Sunteți pe pagina 1din 31

INTEGRITY MANAGEMENT OF FLOATING PRODUCTION UNITS

PIANC SEMINAR ON LIFE CYCLE APPROACH IN PORT INFRASTRUCTURE BRUSSELS FEBRUARY 2, 2005 Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005

Total in brief
Total Group : 4th petroleum group in the world 122 000 employees, present in 120 countries

Exploration & Production of the Total Group: 30% Onshore 70% Offshore
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 2

Content of the presentation

The Floating Units Worldwide Hull and Structure of F(P)SO Anchoring of F(P)SO Offloading of the production Floating Units Integrity Management

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

Different types of Floating Units

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

Acronyms

FSU : Floating Storage Unit FPU : Floating Production Unit FPSU : Floating Production & Storage Unit FSO : Floating Storage & Offloading FPSO : Floating Production Storage & Offloading FDPSO : Floating Drilling Production Storage & Offloading FSG : Floating Storage of Gas FGSO : Floating Gas Storage Offloading FPSG : Floating Production Storage of Gas

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

FPSO
FPSO = Floating Production Storage & Offloading

FPSO Girassol, Angola, Total

Asgard A, Norvway, Statoil

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

FSO
FSO = Floating Storage & Offloading

FSO Pathumabaha, Gulf of Thailand, PTTEP

ex-FSO15 Domy, Nigeria, Total (decommissioned)

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

FG(P)SO
FG(P)SO = Floating Gas (Production) Storage & Offloading

N'Kossa NKP et N'Kossa 2, Congo, Total

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

SemiSemi-Submersibles

Asgard B, Norway, Statoil

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

TLP
TLP = Tension Legs Platform

TLP Magnolia, USA, Conoco

TLP Matterhorn, USA, Total

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

10

Spars

Genesis spar, USA, ChevronTexacco

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

11

Choice of the Floating Units

Governing parameters:

Water depth Development requirements


Storage capacity, production system, Field life duration, production rate

Metocean conditions
Extreme return conditions, typhoons, waves , currents

Construction and installation cost

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

12

The Floating Production Units in 2003

12 2 6 13 1 2 11 6 1 2 19 8 1 7 4 3 7 1 1 2 1 1 2 2 1 3 1 11

78 FPSO

34 Semi-Sub

6 Spars

13 TLP

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

13

Forecast for 20032003-2007


FPSO FSO Semi-submersibles TLP Spars
: : : : : 50 units 34 units 15 units 13 units 11 units

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

14

History of FPSO

DALIA Future FPSO, Angola (Total)

CASTELLON DELTA 1977 : First FPSO, Spain (Shell)

N'KOSSA NKP 1996 : Concrete barge for gas production, Congo (Total)

FLNG Barge project , Nigeria (Shell)

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

15

International and National rules

International rules (IMO) :


SOLAS and ISPS (*) MARPOL (*) MODU ILLC ISM

National rules :
flag if any government regulations

Standards, norms, conventions :


API ISO ISGOTT OCIMF,

Class rules
(if classed)
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 16

Company Referential (Total E&P)


Referential is mandatory worldwide: HIERARCHY OF COMPANY RULES & SPECIFICATIONS

Internal to Company, however: General specifications can be given to


engineerings, contractors, yards, They cover:

Design, age Exploitation, integrity, marine


operations Organisation purposely set-up:

Marine experts Transverse multi-disciplinary


structure Groupe Supports Flottants
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005

17

Classification Societies
4 classification societies have rules for offshore :

American Bureau of Shipping (ABS) Rules & Guides for Offshore Installations Bureau Veritas (BV) Rules for the classification of Offshore Units Guidances Notes Rule Notes Det Norske Veritas (DNV) Offshore Codes : Rules for classification Recommended practice Offshore standards Classification notes Lloyd's Register of Shipping Classification of offshore installation at a fixed position

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

18

Hull and structure

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

19

Hull design (new built) built)


