PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS

(CL07) ITEM Soil investigation The contractor shall implemented of exploratory drilling and mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer SITE DEVELOPMENT Earthworks, concrete works, water proofing, moisture protection for foundations works are measured in BOQ AP06 The bidder is advised to visit the site before quoting the rates in order to get himself familiarized with the present site conditions Site clearance and demolitions 02 Demolish and clear away existing structures, pavings, electrical lighting, pavements or upstands, cut and plug or reroute existing service lines or utilities inside property line, clear site of rubbish or any impediments, loose top soil and as deemed necessary, for the total site cluster number 7 (CL07) area, approximately (16150m2), subject to engineer approval and as coordinated with public pension agency as shown on drawing CL07- XC-01 Note Note DESCRIPTION QTY UNIT RATE AMOUNT SR

M3

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals. All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 01 Excavation oversite on unclassified ground including all hard and rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. Fill oversite with approved imported fill material according to site soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. Note DESCRIPTION QTY UNIT RATE AMOUNT SR

Note

50

M3

02

6500

M3

Note
Work on proposed structural built-up areas from part of the Work pertaining to respective building or structure as measured elsewhere. Note

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install precast concrete shotblasted pavers (beige color) size 400x400x60mm thk. including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no A1 on drawing CL07-XL301 to suit required locations as shown on drawing CL07-XL101 Supply and install precast concrete shotblasted pavers (gray & light gray colors) size 400x400x60mm thk including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A2 on drawing CL07-XL301 to suit required locations as shown on drawing CL07-XL101 Supply and install precast concrete shotblasted pavers (beige & light beige color) size 400x400x60mm thk w./grey color granite band shotblasted size 200x200x30mm thk including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. B3 on drawing CL07-XL301 to suit required locations as shown on drawing CL07-XL101 Supply and install polished granite paving dark &light colors,size 400x400x30mm thk w.\ granite band dark color, size 200x200x30mm including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. C4 on drawing CL07-XL301 to suit required locations as shown on drawing CL07-XL101 QTY UNIT RATE AMOUNT SR

910

M2

02

1700

M2

03

85

M2

04

350

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install concrete screed with epoxy coat finish including 100mm/50mm thick cast-in-place concrete slab with A193-WWF reinforcement mesh, polyethylene moisture barrier, compacted sub grade, 3mm water proofing membrane on R.C. slab as per detail no. D on drawing CL07-XL301 to suit required locations as shown on drawing CL07-XL101 Supply and install asphalt paving comprising 80mm bituminous wearing course, bituminous prime coat, including granular base course, 3mm water proofing membrane on R.C. slab as per detail no. E on drawing CL07-XL301 to suit required locations as shown on drawing CL07-XL101 CURBS AND EDGING 03 Supply and install precast concrete road curb, size 300X500X150 mm with exposed aggregate finish including bedding, haunching, cast in place concrete base and concrete grout behind curb, 20mm thick cement mortar setting bed, on R.C. slab as per detail no.1 on drawing CL07-XL302 to suit required locations as shown on drawing CL07-XL101 SUNDRIES Tree/palm pit Formation of cast iron grating tree / palm pits surround including concrete edge pavers and cement mortar setting bed as detail 2 on drawing XL302 to suit required locations as shown on drawing CL07-XL101 04 Cast iron grating tree / palm pits wheel stopper Precast concrete wheel stopper including dowels, grouting and accessories for complete installation as per detail 3 on drawing XL302 to suit required locations as shown on drawing CL07-XL101 05 Precast concrete wheel stopper QTY UNIT RATE AMOUNT SR

7010

M2

02

6157

M2

1546

21

No.

231

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION QTY UNIT RATE AMOUNT SR

SITE SIGNAGE Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL07-XL601 up to CL07-XL604 and as per specifications 01 02 03 ( RESIDENTIAL SIGN ) ( GATE SIGN ) ( ADVERTISING PANEL ) Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL07-XC-07 up to CL07-XC-09 and as per specifications REGULATORY SIGNS 04 05 06 07 08 Ref. type R2-1 (GIVE WAY ) Ref. type R5-1 ( ENTRY PROHIBITED ) Ref. type R8-1 ( NO LEFT TURN ) Ref. type R8-2 ( NO RIGHT TURN ) Ref. type W11-1 ( PEDESTRAIN CROSSING ) INFORMATIVE SIGNS 09 10 Ref. type I-1 (PARKING) Ref. type I-2 (ENTRY )

10 1 1

No. No. No.

