Sunteți pe pagina 1din 9

JACK-UP RIG DESIGNS

SELF- ELEVATING MOBILE OFFSHORE DRILLING UNITS

For tropical storm regions with water depths up to 300 feet.

For more than 50 years, LeTourneau Technologies Offshore Products has designed and manufactured the most reliable, robust, and innovative jack-up rigs in the industry. We currently offer self-elevating mobile drilling units in five distinct designs, applicable to most any offshore requirement ranging from shallow draft to harsh-environment drilling. Through a wide range of comprehensive tests and analyses, we ensure each rig you invest in meets LeTourneaus unparalleled performance standardsthe highest in the world.

SUPER 116E WORKHORSE SUPER GORILLA SUPER GORILLA XL

For moderate regions with water depths up to 350 feet.

For moderate regions with water depths up to 375 feet.

For ultra-harsh environments with water depths up to 400 feet.

10

For tropical storm regions with water depths up to 550 feet.

12

Tarzan CLASS
ABOUT THE Tarzan CLASS
operation in water depths up to 300 feet in tropical storm regions.

STANDARD BUILDER FURNISHED OUTFITTING


DESIGN CRITERIA
Classified by the American Bureau of Shipping W A1, and built in accordance with the 1989 MODU Code established by the IMO Resolution A 649 (16). Service temperature -10C (14F)

JACKING SYSTEM
Nine LeTourneau 440-Kip electromechanical rack and pinion drives (dual 3-high). Each leg jacks independently at 1.5 feet, per minute with a total normal elevating capacity of 21,600 kips and preload jacking of 28,350 kips. Monitoring and control from touch screen displays.

The TARZAN jack-up is a self-elevating mobile drilling unit, designed for year-round

HELIDECK
Bow-mounted octagon configuration 73 ft., flat to flat. Designed to CAP 437 Regulations for S61N or S92 helicopters.

SUBSTRUCTURE, SUBBASE, AND CANTILEVER BEAM


Designed and equipped for cantilever drilling mode utilizing the LeTourneau rack and pinion electromechanical skidding system. 50 foot (60' optional) fore and aft movement of the cantilever and +/- 15 foot transverse movement of the substructure permit multiple drilling positions facilitating workover, production, and exploration drilling.

This rig is a result of LeTourneaus quest to meet the hydrocarbon exploration industrys new requirements imposed by complex sub-salt drilling operations, industry innovations, safety, and environment advantages. This new class of jack-up meets these requirements with the same high standards of constructability and robustness available in every jack-up rig with the LeTourneau name. The TARZAN CLASS represents LeTourneaus dedication to industry leadership and to building cost efficient, long life cycle jack-ups.

QUARTERS
Four-level quarters with accommodations for up to 100 persons. Includes medical treatment room, offices, conference room, galley, dining and recreation facilities. Year-round climate control. Top-mounted control house with internal and external access.

Utilization of the LTI opposed-pinion elevating system and complementary leg design have resulted in a significant increase in the environmental criteria and load carrying capacity under both drilling and storm conditions. These new features found on the TARZAN CLASS have evolved from LeTourneaus traditional design philosophy of simplicity of construction, redundancy, robustness, and ease of operation.

ANCHOR WINCHES
Features two optional LeTourneau W-1500TS (2-speed) each with a 50,000 lb. line pull. Features dynamic electric braking, no clutch or transmission, and provides low maintenance operation.

CRANES
Includes 3 PCM-220SS LeTourneau highperformance, solid state pedestal king post cranes. 140 ft. boom length, rated at 150,000 lbs. at 145 ft. reach.

Main Deck
4

MAchinery Deck
5

Super 116E
ABOUT THE SUPER 116E
The Super 116E is an enhanced unit that builds on the strengths of the original workhorse of the industry, the LeTourneau 116-C, while expanding the capability of its predecessor, the Super 116. The Super 116E provides the international offshore drilling industry with a proven versatile and cost-efficient tool for exploration and development drilling and workover capabilities in most world regions.

STANDARD BUILDER FURNISHED OUTFITTING


DESIGN CRITERIA
Classified by the American Bureau of Shipping W A1, and built in accordance with the 1989 MODU Code established by the IMO Resolution A 649 (16). Service temperature -10C (14F)

CRANES
Includes 3 LeTourneau high-performance solid state pedestalking post cranes. One model PCM-220SS/140 ft. boom rated at 150,000 lbs. at 37 ft. reach. Two model PCM-120SS/ 120ft. booms rated at 83,280 lbs. at 25 ft. reach.

