GENERAL INFORMATION 1
PilingworksCASiteLuqa
Unless otherwise stated in this bill of quantities, the items included are measured according to the SMM7 measurement
In particular, unless otherwise specifically stated in a bill of quantities or herein, the following shall be deemed to be included with all items; Labour and all costs in connection therewith - Materials, goods and all costs in connection therewith - Assembling, fitting and fixing materials and goods in position including all setting out - Plant and all costs in connection therewith - Waste of materials - Square cutting - Establishment charges, overhead charges and profit Costs for works and services described in the various work sections that are necessary in the execution of the works by the Contractor are to be incorporated in the tender rates of the relevant sections. Protection of finished works such that these are not damaged by the works in progress. The cited quantities are to be considered as provisional and may be changed depending on site requirements Any claims for variations in terms of rates and quantities are subject to the approval of the Engineer in charge. Variations that are not endorsed by the Engineer shall not be accepted. Double Handling: The Contractor shall allow for such extra costs in his rates and / or lump sums. No additional claims from the contractor for double handling shall be accepted Unless mentioned otherwise, all rates include for supply of materials, labour, hire and use of equipment and tools (electrical power tools included) hire and use of scaffolding, preparation works, cleaning etc. to ensure a complete and finished job. Dust Generation: All tools and / or equipment that usually generates dust while in operation, shall be fitted with a vacum device to minimize dust generation - wherever used It is assumed that the tenderer has visited the site and made the necessary inspection, familiarised himself with the works and has allowed a provision for the complete installation of the works. All material / debris resulting from demolition shall become the property of the contractor, and include carting away to a dumping site approved by the relevant authorities. The rates shall include for handling of all materials, cranage, hire and use of chute
4 5 6 7 8
10
11
12
Page 1 of 6
WasteservMaltaLtd BillofQuantities
D GROUNDWORK
PilingworksCASiteLuqa
Item
Description
Unit
Qty
Rate exc Amount in Vat, but exc Vat, but including all including all other charges other charges
Where the ground conditions differ from those stipulated in the design, appropriate action should be taken in agreement with the engineer. For details and proposed method of construction of piles Refer to drawings: Attached
Page 2 of 6
WasteservMaltaLtd BillofQuantities
D GROUNDWORK
PilingworksCASiteLuqa
Item
Description
Unit
Qty
Rate exc Amount in Vat, but exc Vat, but including all including all other charges other charges
Initial Concrete shall be poured directly from Top of Pile, so as to create a bell formation as in drawings. Amount to be poured in such way, shall be as directed by Architect in change
Submerged concrete shall be compacted by internal vibration. Suitably qualified and experienced person shall be in charge of the execution of the work.
Spacers around the reinforcement cage shall be placed at intervals of not more than 3.0m and at least three in number should be placed at each level.
Bored piles (4 nr) Temporary casings Driving down cylindrical mild steel (minimum 3mm thickness) temporary casing to prepare for augering; internal diameter 0.60m; including the subsequent removal of temporary casing as directed by Architect & Civil Engineer.
16
Boring/Augering B Boring or augering in temporary casing: an internal pile diameter 0.60m; any type of rock/material; average depth 4.00m below existing road level. Excavation C Excavate 1.4m x 1.4m x 0.5m deep area around pile location, including the removal of kerbs. Paving blocks should be stored to be re-used later.
16
m3
15.00
Page 3 of 6
WasteservMaltaLtd BillofQuantities
D GROUNDWORK
PilingworksCASiteLuqa
Item
Description
Unit
Qty
Rate exc Amount in Vat, but exc Vat, but including all including all other charges other charges
16
m3
Pile Cap A C30 Concrete Cast in situ for pile cap 1.4m x 1.4m x 0.5m deep approximately 1m3 each pile cap m
3
Aggregate >10mm but <20mm; obtained off site, average thickness 0.025m; around 5m in length
In situ concrete pressure grouting consisting of C25 (grout) around location of piles prior to boring of the pile shaft to consolidate the underlying material as per Specs D40. Located at varying depths; rate to include borehole for inserting pressure hose and drilling of the necessary holes Reinforcement to piles Pile diameter 600mm
20
D E
kg kg
465.00
475.00
High Yield Rebar fy = 460 N/mm2; Bar size 12mm; curved (helical)
Gate Post G Carefully position steel gate post (to be supplied by contracting authority), into upper pile casing approximate depth 0.80m below exiting road level, including welding to the steel stirrup cage in pile cap Supply and Install, circular formwork to protect steel gate post, above existing street level, approximate length 1.50m with a diameter of circa 300mm.
nr
nr
0.00
Page 4 of 6
WasteservMaltaLtd BillofQuantities
D GROUNDWORK
PilingworksCASiteLuqa
Item
Description
Unit
Qty
Rate exc Amount in Vat, but exc Vat, but including all including all other charges other charges
Making Good
Making Good for areas disturbed by above works, including but not limited to the supply and laying of new kerbs, laying of previously stored paving blocks, including required subbase formation.
item
0.00
Page 5 of 6
WasteservMaltaLtd BillofQuantities
Item Collection for D30 PILING Description
PilingworksCASiteLuqa
Page
Total
Pages 3
Page 4 Page 5
Euro
Page 6 of 6