8 4 1 2 9

No. No. No. No. No.

2 2

No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION QTY UNIT RATE AMOUNT SR

ROAD SIGNAGE & PAVEMENTMARKING Thermoplastic paint for traffic marking on drive way at basement/ground floor and ramps floor as per Manufacturer's standard as shown on details on drawing CL07-XC-07 up to CL07-XC-09 and as per specification and as per engineer's instructions pavement marking 01 02 03 04 05 06 07 08 09 10 11 12 White edge line, ref. detail 2 Lane marking, as per detail 3 Central plaza parking sign, as per detail 4 Small mosque sign, as per detail 5 Baskeball playground sign, as per detail 6 Dotted line marking (give way line), ref. detail 7 South gate sign, as per detail 8 Through traffic arrow, ref. detail 9-1 Right turn arrow, ref. detail 9-2 Left turn arrow, ref. detail 9-3 Through & right turn arrow, ref. detail 9-4 Through & left turn arrow, ref. detail 9-5 MISCELLANEOUS STRUCTURES Reinforced concrete ( ETS ROOM ) under ground with stairs including earthworks, concrete works, water proofing , doors , finishing and all associated work as per drawing and spec. 13 ETS Room

830 390 195 120 55 740 98 34 12 6 3 5

M M M M M M M No. No. No. No. No.

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION QTY UNIT RATE AMOUNT SR

LANDSCAPING Trees including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1 on drawing CL07-XL-401 01 T/Fm Lawn planting, including soil planting mix, filter membrane and drainage layer, screed sloped to drain all as per details and planting schedule as per detail P2 on drawing CL07-XL-401 02 L/Cd

37

No.

392

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION QTY UNIT RATE AMOUNT SR

SITE DEVELOPMENT Collection Sheet -1 Sheet -2 Sheet -3 Sheet -4 Sheet -5 Sheet -6 Sheet -7

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION QTY UNIT RATE AMOUNT SR

DIVISION 2 - SITE WORK TRAFFIC MARKING DIMENSION Thermoplastic paint for traffic marking on parking pavement as detail 11 shown on drawing CL-GA-901 and specification 01 02 Parking lane marking Handicapped marking on floor

1895 10

M No.

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DIVISION 9 - FINISHES EXTERNAL FINISHES Finishing : walls including metal angle beads and lathing at junctions of differing backgrounds 01 Non toxic epoxy paint on structure ,ref. W07 to suit external surface DESCRIPTION QTY UNIT RATE AMOUNT SR

3250

M2

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 10 - SPECIALITIES SIGNAGE Manufacturer's standard indoor signs, letters and plaques including fixings, finishes, accessories complete as per interior design drawings CL07-i901 up to CL07-i905 and all required materials and equipments to complete and finish the works according to specifications, drawings and code of practice 01 02 Ref. type S10 Ref. type S11 25 10 No No QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 11 -EQUIPMENT COLUMN GUARD Corner and column guard Supply and install rubber columm guard including all reguired to fix the work as per detail No.18 shown on drawing CL-GA-901 and according to specifications QTY UNIT RATE AMOUNT SR

01

rubber columm guard

16

No

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS AUTOMATED WASTE COLLECTION SYSTEM Supply and provide all required to construct, test and operate automated waste collection system, consisting of the following items:01 Discharge valve room with basement floor including all required works as detailed on drawing no. STM - ITCCP2 - TD - 008. Contractor shall perform all required coordination with other trade to ensure proper installation and operation of the complete system to transport waste from tower chute to pipe networks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications PIPE WORK Supply and installation of Automated waste collection system piping. Item shall include the earth works, insulation, ,concentric reducer, puddle flanges ,inspection covers and all required materials and equipments to complete the transport pipe line from DV rooms , outdoor load stations and full vacuum load stations to waste plant 02 508mm under/above ground transport pipe RC MANHOLE Supply and install cast insitu or precast reinforced concrete manhole ,the item shall include excavation, backfill insulation ,inspection cover steel rungs and all required to complete the work. 03 RC manhole to suit required location in sitesas shown on drawings STM - ITCCP2 - TD 001 to 016 310 M 8 No. QTY UNIT RATE AMOUNT SR

No.