HELIDECK
Octagonal configuration 73 ft. flat to flat. Designed for Sikorsky S61N. CAP437 structure.

JACKING SYSTEM
60 LeTourneau 375-Kip electromechanical rack and pinion drives (5-high). Each leg jacks independently at 1.5 ft. per minute with a total normal elevating capacity of 20,250 kips. Monitoring and control from touch screen displays.

QUARTERS
Four-level quarters with accommodations for up to 110 persons. Includes medical treatment room, galley, dining, and recreation facilities. Year-round climate control. Topmounted control house with internal and external access.

SUBSTRUCTURE SUBBASE AND CANTILEVER BEAM


Designed and equipped for cantilever drilling mode utilizing the LeTourneau rack and pinion electromechanical skidding system. 70 foot fore and aft movement of the cantilever and +/- 15 foot transverse movement of the substructure permit multiple drilling positions facilitating workover, production, and exploration drilling. Note: Combining drilling loads composed of hook, rotary, setback loads, and conductor tension may be supported to 2,650 kips.

ANCHOR WINCHES
The Super 116E cantilever with its electromechanical transverse and longitudinal skidding system allows for maneuvering the rotary 15 feet each side of center and 70 feet from the stern of the platform. Features optional LeTourneau W-1500TS (2-speed) Lebus grooved anchor winches and level winder each with a 50,000 lb. line pull. Drum capacity for 2,000 ft. 1-11/2 inch wire rope. Features dynamic electric braking, no clutch or transmission, and provides low maintenance operation. Lebus level winder and fairlead are included.

Main Deck
6

Mezzanine Deck

Machinery Deck
7

Workhorse
ABOUT THE WorkHorse
and 100-knot winds in 375 feet of water while supporting a 6,000-kip payload, the WORKHORSE jack-up rig utilizes

STANDARD BUILDER FURNISHED OUTFITTING


DESIGN CRITERIA
Classified by the American Bureau of Shipping W A1, and built in accordance with the 1989 MODU Code established by the IMO Resolution A 649 (16). Service Temperature -20C (4F) Note: When required by the customer, the Workhorse can be built to meet the requirements of other regulatory bodies.

JACKING SYSTEM
Built with 72 LeTourneau 440-Kip opposed electromechanical rack and pinion drives (dual 3-high). Each leg jacks independently at 1.5 ft. per minute with a total normal elevating capacity of 28,800 kips. Preload jacking of 37,800 kips. Monitoring and control from touch screen displays.

Designed to survive 55-foot seas combined with a 2-knot current

HELIDECK
The Workhorse features a bow-mounted octagonal helideck for the use of an S61N or S-92 helicopter.

SUBSTRUCTURE, SUBBASE, AND CANTILEVER BEAM


Designed and equipped for cantilever drilling mode utilizing the LeTourneau rack and pinion electromechanical skidding system. 70 foot (80 optional) fore and aft movement of the cantilever and +/- 15 foot transverse movement of the substructure permit multiple drilling positions facilitating workover, production, and exploration drilling. Note: Combining drilling loads composed of hook, rotary, setback loads, and conductor tension may be supported to 2,650 kips.

LeTourneau 440-kip (rated elevating) opposed-pinion elevating system; a tested and proven evolution of our prior units with more than 7,600 units built.

QUARTERS
The Workhorse comfortably accommodates up to 120 persons in single or double staterooms on a 5-level superstructure. Quarters include 6 offices, a conference room, and 2 recreation rooms.

The WORKHORSE consists of a triangularshaped steel hull with 6-foot innerbottom and perimeter tanks, equipped with 3 open-truss legs of square cross section and tubular rack/chord cornerposts. The unit is supported by LeTourneau rack and pinion elevating systems. The hull is equipped with engine/generator systems, marine systems, drilling mud processing equipment, workshops and storage rooms, a 5-level accommodation superstructure for 120 persons, and a helideck for the use of an S61N or S-92 helicopter.

ANCHOR WINCHES
Features optional LeTourneau W-1500TS (2-speed) Lebus grooved anchor winches and level winder each with a 50,000 lb. line pull. Features dynamic electric braking, no clutch or transmission, and provides low maintenance operation. Lebus level winder and fairlead are included.

