Sunteți pe pagina 1din 94

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MOU DURING THE YEAR 2011-12

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

E=D/C

LT3Ph Type: Metered / Flat Rate:


LTKWH Name of 33/11KV Sub-Stations:
N.A
Feeder No:
F-1

Opening
Balance

Energy
Charges

ED Billed
(In Rs.)

Capacitor
Surcharge
Billed (In
Rs.)

Metered
Zakura

Late payment
surcharge biled

AV-Power
Factor

Sub-Division:- Zakura

Surcharge for
metering on LT
side

Month

KWH
KVAH Units
Units
recorded / KWH Units
supplied computed
recorded

Supply Type:
Meter Type:
Rating of Capacitor:

Demand charges billed


(In Rs. )

S.No

KVAH
Units
supplied

DiVision:Electric Division-IV, Khanyar

Max. Demand
Recorded KVA

Circle:
EM & RE Circle-Ist, Srinagar
Name of Installation:- M/S Snowbar Cotton Mills
Category:
LT Indust.
CT Ratio:
200/5
Installation No:
17877/MMeter Rated Current:5 Amp.
Computer Code:
3404
Capacitor Installed: Y/N
N
60 HP
Sanctioned Load:

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount
received (In
Rs.)

Arrears

N=H+I+J+K+L+M

O=G+N

Q=O-P

10 Jan-12
11 Feb-12
12 Mar-12

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


1 except for domestic, street lighting and loads where KVAH billing done.
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by
dividing
4 recorded KWH units with power factor = 0.85
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Zakura

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MOU DURING THE YEAR 2010-11 ENDING March, 2011
Circle:
EM & RE Circle-Ist, Srinagar
Name of Installation:- M/S P.H Industries
Category:
LT Indust.
CT Ratio:
200/5
Installation No:
29084 Meter Rated Current:5 Amp.
Computer Code:
3407
Capacitor Installed: Y/N
N
47HP
Sanctioned Load:

S.No

Month

KVAH
Units
supplied

KWH
KVAH Units
Units
recorded / KWH Units
supplied computed
recorded

AV-Power
Factor

DiVision:Electric Division-IV, Khanyar


Supply Type:
Meter Type:
Rating of Capacitor:

Max.
Demand
Recorded
KVA

Opening
Balance

Sub-Division:- Zakura

LT3Ph Type: Metered / Flat Rate:


LTKWH Name of 33/11KV Sub-Stations:
N.A
Feeder No:
F-1

Energy
Charges

Demand
charges billed
(In Rs. )

ED Billed
(In Rs.)

Metered
Zakura

Capacitor Surcharge
Late
Surcharge
for
payment
Billed(In
metering surchar
Rs.)
on LT side ge biled

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount
received (In
Rs.)

Arrears

E=D/C

N=H+I+J+K+L+M

O=G+N

Q=O-P

Apr-11

3012

2560

3012

2560

0.85

N.A

106976.64

6054.00

1225.00

1331.97

550.40

8611.00

115588.00

0.00

115588.00

May-11

1647

1400

1647

1400

0.85

N.A

117321.83

3311.00

1225.00

728.42

301.00

5264.00

122586.00

0.00

122586.00

Jun-11

1647

1400

1647

1400

0.85

124425.00

3311.00

1225.00

728.42

301.00

5264.00

129689.00

0.00

129689.00

Jul-11

2024

1720

2024

1720

0.85

N.A

131635.00

4068.00

1225.00

894.00

369.00

6188.00

137823.00

0.00

137823.00

Aug-11

1176

1000

1176

1000

0.85

N.A

139889.00

2365.00

1225.00

520.00

215.00

4110.30

144000.00

0.00

144000.00

Sep-11

1129

960

1129

960

0.85

N.A

146160.00

2270.00

1225.00

499.00

206.00

3994.89

150155.00

0.00

150155.00

Oct-11

659

560

659

560

0.85

N.A

152407.00

1521.00

1400.00

335.00

138.00

3256.00

155664.00

0.00

155664.00

Nov-11

0.85

N.A

157998.00

0.00

1400.00

0.00

0.00

1400.00

159399.00

0.00

159399.00

Dec-11

0.85

N.A

161789.00

0.00

1400.00

0.00

0.00

1400.00

163190.00

0.00

163190.00

10 Jan-12

0.85

N.A

165637.00

0.00

1400.00

0.00

0.00

1400.00

167037.00

0.00

167037.00

11 Feb-12

0.85

N.A

167037.00

0.00

1400.00

0.00

0.00

1400.00

168437.00

0.00

168437.00

12 Mar-12

0.85

N.A

168437.00

0.00

1400.00

0.00

0.00

1400.00

169837.00

0.00

169837.00

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


1 except for domestic, street lighting and loads where KVAH billing done.
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by
dividing
4 recorded KWH units with power factor = 0.85
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Zakura

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MOU DURING THE YEAR 2010-11 ENDING March, 2011

Circle:

EM & RE Circle-Ist, Srinagar

DiVision:
Electric Division-IV, Khanyar

Sub-Division:- Zakura

Name of Installation:M/S Royal Enterprises


Category:

LT Indust

CT Ratio:

100/5

Supply Type:

Installation No:

8151/M

Meter Rated Current:


5 Amp. Meter Type:

Computer Code:

3882

Capacitor Installed:NY/N

Sanctioned Load:

60HP

S.No

Month

KVAH
Units
supplied

KWH
KVAH Units
Units
recorded / KWH Units
supplied computed
recorded

LT3Ph Type: Metered / Flat Rate:


LTKWH Name of 33/11KV Sub-Stations:

Rating of Capacitor:

AV-Power
Factor

Max.
Demand
Recorded
KVA

Metered

Opening
Balance

N.A

Energy
Charges

Demand
charges billed
(In Rs. )

Feeder No:

ED Billed
(In Rs.)

Zakura

F-1

Capacitor Surcharge
Late
Surcharge
for
payment
Billed(In
metering surchar
Rs.)
on LT side ge biled

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount
received (In
Rs.)

