Purpose Work Breakdown Structures is a basic master data in Project system. After the Work Breakdown Structures is created, you will have to assign Program position into WBS. Trigger Perform this transaction when you need to create work breakdown structures. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Accounting > Project System > project > Special Maintenance Functions > Work breakdown Structure > CJ01 - Create
1/58
Work Instruction
Screen Flow
2/58
Work Instruction
3/58
Work Instruction
Procedure 1. In SAP, start the transaction using the menu path or transaction code. Due to the length of the process for this transaction, this simulation has been split into two parts. This is Part 1 of the simulation for CJ01 Create Work Breakdown Structure. SAP Easy Access
4/58
Work Instruction
5/58
Work Instruction
5. Double-click the Special Maintenance Functions node . 6. Double-click the Work Breakdown Structure (WBS) node . 7. Double-click the CJ01 - Create node Create Project: Initial Screen .
6/58
Work Instruction
9. Click the Z000002 UL CAPEX projects list item . 10 As required, complete/review the following fields: .
7/58
Work Instruction
A R/O/C framewor k for a business undertaki ng with a fixed goal to achieve with given resources .The project definition contains dates and organizati onal informatio n that are binding for the entire project. Field Example: I-Sk-08005 R Project Def.
Description
8/58
Work Instruction
9/58
Work Instruction
13 As required, complete/review the following fields: . A R/O/C framewor k for a business undertaki ng with a fixed goal to achieve with given resources .The project definition contains dates and organizati onal informatio n that are binding for the entire project. Field Example: Capex Skin Project 005 R Project Def.
Thursday, July 16, 2009 CO_CJ01_JPN_Create Work Breakdown Structures_Part 1 of 2.udc 10/58
Description
Work Instruction
. .
11/58
Work Instruction
16 Double-click the00000001 Project Engineer line item . . Create Project: Project Definition
12/58
Work Instruction
The R/O/C starting date for the cycle or the date that determine s the beginning of a period of time. Field Example: 01.08.2008 R Start date
Description
13/58
Work Instruction
20 As required, complete/review the following fields: . Planned finish date for the project. Field Example: 31.07.2009 R Finish date 21 Click the CO area edit field . . R/O/C Description
22 As required, complete/review the following fields: . Organizati R/O/C onal unit within a company, used to represent a closed system for cost accountin g purposes. A Description
14/58
Work Instruction
controllin g area may include single or multiple company codes that may use different currencies . These company codes must use the same operative chart of accounts. All internal allocation s refer exclusivel y to objects in the same controllin g area. Field Example: ID01 R
15/58
Work Instruction
24 As required, complete/review the following fields: . An R/O/C organizati onal unit used to provide a selfcontained set of accounts. Legally required balance sheets and Profit and Loss statement s are generated at the Company Code level. Several Company Codes can be set up within each Client to Description
16/58
Work Instruction
manage the accounts. Field Example: 2408 R Company code 25 Click the Plant edit field . .
17/58
Work Instruction
26 As required, complete/review the following fields: . A plant is R/O/C an organizati onal unit for dividing an enterprise according to productio n, procurem ent, maintena nce, and materials planning. It is a place where materials are produced, or goods and services are provided. Field Example:
Thursday, July 16, 2009 CO_CJ01_JPN_Create Work Breakdown Structures_Part 1 of 2.udc 18/58
Description
Work Instruction
9003 R Plant 27 Click the WBS element overview button . Create Project: WBS Element Overview .
19/58
Work Instruction
29 As required, complete/review the following fields: . A level on R/O/C which a WBS element is assigned in a work breakdow n structure. Field Example: 1 R Level 30 Click the WBS element edit field . 31 As required, complete/review the following fields: . A R/O/C structural element in a work breakdow n structure representi ng the hierarchic Description . Description
20/58
Work Instruction
al organizati on of a project.A WBS element describes a task or a partial task that can be divided. Field Example: I-SK-08005 R WBS element 32 Click the Description edit field . 33 As required, complete/review the following fields: . Text to R/O/C identify and characteri ze an object or activity. Field Example: WBS Level 1
Thursday, July 16, 2009 CO_CJ01_JPN_Create Work Breakdown Structures_Part 1 of 2.udc 21/58
Description
Work Instruction
22/58
Work Instruction
23/58
Work Instruction
38 As required, complete/review the following fields: . A level on R/O/C which a WBS Description
24/58
Work Instruction
element is assigned in a work breakdow n structure. Field Example: 2 R Level 39 Click the WBS element edit field . .
25/58
Work Instruction
40 As required, complete/review the following fields: . A R/O/C structural element in a work breakdow n structure representi ng the hierarchic al organizati on of a project.A WBS element describes a task or a partial task that can be divided. Field Example: I-SK-08005C R WBS element 41 Click the Description edit field . . Description
26/58
Work Instruction
42 As required, complete/review the following fields: . Text to R/O/C identify and characteri ze an object or activity. Field Example: WBS Level 2 Capital R Description 43 Click the Typ edit field . . Description
44 As required, complete/review the following fields: . A key that R/O/C identifies which group of document s this document will be assigned. Document s of the same type Description
27/58
Work Instruction
contain common informatio n which is relevant to posting and update of the value fields in the data base. Field Example: 01 R Typ 45 Click the Level edit field . .