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 100 mm dia. 150 mm dia. Accesssories 03 Ground cleanout 15 mm dia, ref. GCO Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 04 Inspection chamber, ref. (IC) 600x600mm WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 80 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 05 75 mm dia 215 M 3 No 3 No 180 345 M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION Drainage installation to the external drainage network Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover, UPVC pipework schedule 40 to nearest main sewer manhole and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 01 02 Inspection chamber, ref. (IC) 600x600mm Slow down chamber 8 3 No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM MANHOLE AND COVERS Supply , install, testing and commissioning precast concrete sewer manholes with standard traffic (heavy duty) type cast iron manhole covers and frames, access ladders, concrete channel at manhole bed, foundation bed, drop pipe to manhole where required, all associated earthworks, damp proofing, and all materals, equipments required to complete and finish. the work according to specifications section 02605, 02730, drawings and code of practices 01 Sewer manhole, ref. (SMH) POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 03 04 50 mm dia. 63 mm dia. 100 mm dia. Reinforced concrete under ground water tank and pump room with proprietary cast iron manhole covers and frames the work shall include but not limited to earthworks, concrete works, sump pit, and submersible pump internal lining and water proofing, access ladders, pipework and valving, test main fold vent pipes, truck fill pipework with back flow preventer, ventilating fan and duct work within tank and pump room structure, and UPVC schedule 80 drainge pipe from submersible pump to the nearest sewer manhole and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 05 06 07 Potable water tank CAP 230 M3 Potable water tank CAP 269 M4 Fire water tank CAP. 176 M3 1 1 1 No. No. No. 305 100 320 M M M 3 No. DESCRIPTION QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION POTABLE WATER SUPPLY SYSTEM Drainage installations Reinforced concrete gray water tank with proprietary medium duty cast iron manhole cover and frame, including sump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concrete work, earthwork & water proofing measured elsewhere) 01 02 03 04 Gray water tank CAP. 11 M3 Gray water tank CAP. 29 M3 Gray water tank CAP. 41 M3 Gray water tank CAP. 42 M3 Packaged type variable speed discharge pressure system Gray water lift pumps (one duty & one stand-by), including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing as per spec. section 15453 02 Gray water lift pumps CAP. 5 KW Allow for the design, supply and installation of packaged type waste water treatment plant complete including filter, chemical feeders, air blowers controls, wirings, piping and all as associated works as per specifications section 02736 and scheduled on drawing 07 07 07 07 Packaged water treatment unit. Cap. 11 m3/day Packaged water treatment unit. Cap. 29 m3/day Packaged water treatment unit. Cap. 41 m3/day Packaged water treatment unit. Cap. 42 m3/day NON-POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for non-potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 04 100 mm dia. Accessories 05 Isolating & check valve assembly 100 mm dia. To Collection 3 No SR 120 M 2 1 1 1 No. No. No. No. 5 Set 2 1 1 1 No. No. No. No. QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION POTABLE WATER SUPPLY SYSTEM Supply, installation and test Packaged type constant pressure booster potable water pumps, set of one duty and one stand by pump, including piping and valving network within pump chamber, complete with all controllers, accessories for automatic operateion and all associate works as per code standard and as described on drawings and specification 01 02 Ref. PWP CAP 7.17 KW Ref. CP CAP 0.5 HP Accessories 03 04 05 Water meter assembly 63 mm dia., ref. WMA Water meter assembly 50 mm dia., ref. WMA Back flow preventer assembly, 100mm dia., ref. BFPA Supply, installation and test Electrically driven horizontal split case centrifugal fire pump, including piping network and valving within pump chamber,complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 06 07 Ref. FP1 CAP 75 KW electrically driven Ref. FP2 CAP 75 KW fuel diesel driven 1 1 No No 1 6 1 No No No 2 2 Set Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM FIRE WATER UTILITIES Supply, installation and test Electrically driven peripheral turbine Jockey pump, including piping network and valving within pump chamber, complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 01 Ref. JP CAP 5 KW Supply, install and testing pipework, UPVC Schedule 80 for fire water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 100 mm dia. Accessories 03 Isolating & check valve assembly 100 mm dia., IRRIGATION WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 04 05 06 07 08 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 58 50 215 255 45 M M M M M 1 No. 35 M 1 No DESCRIPTION QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15 - MECHANICAL IRRIGATION WATER INSTALLATION Accessories 01 Supply and installation irrigation controller as detailed on drwings and as per specifications Supply and installation bubbler for trees Supply and installation spray lawn sprinkler Gate valve W/valve box 20 mm dia., Gate valve W/valve box 25 mm dia., Gate valve W/valve box 32 mm dia., Gate valve W/valve box 40 mm dia., Gate valve W/valve box 50 mm dia., Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 09 10 11 12 13 Ref. RCV 20mm dia. Ref. RCV 25mm dia. Ref. RCV 32mm dia. Ref. RCV 40mm dia. Ref. RCV 50mm dia. DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 14 15 Proprietary tank units CAP. 2800 Lit. Proprietary tank units CAP. 1890 Lit. To Collection 1 1 No. No. SR 1 1 1 1 1 No. No. No. No. No. 1 No. QTY UNIT RATE AMOUNT SR

