Sunteți pe pagina 1din 4

7/1/13

CSQA Prep - Chapter 7 Quality Control Practices

Create A Quiz

Take Quizzes

Search Quizzes

Home Take Quizzes Set 38 CSQA Prep - Chapter 7 Quality Control Practices

CSQA Prep - Chapter 7 Quality Control Practices


43 Questions I
Created By uhgcsqa - 1220 days ago

Remove Ad

This quiz goes over chapter 7 of the CBOK for the CSQA exam.

Start

Question Excerpt
1.

Remove Excerpt

What are the 4 main testing stages (7.2/7.3)


A.System B.UAT C.End to End D.Unit E.Integration

Related Topics
Quality Control Practices CSQA Prep CSQA exam chapter quiz CBOK

2.

Independent test team is comprised of: (choose 3) (7.4)


A.Test Owner B.Additional Testers C.Key Testers D.Test Manager

Related Quizzes
Chapter 14 Section 2 Vocabulary & Reading Quiz Transition Math Chapter 10 Quiz Technology Applications - Chapter 9 - Review Chapter 12 Inference for proportions Quiz 1 Chapter 12 Types of Inference Procedures quiz

3.

Name one thing that the Testers are not responsible for (7.4)
A.Planning, capturing and conditioning test data B.Executing Tests C.Preparing test documentation D.Updating analyst and design artifacts E.Tracking and reporting defects

4.

What is the definition of validation (7.5)


A.ensures the system operates B.ensures the system operates according to plan C.ensures the system is defect free

5.

What is the definition of verification (7.5)


A.ensures the system complies with the plan B.ensures the system is compliant C.ensures the system is organized D.ensures the system complies with an organization standard and process

6.

Verification requires 5 types of reviews. Which one is not one of the review types? (7.5)
A.Code inspection B.Design C.Test Review D.Functional E.Requirements

7.

True or false Static testing is done with executing code (7.5)


A.True B.False

8.

What is the definition of stress test? (7.9)


A.tests the systems ability to process very large amounts of data B.tests the built in constraints of the system such as internal table size C.tests the systems ability to meet performance standards

9.

What is the definition of Volume testing? (7.9)


A.tests the systems ability to process very large amounts of data B.tests the systems ability to meet performance standards C.tests the built in constraints of the system such as internal table size

www.proprofs.com/quiz-school/story.php?title=csqa-chapter-7

1/4

7/1/13

C.tests the built in constraints of the system such as internal table size 10.

CSQA Prep - Chapter 7 Quality Control Practices

What is the definition of performance testing? (7.9)

A.tests the build in constraints of the system such as internal table size B.Tests the systems ability to process very large amounts of data C.Tests the systems ability to meet performance standards 11.

What are the 3 types of review formats? (7.10)

A.Informal, Semiformal, Formal B.Unofficial, Proper, Reserved C.Start, Mid, Final 12.

There are 3 rules that apply to all reviews, which one is not one of them? (7.11)

A.All members of the review team are responsible for the results of the review B.Identify who is going to be accountable for what actions. C.The product is reviewed not the producer D.Defects and issues are identified, not corrected during the session 13.

This type of review is used to examine a product during a specific time period of it's life cycle. (7.11)

A.Checkpoint B.In Process C.Phase End D.Test Readiness 14.

This review's objective is to evaluate a system as it is being specified, designed, implemented and tested. (7.11)

A.Critical Design B.In Process C.Software Requirements D.Checkpoint 15.

This review looks at the product for the main purpose of determining whether to continue with planned activities. (7.11)

A.Checkpoint Reviews B.Phase End Review C.Critical Design Review D.Test Readiness Review 16.

This review verifies and approved the documented software requirements for the purpose of establishing a baseline and identifying analysis package (7.12)

A.Test Readiness Review B.Critical Design Review C.Software Requirements Review D.Checkpoint Review 17.

This review baselines the detailed design specification (7.12)

A.In Process Review B.Test Readiness Review C.Checkpoint Review D.Critical Design Review 18.