CRANES
Includes 3 LeTourneau high-performance solid state pedestal-king post cranes. One model PCM-220SS/140 ft. boom rated at 150,000 lbs. at 37 ft. reach. Two model PCM-120SS/120ft. booms rated at 83,280 lbs. at 25 ft. reach.

Main Deck
8

Mezzanine Deck

Machinery Deck
9

Super Gorilla
ABOUT THE SUPER GORILLA
Designed and manufactured by LeTourneau Technologies Offshore Products, the Super Gorilla lives up to the tough legacy of the original Gorilla Class. This high-reliability jack-up is known for coining the term Harsh-Environment Jack-Up in 1981. The Gorilla Class jack-ups are built strong enough to perform almost anywhere in the world, including some of the roughest waters known to drillers, the Central North Sea, the African coasts, the coast of Eastern Asia, both coasts of North and South America, and the Bering Sea.

STANDARD BUILDER FURNISHED OUTFITTING


DESIGN CRITERIA
American Bureau of Shipping W A1 Det Norske Veritas 1A1 IMO A.649 (16) 1989 MODU Code Norwegian Petroleum Directorate CNOPB, CNSOPB HSE UK United States Coast Guard Service Temperature -20C (4F) Note: When required by the customer, the Super Gorilla can be manufactured to meet the requirements of other regulatory bodies.

CRANES
Includes 5 of LeTourneaus high-performance marine cranes. Four model PCM-350SS/N/123.5 ft. booms rated at 146,000 lbs. at 55 ft. and one model PCM-120SS/ N/100 ft. boom rated at 98,400 lbs. at 22 ft.

JACKING SYSTEM
Features 72 LeTourneau 1,000-Kip electromechanical rack and pinion drives (dual 4-high). Each leg jacks independently at 1.5 feet per minute, with a total normal elevating capacity of 72,000 kips and preload jacking of 86,400 kips. Monitoring and control from touch screen displays.

HELIPORT
The Super Gorilla features a heliport 94 x 90 feet designed to North Sea standards for a Sikorsky S-76.

SUBSTRUCTURE, SUBBASE, AND CANTILEVER BEAM


Designed and equipped for cantilever drilling mode utilizing the LeTourneau rack and pinion electromechanical skidding system. 75 foot (100' optional) fore and aft movement of the substructure permit multiple drilling positions facilitating workover, production, and exploration drilling. Note: Combination of hook, rotary, setback, and conductor tension loads is not to exceed the total imposed load of 3,750 kips.

QUARTERS
The Super Gorillas size allows for spacious quarters for a standard complement of 120 persons in 2-man rooms with separate office area.

ANCHOR WINCHES
Four W-2000 electric-drive 2-speed anchor winches each with a 100,000-lbs. line pull. Features electric braking, no clutch or transmission, and provides low maintenance operation.

The Super Gorilla features the Slotilever that can drill in both the slot and cantilever modes in a pattern of 102 x 24 feet (31 x 7.3 meters) with drilling loads up to 3,750 kips.

In addition, the first Super Gorillas are dual classified: American Bureau of Shipping W Al, Det Norske Veritas 1A1 (N) and built in accordance with the Mobile Offshore Drilling Unit Regulations established by the USCG, IMO, NPD, and HSE (UK) and other regulatory bodies.

Mezzanine Deck Main Deck


10

Machinery Deck

11

Super Gorilla XL
ABOUT THE SUPER GORILLA XL
The Super Gorilla XL takes high-performance to new depths. Operating within tropical storm regions in water depths to 550 feet, the Super Gorilla XL jack-up is built to the same robust standards as its cousin, the Super Gorilla. Just like the Super Gorilla, the XL is tough enough to perform almost anywhere in the world, including the rough waters of the Central North Sea, the African coasts, the coast of Eastern Asia, both coasts of North and South America, and the Bering Sea.

STANDARD BUILDER FURNISHED OUTFITTING


DESIGN CRITERIA
American Bureau of Shipping W A1 Det Norske Veritas 1A1 IMO A.649 (16) 1989 MODU Code Norwegian Petroleum Directorate CNOPB, CNSOPB HSE UK United States Coast Guard Service Temperature -20C (4F) Note: When required by the customer, the Super Gorilla can be manufactured to meet the requirements of other regulatory bodies.