02 03 04 05 06 07 08

40 11 1 1 1 1 1

No. No. No. No. No. No. No.

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 04 05 06 32 mm dia. 40 mm dia. 50 mm dia. 75 mm dia. 100 mm dia. 150 mm dia. Accesssories 07 08 09 10 Floor drain 50mm dia., ref. FD Floor cleanout 75 mm dia, ref. FCO Floor cleanout 100 mm dia, ref. FCO Cleanout 75 mm dia., ref. CO WASTE AND DRAINAGE INSTALLATION Supply, installation and test discharge pipe work UPVC schedule 80 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 11 75 mm dia 40 M 10 3 61 40 No No No No 80 25 120 455 1250 130 M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15 - MECHANICAL MANHOLE AND COVERS Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 04 05 06 20 mm dia. 25 mm dia. 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. Supply, install and testing pipework, UPVC Schedule 80 for non-potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 07 08 09 10 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. Drainage installations Reinforced concrete gray water tank with proprietary medium duty cast iron manhole cover and frame, including sump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concrete work, earthwork & water proofing measured elsewhere) 11 Gray water tank CAP. 11 M3 2 No. 430 33 335 80 M M M M 560 20 285 200 50 50 M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION POTABLE WATER SUPPLY SYSTEM Drainage installations Packaged type variable speed discharge pressure system Gray water lift pumps (one duty-one stand-by), including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing as per spec. section 15453 01 Gray water lift pumps power 6 KW Allow for the design, supply and installation of packaged type waste water treatment plant complete including filter, chemical feeders, air blowers controls, wirings, piping and all as associated works as per specifications section 02736 and scheduled on drawing 02 Packaged water treatment unit Accessories Hose bib 20mm dia., ref. HB 03 04 05 06 07 Water meter assembly 63 mm dia., ref. WMA Isolating valve 25 mm dia., ref. IV Isolating valve 63 mm dia., ref. IV Isolating valve 75 mm dia., ref. IV Isolating and check valve assembly 100 mm dia., 30 8 8 2 8 2 No No No No No No 2 No 2 Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, installation and test Pipework, UPVC class 5 including fittings, trenching, back fill supports system and all associate works as per code standard 01 02 03 04 05 06 07 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 63 mm dia. 100 mm dia. 150 mm dia. Accessories 08 09 10 11 12 Pendent sprinkler head Side wall sprinkler head 100mm Fire departement valve , ref. FDV Floor control valve assembly 100mm dia., ref. FCVA Fire department connection, 2 way fire department inlet connection type with gate and check valve 150mm dia. Supply, install, testing and commissioning proprietary integrated fire hose reel and fire extinguisher cabinet the work shall include but not limited to fire extinguisher, hose reel nozzle, fixings, isolating valve 40 mm dia., trims and all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 13 Ref. FHC 9 No 50 8 10 10 No No No No 145 20 40 37 6 350 330 M M M M M M M QTY UNIT RATE AMOUNT SR

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, install, testing and commissioning portable multipurpose fire extinguisher the work shall include but not limited to fixing to wall, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 Ref. PFE Ref. CO2 2 20 No No SR QTY UNIT RATE AMOUNT SR

To Collection Collection Sheet -14 Sheet -15 Sheet -16 Sheet -17 Sheet -18 Sheet -19 Sheet -20 Sheet -21 Sheet -22 Sheet -23 Sheet -24 Sheet -25