Double Side Full Width Cargo Tanks
SBT SBT

Double Side Centerline Bulkhead


SBT

Oil Tank

Oil Tank

Oil Tank

SBT

FSO Unity, Total, Nigria

FPSO Girassol, Total, Angola

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

20

Hull design (new built) built)


J Shaped Double Hull 2 Longitudinal Bulkheads in Cargo Oil Tank Oil Tank Oil Tank J Shaped Double Hull CL Bulkhead Oil Tank Oil Tank

SBT

SBT

SBT

SBT

Norne FPSO, Statoil, Norway

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

21

Girassol example (water depth 1 400 m) TOTAL E&P Angola


HULL Length Breadth Depth Displacement Deadweight Tanks : : : : : : : : : : 300 m 60 m 31 m 51 280 t 343 000 t 12 (6 x 2) 20 000 t 200 000 bopd Spread 12 (4 x 3) 67 430 m 193 315 m > 300 000 m
22

Weight Production Type Mooring lines


CONSTRUCTION ANCHORING

TOPSIDES

External coating : Tank coating : Cables :


February 2, 2005

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF

Girassol example

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

23

Girassol

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

24

Problems usually encounted: encounted: corrosion


Where ? Mainly in tanks, ballasts et side shell compartments Causes ? Corrosive atmosphere, bad quality or damaged coating, Consequences ? Cracks due to weakening of the structure, steel wastage, ... Difficult and expensive to repair at sea.

Example of corrosion in a ballast tank

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

25

Problems usually encounted: encounted: fatigue of structures


Where ? Stiffeners, reinforcements, welds, bulkheads,... Causes ? Shipyards more used to ship design, in a F(P)SO efforts and behaviour is different, Metocean conditions at the anchoring location Frequency of loading & discharging Consequences ? Fatigue cracks, weakening of the structure, walls and bulkheads, Difficult and costly repairs at sea Class certificate renewal (if classed) can be a problem in case of heavy damage

Example of crack at a bulkhead level

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

26

Problems usually encounted: encounted: chock & collisions

Where ? Side shell Causes ? Support vessels moored alongside or container handling Consequences ? Deformations, cracks, weakening of the side shell structure, corrosion, ...

FSO XV Domy, removed from service in Spring 2003

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

27

Problems usually encounted: encounted: Green Waters


Where ? Bow, turret, topside structures, deck equipment Causes ? Difficult to model the greenwater and difficult to design the bow shape accordingly Consequences ? Damages, equipment loss
Protection du touret de Schiehallion, UK

Source : analysis of green water suceptibility of FPSO/FSU on the UKCS (Bomel Ltd - 2001)

FPSO Asgard A et her protection panels (white)

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

28

Mooring / Anchoring

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

29

External turret

Weathervanning of the F(P)SO facing prevailing metocean


conditions

Rather expensive system, uneasy maintenance The turret can be disconnectable to escape typhoon (ex. China sea)
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 30

Internal turret
Protection of the turret and
risers/umbilicals against the climatic conditions

Expensive system, uneasy maintenance Number of risers limited (say 20 to 40)

Example of use: North Sea

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

31

Fixed Mooring : spread mooring

Simple system , less


expensive

Mono-directional Allows an important number


of risers connected to the side of the F(P)SO

Example of use: W. coast


Africa
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 32

SEPLA anchor
Allows vertical tension component on the anchor

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

33

Classical anchor
Only horizontal traction is permitted on the anchor

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

34

Suction anchor

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

35

Mooring line : chain

Unexpensive because widely


used

Corrosion and fatigue leading to


safety coefficients above 10

Low resistance in torsion Heavy linear weight, not


compatible with deep water locations

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

36

Mooring line : cables

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

37

Mooring line : composite


Light material suitable
for deep water locations

Subject to wear in
case of friction

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

38

Mooring line configuration: taut, taut, catenary (or semisemi-taut) taut)

Catenary :