Arrears

E=D/C

N=H+I+J+K+L+M

O=G+N

Q=O-P

Apr-11

3153

2680

3153

2680

0.85

N.A

0.00

6338.00

1575.00

1394.00

576.20

9307.60

9308.00

0.00

9308.00

May-11

1929

1640

1929

1640

0.85

N.A

9447.00

3878.00

1575.00

853.29

352.60

6306.89

15754.00

0.00

15754.00

Jun-11

1835

1560

1835

1560

0.85

N.A

15990.00

3689.40

1575.00

811.67

335.40

6076.07

22067.00

22070.00

-3.39

Jul-11

1647

1400

1647

1400

0.85

N.A

-3.39

3311.00

1575.00

728.00

301.00

5614.00

5611.00

5611.00

0.00

Aug-11

565

480

565

480

0.85

N.A

0.00

1135.00

1575.00

249.74

103.20

2959.94

2960.00

2960.00

0.00

Sep-11

282

240

282

240

0.85

N.A

0.00

567.00

1575.00

124.87

51.60

2267.00

2267.00

2267.00

2267.00

Oct-11

471

400

471

400

0.85

N.A

2301.00

1086.00

1800.00

239.00

98.00

3126.00

5427.00

5507.00

1.77

Nov-11

518

440

518

440

0.85

N.A

1.77

1195.00

1800.00

263.00

109.00

3259.00

3260.00

3260.00

0.00

Dec-11

376

320

376

320

0.85

N.A

0.25

869.00

1800.00

191.00

79.00

2860.00

2861.00

0.00

2861.00

10 Jan-12

329

280

329

280

0.85

N.A

2903.00

760.00

1800.00

167.00

69.00

2728.00

5632.00

5632.00

0.00

11 Feb-12

329

280

329

280

0.85

N.A

0.01

760.00

1800.00

167.00

69.00

2728.00

2728.00

2728.00

0.00

12 Mar-12

471

400

471

400

0.85

N.A

1086.00

1800.00

239.00

98.00

3125.00

3125.00

0.00

3125.00

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by

Surcharge
shall include
Capacitor surcharge
@ 10% forfollowing:
not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

dividing
4 recorded KWH units with power factor = 0.85
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer

Executive Engineer

Zakura

Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MOU DURING THE YEAR 2010-11 ENDING March, 2011
Circle:
EM & RE Circle-Ist, Srinagar
Name of Installation:- Joint Director Animal Husbandary
Category:
State/Central CT Ratio:
400/5
Installation No:
1/SD
Meter Rated Current:5 Amp.
Computer Code:
3944
Capacitor Installed: Y/N
N
35 HP
Sanctioned Load:

S.No

Month

KVAH
Units
supplied

KWH
KVAH Units
Units
recorded / KWH Units
supplied computed
recorded

DiVision:Electric Division-IV, Khanyar


Supply Type:
Meter Type:
Rating of Capacitor:

AV-Power
Factor

Max.
Demand
Recorded
KVA

Opening
Balance

HT
N.A
N.A

Sub-Division:- Zakura

Type: Metered / Flat Rate:


Name of 33/11KV Sub-Stations:
Feeder No:
F-1

Energy
Charges

Demand
charges billed
(In Rs. )

ED Billed
(In Rs.)

Flat Rate
Zakura

Capacitor Surcharge
Late
Surcharge
for
payment
Billed(In
metering surchar
Rs.)
on LT side ge biled

E=D/C

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount
received (In
Rs.)

Arrears

N=H+I+J+K+L+M

O=G+N

Q=O-P

Apr-11

0.85

N.A

387919.75

41316.00

0.00

9089.52

3756.00

50405.52

438325.00

438325.00

May-11

0.85

N.A

444900.00

41316.00

0.00

9089.52

3756.00

50405.52

495306.00

0.00

495306.00

Jun-11

0.85

502735.00

41316.00

0.00

9089.52

3756.00

50405.52

553141.00

0.00

553141.00

Jul-11

3106

2640

3106

2640

0.85

N.A

561438.00

41316.00

0.00

9089.52

3756.00

50405.52

611843.00

0.00

611843.00

Aug-11

1035

880

1035

880

0.85

N.A

621021.00

41316.00

0.00

9089.52

3756.00

50405.52

671426.00

0.00

671426.00

Sep-11

1035

880

1035

880

0.85

N.A

671426.00

41316.00

0.00

9089.52

3756.00

50405.52

721831.00

0.00

721831.00

Oct-11

5808

4937

5808

4937

0.85

N.A

302431.00

41708.00

2940.00

9175.00

3792.00

53823.00

356254.00

0.00

356254.00

Nov-11

7786

6618

7786

6618

0.85

N.A

361598.00

51645.00

0.00

11362.00

4695.00

63006.00

424605.00

0.00

424605.00

Dec-11

5948

5056

5948

5056

0.85

N.A

329474.00

51645.00

0.00

11362.00

4695.00

63006.00

392481.00

0.00

392481.00

10 Jan-12

6468

5498

6468

5498

0.85

N.A

398368.00

23223.00

2940.00

5109.00

2111.00

31272.00

429641.00

0.00

429641.00

11 Feb-12

3421

2908

3421

2908

0.85

N.A

429641.00

12283.00

2940.00

2702.00

1116.00

17925.00

447567.00

0.00

447567.00

12 Mar-12

3421

2908

3421

2908

0.85

N.A

447567.00

12283.00

2940.00

2702.00

1116.00

17925.00

465493.00

0.00

465493.00

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


1 except for domestic, street lighting and loads where KVAH billing done.
3 KVAH and demand readings will be required for load more than 100KW only.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by
4 dividing
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer

Executive Engineer

Zakura

Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MOU DURING THE YEAR 2010-11 ENDING March, 2011
Circle:
EM & RE Circle-Ist, Srinagar
DiVision:Electric Division-IV, Khanyar
Name of Installation:- Ex. Engineer PHE Mechanical Irrigation
Category:
LT Water Works CT Ratio:
N.A
Supply Type:
HT
Type: Metered / Flat Rate:
Installation No:
80/SD Meter Rated Current:N.A
Meter Type:
N.A
Name of 33/11KV Sub-Stations:
Computer Code:
4386
Capacitor Installed: Y/N
N
Rating of Capacitor:
N.A
Feeder No:
F-2
Sanctioned Load:

S.No

Month

KVAH
Units
supplied

Sub-Division:- Zakura
Flat Rate
Zakura

170HP

KWH
KVAH Units
Units
recorded / KWH Units
supplied computed
recorded

AV-Power
Factor

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges

Demand
charges billed
(In Rs. )

ED Billed
(In Rs.)

Capacitor Surcharge
Late
Surcharge
for
payment
Billed(In
metering surchar
Rs.)
on LT side ge biled

Amount
received (In
Rs.)

Arrears

E=D/C

N=H+I+J+K+L+M

O=G+N

Q=O-P

Apr-11

0.85

N.A

########

189200.00

0.00

41624.00

17200.00

230824.00

4402345.00

0.00

4402345.00

May-11

0.85

N.A

########

189200.00

0.00

41624.00

17200.00

230824.00

4699204.00

0.00

4699204.00

Jun-11

0.85

N.A

########

189200.00

0.00

41624.00

17200.00

230824.00

5000516.00

0.00

5000516.00

Jul-11

0.85

N.A

########

189200.00

0.00

41624.00

17200.00

230824.00

5306347.00

0.00

5306347.00

Aug-11

0.85

N.A

########

189200.00

0.00

41624.00

17200.00

230824.00

5616766.00

0.00

5616766.00

Sep-11

0.85

N.A

########

189200.00

0.00

41624.00

17200.00

230824.00

5931841.00

70000.00

5861841.00

Oct-11

0.85

N.A

########

236500.00

0.00

52030.00

21500.00

288530.00

6239349.00

0.00

6239349.00

Nov-11

0.85

N.A

########

236500.00

0.00

52030.00

21500.00

288530.00

6621469.00

0.00

6621469.00

Dec-11

0.85

N.A

########

236500.00

0.00

52030.00

21500.00

288530.00

7009321.00

0.00

7009321.00

10 Jan-12

0.85

N.A

########

236500.00

0.00

52030.00

21500.00

288530.00

7402991.00

11 Feb-12

0.85

N.A

########

236500.00

0.00

52030.00

21500.00

288530.00

7691521.00

7691521.00

12 Mar-12

0.85

N.A

########

236500.00

0.00

52030.00

21500.00

288530.00

7980051.00

400000.00 7580051.00

2
3

Total
Amount
due
(in Rs.)

