 0.75-HC-07527-HNO; 14-HC-07518-HNO; 14-PG-135-1BB; 14-PX-123-1BB; 14-PX-223-1BB; 1-D150-1BB; 1-HC-07525-HNO; 1-PG-137-1BB; 3-PL-136-1BB

11 July 2011

Page 164 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-754 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: T-0703 Pipework to: PK-721

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 04/02/2009 04/02/2019 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 5% of Potential locations by Location Category.

120 01/01/2003 01/01/2013 Shutdown

UT/01

Line list: 0.75-D-153-1BB; 0.75-D-285-1BB; 0.75-HC-07507-HC; 0.75-HC-07528-HNO; 16-HC-07104-NO; 16-NI-07045-N0; 16-NI-07523-HN0; 16-PG-138-1BB; 18-NI-07517-HNO; 18-PG-125-1BB; 18-PG225-1BB; 20-PG-226-1BB

11 July 2011

Page 165 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-755 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: P-0701A/B/C Pipework to: E-0721

Material: SA-358 Exam Spec:


Freq. Last insp. (months) date

304L

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 30/03/2009 30/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Shutdown

UT/01

Line list: 0.75-D-259-6BB; 0.75-HC-07521-HNO; 1.5-V-07136-RO; 1.5-V-07137-RO; 1.5-V-07138-RO; 2-HC-07215-RO; 2-HC-07553-RO; 2-HC-07554-HRO; 6-HC-07059-RO; 6-HC-07060-RO; 6-HC-07061RO; 8-HC-07048-RO; 8-HC-07516-HRO; 6-PL-221-6BB

11 July 2011

Page 166 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-762 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PK-0722 Pipework to: PK-0723

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 26/03/2009 25/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 Shutdown

UT/01

Line list: 18-HC-07479-HR0; 12-PX-202-6BB; 12-PX-302-6BB; 8-HC-07305-RO; 8-HC-07491-HRO; 18-HC-07496-HRO; 6-PG-330-6BB; 1.5-V-07550-HRO; 12-PG-203-6BB; 3-PL-307-6BB; 1-D-350-6BB; 0.75-D-351-6BB; 1-HC-07489-HNO; 0.75-HC-07488-HNO; 18-PX-202-6BB; 18-PG-203-6BB; 4-V-07330-B1

11 July 2011

Page 167 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-771 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0751 Pipework to: E-0721

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 26/03/2009 26/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/2003 01/01/2008 Shutdown

UT/01

Line list: 3-PX-207-3BB; 0.75-D-251-3BB; 0.75-D-252-3BB; 0.75-D-352-6BB; 0.75-HC-07487-HNO; 0.75-HC-07500-HNO; 0.75-HC-07501-HNO; 1.5-HC-07490-HRO; 1.5-PX-329-3BB; 1-D-250-3BB; 1-HC07336-RO; 1-HC-07498-HNO; 1-PG-210-1BB; 2-PL-209-3BB; 3-HC-07484-HPO; 3-PG-206-3BB; 3-PG-208-3BB; 3-PL-209-3BB; 3-PX-307-3BB

11 July 2011

Page 168 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-776 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PK-0722 Pipework to: PK-0723

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 30/03/2009 30/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Shutdown

UT/01

Line list: 6-HC-07497-HRO; 12-PX-204-6BB; 16-HC-7494-HRO; 16-PX-304-6BB; 16-PG-305-6BB; 1.5-V-07549-6BB; 16-HC-7495-HRO; 12-PG-205-6BB; 1.5-V-07583-HRO; 2-HC-07541-HRO; 2-HC-07542HRO; 0.75-HC-07559-HRO; 0.75-HC-07560-HRO; 0.75-HC-07561-HRO; 0.75-HC-07548-HRO; 1.5-HC-07522-HRO; 16-PG-205-6BB; 16-PX-204-6BB; 0.75-V-341-6BB; 0.75-HC-07547-HRO

11 July 2011

Page 169 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-784 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: D-0723 Pipework to: D-0722

Material: SA-358 Exam Spec:


Freq. Last insp. (months) date

304L

Nace: Insulated (Y/N): Y

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 26/03/2009 26/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/2003 01/01/2008 Shutdown