Taut lines :

unexpensive Important offsets of the


floating unit
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005

reduced offsets of the floating


unit

Requires anchors accepting


vertical tensions
39

Problems usually encounted: encounted: anchorings


Where ? Chains, cables, synthetic lines, connectors Causes ? Design in fatigue not always mastered, lines and components (connectors, ) difficult to inspect Consequences ? Difficult to repair in deep water locations; in case of breakout, the offset is greater and may be critical (risers)

FPSO Girassol with offloading buoy

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

40

Production offloading

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

41

Offloading on buoys

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

42

Tandem offloading

Risks during manoeuvre of the export tanker near the F(P)SO Situation more difficult to handle in case of spread mooring Tugs of sufficient number and capacity required to control the
relative behaviour of the export tanker and the F(P)SO
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 43

SideSide-byby-side offloading

Risks during manuvre of


the export tankerwhile berthing alongside the FSO (not recommended for FPSO)

Duration of the manoeuvres

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

44

Needs for an Integrity Management of Floating Units


Continuous follow-up of the structure and moorings Inspection, repair & maintenance programme / RBI Initial assessment followed by periodic reassessments Assistance in case of problem and remedial solutions Analysis in case of emergency Storage of data, access to databank through a network system, reporting
Accidents : got the best reaction

Inspection & Maintenance : what, where, how?


Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 45

The main components of the Integrity Management Programme IMPLEMENTATION OF THE "ASSET INTEGRITY MANAGEMENT"
(4 COMPLEMENTARY TASKS):

MODELS / TOOLS (*)

IRM CYCLE (AND RBI)

"RE-ASSESSMENT"

REACTIONS EMERGENCY SITUATIONS


= interaction

(*) INCORPORATES THE TREATMENT OF THE INFORMATION AND REPORTING

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

46

MODELS AND DATABASE HULL FINITE ELEMENTS MODEL (FEM) MOORING MODEL (WHERE NECESSARY GLOBAL MODEL FOR
COUPLED ANALYSIS) RISK BASED INSPECTION MODEL (RBI) DATA MANAGEMENT MODEL

WEB BASED SYSTEM FOR EASY EXCHANGE / ACCESS /


UPDATING OF THE INFORMATION AND EXPERIENCE POOLING

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

47

FEM model : SESAM (example ) (example)

Model of various structures

Assembly of structural models

SESAM
Structural analysis Fatigue calculation

Visualisation of the results

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

48

FEM model: model: VeriSTAR (example) example)

Hull model

VeriSTAR Hull

FEM calculations

Fine mesh for critical details and fatigue calculation

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

49

Mooring calculation softwares : ArianeAriane-3D and Hydrostar (example) example)

Modelling of the units & hydrodynamic calculations

ArianeAriane-3D Hydrostar

Displacements & Efforts in the mooring lines calculations

Modelling of the environment & recording of the metocean data

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

50

Mooring calculation softwares : DeepC (example) example)

Modelling of the mooring

Importation of the hull models and hydrodynamic results from namiques de Sesam

DeepC
Recording of the metocean data Visualisation of the results

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

51

EXAMPLE OF SEMANTIC AND 33-D MODEL (FOR EASY NAVIGATION THROUGH THE DATABASE)

3-D model

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

52

ASSET DATA FOLLOWFOLLOW-UP: EXAMPLE OF DATA RELATED TO CLASS / REGULATION FOLLOWFOLLOW-UP

Flagging system (colours) when inspection is overdue


Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 53

IRM CYCLE AND RBI NOTHING WILL REPLACE THE INSPECTION PROGRAMME THE "INSPECTION MANAGEMENT AND DECISION TOOL" HELPS
THE INSPECTOR (PREPARATION AND RECORDING) AND THE SUPERINTENDENT (MANAGEMENT OF INSPECTIONS, EVALUATION OF FINDINGS AND MAINTENANCE DECISION) THE "RBI TOOL (RISK BASED INSPECTION): INCORPORATES THE NOTION OF ACCEPTABLE RISK (FATIGUE LEVELS, RISK OF COLLAPSE, DEGRADATION OF THE ANTI-CORROSION COATING, AND COST) DETERMINES / ADJUST THE INSPECTION INTERVALS DEVELOPS AND STRUCTURES THE INSPECTION PLAN (EQUIPMENT RANKING BY CRITICALITY)