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Total Amount
Billed
(In Rs.)

7402991.00

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by
dividing

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

4
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Zakura

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MOU DURING THE YEAR 2010-11 ENDING March, 2011
Circle:
EM & RE Circle-Ist, Srinagar
Name of Installation:- Baba Atomic Research Centre
Category:
State/Central CT Ratio:
200/5

Supply Type:

Installation No:
Computer Code:

3163
4408

Meter Type:
Rating of Capacitor:

Sanctioned Load:

173kW

S.No

Month

KVAH
Units
supplied

Meter Rated Current:5 Amp.


Capacitor Installed: Y/N
N

KWH
KVAH Units
Units
recorded / KWH Units
supplied computed
recorded

AV-Power
Factor

DiVision:Electric Division-IV, Khanyar

Max.
Demand
Recorded
KVA

HT

Opening
Balance

Sub-Division:- Zakura

Type: Metered / Flat Rate:

Metered

HT
trivector Name of 33/11KV Sub-Stations:
N.A
Feeder No: F-4

Energy
Charges

Demand
charges billed
(In Rs. )

ED Billed
(In Rs.)

Habak

Capacitor Surcharge
Late
Surcharge
for
payment
Billed(In
metering surchar
Rs.)
on LT side ge biled

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount
received (In
Rs.)

Arrears

E=D/C

N=H+I+J+K+L+M

O=G+N

Q=O-P

Apr-11

16246

13809

16246

13809

0.85

N.A

0.00

87122.77

3460.00

0.00

7920.00

90583.00

90583.00

90583.00

0.00

May-11

19580

16643

19580

16643

0.85

N.A

0.00

104997.75

3460.00

0.00

9545.25

108457.00

108457.00

108457.00

0.00

Jun-11

17930

15241

17930

15241

0.85

N.A

0.00

96149.63

3460.00

0.00

8740.88

99609.63

99610.00

99610.00

0.00

Jul-11

21640

18394

21640

18394

0.85

N.A

0.00

116044.00

3460.00

0.00

10549.00

119504.00

119504.00

119504.00

0.00

Aug-11

21240

18054

21240

18054

0.85

N.A

0.00

113899.00

3460.00

0.00

10354.00

117359.00

117359.00

117360.00

0.00

Sep-11

19420

16507

19420

16507

0.85

N.A

0.00

104139.75

3460.00

0.00

9467.00

107599.00

107600.00

107600.00

0.00

Oct-11

20530

17451

20530

17451

0.85

N.A

0.25

129909.00

4152.00

0.00

11889.00

134060.00

134060.00

134060.00

0.00

Nov-11

38660

32861

38660

32861

0.85

N.A

0.00

244631.00

4152.00

0.00

22239.00

248783.00

248783.00

248783.00

0.00

Dec-11

31740

26979

31740

26979

0.85

N.A

0.00

200843.00

4152.00

0.00

18258.00

204994.00

204995.00

204995.00

0.00

10 Jan-12

32020

27217

32020

27217

0.85

N.A

0.00

202614.00

4152.00

0.00

18419.00

206766.00

206766.00

206766.00

0.00

11 Feb-12

32700

27795

32700

27795

0.85

N.A

0.00

206917.00

4152.00

0.00

18810.00

211069.00

211069.00

211070.00

0.00

12 Mar-12

22540

19159

22540

19159

0.85

N.A

0.00

142627.00

4152.00

0.00

12966.00

146779.00

146779.00

146779.00

0.00

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:


Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


1 except for domestic, street lighting and loads where KVAH billing done.
3 KVAH
and
demand
readings
will
be
required
for
load
more
than
100KW
only.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by
dividing
4 recorded KWH units with power factor = 0.85
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Zakura

Executive Engineer
Electric Division-IV, khanyar

Information from April 2011 to March 2012


ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM
M/S ZAMIR Fayaz (timbo traders)
Installation No:
1911/M
Computer Code:
415
Sanctioned Load:
45 HP

CT Ratio:
100/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

Amount received
(In Rs.)

(H)
0.00
0.00
0.00
0.00
1214.00
1214
0
0
0
0
0
0

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
485.00
0
0
365
0
0
0
0

(F)
1190.00
1190.00
1190.00
1190.00
1190.00
1190.00
1360.00
1360.00
1360.00
1360.00
1360.00
1360.00

ED Billed
(In Rs.)
(G)
822.07
926.13
1384.00
1394.40
1175.00
915.73
1207.43
884.66
1159
1087
382.55
896

Surcharge if any
billed (In Rs.)

Opening Balance
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0

Energy
Charges
billed
(In Rs.)
(E)
3736.00
4209.70
6290.90
6338.00
5344.00
4162
5488
4021
5270
4944
1738.88
4075

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Total

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
1858.82
1580
1858.82
1580
0.85
NA
2094.12
1780
2094.12
1780
0.85
NA
3129.41
2660
3129.41
2660
0.85
NA
3152.94
2680
3152.94 2680.00
0.85
NA
2658.82
2260
2658.82
2260
0.85
NA
2070.59
1760
2070.59
1760
0.85
NA
2376.47
2020
2376.47
2020
0.85
NA
1741.18
1480
1741.18
1480
0.85
NA
2282.35
1940
2282.35
1940
0.85
NA
2141.18
1820
2141.18
1820
0.85
NA
494.118
420
494.118
420
0.85
NA
1764.71
1500
1764.71
1500
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(E+F+G+H=I)
5748.07
6325.83
8864.90
8922.40
7709.00
7481.00
8055.00
6265.00
7791.00
7392
3481
6332

(J)
4364.00
5749.00
6325.00
8865
8923.00
7711.00
6268.00
8056.00
6265.00
7791
7393
3481

Note:
1
2
3
4

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Arrears
(K=I-J)
1384.07
576.83
2539.90
57.40
17846.00
0.00
8056.00
0.00
7791.00
7393
3481
6332

m/s a.r.k. joinery


Installation No:
Computer Code:
Sanctioned Load:

293/M
397
30 HP

CT Ratio:
100/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(H)
400.00
0.00
400.00
400.00
400.00
400
400
400
0
0
0
0

Amount received
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

Surcharge if any
billed (In Rs.)