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

25 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION QTY UNIT RATE AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Under ground pipe work Supply, install and test black steel pipe work including duct leak detection system for underground chilled water piping, fittings thermal insulation, trench work , flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 04 05 300 mm dia. 250 mm dia. 200 mm dia. 150 mm dia. 100 mm dia. ETS room and main ent. Lobbys pipe work Supply, install and test black steel pipe work including fittings thermal insulation, flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 06 07 08 09 10 11 12 15 mm dia. 25 mm dia. 32 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. 300 mm dia. To Collection

325 65 200 355 125

M M M M M

90 15 210 200 120 20 85

M M M M M M M
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

26 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply and install valve / BTU meter Butterfly valve 01 Ref. MBFV 300 mm dia., Isolating valve 02 32mm dia., Check valve 03 32mm dia., BTU meter 04 32mm dia., Supply, install, test and commission, Ventilating fans as details on drawings and specifications, section 15860 06 Ref. EF- 01, 40 LPS capacity Supply and install heat exchanger including valves and short length piping as detailed on drawings and as per specifications 07 Ref. HEX-01 to 04, 1634 KW capacity Supply, install and test galvanized steel sheet rectangular ductwork, including supports as per drawings and specifications 08 Various gauge Supply and install duct installation 09 Thermal semi-rigid insulation to rectangular ductwork 25 mm indoor To Collection QTY UNIT RATE AMOUNT SR

No.

20

No.

10

No.

10

No.

10

No.

No.

500

Kg

90

M2
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

27 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install, test and commission, variable speed chilled water centrifugal inline pumps unit including valves, flexible connections, Y-striners, mounting and fixing to pads (measured separately) as detailed on drawing and specifications 01 Ref. SCWP-01 to 04, 43.33 L/S capacity 40 m TDH Supply, install and commission, expansion tank as detailed on drawings and specifications 02 Ref. ET, 600 liter capacity Supply, install, test and commission DX-ducted split unit including control, pipes and fixing as per drawing and specifications 03 Ref. RAC-01, 3.51 KW nominal coollling capacity Supply, install and commission, air separator tank as detailed on drawings and specifications 04 Ref. AS Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications section 15781 05 06 07 Ref. FCU-01, 12.2 KW cooling capacity Ref. FCU-02, 4.3 KW cooling capacity Ref. FCU-03, 5.3 KW cooling capacity Supply, install, test and commission automatic chemical dosing unit as detailed on drawings and specifications 08 Ref. ACDU To Collection QTY UNIT RATE AMOUNT SR

No.

No.

22

No.

No.

1 8 2

No. No. No.

No.
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

28 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install, test and commission, Supply air round ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 01 02 Ref. SD1 Ref. SD2 Supply, install, test and commission, Return round louver face ceiling diffusers as detailed on drawing and specification 03 04 Ref. RD1 Ref. RD2 Supply, install, test and commission, door grill as detalied and specificaitons 05 Ref. DG1 Supply, install, test and commission, of electric works and motor control centers MCC C/W weather proof, magnetic starters, cabinets including power cables, wiring and conduits and cable trays from the MCC to HVAC equipment, interlocks, earthing ...etc, all materials and equipments required to complete and finish the work according to drawings, specifications and code of practices 06 Ref. MCC- CWP QTY UNIT RATE AMOUNT SR

16 4

No. No.

16 4

No. No.

10

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

29 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 15 - MECHANICAL CHILLED WATER SYSTEM Collection Sheet - 26 Sheet - 27 Sheet - 28 Sheet - 29 QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

30 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller ,M-bus IP router, complete with soft ware, including electronic KWH meter, interface with water meter& digital BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each meter, and the necessary connection to TCP/IP net work and all associated works required as shown on drawing and as described in specifications To suit Building Smart Metering System as required to form a complete and fully operative system to link all project buildings with the existing data center at phase (1) 01 02 03 Electronic KWH meters M-bus master controller complete with software M-bus IP router 13 13 13 Note QTY UNIT RATE AMOUNT SR