CRANES
Includes 5 LeTourneau high-performance marine cranes. Four model PCM-350SS/N/123.5 ft. booms rated at 146,000 lbs. at 55 ft. and one model PCM-120SS/N/100 ft. boom rated at 98,400 lbs. at 22 ft.

JACKING SYSTEM
Features 72 LeTourneau 1,000-Kip electromechanical rack and pinion drives (dual 4-high). Each leg jacks independently at 1.5 feet per minute, with a total normal elevating capacity of 72,000 kips and preload jacking of 86,400 kips. Monitoring and control from touch screen displays.

HELIPORT
The Super Gorilla XL features a heliport 94 x 90 feet designed to North Sea standards for a Sikorsky S-76.

SUBSTRUCTURE, SUBBASE, AND CANTILEVER BEAM


Designed up to 100 feet, and equipped for cantilever drilling mode utilizing the LeTourneau rack and pinion electromechanical skidding system. 75 foot (100' optional) fore and aft movement of the substructure permit multiple drilling positions facilitating workover, production and exploration drilling. Note: Combination of hook, rotary, setback, and conductor tension loads is not to exceed the total imposed load of 3,750 kips.

QUARTERS
The Super Gorilla XLs size allows for spacious quarters for a standard complement of 120 persons in 2-man rooms with separate office area.

And like The Super Gorilla, the XL features the Slotilever which allows drilling in both the slot and cantilever modes in a pattern of 102 x 24 feet (31 x 7.3 meters) with drilling loads up to 3,750 kips.

ANCHOR WINCHES
Four W-2000 electric-drive 2-speed anchor winches each with a 100,000-lbs. line pull. Features electric braking, no clutch or transmission, and provides low maintenance operation.

Additionally, all Super Gorilla Class rigs are dual classified with the American Bureau of Shipping W A1, Det Norske Veritas 1A1 (N) and built in accordance with the Mobile Offshore Drilling Unit Regulations established by the USCG, IMO, NPD, and HSE (UK) and other regulatory bodies.

Main Deck
12

Mezzanine Deck

Machinery Deck
13

THE MOST RELIABLE RIGS START WITH THE MOST INNOVATIVE MINDS

Since 1955, when LeTourneau launched the worlds first independent leg offshore jack-up rig, The Scorpion, we have demonstrated our commitment to making rigs that stand the test of time. We do this through a combination of innovative thinking and a relentless dedication to building jack-up rigs that meet, and often exceed, customer requirements. The truth is that no other manufacturer in the world designs, engineers, and fabricates a more durable, reliable self-elevating mobile jack-up rig than LeTourneau Technologies Offshore Products. No other rig manufacturer offers as many jack-up rig designs. Our fabrication facilities are the most extensive in the country. Our commitment to flexibility is evident in our innovative licensing and kit component packaging options, the heart of every LeTourneau rig. And our customer service representatives are the most knowledgeable and responsive youll find anywhere. Unlike many others who design for the short term, you can be sure that LeTourneau will be there for years to come with the systems, products, and services that not only meet todays deep drilling challenges, but also stand ready to meet whatever the industry brings next.

CERTAIN

EVEN WHEN THE WORLD ISNT

With our world more demanding and unpredictable than ever, its reassuring to know that LeTourneau Technologies Offshore Products is engineering and building jack-ups with the worst case scenario in mind. As a result, we not only deliver the worlds

most stable and reliable rigs, we also deliver supreme confidence in even the most extreme conditions, especially during set-up. In fact, many LeTourneau rigs have been operating for more than 30 years. Long rig life. Reduced downtime. And ultra-efficient operations. While nothing in this world is certain, at least with LeTourneau, you can count on all this and much more.

14

15

LeTourneau Technologies Offshore Products designed and built the worlds first jack-up drilling rig in 1955, and has designed and built close to 200 jack-ups since then. As part of LeTourneau Technologies, Inc. (LTI), the company is a leader in offshore jack-up drilling rigs, offering more standard designs and deeper experience than any other supplier.

P.O. Box 2307 Longview, TX 75606 903-237-7500 lti-offshore.com

LTI Drilling Systems


LM174 05-08 2.5

LTI Forestry Products

LTI Mining Products

LTI Steel Products

S-ar putea să vă placă și