Presentation Outline
1) Overview of Launching and how can it be used for construction of steel structures bridges or other 2) Site Constraints for Launching - Reviewing the suitability of the site. Two projects Park Bridge & Coast Meridian 3) Bridge Design for Launching - Adequacy of permanent bridge superstructure for temporary launching demands 4) Fabrication and Assembly for Launching - unique aspects 5) Launch Equipment - Function of systems typically used 6) "Jack Down" after Launching - Transfer of bridge superstructure from temporary supports to permanent bearings 7) Summary and Conclusion
2
2012 CISC Alberta Steel Workshop
1) Overview of Launching
Conventional Delivery or Design Build Architect/ Design Engineer Simple Org Chart
Fabricator
Construction Method
3
2012 CISC Alberta Steel Workshop
1) Overview of Launching
Launching can be used for many types of structures, but alignment should be straight or constant curve. Launching is a viable option for regions of: Steep or inaccessible terrain of obstacles below, or heavy vehicle traffic below. Design girders for permanent loads and temporary launch loads. Check elements of superstructure for launching (splices, bottom flange, plan bracing, jacking stiffeners). May need re-design. Require an assembly bed that is wide enough for crane access and long enough to assemble girders to safely cantilever out. Launching may not be cost effective if traditional construction methods are available (Need to manage all girders throughout work).
4
2012 CISC Alberta Steel Workshop
1) Overview of Launching
5
2012 CISC Alberta Steel Workshop
1) Overview of Launching
Deh Cho Bridge, NWT
6
2012 CISC Alberta Steel Workshop
1) Overview of Launching
1) Overview of Launching
South Layton Overpass, UT
8
2012 CISC Alberta Steel Workshop
1) Overview of Launching
Capilano River Bridges, N Vancouver, BC
9
2012 CISC Alberta Steel Workshop
1) Overview of Launching
Peace Bridge, Calgary, AB
10
2012 CISC Alberta Steel Workshop
Presentation Outline
1) Overview of Launching and how can it be used for construction of steel structures bridges or other. 2) Site Constraints for Launching - Reviewing the suitability of the site. Two projects Park Bridge & Coast Meridian. 3) Bridge Design for Launching - Adequacy of permanent bridge superstructure for temporary launching demands 4) Fabrication and Assembly for Launching - Unique aspects 5) Launch Equipment - Function of systems typically used 6) "Jack Down" after Launching - Transfer of bridge superstructure from temporary supports to permanent bearings 7) Summary and Conclusion
11
2012 CISC Alberta Steel Workshop
2) Site Constraints
Old Park Bridge One of the highest rock fall hazard areas in BC. Accident rate double the provincial average.
12
2012 CISC Alberta Steel Workshop
2) Site Constraints
2) Site Constraints
2) Site Constraints
Assembly Bed
Fabrication Shop
16
2012 CISC Alberta Steel Workshop
2) Site Constraints
17
2012 CISC Alberta Steel Workshop
2) Site Constraints
2) Site Constraints
Presentation Outline
1) Overview of Launching and how can it be used for construction of steel structures bridges or other. 2) Site Constraints for Launching - Reviewing the suitability of the site. Two projects Park Bridge & Coast Meridian 3) Bridge Design for Launching - Adequacy of permanent bridge superstructure for temporary launching demands 4) Fabrication and Assembly for Launching - Unique aspects 5) Launch Equipment - Function of systems typically used 6) "Jack Down" after Launching - Transfer of bridge superstructure from temporary supports to permanent bearings 7) Summary and Conclusion
20
2012 CISC Alberta Steel Workshop
21
2012 CISC Alberta Steel Workshop
22
2012 CISC Alberta Steel Workshop
23
WBES 2011 Phoenix, AZ
25
2012 CISC Alberta Steel Workshop
27
2012 CISC Alberta Steel Workshop
29
2012 CISC Alberta Steel Workshop
Flush bottom flange to allow girder unobstructed advance on rollers. Constant width of bottom flange easier, but not required, for guiding
30
2012 CISC Alberta Steel Workshop
Bolted field splices detailed to allow passage of roller No coatings in roller path or use weathering steel
31
2012 CISC Alberta Steel Workshop
Presentation Outline