28/58
Work Instruction
A level on R/O/C which a WBS element is assigned in a work breakdow n structure. Field Example: 3 R Level
Description
47 Click the WBS element edit field . 48 As required, complete/review the following fields: . A R/O/C structural element in a work breakdow n structure representi ng the hierarchic al organizati on of a
Thursday, July 16, 2009
Description
29/58
Work Instruction
project.A WBS element describes a task or a partial task that can be divided. Field Example: I-SK-08005C-BD R WBS element 49 Click the Description edit field . 50 As required, complete/review the following fields: . Text to R/O/C identify and characteri ze an object or activity. Field Example: WBS Level 3 Building R
Thursday, July 16, 2009 CO_CJ01_JPN_Create Work Breakdown Structures_Part 1 of 2.udc 30/58
Description
Work Instruction
52 As required, complete/review the following fields: . A key that R/O/C identifies which group of document s this document will be assigned. Document s of the same type contain common informatio n which is relevant to posting and update of the value fields in the data base. Field Example: 01 R Description
31/58
Work Instruction
Typ
32/58
Work Instruction
53 Click the Acct check box . 54 Click the Level edit field . .
55 As required, complete/review the following fields: . A level on R/O/C which a WBS element is assigned in a work breakdow n structure. Field Example: 3 R Level 56 Click the WBS element edit field . 57 As required, complete/review the following fields: . A R/O/C structural element in a work breakdow n
Thursday, July 16, 2009
Description
Description
33/58
Work Instruction
structure representi ng the hierarchic al organizati on of a project.A WBS element describes a task or a partial task that can be divided. Field Example: I-SK-08005C-PL R WBS element 58 Click the Description edit field . 59 As required, complete/review the following fields: . Text to R/O/C identify and characteri ze an object or activity.
Thursday, July 16, 2009
Description
34/58
Work Instruction
Field Example: WBS Level 3 Plant R Description 60 Click the Typ edit field . .
35/58
Work Instruction
A key that R/O/C identifies which group of document s this document will be assigned. Document s of the same type contain common informatio n which is relevant to posting and update of the value fields in the data base. Field Example: 01 R Typ
Description
62 Click the Acct check box . 63 Click the Level edit field .
36/58
Work Instruction
. 64 As required, complete/review the following fields: . A level on R/O/C which a WBS element is assigned in a work breakdow n structure. Field Example: 3 R Level 65 Click the WBS element edit field . 66 As required, complete/review the following fields: . A R/O/C structural element in a work breakdow n structure representi ng the hierarchic Description . Description
37/58
Work Instruction
al organizati on of a project.A WBS element describes a task or a partial task that can be divided. Field Example: I-SK-08005C-OT R WBS element 67 Click the Description edit field . 68 As required, complete/review the following fields: . .
38/58
Work Instruction
Text to R/O/C identify and characteri ze an object or activity. Field Example: WBS Level 3 Others R Description
Description
70 As required, complete/review the following fields: . A key that R/O/C identifies which group of document s this document will be assigned. Document s of the same type contain common
Thursday, July 16, 2009
Description
39/58
Work Instruction
informatio n which is relevant to posting and update of the value fields in the data base. Field Example: 01 R Typ 71 Click the Acct check box . .
40/58
Work Instruction
41/58
Work Instruction
42/58
Work Instruction
74 Click the WBS Elem. details button . 75 Click the Investment program button .
. .
43/58
Work Instruction
44/58
Work Instruction
. .
77 Click the Investment program possible entry button . Investment program name (1)
78 Click the Investment program edit field . 79 As required, complete/review the following fields: . A R/O/C hierarchic al structure representi ng business plans for Description
45/58
Work Instruction
producing fixed assets or providing services during an approval year. Field Example: I* R Investment program 80 Click the Fiscal Year edit field . .
46/58
Work Instruction
Period, 12 R/O/C months as a rule, for which the company is to create its inventory and balance sheet. The fiscal year can be the same as the calendar year, but does not have to be. Field Example: 2008 R Fiscal Year
Description
47/58
Work Instruction
48/58
Work Instruction
83 Double-click the I-08T/2008/Z001/ULI Investment Program 001 line . item . I-SK-08005 - Assignment to investment program position
84 Click the Position ID edit field . 85 Click the Position ID possible entry button . Choose Point of Entry .
49/58
Work Instruction
Structure of I-08T/2008
. .
50/58
Work Instruction
Structure of I-08T/2008
51/58
Work Instruction
52/58
Work Instruction
53/58
Work Instruction
54/58
Work Instruction
Scenario Situation You want to create Work Breakdown Structures. Instructions In this simulation you are required to: Create Work Breakdown Structures . Required Data This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise. I-SK-08005-C-BD 3 01 WBS Level 2 Capital I-SK-08005-C 2 WBS Level 1 Skin I-SK-08005 1 9003 2408 ID01 31.07.2009 01.08.2008 Capex Skin Project 005 Field WBS element Level Typ Description WBS element Level Description WBS element Level Plant Company code CO area Finish date Value
55/58
Work Instruction
56/58
Work Instruction
3 AUC Others - Equipment 24 5 Plant WBS Level 3 Building 3 23 Building 3 22 2008 I* WBS Level 3 Others I-SK-08005-C-OT WBS Level 3 Plant Description Room AUC Others - Equipment Asset Class Room Plant 3 Asset Class Building 3 Asset Class Fiscal Year Investment program Description WBS element Description I-SK-08005-C-PL WBS element
57/58
Work Instruction
58/58