Opening Balance
26279.00
33320.70
40586.00
51000.36
62378
71211
81077
9895
19731
30969
42062.08
49450

(F)
1575.00
1855.00
1855.00
1855.00
1855.00
1855.00
2226.00
2226.00
2226.00
2226.00
2226.00
2226.00

ED Billed
(In Rs.)
(G)
913.79
975.74
1471.36
1424.90
1068.00
1068
1356
1319
1542
1486
799.18
836

Total Amount
Billed
(In Rs.)

(D)
NA
NA
NA
NA
NA
na
NA
NA
NA
NA
NA
NA

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

Energy
Charges
billed
(In Rs.)
(E)
4153.00
4435.00
6688.00
6476.00
4857.00
4857
6167.04
5998
7011.084
6758
3632.64
3801

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A)
1388.24
1180
1388.24
1180
0.85
1482.35
1260
1482.35
1260
0.85
2235.29
1900
2235.29
1900
0.85
2164.71
1840
2164.71 1840.00
0.85
1623.53
1380
1623.53
1380
0.85
1623.53
1380
1623.53
1380
0.85
1717.65
1460
1717.65
1460
0.85
1670.59
1420
1670.59
1420
0.85
1952.94
1660
1952.94
1660
0.85
1882.35
1600
1882.35
1600
0.85
1011.76
860
1011.76
860
0.85
1058.82
900
1058.82
900
0.85

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(E+F+G+H=I)
6642.00
7265.00
10014.00
9756.00
7781.00
7781
9749
9543
10780
14071
6657
6863

(J)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80178.00
0
0
0
0

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Arrears
(K=I-J)
32921.00
40585.70
50600.00
60756.36
70159.00
78992.00
90826.00
-60740.00
30511.00
41440
48720
56315

ENERGY
ACCOUN
m/s modern joinery mill
Installation No:
Computer Code:
Sanctioned Load:

1 M/ 11
388
53 HP

CT Ratio:
400/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(H)
700.00
700.00
700.00
700.00
700.00
700.00
700
700
700
700
700
700
700

(E+F+G+H=I)
2100.00
2100.00
2100.00
2100.00
2100.00
2100.00
2100.00
2300.00
2300.00
1600
1600
1600
1600

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
1400.00
1400.00
1400.00
1400.00
1400.00
1400.00
1400
1600
1600
1600
1600
1600
1600

ED Billed
(In Rs.)
(G)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0

Surcharge if any
billed (In Rs.)

Opening Balance
68355.66
72607.00
75117.00
77664.00
80250.00
82875.00
85539
88243
91191
94183
97220
100302
103431

Energy
Charges
billed
(In Rs.)
(E)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Demand charges
billed (In Rs. )

Month
Mar-11
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
0
0
0
0
0.00
NA
0
0
0
0
0.00
NA
0
0
0
0
0.00
NA
0
0
0
0
0.00
NA
0
0
0
0.00
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
Note:

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

Arrears
(K=I-J)
70455.66
74707.00
77217.00
79764.00
82350.00
84975.00
87639.00
90543
93491
95783
98820
101902
105031

ENERGY
ACCOUN
m/s national wood industries
Installation No:
Computer Code:
Sanctioned Load:

3049/M
393
37 HP

CT Ratio:
100/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(H)
400.00
2000.00
0.00
0.00
0.00
2000.00
0
0
0
0
0
0
0

(E+F+G+H=I)
11120.58
10806.46
7167.39
7339.17
7768.61
6222.62
7682
9219
9219
11280
11898
11898
9837

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
1960.00
1960.00
2100.00
2100.00
2100.00
2100.00
2100
2520
2520
2520
2520
2520
2520

ED Billed
(In Rs.)
(G)
1579.78
1595.26
913.79
944.77
1022.21
743.42
1006.00
1208
1208
1579.78
1691
1691
7317

Surcharge if any
billed (In Rs.)

Opening Balance
37298.74
49627.00
51190.00
44008.00
36892.00
30106
21874
14775
9129
0
0
0
0

Energy
Charges
billed
(In Rs.)
(E)
7180.80
7251.20
4153.60
4294.40
4646.40
3379.20
4576.00
5491.00
5491.00
7180.8
7687
7687
5998

Demand charges
billed (In Rs. )

Month
Mar-11
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
2400
2040
2400
2040
0.85
NA
2423.53
2060
2423.53
2060
0.85
NA
1388.24
1180
1388.24
1180
0.85
NA
1435.29
1220
1435.29
1220
0.85
NA
1552.94
1320
1552.94 1320.00
0.85
NA
1129.41
960
1129.41
960
0.85
NA
1529.41
1300
1529.41
1300
0.85
NA
1529.41
1300
1529.41
1300
0.85
NA
1529.41
1300
1529.41
1300
0.85
NA
2000
1700
2000
1700
0.85
NA
2141.18
1820
2141.18
1820
0.85
NA
2141.18
1820
2141.18
1820
0.85
NA
1670.59
1420
1670.59
1420
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
Note:

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
10000.00
10000.00
15000.00
15000
15000.00
15000
15000.00
15000.00
18349
11280
11899
11899

Arrears
(K=I-J)
48419.32
52433.46
48357.39
36347.17
29660.61
21328.62
14775.00
9129.00
18349.00
11280
11899
11899
9838

ENERGY
ACCOUN
m/s national spices
Installation No:
Computer Code:
Sanctioned Load:

1 M / 44
310
31 HP

CT Ratio:
100/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1435.29
1176.47
1364.71
1411.76
1529.41
870.588
1623.53
1411.76
1647.06
1529.41
988.235
1105.88
1811.76

1220
1000
1160
1200
1300.00
740
1380
1200
1400
1300
840
940
1540

0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

840.00
840.00
840.00
840.00
840.00
840.00
840
960
960
960
960
960
960

634.77
520.30
603.55
624.36
676.39
385.00
718
717
836
777.06
502.1
561.88
920

Surcharge if any
billed (In Rs.)

2885.30
2365.00
2743.00
2838.00
3074.00
1750.00
3263.00
3260.00
3803.00
3532
840
22553.98
4184

Demand charges
billed (In Rs. )

Opening Balance
#REF!
4425.00
8272.00
12646.00
17203.00
22121
0
0
0
5684.21
11117.67
0
0

Amount received
(In Rs.)

1220
1000
1160
1200
1300
740
1380
1200
1400
1300
840
940
1540

(F)

ED Billed
(In Rs.)
(G)

Total Amount
Billed
(In Rs.)