No No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

31 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit or cable tray (measured elsewhere ) , including earth cable, junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 4C-16mm2-CU/XLPE/PVC+16mm2G/ 110mmd UPVC conduit 4C-25mm2-CU/XLPE/PVC+16mm2G/ cable tray 4C-50mm2-CU/XLPE/PVC+25mm2G / cable tray 4C-50mm2-CU/XLPE/PVC+25mm2G /110mmd UPVC conduit 4C-95 mm2-CU/XLPE/PVC+ 50 mm2G / UPVC conduit. 4C-150mm2-CU/XLPE/PVC+70mm2G / 110mmd UPVC conduit 2(4C-185mm2)-CU/XLPE/PVC+185mm2G/ 110mmd UPVC conduit 4C-300mm2-CU/XLPE/PVC / cable trench 4C-300mm2-CU/XLPE/PVC+150mm2G / 110mmd UPVC conduit The following items listed below shown in drawing AP03 - E701 , &AP06 - E701(inside each apartment building AP03 &AP06) 10 11 12 13 4C-10mm2-CU/XLPE/PVC+10 mm2G/ cable tray 4C-35mm2-CU/XLPE/PVC+16mm2G/ cable tray 4C-50mm+1C-25mmG-CU/XLPE/PVC / cable tray 4C-70mm+1C-35mmG-CU/XLPE/PVC / cable tray 90 10 50 40 M M M M 530 130 405 276 305 135 811 30 811 M M M M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

32 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER MAN / HAND HOLE Supply, install, testing and commissioning reinforced concrete manholes and hand holes connected via UPVC conduit, complete with hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for UPVC conduits for power and communication cables in UPVC conduit, tapes, , grounding, all as required to suit locations as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 Power manhole (1800x1800x1800mm) ( Ref.PMH). Power hand hole (600x600x600mm) ( Ref.PHH). Communication hand hole (600x600x600mm) ( Ref.CHH). 15 10 25 No No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

33 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and SAC switching actuator , DAC dimming actuators , other functional units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Ref. DP31 Ref. DP32 Ref.PPSC Ref. SLPC ( listed in bill of site lighting package ) Ref. EDPS3 with ATS (built-in ) Ref. EPSC Ref. DP61 Ref. DP62 Ref.PPSE Ref. EPSE with ATS (built-in ) Ref. SLPE ( listed in bill of site lighting package ) Ref. EPP1 Ref. EPP2 Ref. EPP3 Ref. EPPM 8 8 8 8 8 8 2 2 2 2 2 1 1 1 1 No No No No No No No No No No No No No No No NIC NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

34 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and SAC switching actuator , DAC dimming actuators , other functional units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 Ref. EPP4 Ref. EPP5 Ref. MCC ( supplied and installed by others ) Sub-Main circuit :Supply , install, Power & Communication distribution galvanized steel cable trays, including fittings, supports and all accessories as described on drawing Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 04 05 06 400 mm wide 600 mm wide 600 mm wide double layer 55 55 200 M M M 1 1 1 No No No NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

35 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION The contractor is to insure that all power outlets mounted in wet areas and all service outlets for kitchens, bathrooms, laundry and water heaters are to be protected by central ground fault circuit interrupter (GFCI) Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Above false ceiling disconnect switch, non-fused with pilot light, 20A, 1P, 230V for FCU-04,05 Disconnect switch, non-fused with pilot light, 16A, 1P, 230V for waste collection equ. Disconnect switch, non-fused with pilot light, weatherproof, 16A, 1P, 230V for waste collection Disconnect switch, non-fused with pilot light, 20A, 1P, 230V for FACP,FD3G,BD3 ,FD6G,BD6 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for sub. Pump ,gray pumps & fuel pump Disconnect switch, non-fused with pilot light, weatherproof, 20A,3P, 400V for gray pumps, left station pump &potable pump Disconnect switch, non-fused t, weatherproof, 250A, 3P, 400V for MCC-CWP 10 No Note QTY UNIT RATE AMOUNT SR

02

No

03

No

04

32

No

05

No

06

No

07

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

36 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Disconnect switch, non-fused t, weatherproof, 400A, 3P, 400V for fire pump & jockey pumps Disconnect switch, fused with pilot light, 20A, 1P, 230V for RAC-01 Disconnect switch, fused with pilot light ,weatherproof, 20 A, 1P, 230V for FCU-01 Floor mounted ,Junction box, Ceiling mounted junction box Wall mounted junction box Single socket outlet, 10A, 230V, grounding type Single socket outlet, weatherproof , 10A, 230V, grounding type Duplex socket outlet, weatherproof ,16A,230V, grounding type 1 No QTY UNIT RATE AMOUNT SR