This review is performed when the appropriate application components are near completion. It determines the readiness of the application or project for system and acceptance testing.(7.12)

A.Phase End Review B.Test Readiness Review C.Critical Design Review D.In Process Review 19. 20. 21.

Validation represents __________ Testing (7.20) Verification represents ___________ Testing (7.20) What are the different types of verification techniques? (7.20)

A.Code Walk Thru's B.Design Walk Thru's C.Requirements tracing D.Feasability Reviews E.Code Inspections 22.

When you can see everything from branch to branch that is called __________ box testing (7.22) Name some different types of Validation Techniques (7.22)

23.

A.System Test B.String Test C.Acceptance Test D.Integraions Test E.Unit Test 24.

The Post Implementation review focuses on what questions (choose 2) (7.12)


2/4

www.proprofs.com/quiz-school/story.php?title=csqa-chapter-7

A.Did we overspend our budget? B.was the quality what we expected?

7/1/13
B.was the quality what we expected? C.Did we make it on schedule? D.Did the process work? E.Was there any fallout? 25.

CSQA Prep - Chapter 7 Quality Control Practices

There are 16 types of software systems name 3 of them (7.15)

A.Process Control B.Data Manipulation C.Computer Hardware D.Sensor and Signal Processing E.Advanced Mathmatical Models 26.

Tactical risks are divided into 3 categories, what are they? (7.17)

A.structure, technical, resource B.size, technical, structure C.resource, timeline, knowledge 27.

The risks assoicated with the application and the methodes used to build it are called _______ risks When determining when testing should occur there are 4 phases, which one listed is not one of them? (7.18)

28.

A.Maintenance B.Program C.Test D.Design E.Maintenance 29.

The "V" model of testing shows two development paths which are the two sides of the "V". these 2 proceses are: (7.8)

A.Developmental process and test process B.Test planning process and test execution process C.Requirements development process and programming process D.Test planning process and acceptance test planning process E.System design process and system programming process 30.

Testers are responsible for: (choose more than 1) 7.4

A.Test execution B.Developing test cases and procedures C.Preparing test documentation D.Defect reoprting E.Reviewing analyst and design artifacts 31.

What is the primary objective of configure management? (7.27)


the right the right the right the right change installed on time fix installed at the right time change installed within budget change installed at the right time

A.To get B.To get C.To get D.To get 32. 33. 34.

The _______ of a defect is assigned objectively (7.31) The ________ of a defect is assigned subjectively (7.31) There are 8 considerations that provide the framework for developing testing tactics, name 4 of them (7.14)

A.Acquire and study the test strategy B.Build the system test plan C.Identify the tactical risks D.Determine the project scope E.Determine the type of software systems 35.

The 2 types of Incremental testing are Top-down and Bottom-up (7.24)

A.True B.False 36.

What are the 3 types of Regression testing? (7.25)

A.Unit, System, Full B.System, Regional, Unit C.Unit, Regional Full D.Full, System, Regional 37.

Testing a string of units that accomplish a specific function in the application is called _________ Testing Structural testing is considered ________ ________ testing (2 words) (7.25) Functional testing is considered ________ _________ testing There are 4 change control procedures, which one below is not one of them> (7.28)

38.

39. 40.

The documentation system should be updated with all change sheets or change registers and printouts. B.Developers should make the change A.

www.proprofs.com/quiz-school/story.php?title=csqa-chapter-7

3/4

7/1/13

B.Developers should make the change Someone independent of the person who designed and made the change should be C. responsible for testing the final revised program D.The change should be discussed to determine the impact on the project 41. 42.

CSQA Prep - Chapter 7 Quality Control Practices

Defects are used for ________ improvement (7.33) Which of the below explains the defect tracking process? (7.31/7.32)

A.schedule the correction B.determine if discrepancy is a defect C.report the resolution D.assign the defect to a developer E.prioritize the correction 43.

The Red Sox play in Fenway Park

A.True B.False

Back to top

Login to post comments.


Powered by ProProfs

www.proprofs.com/quiz-school/story.php?title=csqa-chapter-7

4/4

S-ar putea să vă placă și