1435.29
1176.47
1364.71
1411.76
1529.41
870.588
1623.53
1411.76
1647.06
1529.41
988.235
1105.88
1811.76

(D)

Energy
Charges
billed
(In Rs.)
(E)

Capicator
Charges

S.No
Month
Closing Balance as on 11/2010
1
Mar-11
2
Apr-11
3
May-11
4
Jun-11
5
Jul-11
6
Aug-11
7
Sep-11
8
Oct-11
9
Nov-11
10
Dec-11
11
Jan-12
12
Feb-12
13
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A)

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(H)

(E+F+G+H=I)

(J)

0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

4360.07
3725.30
4186.55
4302.36
4590.39
2975.00
4821.00
4937.00
5599.00
5269.06
3744
4075.86
6064

5399.00
0.00
0.00
0.00
0
0.00
25096.00
4822.00
4938.00
0
0
14862
4076

Note:
1
2
3
4

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar
ENERGY
ACCOUN
m/s famous industries

Arrears
(K=I-J)
3091.00
#REF!
8150.30
12458.55
16948.36
21793.39
25096.00
4821.00
4937.00
5599.00
10953.27
14862
4076
6265

Installation No:
Computer Code:
Sanctioned Load:

1079/M
1871
30 HP

CT Ratio:
100/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

S.No
1
2
3
5
6
7
8
9
10
11
12
13
Note:

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
1
2
3
4

199917.00
207092.00
221637.00
231597.00
252952
267248
273441
293635
304712.03
282005
289946.69
268814

0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

(F)
1575.00
1748.21
1575.00
1575.00
1575.00
1575.00
1800.00
1800.00
1800.00
1800.00
1800.00
1800.00

(H)
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

(E+F+G+H=I)
4113.76
11269.00
6537.72
17616.67
10345.71
2152.60
15854.00
6572.48
3125
3656
4451
3258

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

ED Billed
(In Rs.)
(G)
457.56
722.40
894.92
2892.27
1581.71
104.6
2534
860
239.1
334.73
478.19
263

Surcharge if any
billed (In Rs.)

Demand charges
billed (In Rs. )

Energy
Charges
billed
(In Rs.)
(E)
2081.20
7946.40
4067.80
13149.40
7189.00
473
11520
3912.48
1086.8
1521
2173.6
1195

Capicator
Charges

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
1035.29
880
1035.29
880
0.85
NA
3952.94
3360
3952.94
3360
0.85
NA
2023.53
1720
2023.53
1720
0.85
NA
6541.18
5560
6541.18 5560.00
0.85
NA
3576.47
3040
3576.47
3040
0.85
NA
235.294
200
235.294
200
0.85
NA
4988.24
4240
4988.24
4240
0.85
NA
1694.12
1440
1694.12
1440
0.85
NA
470.588
400
470.588
400
0.85
NA
658.824
560
658.824
560
0.85
NA
941.176
800
941.176
800
0.85
NA
517.647
440
517.647
440
0.85
NA

Opening Balance

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
30000
0
30000

Arrears
(K=I-J)
204030.76
218361.00
228174.72
249213.67
263297.71
269400.60
269401.00
300209.00
307838
285662
294398
272073

ENERGY
ACCOUN
m/s shah steel industries
Installation No:
Computer Code:
Sanctioned Load:

3439/M
15238
30 HP

CT Ratio:
150/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(H)
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

(E+F+G+H=I)
3661.35
3228.05
3142.09
4007.68
2536.00
2881.00
3604.00
3007.00
1616.1
2113.33
2808.71
3207

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
805.00
805.00
805.00
805.00
805.00
805
920
920
920
920
920
920

ED Billed
(In Rs.)
(G)
515.00
437.05
421.44
577.53
312.00
374
484
376
125.53
215.19
340.71
412

Surcharge if any
billed (In Rs.)

Energy
Charges
billed
(In Rs.)
(E)
2341.35
1986.00
1915.65
2625.15
1419.00
1702.00
2200.00
1711.00
570.57
978.14
1548
1874

Demand charges
billed (In Rs. )

Opening Balance

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
Month supplied supplied
(A)
(B)
(C=B/A) (D)
Apr-11
1164.71
990
1164.71
990
0.85
NA
5642.20
May-11
988.235
840
988.235
840
0.85
NA
3582.55
Jun-11
952.941
810
952.941
810
0.85
NA
3189.00
Jul-11
1305.88
1110
1305.88 1110.00
0.85
NA
3062.69
Aug-11
705.882
600
705.882
600
0.85
NA
0
Sep-11
847.059
720
847.059
720
0.85
NA
0
Oct-11
952.941
810
952.941
810
0.85
NA
0
Nov-11
741.176
630
741.176
630
0.85
NA
0
Dec-11
247.059
210
247.059
210
0.85
NA
0
Jan-12
423.529
360
423.529
360
85
NA
0
Feb-12
670.588
570
670.588
570
0.085 NA
0
Mar-12
811.765
690
811.765
690
0.085 NA
0
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
5721.00
3662.00
3228.00
0.00
7197.00
2536.00
2883.00
3605.00
3008
1616
2113
2810

Arrears
(K=I-J)
3582.55
3148.60
3103.09
7070.37
-4661.00
345.00
721.00
-598.00
1616
2113
2810
3207

ENERGY
ACCOUN
m/s minoo metallic
Installation No:
Computer Code:
Sanctioned Load:

20302/M CT Ratio:
100/5
15245
Meter Rated Current:
31 HP
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(D)
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

(H)
500.00
500.00
500.00
500.00
500.00
0.00
0
500
500
0
0
0
0

(E+F+G+H=I)
4513.33
4360.07
3416.80
2724.74
2397.96
1531.00
2167.00
1689.00
1954.00
1954
2153
3147
3479

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

ENERGY
ACCOUN
m/s khan textiles

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
840.00
840.00
840.00
840.00
840.00
840.00
840
960
960
960
960
960
960

ED Billed
(In Rs.)
(G)
572.33
634.77
374.00
249.74
280.96
124.00
239
131.5
179.32
179.32
215.19
394.51
454

Surcharge if any
billed (In Rs.)

Opening Balance
40620.51
35400.00
35281.00
33697.00
31385.00
29215
26209
23727
20797
18018.38
15197
12350
10730

Demand charges
billed (In Rs. )

Month
Mar-11
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

Energy
Charges
billed
(In Rs.)
(E)
2601.00
2885.30
1702.80
1135.00
1277.00
567.00
1087.00
597.00
815.00
815
978.12
1793.22
2064

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
Note:

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A)
1294.12
1100
1294.12
1100
0.85
1435.29
1220
1435.29
1220
0.85
847.059
720
847.059
720
0.85
564.706
480
564.706
480
0.85
635.294
540
635.294
540.00
0.85
282.353
240
282.353
240
0.85
541.176
460
541.176
460
0.85
258.824
220
258.824
220
0.85
352.941
300
352.941
300
0.85
352.941
300
352.941
300
0.85
423.529
360
423.529
360
0.85
776.471
660
776.471
660
0.85
894.118
760
894.118
760
0.85

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
5000.00
5000.00
5000.00
5000.00
5000.00

Arrears
(K=I-J)
40133.84
34760.07
33697.80
31421.74
28782.96

5000.00
5000.00
5000.00
5000
5000
5000
5000

28377.00
25416.00
22752.00
19973
17351
15498
14210

Installation No:
Computer Code:
Sanctioned Load:

10811/M CT Ratio:
400/5
15266
Meter Rated Current:
30 HP
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(D)
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

(H)
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

(E+F+G+H=I)
13220.88
6925.68
6506.00
7345.36
6086.32
5876.00
6019.97
6019.97
15421.38
18073.97
21931.12
13734.00

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

(F)
1260.00
1260.00
1260.00
1260.00
1260.00
1260
1440
1440
1440
1440
1440
1440

ED Billed
(In Rs.)
(G)
2156.88
1021.68
946.00
1097.36
870.32
832
825.97
825.97
2521.38
2999.57
3695.12
2217

Surcharge if any
billed (In Rs.)

