Sunteți pe pagina 1din 26

KERALA STATE NIRMITHI KENDRA

GOVT.POLY TECHNIC COLLEGE CAMPUS


PRODUCTION CENTRE, KALAMASSERY ERNAKULAM-683 503 PH: 0484-2555944

The Regional Engineer, Kerala State Nirmithi Kendra, Ernakulam invites sealed tenders from contractors of PWD, MES, Railways, Accredited agencies of KESNIK for the following work. Name of work : Construction of Office cum Commercial Complex for Kerala Building and Other Construction Workers Welfare Board at Edappally, Ernakulam. Seven months from the date of Agreement Rs. 98,91,000/Rs. 50,000/Rs. 12,000/-+VAT 12.5% (Orginal) Rs. 6,000/-+VAT 12.5% (duplicate) : : : 12 pm on 14.06.2011 3 pm on 14.06.2011 3.30 pm on 14.06.2011

Period of Completion PAC EMD Cost of Tender form

: : : :

Last date of issue of Tender document Closing date of Tender Opening date of Tender

The undersigned has the right to reject all or any of the tenders without assigning reasons.

Sd/Regional Engineer

Schedule of Works
GROUND FLOOR Sl No Approx. Quantity Description of Work Unit Figure Earth filling and leveling of the land using red earth including cost of materials, labour etc. complete. m3 3 7000.00 Chipping of the piles to a depth of 30cm including cost of labour etc. complete. 10dm3 Welding V cut end of 16mm & 20mm MS rod including cost of Electrode etc. complete Each Earth work excavation in ordinary soil for foundation with in initial lead up to 50m and lift up to 1.5 m including all labour charges etc. complete. 10m3 PCC 1:4:8 using 40 mm size broken stone for foundation including cost of all materials, labour charges etc. complete but excluding cost of cement . m3 RCC 1: 1 :3 using 20mm broken stone including cost Words Figure Words Rate Amount Remarks

1125.00

434.00

143.00

10.50

19.00

22.00

10

21.00

of all materials, labour etc. complete for pile cap but excluding cost of cement . RCC 1: 1 :3 using 20mm size broken stone for grade beam including cost of all materials, labour etc. complete but excluding cost of cement . Dodofor column

m3

m3 m3

11

34.75

--Dodofor lintel, beam , stair & sunshade ---dodo for floor slab Random Rubble Masonry in CM 1:8 for foundation and basement including cost of all materials, labour etc. complete but excluding cost of cement . Earth filling in the basement including all labour charge etc. complete. Solid block masonry in CM 1:6 using solid block of size 30 x 20 x 15cm for super structure including cost of all materials, labour etc. complete but excluding cost of cement . Supplying and fixing wooden frames for doors

m3 m3

12 13

40.00 131.00

m3 m3

14 15

80.00 48.00

m3

16

900.00

17

2250.00

18

1100.00

19

61.00

20

0.70

and windows using pincoda (cheru teak) including cost of all materials, labour etc. complete. Supplying and fixing fully paneled shutter , using picoda (cheruteak) including cost of all materials, labour etc. complete. Supplying and fixing fully glazed shutter including cost of all materials, labour etc. complete. Supplying and fixing good quality powder coated aluminium sections ( twin style sections) of size 100 x 45 x 2 mm width 12mm plain glass including cost of all materials, labour etc. complete. Supplying and fixing hold fast including cost of all materials, labour etc. complete. Supplying and fixing window bar and flats including cost of all materials, labour etc. complete. Supplying and fixing 100mm iron Butt hinges

10dm3

10dm2

10dm2

m2

Q 21 1.74

22

96Nos

including cost of all materials, labour etc. complete. Each 23 24Nos Supplying and fixing 200mm iron Tower bolt Each Supplying and fixing 150mm iron Tower bolt Each 25 9Nos Supplying and fixing 200mm aluminium aldrop including cost of all materials, labour etc. complete. Supplying and fixing 75mm aluminium door handle including cost of all materials, labour etc. complete Supplying and fixing 65mm best quality pad locks including cost of all materials, labour etc. complete. Supplying and fixing 75mm iron hook & eyes including cost of all materials, labour etc. complete. Supplying and fixing 200mm iron hook & eyes

24

12Nos

Each

26

9Nos

Each

27

9Nos

Each

28

44Nos

Each

29

22Nos

including cost of all labour , etc. complete. Plastering walls in CM 1:5, 12mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement .. Plastering ceiling etc. in CM 1:3, 9mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement .. PCC 1:4:8 for flooring including cost of all materials, labour etc. complete but excluding cost of cement .. Floor finishing with vitrified tiles including cost of all materials, labour charges etc. complete but excluding cost of cement .. Floor finishing with ceramic tiles including cost of all materials, labour charges etc but excluding cost of cement . complete. Dadoing with glazed tiles including cost of all