02 03

20 2

No No

04 05 06 07 08 09

1 6 22 118 3 6

No. No No No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

37 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of switches lighting accessories including all necessary boxes, switches, faces, conduits, wires (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 Single pole one-way switch (13A) Single pole one-way switch weatherproof (13A) Push button switch Motor switch with built-in overload protection (tumbler switch) Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 05 06 Lighting fixture outlets Lighting fixture outlets type FT1 (cove light ) 524 10 No No 48 7 18 16 No. No. No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

38 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply ,install, testing and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories.(according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 Ref. EX (Exit light wall mounted, single sided) Ref. EX (Exit light ceiling mounted, double sided ) Ref. F1 Ref. F1E Ref. F2 Ref. F2E Ref. F7E Ref. F8E Ref. NE Ref. WL3 Ref. FT1 34 4 124 46 116 32 68 72 10 18 359 No No No No No No No No No No M. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

39 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply, install , testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panels, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit system network equipped with: 01 02 Wall mounted telecommunication outlet, 1 ports ( one data ) ref. (T0 ) Ceiling mounted telecommunication outlet, 1 ports ( one data ) ref. (T0 ) Wall mounted telecommunication outlet for intercom system Ref. (T0 )I Wall mounted telecommunication outlet, 1 ports ( one tel ),at 1500 mm A.F.F.L Ref. (T01)W Wall mounted telecommunication outlet, 1 ports ( one data, one tel ) Ref.( T02 ) Wall mounted telecommunication outlet, 3 ports ( two data, one telephone. ) Ref.( T04 ) 12 18 No No QTY UNIT RATE AMOUNT SR

03

10

No

04

10

No

05

10

No

06

10

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

40 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply ,install, testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panel, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications The following items listed below shown in drawing AP03 - E801 , &AP06 - E801(inside each apartment building AP03&AP06.) 01 Building distributor (BD3&BD6) ( Includes main F. O. P. P. and all necessary works required for installation as shown on drawings, on single line diagram in AP -03-E801 & AP -06-E801) to form a complete and fully operative system Floor Distributor includes : 19",standard rack , fiber optic patch panel (F. O. P. P. (2 x 4 port)) , data switch cable 1x24 RJ45portss ,UTP patch panel (24 ports) with fans ,UPS,power supply and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FD3G &FD6G) Data and voice system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 10 No QTY UNIT RATE AMOUNT SR

02

10

No

03

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

41 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM
Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, ear thing for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications

QTY

UNIT

RATE

AMOUNT SR

To suit fire alarm system network equipped with: 01 02 03 04 05 06 07 08 Ceiling mounted optical smoke detector, Ceiling mounted multi sensor ( heat , smoke ) Fire fighting telephone panel ref (FFT) Fire alarm bell Fire alarm manual call station Fire alarm interface module Fire man's telephone jack Master analogue fire alarm control panel-FACP comprising of TCP-IP interface and power supply unit with complete PC work station , interfacing to auto - dialer to local fire department, Analogue terminal adapter (interfacing with auto - dialer ) 39 30 10 10 10 1 10 1 No No No No No No No No

09

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

42 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM
Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, ear thing for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications

QTY

UNIT

RATE

AMOUNT SR

The following items listed below shown in drawing AP03 - E801 , &AP06 - E801(inside each apartment building AP03 &AP06.) 01 Analogue addressable fire alarm control panel-FACP (3-loops) comprising power supply unit, automatic dialer ,analogue terminal adapter interfacing to auto - dialer to local fire department, Fire alarm system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 10 No

02

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

43 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL VOICE EVACUATION SYSTEM Supply , installation, testing and commissioning of voice evacuation system complete with all accessories required for installation including distribution panel for voice evacuation system , pull boxes, loudspeaker , microphone, cable/ wire and conducting supports, fittings, interfacing units , and all required to suit the locations shown on drawings. Coordination and integration with other systems shall be conducted during work execution, as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit evacuation system network equipped with: 01 Master voice evacuation distribution panel ref. MVP complete with fire phone, power supply unit with battery backup (3-hours continuance operation), including master mic with zone selection, master mic control, 96 switch control, dual channel , integrated fire phone & interface to fire alarm control panel (FACP). Voice evacuation distribution panel (ref.VDP) with 2x100W amplifier, and power supply unit 2 Watts, voice evacuation speaker, ceiling mounted Voice evacuation system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 No. QTY UNIT RATE AMOUNT SR

02

10

No.

