1 2008-03-07
Modeling, Integrated Design & Analysis Software
2002. 11 MIDAS IT Beijing Co.,Ltd
2 2008-03-07
Modeling, Integrated Design & Analysis Software
2005. 4 Shanghai Branch
3 2008-03-07
Modeling, Integrated Design & Analysis Software
2007. 3 Guangzhou Branch
4 2008-03-07
Modeling, Integrated Design & Analysis Software
2007. 3 Chengdu Branch
5 2008-03-07
Modeling, Integrated Design & Analysis Software
l ie nt s
000 c
1
MIDAS/GTS
Geotechnical and Tunnel analysis System
MIDAS/Civil
Integrated Solution System for Bridge and Civil Structure
MIDAS/FX+
General Pre Processors for Finite Element Analysis
MIDAS/Gen
Integrated Solution System for Building and General Structure
MIDAS/SDS
Slab & basement Design System
6 2008-03-07
Modeling, Integrated Design & Analysis Software
Mid-long range passenger dedicated line planning
Total length of
Passenger Dedicated Lines:
7000 km
7 2008-03-07
Modeling, Integrated Design & Analysis Software
Urban mass transit planning
25 cities
Changchun
Shenyang
Beijing Dalian Total length:
Tianjin
Qingdao 5000 km
Sian
Zhengzhou
Nanjing
Hefei Suzhou
Chengdu Wuhan Shanghai
Chongqing Hangzhou
Changsha Ningbo
Nanchang
Xiamen Taipei
Kunming Guangzhou Shenzhen
Hong Kong
8 2008-03-07
Modeling, Integrated Design & Analysis Software
Beijing urban mass transit planning 2050
16 metro lines
9 2008-03-07
Modeling, Integrated Design & Analysis Software
Shanghai urban mass transit planning 2012
12 metro lines
10 2008-03-07
Modeling, Integrated Design & Analysis Software
Guangzhou urban mass transit planning 2010
7 metro lines
Total length:200 km
11 2008-03-07
Modeling, Integrated Design & Analysis Software
Opportunity:
Perfect GTS-self
12 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels
Shield tunnel
⑥ ⑤ ④ ③ ② ①
⑧
⑦
13 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels
14 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels
O X
X*Y*Z=140m*100m*70m
6 layers of soil
15 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels
-3.87cm
Vertical displacement
Settlement trough
16 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 2 Indoor test of expanding excavation of single connecting tunnel
Shield Tunnel
17 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 2 Indoor test of expanding excavation of single connecting tunnel
X*Y*Z = 6.2m*1.8m*2.7m
Scale: 1:10
18 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 2 Indoor test of expanding excavation of single connecting tunnel
-5.71cm
Vertical displacement
Settlement trough
19 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 3 Influence of heat distribution pipeline construction
on running tunnel
Running tunnel
Running tunnel
20 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 3 Influence of heat distribution pipeline construction
on running tunnel
②
①
X*Y*Z = 90m*117m*30m ②
21 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 3 Influence of heat distribution pipeline construction
on running tunnel
-20.3mm +8.25mm
Vertical displacement of soil Vertical displacement of running tunnel
22 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 4 Influence of running tunnel construction on pile foundation
pile foundation
23 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 4 Influence of running tunnel construction on pile foundation
Case 1 Case 2
Case 3
24 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 4 Influence of running tunnel construction on pile foundation
Case 1
-11.95mm
Case 2
Case 3
-9.18mm
Vertical displacement of pile foundation
-9.07mm
25 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 5 Influence of road tunnel construction on water tunnel
road tunnel
water tunnel
26 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 5 Influence of road tunnel construction on water tunnel
oblique crossing
27 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 5 Influence of road tunnel construction on water tunnel
-2.9mm
+2.07mm
Vertical displacement of soil Vertical displacement of water tunnel
28 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 6 Covered excavation construction
左 右
线 线
中 中
线 线
轨面
new structure
existing pile
钻孔桩?
29 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 6 Covered excavation construction
temporary strut
temporary pile
30 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 6 Covered excavation construction
31 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 7 Construction of ventilation shaft
ventilation shaft
32 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 7 Construction of ventilation shaft
33 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 7 Construction of ventilation shaft
34 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 8 Construction stage analysis of underground powerhouse
Covering depth:160~200m
Main workshop
Length:200.7m
width:21.0m
height:47.53m
Accessorial workshop
Length:180.9m
width 18.0m
height 27.73m
Distance
33.5m
35 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 8 Construction stage analysis of underground powerhouse
O Y
X×Y×Z=205m×320m×195 m
36 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 8 Construction stage analysis of underground powerhouse
Calculated deformation evolutions at top and toe of the caverns along z or x direction
37 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 9 Analysis of square foundation ditch excavation
O X
38 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 9 Analysis of square foundation ditch excavation
39 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 10 Analysis of stability on retaining structure
gantry crane
40 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 10 Analysis of stability on retaining structure
41 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 10 Analysis of stability on retaining structure
42 2008-03-07
Modeling, Integrated Design & Analysis Software
List of clients
43 2008-03-07
Modeling, Integrated Design & Analysis Software
List of clients
44 2008-03-07
Modeling, Integrated Design & Analysis Software
List of clients
……
…………
………………
45 2008-03-07
Modeling, Integrated Design & Analysis Software
46 2008-03-07
Modeling, Integrated Design & Analysis Software