Each

30

662.00

10m2

31

579.00

10m2

32

23.00

m3

33

180.00

m2

34

20.00

m2

35

70.00

36

1241.00

37

373.00

materials, labour charge etc. complete but excluding cost of cement .. White cement washing two coats including cost of materials, labour etc. complete. Painting inside walls with plastic emulsion paint after priming coat including cost of all materials, labour charge etc. complete. Painting the outer walls with weather coat emulsion paint including cost of all materials, labour charge etc. complete. Painting with synthetic enamel paint on wood work etc. including cost of all materials, labour charge etc. complete. Providing hand rails using MS pipe including cost of all materials, labour charges etc. complete Floor finishing of parking area with anti skid paving tiles including cost of all materials, labour charges etc. complete Reinforcement bending, tying, placed in position

m2

10m2

10m2 38 290.00

10m2

39

71.00

10m2

40

15.00

41

487.00

m2

42

699.00

including cost of all material and labour etc. complete but excluding cost of steel . Total FIRST FLOOR 1 14.00 RCC 1:1 :3 using 20mm size broken stone for column including cost of all materials, labour etc. complete. RCC 1:1:3 using 20mm size broken stone including cost of all material, labour etc. complete, but excluding cost of reinforcement for lintel, beam and sunshade

m3

35.75

m3 3 4 38.00 60.00 ---Do---do--for floor slab(1:1 :3) m3 Solid block masonry in CM 1:6 for super structure including cost of all materials, labour etc. complete. m3 Supplying and fixing wooden frames for doors and windows using pincoda (cheruteak) including cost of all materials, labour etc. complete. 10dm3 Supplying and fixing fully paneled shutter , using

1100.00

1600.00

2100.00

67.00

0.80

10

3.36

11

135Nos

12

18Nos

pincoda (cheru teak) including cost of all materials, labour etc. complete. Supplying and fixing fully glazed shutter including cost of all materials, labour etc. complete. Supplying and fixing good quality powder coated aluminium sections ( twin style sections) of size 100 x 45 x 2 mm width 12mm plain glass including cost of all materials, labour etc. complete. Supplying and fixing hold fast including cost of all materials, labour etc. complete Supplying and fixing window bars and flats including cost of all materials, labour etc. complete. Supplying and fixing 100mm iron Butt hinges including cost of all materials, labour etc. complete. Supplying and fixing 200mm iron Tower bolts including cost of all materials, labour etc.

10dm2

10dm2

m2

Each

13

9Nos

14

7Nos

15

7Nos

16

7Nos

17

76Nos

complete. Supplying and fixing 150mm iron Tower bolts including cost of all materials, labour etc. complete. Supplying and fixing 200mm aluminium aldrop including cost of all materials, labour etc. complete. Supplying and fixing 75mm aluminium door handle including cost of all materials, labour etc. complete. Supplying and fixing 65mm pad locks best quality including cost of all materials, labour etc. complete. Supplying and fixing 75mm iron hook & eyes including cost of all materials, labour etc. complete.

Each

Each

Each

Each

Each

Each 18 38Nos Supplying and fixing 200mm iron hook & eyes including cost of all labour , labour etc. complete. Each Plastering walls in CM 1:5, 12mm thick floated hard and trowelled smooth including cost of all

19

653.00

materials, labour etc. complete but excluding cost of cement . 10m2 20 578.00 Plastering ceiling, etc. in CM 1:3, 9mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement .. Floor finishing with vitrified tiles including cost of all materials, labour charges etc. complete but excluding cost of cement .

10m2

21

238.00

m2

22

20.00

23

70.00

24

1231.00

Floor finishing with ceramic tiles including cost of all materials, labour etc. complete but excluding cost of cement but excluding cost of cement .. m2 Dadoing with glazed tiles including cost of all materials, labour etc. complete but excluding cost of cement . . m2 White cement washing two coats including cost of materials, labour etc. complete. 10m2 Painting inside walls with plastic emulsion paint after

25

424.00

26

229.00

27

68.00

priming coat including cost of all materials, labour charge etc. complete. Painting the outer walls with weather coat emulsion paint including cost of all materials, labour charge etc. complete. Painting with synthetic enamel paint on wood work etc. including cost of all materials, labour charge etc. complete. Providing hand rails using MS pipe including cost of all materials, labour charges etc. complete

10m2

10m2

10m2 28 15.00

m 29 100.50 Reinforcement bending, tying, placed in position including cost of all material and labour etc. complete but excluding cost of steel . Qtl TOTAL