UT/01

Line list: 2-PL-213-6BB; 0.75-D-254-6BB; 0.75-D-255-6BB; 0.75-D-262-6BB; 0.75-D-263-6BB; 0.75-D-265-6BB; 0.75-D-266-6BB; 0.75-D-354-6BB; 0.75-D-355-6BB; 0.75-D-356-6BB; 0.75-HC-07480-HNO; 0.75-HC-07481-HNO; 0.75-HC-07485-HNO; 0.75-HC-07503-HNO; 0.75-HC-07504-HNO; 0.75-HC-07513-HNO; 0.75-HC-07587-HNO; 0.75-HC-07588-HNO; 0.75-HC-07514-HNO; 1.5-V-07606HRO; 0.75-V-240-6BB; 1.5-HC-07482-HRO; 1.5-PL-227-6BB; 1.5-PL-315-6BB; 1.5-PX-215-6BB; 1.5-PX-227-6BB; 1-D-253-6BB; 1-D-261-6BB; 1-D-353-6BB; 1-HC-07486-HNO; 1-HC-07502-HNO; 1-HC-07515-HNO; 1-HC-07520-HNO; 1-PG-214-6BB; 2-PG-212-6BB; 3-PG-218-6BB; 3-PX-217-6BB; 3-PX-220-6BB; 4-HC-07483-HRO; 4-HC-07579-HRO; 4-PL-213-6BB; 4-PL-219-6BB; 4-PL-3116BB; 4-PX-211-6BB; 4-PX-217-6BB; 4-PX-220-6BB

11 July 2011

Page 170 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-793 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0721A Pipework to: C-0703A/B

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 27/03/2009 27/03/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 06/11/2008 06/11/2013 Shutdown

UT/01

Line list: 6-HC-07634-D1A; 10-HC-07343-C1; 12-HC-07015-C1; 12-HC-07310-C1; 12-HC-07352-C1; 12-HC-07569-HC1; 12-HC-07570-HC1; 16-HC-07084-C1; 16-HC-07085-C1; 16-HC-07093-C1; 16-HC07511-HC1; 16-PG-222-6BB; 2-HC-07207-C1; 2-HC-07208-C1; 4-V-07248-C1; 6-HC-07151-C1; 8-HC-07094-C1; 8-HC-07345-C1

11 July 2011

Page 171 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-793A Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: C-0760 Pipework to: E-0760

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 27/03/2009 27/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Shutdown

UT/01

Line list: 12-HC-07339-C1; 8-V-07355-C1

11 July 2011

Page 172 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-793B Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: E-0760 Pipework to: PL-793

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 27/03/2009 27/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Shutdown

UT/01

Line list: 10-HC-07342-C1; 12-HC-07337-C1; 12-HC-07338-C1; 14-HC-07311-C1; 1-HC-07341-C1; 8-HC-07348-C1

11 July 2011

Page 173 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-797 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: PK-0721 Pipework to: HC-07054

Material: SA-312 Exam Spec:


Freq. Last insp. (months) date

TP304L

Nace: Insulated (Y/N): Y

Insp. Priority 15

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 04/02/2009 03/02/2014 OnLine

Internal Corrosion

15

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category. (Date In Service was used as last inspection date.)

60 01/01/1995 31/12/1999 Shutdown

UT/01

Line list: 12-HC-07532-HR0; 12-PL-131-6BB; 10--7054-RO; 0.75-HC-07529-HNO; 0.75-D-154-6BB; 2-HC-07543-HRO; 10-HC-07055-PO

11 July 2011

Page 174 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-7P5 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: C-0750 Pipework to: PL-7P11/PL-7PX

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 19

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

60 26/03/2009 26/03/2014 OnLine

Internal Corrosion

19

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

60 01/01/1995 01/01/2000 Offline

UT/01

Line list: 2-RF-07326-B1; 2-RF-07351-B1; 2-V-07349-A1; 3-RF-07325-B1; 4-RF-07320-B1; 4-RF-07321-B1; 4-RF-07322-B1; 4-RF-07323-B1; 6-RF-07317-B1; 6-RF-07318-B1; 6-RF-07319-B1; 6-RF-07324B1; 6-V-07314-A1

11 July 2011

Page 175 of 176

WRITTEN SCHEME OF EXAMINATION (EXAM SPECIFICATION)


Equiment ID: PL-801 Const Code : ASME B31.3 Inspection plan Damage mechanisms
External Deterioration

Pipework from: H-2201 Pipework to: D-1803

Material: SA-53 Exam Spec:


Freq. Last insp. (months) date

Nace: Insulated (Y/N): N

Insp. Priority 22

Insp. Method Extent of Inspection VI-EXT 100% Coverage

Next insp. Due date

Availability Guideline Comments DVI/01

120 04/01/2009 02/01/2019 OnLine

Internal Corrosion

22

UT

Random Corrosion - consult with Materials Engineer. As a minimum take the following UT's: 10% of Potential locations by Location Category.

120 29/01/2009 27/01/2019 OnLine

UT/01

Line list: 3-HC-18060-A1; 3-HC-22011-C1; 4-HC-08006-C1; 0.75-HC-07187-RO; 0.75-HC-07188-RO; 0.75-HC-07189-RO; 0.75-HC-07190-RO; 0.75-HC-07191-RO; 2-HC-07129-RO; 2-HC-07186-RO; 2-HC22033-C1; 2-HC-22044-C1; 2-HC-22045-C1; 2-HC-22046-C1; 2-HC-22054-C1; 2-HC-22100-C1; 3-HC-08004-C1; 3-HC-08005-C1; 3-HC-08014-CC3

11 July 2011

Page 176 of 176