Opening Balance
10912.48
13221.36
6926.04
6506.04
0
0
0
0
0
0
0
0

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

Energy
Charges
billed
(In Rs.)
(E)
9804.00
4644.00
4300.00
4988.00
3956.00
3784
3754
3754
11460
13634.4
16796
10077

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A)
5364.71
4560
5364.71
4560
0.85
2541.18
2160
2541.18
2160
0.85
2352.94
2000
2352.94
2000
0.85
2729.41
2320
2729.41 2320.00
0.85
2164.71
1840
2164.71
1840
0.85
2070.59
1760
2070.59
1760
0.85
1788.24
1520
1788.24
1520
0.85
1788.24
1520
1788.24
1520
0.85
5458.82
4640
5458.82
4640
0.85
6494.12
5520
6494.12
5520
0.85
8000
6800
8000
6800
0.85
4800
4080
4800
4080
0.85

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
10912.00
13221.00
6926.00
6506
7345.00
6178
5876
6021
6020
15422
18074
21931

Arrears
(K=I-J)
13221.36
6926.04
6506.04
7345.40
-1258.68
5876.00
6021.00
6021.00
15422
18074
21931
13735

ENERGY
ACCOUN
m/s taj spices
Installation No:
Computer Code:
Sanctioned Load:

1090/M
15269
50 HP

CT Ratio:
100/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(H)
300.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0

Amount received
(In Rs.)

0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0

Surcharge if any
billed (In Rs.)

Opening Balance
26693.00
0.00
0.00
4337.00
9149.00
4391
0
0
5244
10229.63
0
0

(F)
1330.00
1330.00
1330.00
1330.00
1330.00
1330.00
1520
1520
1520
1520
1520
1520

ED Billed
(In Rs.)
(G)
645.17
635.00
530.71
603.00
332.99
509.89
717
657.51
597.74
573.83
741
418

Total Amount
Billed
(In Rs.)

(D)
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

Energy
Charges
billed
(In Rs.)
(E)
2932.60
2885.30
2412.30
2743.00
15613
2317
3260
2988
2717
2608.32
3369
1901

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A)
1458.82
1240
1458.82
1240
0.85
1435.29
1220
1435.29
1220
0.85
1200
1020
1200
1020
0.85
1364.71
1160
1364.71
1160
0.85
752.941
640
752.941
640.00
0.85
1152.94
980
1152.94
980
0.85
1411.76
1200
1411.76
1200
0.85
1294.12
1100
1294.12
1100
0.85
1176.47
1000
1176.47
1000
0.85
1129.41
960
1129.41
960
0.85
1458.82
1240
1458.82
1240
0.85
823.529
700
823.529
700
0.85

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(E+F+G+H=I)
5207.77
4850.30
4273.01
4676.00
17275.99
4156.89
5497.00
5165.51
4834.00
4702
5630
3840

(J)
0.00
0.00
4850.00
0.00
0.00
8000.00
8549.00
5497.00
0.00
0
14932
5130

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Arrears
(K=I-J)
31900.77
4850.30
-576.99
9014.00
26424.99
8549.00
5497.00
5167.00
10079.00
14932
5630.28
3841

m/s general electric industries


Installation No:
Computer Code:
Sanctioned Load:

2126/M
294
60 HP

CT Ratio:
200/5
Meter Rated Current:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

(F)
1575.00
1575.00
1575.00
1575.00
1575.00
1575.00
1800
1800
1800
1800
1800
1800

ED Billed
(In Rs.)
(G)
20.81
145.68
62.44
83.25
124.87
62.44
0.00
0.00
23.91
95.64
95.64
71

Surcharge if any
billed (In Rs.)

Demand charges
billed (In Rs. )

Capicator
Charges

Opening Balance
0.00
0.00
0.00
0.00
0.00
2301.37
0
1826
0
0
0
2364

Energy
Charges
billed
(In Rs.)
(E)
94.60
662.20
283.80
378.40
567.00
283.00
0.00
0.00
108.68
434.72
434.72
326

(H)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0

Amount received
(In Rs.)

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
47.0588
40
47.0588
40
0.85
NA
329.412
280
329.412
280
0.85
NA
141.176
120
141.176
120
0.85
NA
188.235
160
188.235
160
0.85
NA
282.353
240
282.353
240.00
0.85
NA
141.176
120
141.176
120
0.85
NA
0
0
0
0
0.85
NA
0
0
0
0
0.85
NA
47.0588
40
47.0588
40
0.85
NA
188.235
160
188.235
160
0.85
NA
188.235
160
188.235
160
0.85
NA
141.176
120
141.176
120
0.85
NA

Total Amount
Billed
(In Rs.)

S.No
1
2
3
4
5
6
7
8
9
10
11
12

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(E+F+G+H=I)
1690.41
2382.88
1921.24
2036.35
2266.87
1920.44
1800.00
1800.00
1932.59
2330.36
2330.36
2197

(J)
2383.00
1690.00
2383.00
1921.00
2037.00
1921.00
4223
1800
3627
1932
2331
0

Note:
1
2
3
4

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.
133011
-116064
16947

13000

3947
Executive Engineer
Electric Division-IV, khanyar

m/s k.p. iron product


Installation No:
Computer Code:

1245/M
272

CT Ratio:

Meter Rated Current:

Supply Type:
Meter Type:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

Arrears
(K=I-J)
-692.59
692.88
-461.76
2037.00
229.87
4223.00
1800.00
3627.00
1932.00
2331
2330
4563

Sanctioned Load:

26 HP

Capacitor Installed: Y/N


N

Rating of Capacitor:

1
2
3
4

(H)
1400.00
1600.00
1800.00
2000.00
0.00
0
2000
2000.00
3000
0
0

(E+F+G+H=I)
3694.73
3572.41
4141.74
3727.17
1535.89
1516.53
2248.00
1913.75
1376
2692.72
3067
1704

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
700.00
700.00
700.00
700.00
700.00
700
800
800
800
800
800
800

ED Billed
(In Rs.)
(G)
287.73
229.45
296.05
185.23
150.89
147.24
261.21
200.8/4
104.01
341.31
408.85
163

Surcharge if any
billed (In Rs.)