SECOND FLOOR

14.00

RCC 1:1 :3 using 20mm size broken stone for

34.50 2

38.00

column including cost of all materials, labour etc. complete but excluding cost of cement .. RCC 1:1:3 using 20mm size broken stone including cost of all material, labour etc. complete, but excluding cost of reinforcement for lintel, beam and sunshade but excluding cost of cement . ---Do---do--- for floor slab(1:1 :3) but excluding cost of cement . Solid block masonry in CM 1:6 for super structure including cost of all materials, labour etc. complete but excluding cost of cement . Supplying and fixing wooden frames for doors and windows using pincoda (cheru teak) including cost of all materials, labour etc. complete. Supplying and fixing fully paneled shutter , using anjili wood including cost

m3

m3 m3

48.00

m3

1000.00

10dm3

1200.00

2100.00

of all materials, labour etc. complete. Supplying and fixing fully glazed shutter including cost of all materials, labour etc. complete. Supplying and fixing good quality powder coated aluminium sections ( twin style sections) of size 100 x 45 x 2 mm width 12mm plain glass including cost of all materials, labour etc. complete. Supplying and fixing hold fast including cost of all materials, labour etc. complete Supplying and fixing window bars and flats including cost of all materials, labour etc. complete. Supplying and fixing 100mm iron Butt hinges including cost of all materials, labour etc. complete. Supplying and fixing

10dm2

10dm2

67.00

m2

0.75

10

3.36

11

129Nos

Each

12

14Nos

13

7Nos

200mm iron Tower bolts including cost of all materials, labour etc. complete. Supplying and fixing 150mm iron Tower bolts including cost of all materials, labour etc. complete. Supplying and fixing 200mm aluminium aldrop including cost of all materials, labour etc. complete. Supplying and fixing 75mm aluminium door handle including cost of all materials, labour etc. complete. Supplying and fixing 65mm pad locks best quality including cost of all materials, labour etc. complete. Supplying and fixing 75mm iron hook & eyes including cost of all materials, labour etc. complete. Supplying and fixing 200mm iron hook & eyes

Each

Each

14

6Nos

Each

15

6Nos

Each

16

6Nos

Each

17

76Nos

Each

18

38Nos

19

654.00

20

581.00

including cost of all labour , labour etc. complete. Plastering walls in CM 1:5, 12mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement . Plastering ceiling, etc. in CM 1:3, 9mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement . Floor finishing with vitrified tiles including cost of all materials, labour charges etc. complete but excluding cost of cement . Floor finishing with ceramic tiles including cost of all materials, labour etc. complete but excluding cost of cement .. Dadoing with glazed tiles including cost of all materials, labour etc. complete but excluding cost of cement . White cement washing two

Each

10m2

10m2

21

275.00

m2

22

20.00

m2

23

70.00

m2

24

1235.00

coats including cost of materials, labour etc. complete. 25 438.00 Painting inside walls with plastic emulsion paint after priming coat including cost of all materials, labour charge etc. complete. Painting the outer walls with weather coat emulsion paint including cost of all materials, labour charge etc. complete. Painting with synthetic enamel paint on wood work etc. including cost of all materials, labour charge etc. complete. Providing hand rails using MS pipe including cost of all materials, labour charges etc. complete Reinforcement bending, tying, placed in position including cost of all material and labour etc. complete but excluding cost of steel . TOTAL

10m2

10m2

26

217.00

10m2

27

57.00

10m2

28

15.00

29

99.00

Qtl

THIRD FLOOR

14.00

34.50

RCC 1:1 :3 using 20mm size broken stone for column including cost of all materials, labour etc. complete but excluding cost of cement .. RCC 1:1:3 using 20mm size broken stone including cost of all material, labour etc. complete, but excluding cost of reinforcement for lintel, beam and sunshade but excluding cost of cement . ---Do---do--for roof slab(1:1 :3) but excluding cost of cement .

m3

m3

38.00

m3

52.00

1000.00

Solid block masonry in CM 1:6 for super structure including cost of all materials, labour etc. complete but excluding cost m3 of cement .. Supplying and fixing wooden frames for doors and windows using pincoda (cheru teak)including cost of all materials, labour etc. complete. 10dm3

1200.00

Supplying and fixing fully paneled shutter , using pincoda(cheruteak)including cost of all materials, labour etc. complete. 10dm2

2100.00

Supplying and fixing fully glazed shutter including cost of all materials, labour etc. complete. 10dm2 Supplying and fixing good quality powder coated aluminium sections ( twin style sections) of size 100 x 45 x 2 mm width 12mm plain glass including cost of all materials, labour etc. complete. Supplying and fixing hold fast including cost of all materials, labour etc. complete Supplying and fixing window bars and flats including cost of all materials, labour etc. complete. Supplying and fixing 100mm iron Butt hinges including

67.00

m2

0.75

10

3.36

11

129Nos

12

14Nos

13

7Nos

cost of all materials, labour etc. complete. Supplying and fixing 200mm iron Tower bolts including cost of all materials, labour etc. complete. Supplying and fixing 150mm iron Tower bolts including cost of all materials, labour etc. complete. Supplying and fixing 200mm aluminium aldrop including cost of all materials, labour etc. complete.