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

54

INSPECTION MANAGEMENT AND DECISION SUPPORT TOOL (EXAMPLE)

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

55

ACTIVITIES UNDERTAKEN IN A RBI APPROACH

Inspection data evaluation Analysis of results

Inspection Philosophy Inspection Systematics Acceptance criteria

RBI
Consequence of Failure Safety, Environment, Economy Probability of Failure Materials/Environment and Strength Risk evaluation per component

Inspection and testing Execution & Reporting

Inspection Management

Inspection Plan Inspection details, planning, logistics

Inspection Programme Method, Timing, Coverage, Location

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

56

PERIODICAL ASSESSMENT FOLLOWS THE FIRST ASSESSMENT. IS DONE YEARLY. ALLOWS A


RAPID AND RELIABLE RE-ANALYSIS IN ORDER TO: EVALUATE THE EFFECTS OF MODIFICATIONS / CHANGES (IN OPERATIONS, DESIGN) PREPARE THE BASIS OF THE INSPECTION PLAN REEVALUATION EVALUATE THE CONSEQUENCES OF THE INSPECTION FINDINGS ("FRACTURE MECHANICS", ) COMPARE THE RESULTS OBTAINED FROM THE MONITORING WITH THE ANALYTICAL RESULTS (MODELS) EVALUATE THE EFFECTS / CONSEQUENCES OF THE FLOATING UNIT AGEING AND DEGADATION AND THE IMPACT, ESTABLISH THE CUMULATED FATIGUE (BASED ON REAL HISTORICAL DATA) DOCUMENT THE LONGEVITY STUDIES
Bertrand LANQUETIN - DGEP/TDO/LSO/SSF
February 2, 2005 57

TYPICAL EXAMPLE OF A GLOBAL MODEL AND OF SUBSUBMODELS USED FOR A STOCHASTIC ANALYSIS
Global model

Sub-models

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

58

EMERGENCY RESPONSE SERVICE (ERS) ASSISTANCE SERVICE 24 HR/DAY IN ORDER TO PERFORM ALL
NECESSARY CALCULATIONS AND ESTABLISH RECOMMENDATIONS RELATED TO: STABILITY / RESISTANCE OF THE FLOATING UNIT AFTER HULL OR MOORING DAMAGE STABILITY / HULL RESISTANCE IN TRANSITORY STAGES LIKE LIGHTENING, BALLASTING, CARGO TRANSFER EXTREME CONDITIONS SURVIVAL IN DAMAGE STATE, WEATHER AND OPERATIONAL RESTRICTIONS,

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

59

THIRD PARTY ASSISTANCE COMPANY = SOFTWARES, EMERGENCY RESPONSE SERVICE, ADVISOR (NEUTRALITY)
Company Head Office Third party assistance company
Design / Softwares IRM / RBI Re-Assessment Emergency Response

Operated

Company Subsidaries
General Manager Asset Manager Marine Superintendent

Maintenance

Inspection

Contractor

Leasing

Class

Bertrand LANQUETIN - DGEP/TDO/LSO/SSF


February 2, 2005

60

Some of the proposed integrity management systems reviewed

Bureau Veritas :
AIMS

Veristar Offshore (Assessment of life-cycle hull conditions) /

(Asset Integrity Management System for the database and web based system) Life - Cycle Asset Integrity Management / FLCM (Field Life

DNV Software :

Cycle Management System for the database and web based system)

Lloyd's Register : V.Ships : EM&I :

Integrity Assessment of Floating Structures Through Life Condition Monitoring System (TLCM) Asset Integrity Management System (AIMS)