1) Overview of Launching and how can it be used for construction of steel structures bridges or other. 2) Site Constraints for Launching - Reviewing the suitability of the site. Two projects Park Bridge & Coast Meridian. 3) Bridge Design for Launching - Adequacy of permanent bridge superstructure for temporary launching demands 4) Fabrication and Assembly for Launching - Unique aspects 5) Launch Equipment - Function of systems typically used 6) "Jack Down" after Launching - Transfer of bridge superstructure from temporary supports to permanent bearings 7) Summary and Conclusion
32
2012 CISC Alberta Steel Workshop
Assemble at "no load" camber so that DL steel deflections are correct after launching
33
2012 CISC Alberta Steel Workshop
36
2012 CISC Alberta Steel Workshop
37
2012 CISC Alberta Steel Workshop
View of Interior framework and two main rib beams for cable-stay loads. More than 180,000 bolts for structure
38
2012 CISC Alberta Steel Workshop
Presentation Outline
1) Overview of Launching and how can it be used for construction of steel structures bridges or other. 2) Site Constraints for Launching - Reviewing the suitability of the site. Two projects Park Bridge & Coast Meridian. 3) Bridge Design for Launching - Adequacy of permanent bridge superstructure for temporary launching demands 4) Fabrication and Assembly for Launching - Unique aspects 5) Launch Equipment - Function of systems typically used 6) "Jack Down" after Launching - Transfer of bridge superstructure from temporary supports to permanent bearings 7) Summary and Conclusion
39
2012 CISC Alberta Steel Workshop
40
2012 CISC Alberta Steel Workshop
41
2012 CISC Alberta Steel Workshop
43
2012 CISC Alberta Steel Workshop
Roller assembly with integral guide system. Can also side on greased plates or teflon/stainless systems
47
2012 CISC Alberta Steel Workshop
Roller assemblies need certain amount of space on pier top for equipment and temporary anchor bolts
48
2012 CISC Alberta Steel Workshop
Friction system for Park Bridge - hydraulic rams with clamping jaws All pushing force goes into concrete abutment
49
2012 CISC Alberta Steel Workshop
52
2012 CISC Alberta Steel Workshop
53
2012 CISC Alberta Steel Workshop
Launch system using two linked strand jacks pulling from abutment
54
2012 CISC Alberta Steel Workshop
Presentation Outline
1) Overview of Launching and how can it be used for construction of steel structures bridges or other. 2) Site Constraints for Launching - Reviewing the suitability of the site. Two projects Park Bridge & Coast Meridian. 3) Bridge Design for Launching - Adequacy of permanent bridge superstructure for temporary launching demands 4) Fabrication and Assembly for Launching - Unique aspects 5) Launch Equipment - Function of systems typically used 6) "Jack Down" after Launching - Transfer of bridge superstructure from temporary supports to permanent bearings 7) Summary and Conclusion
56
2012 CISC Alberta Steel Workshop
Bearing installed
59
2012 CISC Alberta Steel Workshop
Presentation Outline
1) Overview of Launching and how can it be used for construction of steel structures bridges or other. 2) Site Constraints for Launching - Reviewing the suitability of the site. Two projects Park Bridge & Coast Meridian. 3) Bridge Design for Launching - Adequacy of permanent bridge superstructure for temporary launching demands 4) Fabrication and Assembly for Launching - Unique aspects 5) Launch Equipment - Function of systems typically used 6) "Jack Down" after Launching - Transfer of bridge superstructure from temporary supports to permanent bearings 7) Summary and Conclusion
60
2012 CISC Alberta Steel Workshop
61
2012 CISC Alberta Steel Workshop
Incremental Launching of Steel Girders in British Columbia Two Case Studies Structural Engineering International (SEI) magazine, November 2011 Issue
62
2012 CISC Alberta Steel Workshop
Acknowledgements
General Contractors Park Bridge: Flatiron Construction Corp (Richmond, BC) CMO: SNC Lavalin Constructors Pacific (Vancouver, BC) Erector KWH Constructors & Somerset Engineering (Burnaby, BC) Fabricators Park Bridge: Rapid-Span (Armstrong, BC) Park Bridge: Structal-Bridges (Quebec) CMO: Geo. Third & Son (Burnaby, BC) CMO: Dynamic Structures (Port Coquitlam, BC)
63
2012 CISC Alberta Steel Workshop
Thank-you !!
Questions?