03 04

20 1

No. Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

44 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL AUDIO / VIDEO IP INTERCOM SYSTEM Supply , installation testing and commissioning of audio / video IP intercom system comprising of outdoor station unit with built-in color camera, indoor station units with built -in monitors, electrical door lock , AC power supply, cables and conduits and associated works as required to suit the locations shown on drawings and coordination & integration & communication kit with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit audio /video phone IP intercom system network equipped with: 01 Waterproof outdoor station unit (48 lines) including but not limited to color camera, mic, speaker, push buttons, power supply, etc. Electric door lock Network controller with power supply Exit push button Electric door strike Audio / video IP intercom system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 18 No QTY UNIT RATE AMOUNT SR

02 03 04 05 06

18 10 18 20 1

No No No No Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

45 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL INTEGRATED SECURITY SYSTEM Supply , installation testing and commissioning of integrated security system comprising of CCTV IP cameras, network video recorder with built in motion detection, CCTV monitors, video display unit, keypad, system controllers, readers, readers interface modules, push buttons, electro magnetic locks, encoders, security server, workstations, wire, power supplies, conduits, interfaces and all accessories required for the system as per drawings, riser diagrams and specifications To suit system consisting of ,but not limited to: 01 02 03 04 05 06 07 08 09 10 11 Intelligent security controller (ref. ISC) Reader interface module (ref. RIM) Double reader interface module (ref. DRIM) Card reader ref. (CR) Exit push button (ref. PB) Electromagnetic lock Magnetic door contact(ref. DC) Ceiling mounted IP fixed dome camera Outdoor wall mounted IP CCD day / night camera Outdoor type motion sensor Security system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 10 2 18 No No No QTY UNIT RATE AMOUNT SR

38
20

No.
No

20
20 18 12 12 1

No.
No No No No Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

46 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN TELECOMMUNICATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for data and telephone system to connect all buildings/floor distributers BD/FD to the primary/secondary active switch as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system MAIN FIRE ALARM SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for fire alarm system to connect all FACPs in all buildings with each other as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 02 To suit all network system 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

47 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN VOICE EVACUATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for voice evacuation system to connect all voice evacuation distribution panels. in all buildings with master voice evacuation panel. as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system BUILDING MANAGEMENT SYSTEM (BMS) Supply, install, testing, commissioning and integrating the building / cluster BMS system or sub system items (equipment controllers, routers, cables inside the building between system items, conduits, boxes, fiber optic cables,..etc) with phase 1 main BMS system (located in the data center)via LAN network as shown on the building drawings, indicated in plumbing, HVAC and electrical input/ output schedules (all BMS schedules) and as described in the specifications, consisting of but not limited to: 02 To suit building BMS system network and the system should be applicable to linked with existing operating system in phase one after getting approval from service and operation team in phase one to complete the work to the best possible 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

48 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL GROUNDING SYSTEM Supply, install, test and commissioning a grounding system for cluster comprising bare copper conductors for grounding all electrical and mechanical equipments in the cluster and all required works for connecting in one grounding system In addition to all earthwork, connections, clips, copper clad steel rods in ground test wells with cast iron covers situated around the building as required and all associated works as necessary to provide a complete grounding system, all as shown on drawing . Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 To suit grounding system for network of cluster 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

49 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Collection Sheet - 31 Sheet - 32 Sheet - 33 Sheet - 34 Sheet - 35 Sheet - 36 Sheet - 37 Sheet - 38 Sheet - 39 Sheet - 40 Sheet - 41 Sheet - 42 Sheet - 43 Sheet - 44 Sheet - 45 Sheet - 46 Sheet - 47 Sheet - 48 Sheet - 49 QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

50 / 51 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) ITEM DESCRIPTION AMOUNT S.R.

BILL SUMMARY Sheet - 8 Sheet - 9 Sheet - 10 Sheet - 11 Sheet - 12 Sheet - 13 Sheet - 25 Sheet - 30 Sheet - 50 SITE DEVELOPMENT SITEWORK FINISHES SPECIALTIES EQUIPMENT CONVEYING SYSTEM PLUMBING HVAC ELECTRICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

To Tender Summary

SR

0.0

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

51 / 51 REVISED PAGE

Date: MAY 2012