Sunteți pe pagina 1din 46

MIDAS/GTS

Applications of GTS in Geotechnical


and Tunnel Engineering in China

1 2008-03-07
Modeling, Integrated Design & Analysis Software
2002. 11 MIDAS IT Beijing Co.,Ltd

2 2008-03-07
Modeling, Integrated Design & Analysis Software
2005. 4 Shanghai Branch

3 2008-03-07
Modeling, Integrated Design & Analysis Software
2007. 3 Guangzhou Branch

4 2008-03-07
Modeling, Integrated Design & Analysis Software
2007. 3 Chengdu Branch

5 2008-03-07
Modeling, Integrated Design & Analysis Software
l ie nt s
000 c
1
MIDAS/GTS
Geotechnical and Tunnel analysis System

MIDAS/Civil
Integrated Solution System for Bridge and Civil Structure

MIDAS/FX+
General Pre Processors for Finite Element Analysis

MIDAS/Gen
Integrated Solution System for Building and General Structure

MIDAS/SDS
Slab & basement Design System
6 2008-03-07
Modeling, Integrated Design & Analysis Software
Mid-long range passenger dedicated line planning

Total length of new


lines: 17000 km

Total length of
Passenger Dedicated Lines:
7000 km

7 2008-03-07
Modeling, Integrated Design & Analysis Software
Urban mass transit planning

Urban mass transit


planning
Harbin

25 cities
Changchun

Shenyang
Beijing Dalian Total length:
Tianjin

Qingdao 5000 km
Sian
Zhengzhou
Nanjing
Hefei Suzhou
Chengdu Wuhan Shanghai
Chongqing Hangzhou
Changsha Ningbo
Nanchang
Xiamen Taipei
Kunming Guangzhou Shenzhen

Hong Kong

8 2008-03-07
Modeling, Integrated Design & Analysis Software
Beijing urban mass transit planning 2050

16 metro lines

6 light rail lines


Total length:693 km

9 2008-03-07
Modeling, Integrated Design & Analysis Software
Shanghai urban mass transit planning 2012

12 metro lines

1 light rail line


Total length:312 km

10 2008-03-07
Modeling, Integrated Design & Analysis Software
Guangzhou urban mass transit planning 2010

7 metro lines

Total length:200 km

11 2008-03-07
Modeling, Integrated Design & Analysis Software
Opportunity:

A lots of projects will be performed!

Many tunnels, bridges, roadbeds, slopes, and so on will be constructed!

What will GTS do?

Perfect GTS-self

Serve the projects

Acceptance by more users

12 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels

Shield tunnel

Connecting Tunnel 16800

⑥ ⑤ ④ ③ ② ①

13 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels

7.72m 9.24m 10.76m

12m 13.2m 13.2m

Max covering depth: 12.2m


Circle tunnel diameter: 6m

14 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels

O X

X*Y*Z=140m*100m*70m
6 layers of soil

15 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 1 Expanding excavation of single connecting tunnel based
on NATM between the two shield-driven internal tunnels

-3.87cm

Vertical displacement

Von Mises stress

Settlement trough
16 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 2 Indoor test of expanding excavation of single connecting tunnel

Shield Tunnel

Connecting Tunnel 16800

17 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 2 Indoor test of expanding excavation of single connecting tunnel

X*Y*Z = 6.2m*1.8m*2.7m

Scale: 1:10

18 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 2 Indoor test of expanding excavation of single connecting tunnel

-5.71cm

Vertical displacement

Von Mises stress

Settlement trough

19 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 3 Influence of heat distribution pipeline construction
on running tunnel

Running tunnel

Heat distribution pipeline

Heat distribution pipeline

Running tunnel

20 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 3 Influence of heat distribution pipeline construction
on running tunnel


X*Y*Z = 90m*117m*30m ②

21 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 3 Influence of heat distribution pipeline construction
on running tunnel

-20.3mm +8.25mm
Vertical displacement of soil Vertical displacement of running tunnel

22 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 4 Influence of running tunnel construction on pile foundation

pile foundation

new running tunnel

23 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 4 Influence of running tunnel construction on pile foundation

Case 1 Case 2

Case 3
24 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 4 Influence of running tunnel construction on pile foundation

Case 1

-11.95mm
Case 2

Case 3

-9.18mm
Vertical displacement of pile foundation

-9.07mm

25 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 5 Influence of road tunnel construction on water tunnel

road tunnel

water tunnel

26 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 5 Influence of road tunnel construction on water tunnel

oblique crossing

27 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 5 Influence of road tunnel construction on water tunnel

-2.9mm
+2.07mm
Vertical displacement of soil Vertical displacement of water tunnel

28 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 6 Covered excavation construction

existing covered plate

左 右
线 线
中 中
线 线

轨面

new structure
existing pile
钻孔桩?

Max covering depth: 6m

29 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 6 Covered excavation construction

temporary strut

temporary pile

30 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 6 Covered excavation construction

-11mm Internal force

Vertical displacement of soil

31 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 7 Construction of ventilation shaft

ventilation shaft

32 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 7 Construction of ventilation shaft

33 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 7 Construction of ventilation shaft

Internal force Internal stress

34 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 8 Construction stage analysis of underground powerhouse

Covering depth:160~200m

Main workshop
Length:200.7m
width:21.0m
height:47.53m

Accessorial workshop
Length:180.9m
width 18.0m
height 27.73m

Distance
33.5m

35 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 8 Construction stage analysis of underground powerhouse

O Y

X×Y×Z=205m×320m×195 m

36 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 8 Construction stage analysis of underground powerhouse

Horizontal displacement of soil Internal force of anchor bolt

Calculated deformation evolutions at top and toe of the caverns along z or x direction
37 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 9 Analysis of square foundation ditch excavation

Depth of foundation ditch:7.5m


Plane size of foundation ditch: 88.2 m×45.1m

Thickness of underground diaphragm wall:0.85m


Depth of underground diaphragm wall:15.6m

Horizontal strut: circle 609mm×12 mm


Z
I Pile:400 ×400 ×13 ×21 mm

O X

38 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 9 Analysis of square foundation ditch excavation

Bending moment diagram of the diaphragm wall

Displacement of the diaphragm wall along x direction

39 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 10 Analysis of stability on retaining structure

gantry crane

40 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 10 Analysis of stability on retaining structure

41 2008-03-07
Modeling, Integrated Design & Analysis Software
Case 10 Analysis of stability on retaining structure

Horizontal displacement of the pile Bending moment diagram of the pile

42 2008-03-07
Modeling, Integrated Design & Analysis Software
List of clients

43 2008-03-07
Modeling, Integrated Design & Analysis Software
List of clients

44 2008-03-07
Modeling, Integrated Design & Analysis Software
List of clients

……
…………
………………

45 2008-03-07
Modeling, Integrated Design & Analysis Software
46 2008-03-07
Modeling, Integrated Design & Analysis Software

S-ar putea să vă placă și