Each

Each

Each 14 6Nos

Each 15 6Nos Supplying and fixing 75mm aluminium door handle including cost of all materials, labour etc. complete. Each 16 6Nos Supplying and fixing 65mm pad locks best quality including cost of all materials, labour etc. complete. Supplying and fixing 75mm iron hook & eyes including cost of all materials, labour etc. complete. Supplying and fixing 200mm iron hook & eyes including

Each

17

76Nos

Each

18

38Nos

19

722.00

20

581.00

21

248.00

22

275.00

23

20.00

24

70.00

cost of all labour , labour etc. complete. Plastering walls in CM 1:5, 12mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement .. Plastering ceiling, etc. in CM 1:3, 9mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement .. Plastering roof top in CM 1:3, 12mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement .. Floor finishing with vitrified tiles including cost of all materials, labour charges etc. complete but excluding cost of cement .. Floor finishing with ceramic tiles including cost of all materials, labour etc. complete but excluding cost of cement . Dadoing with glazed tiles including cost of all

Each

10m2

10m2

10m2

m2

m2

25

1303.00

26

438.00

27

285.00

28

57.00

29

15.00

30

99.00

materials, labour etc. complete but excluding cost of cement .. White cement washing two coats including cost of materials, labour etc. complete. Painting inside walls with plastic emulsion paint after priming coat including cost of all materials, labour charge etc. complete. Painting the outer walls with weather coat emulsion paint including cost of all materials, labour charge etc. complete. Painting with synthetic enamel paint on wood work etc. including cost of all materials, labour charge etc. complete. Providing hand rails using MS pipe including cost of all materials, labour charges etc. complete Reinforcement bending, tying, placed in position including cost of all material and labour etc. complete but excluding cost of steel . TOTAL

m2

10m2

10m2

10m2

10m2

Qtl

FOURTH FLOOR 1 7.50 RCC 1:1 :3 using 20mm size broken stone for column including cost of all materials, labour etc. complete but excluding cost of cement .. RCC 1:1:3 using 20mm size broken stone including cost of all material, labour etc. complete, but excluding cost of reinforcement for lintel, beam and sunshade but excluding cost of cement . ---Do---do--for roof slab(1:1 :3) but excluding cost of cement . Solid block masonry in CM 1:6 for super structure including cost of all materials, labour etc. complete. Supplying and fixing wooden frames for doors and windows using pincoda (cheru teak)including cost of all materials, labour etc. complete. Supplying and fixing fully

m3

12.50

m3 m3

14.00

45.00

m3

50.00

10dm3 6 220.00

0.05

6Nos

4Nos

10

2Nos

paneled shutter , using pincoda (cheruteak) including cost of all materials, labour etc. complete. 10dm2 Supplying and fixing hold fast including cost of all materials, labour etc. complete Q Supplying and fixing 100mm iron Butt hinges including cost of all materials, labour etc. complete. Each Supplying and fixing 200mm iron Tower bolts including cost of all materials, labour etc. complete. Each Supplying and fixing 150mm iron Tower bolts including cost of all materials, labour etc. complete. Each

11

1No

Supplying and fixing 200mm aluminium aldrop including cost of all materials, labour etc. complete. Each

12

1No

Supplying and fixing 75mm aluminium door handle

including materials, complete. 13 1No

cost of labour

all etc. Each

Supplying and fixing 65mm pad locks best quality including cost of all materials, labour etc. complete. Plastering walls in CM 1:5, 12mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement ..

Each

14

379.00

10m2 15 235.00 Plastering ceiling, etc. in CM 1:3, 9mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement .. Plastering roof top in CM 1:3, 12mm thick floated hard and trowelled smooth including cost of all materials, labour etc. complete but excluding cost of cement . Floor finishing with vitrified tiles including cost of all materials, labour charges etc.

10m2

16

80.00

10m2

17

26.00

18

614.00

19

160.00

20

221.00

21

6.00

22

40.00

complete but excluding cost of cement .. White cement washing two coats including cost of materials, labour etc. complete. Painting inside walls with plastic emulsion paint after priming coat including cost of all materials, labour charge etc. complete. Painting the outer walls with weather coat emulsion paint including cost of all materials, labour charge etc. complete. Painting with synthetic enamel paint on wood work etc. including cost of all materials, labour charge etc. complete. Reinforcement bending, tying, placed in position including cost of all material and labour etc. complete but excluding cost of steel. TOTAL

m2

10m2

10m2

10m2

10m2

Grand Total

S-ar putea să vă placă și