Opening Balance
135006.00
139361.00
143454.00
147982.00
151955
155794
159670.98
164348.33
168756
172684
178008
183791

Energy
Charges
billed
(In Rs.)
(E)
1307.00
1042.96
1345.69
841.94
685.00
669.29
1187.00
912.91
472.76
1551.41
1858.43
741

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
650.588
553
650.588
553
0.85
NA
518.824
441
518.824
441
0.85
NA
669.412
569
669.412
569
0.85
NA
418.824
356
418.824
356.00
0.85
NA
341.176
290
341.176
290
0.85
NA
332.941
283
332.941
283
0.85
NA
514.118
437
514.118
437
0.85
NA
395.294
336
395.294
336
0.85
NA
204.706
174
204.706
174
0.85
NA
671.765
571
671.765
571
0.85
NA
804.706
684
804.706
684
0.85
NA
321.176
273
321.176
273
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Arrears
(K=I-J)
138700.73
142933.41
147595.74
151709.17
153490.89
157310.53
161920.00
166262.00
170133
175377
181075
185496

m/s gee emm shawls


Installation No:
Computer Code:
Sanctioned Load:

18680/M CT Ratio:

17883
Meter Rated Current:
28 HP
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

Mpughal Masjid
F-1

1
2
3
4

(H)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(E+F+G+H=I)
6768.16
7039.38
7154.80
6257.06
8239.00
6259.37
7572.23
6471.00
8314.74
9425
11596
9905

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
735.00
735.00
735.00
735.00
735.00
735.00
840
840
840
840
840
840

ED Billed
(In Rs.)
(G)
1087.95
1136.86
1157.67
995.85
1353.00
996.37
1214.00
1215.56
1347.9
1548.15
11596
1634

Surcharge if any
billed (In Rs.)

Opening Balance
0.00
0.00
0.00
0.00
6352
218.55
0
0
0
0
0
0

Energy
Charges
billed
(In Rs.)
(E)
4945.21
5167.52
5262.13
4526.21
6151.00
4528.00
5518.23
4616.00
6126
7037
8816
7431

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
2460
2091
2460
2091
0.85
NA
2570.59
2185
2570.59
2185
0.85
NA
2617.65
2225
2617.65
2225
0.85
NA
2251.76
1914
2251.76 1914.00
0.85
NA
3060
2601
3060
2601
0.85
NA
2252.94
1915
2252.94
1915
0.85
NA
2389.41
2031
2389.41
2031
0.85
NA
1998.82
1699
1998.82
1699
0.85
NA
2652.94
2255
2652.94
2255
0.85
NA
3047.06
2590
3047.06
2590
0.85
NA
3817.65
3245
3817.65
3245
0.85
NA
3217.65
2735
3217.65
2735
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
7715.00
6768.00
7040.00
7261
0.00
14592
6479
7572
6472
8315
9425
11596

Arrears
(K=I-J)
-946.84
271.38
114.80
-1003.94
14591.00
6479.00
7572.00
6472.00
8315
9425
11596
9906

director, s.k.i.m.s. soura


Installation No:
Computer Code:

Sanctioned Load:

SD / 1
21203
4115
KVA +
874.43
KW

CT Ratio:

Meter Rated Current:

Supply Type:
Meter Type:

Capacitor Installed: Y/N


N

Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
Flat Rate Feeder No:

S.No
Month
(D)
Closing Balance as on 11/2010
1
Apr-11
607059
516000
607059
516000
0.85
NA 39799572.00
2
May-11
547059
465000
547059
465000
0.85
NA 43752908.00
3
Jun-11
564706
480000
564706
480000
0.85
NA 47435568.00
4
Jul-11
705882
600000
705882 #######
0.85
NA 41455352.00
5
Aug-11
764706
650000
764706
650000
0.85
NA 45977016.00
6
Sep-11
682353
580000
682353
580000
0.85
NA
508900008
7
Oct-11
623529
530000
623529
530000
0.85
NA
45427460
8
Nov-11
871765
741000
871765
741000
0.85
NA
49735076
9
Dec-11
725882
617000
725882
617000
0.85
NA
42377600
10
Jan-12
1290588 1097000 1290588 1097000
0.85
NA
41978872
11
Feb-12
1211765 1030000 1211765 1030000
0.85
NA
51005180
12
Mar-12
904706 769000
904706
769000
0.85
NA
52929588
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH and demand readings will be required for load more than 100KW only.
4 Please attach circle-wise and Divisional wise Abstracts with each energy account.

17500.00
17500.00
17500.00
17500.00
17500.00
17500.00
21000.00
21000.00
21000
21000
21000
21000

(H)

####### #########
#######
0.00
#######
0.00
#######
0.00
#######
0.00
#######
0.00
#######
0.00
#######
0.00
836905
0
1487982
0
1397102
0
1043079
0

(E+F+G+H=I)
4391545.75
2981642.00
3077260.00
3842200.00
4160925.00
3714710.00
4007612.31
5594734.81
4662018.5
8272535.25
7768567.25
5805348

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)

ED Billed
(In Rs.)
(G)

Surcharge if any
billed (In Rs.)

2696100.00
2429625.00
2508000.00
3135000.00
3396250.00
3030500.00
3267715.00
4568635.00
3804113.5
6763553.5
6350465
4741269

Demand charges
billed (In Rs. )

Energy
Charges
billed
(In Rs.)
(E)

Capicator
Charges

Opening Balance

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A)

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

Arrears
(K=I-J)
#########
0.00
#########
0.00
#########
0.00
#########
9670115 #########
0.00
#########
9848602.00 #########
0.00
#########
8892427.00 #########
4585233
47039618
5766349
50251407
626374
58773746
2500000
58734935
(J)

manager, govt. spinning mill at nowshehra


Installation No:
SD / 2
Computer Code:
16720
450 HP
Sanctioned Load:

CT Ratio:

Meter Rated Current:


Capacitor Installed: Y/N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph(Old)
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(H)
(E+F+G+H=I)
101060.50
107780.50
101060.50
107780.50
101060.00
107780.00
101060.00
107780.00
101060.00
107780.00
0.00
6720.00
0.00
8064.00
0.00
8064.00
0
8064
0
8064
0
8064
0
8064

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
6720.00
6720.00
6720.00
6720.00
6720.00
6720
8064
8064
8064
8064
8064
8064

ED Billed
(In Rs.)
(G)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Surcharge if any
billed (In Rs.)

Opening Balance

Energy
Charges
billed
(In Rs.)
(E)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
0
0
0
0
0.00
NA
9406493.00
0
0
0
0
0.00
NA
9554411.00
0
0
0
0
0.00
NA
9704548.00
0
0
0
0.00
0.00
NA
9856937.00
0
0
0
0.00
0.00
NA 10011612.00
0
0
0
0
0
NA
10168607
0
0
0
0
0
NA
10327957
0
0
0
0
0
NA
10491061
0
0
0
0
0
NA
10656612
0
0
0
0
0
NA
10824646
0
0
0
0
0
NA
10995201
0
0
0
1
0
NA
11168314

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0

Arrears
(K=I-J)
9514273.50
9662191.50
9812328.00
9964717.00
#########
0 #########
#########
#########
#########
10832710
11003265
11176378

manager, govt. spinning mill for lighting


Installation No:
SD / 3
Computer Code:
16719
33 KW
Sanctioned Load:

CT Ratio:

Meter Rated Current:


Capacitor Installed: Y/N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph(Old)
Feeder No:

B.A.M.Khan
F-1

1
2
3
4

(H)
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000.00
10000
0
0
0

(E+F+G+H=I)
10660.00
10660.00
10660.00
10660.00
10660.00
660.00
792.00
792.00
792
792
792
792

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
660.00
660.00
660.00
660.00
660.00
660
792
792
792
792
792
792

ED Billed
(In Rs.)
(G)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Surcharge if any
billed (In Rs.)

Energy
Charges
billed
(In Rs.)
(E)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Demand charges
billed (In Rs. )

Opening Balance

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
Month supplied supplied
(A)
(B)
(C=B/A) (D)
Apr-11
0
0
0
0
0.00
NA 2376507.00
May-11
0
0
0
0
0.00
NA 2412825.00
Jun-11
0
0
0
0
0.00
NA 2449687.00
Jul-11
0
0
0
0.00
0.00
NA 2487102.00
Aug-11
0
0
0
0
0.00
NA
2525079
Sep-11
0
0
0
0
0.00
NA
2563625
Oct-11
0
0
0
0
0.00
NA 2602749.25
Nov-11
0
0
0
0
0.00
NA 2642594.25
Dec-11
0
0
0
0
0
NA
2683037
Jan-12
0
0
0
0
0
NA 2724086.5
Feb-12
0
0
0
0
0
NA
2765751
Mar-12
1
0
1
0
0
NA
2808042
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
0.00
0.00
0.00
0
0
0
0
0
0

Arrears
(K=I-J)
2387167.00
2423485.00
2460347.00
0 2497762.00
2535739.00
0 2564285.00
2603541.00
2643386.00
2683829
2724878
2766544
2808834

Xen, phe water plant, bahrar


Installation No:
Computer Code:
Sanctioned Load:

13244
13733
400 HP

CT Ratio:

Meter Rated Current:


Capacitor Installed: Y/N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
Flat Rate Feeder No:

Kathidarwaza
F-3

1
2
3
4

(H)
50000.00
50000.00
50000.00
50000.00
50000.00
50000
50000
50000
50000
50000
50000
50000

(E+F+G+H=I)
140174.00
373682.40
280279.00
199905.00
74607.20
691421.00
251608.00
251608.00
230664
250780
250536
75699

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
59040.00
59040.00
59040.00
44233.00
59040.00
59040
73800
73800
55291.8
73800
73800
73800

ED Billed
(In Rs.)
(G)
5614.00
47722.40
30879.00
28072.00
2807.20
25615.70
32063.00
32063.79
31624.6
31914.5
31870
342

Surcharge if any
billed (In Rs.)

Opening Balance
1800438.00
1918971.00
2246032.00
2513456.00
2674062
2999480
2557158
2650992.75
2789611
3065579.5
3366105
3670891

Energy
Charges
billed
(In Rs.)
(E)
25520.00
216920.00
140360.00
127600.00
12760.00
116435.00
145744.50
145744.50
143748
145065
144866
1557

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
9411.76
8000
9411.76
8000
0.85
NA
80000
68000
80000
68000
0.85
NA
51764.7
44000
51764.7
44000
0.85
NA
47058.8
40000
47058.8 40000.00
0.85
NA
4705.88
4000
4705.88
4000
0.85
NA
42941.2
36500
42941.2
36500
0.85
NA
42941.2
36500
42941.2
36500
0.85
NA
42941.2
36500
42941.2
36500
0.85
NA
42352.9
36000
42352.9
36000
0.85
NA
42741.2
36330
42741.2
36330
0.85
NA
42682.4
36280
42682.4
36280
0.85
NA
458.824
390
458.824
390
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

Arrears
(K=I-J)
1940612.00
2292653.40
2526311.00
0 2713361.00
0.00
#########
0 3200571.00
274512
2808766.00
0
2902601.00
156529
3020275
0
3316360
0
3616641
952482
3746591
(J)
0.00
0.00
0.00

project coordinator, undp nallabal


Installation No:
SD / 51
Computer Code:
16723
202 HP
Sanctioned Load:

CT Ratio:

Meter Rated Current:


Capacitor Installed: Y/N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
HT/TVM 3Ph
Feeder No:

B.A.M.Khan
F-1

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
1
2
3
4

(F)
19950.00
19950.00
19950.00
19950.00
19950.00
19950
22990
22990
22990
22990
22990
22990

(H)
48000.00
49000.00
50000.00
0.00
55000.00
55000.00
55000.00
55000.00
55000
0
0
0

(E+F+G+H=I)
67950.00
68950.00
69950.00
19950.00
74950.00
19950.00
22990.00
22990.00
22990
22990
22990
22990

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

ED Billed
(In Rs.)
(G)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Surcharge if any
billed (In Rs.)

Energy
Charges
billed
(In Rs.)
(E)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

Demand charges
billed (In Rs. )

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
0
0
0
0
0.00
NA 34799946.00
0
0
0
0
0.00
NA
3552394.00
0
0
0
0
0.00
NA
3625930.00
0
0
0
0.00
0.00
NA
3600568.00
0
0
0
0
0
NA
3674826
0
0
0
0
0
NA
370197
0
0
0
0
0
NA
3826700
0
0
0
0
0
NA
3907435.25
0
0
0
0
0
NA
3989381.75
0
0
0
0
0
NA
4072557.25
0
0
0
0
0
NA
4156980
0
0
0
0
0
NA
414170

Capicator
Charges

Opening Balance

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
0.00
0.00
100000
0.00
0
0
0
0
0
100000
20000

Arrears
(K=I-J)
#########
3621344.00
3695880.00
3520518.00
3749776.00
3710148.00
3849690.00
3930425.00
4012372
4095547
4179970
4164160

ch. Medical officer, lepper hospital


Installation No:
4196
Computer Code:
13734
110 KW
Sanctioned Load:

CT Ratio:

Meter Rated Current:


Capacitor Installed: Y/N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
Flat Rate Feeder No:

Bagwan Pora
F-2

1
2
3
4

(H)
(E+F+G+H=I)
800000.00
959107.52
81000.00
240107.52
82000.00
241107.52
82000.00
241107.52
82000.00
241107.52
82000
159107.52
82000
198884.41
82000
198884.41
82000
198884.41
82000
198884.41
82000
198884.41
82000
198884

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

ED Billed
(In Rs.)
(G)
28691.52
28691.52
28691.52
28691.52
28691.52
28691.52
35864.00
35864.00
35864
35864
35864
35864

Surcharge if any
billed (In Rs.)

Opening Balance
5622348.00
5868178.00
6117695.00
6370954.00
6628031
6381427.5
6638643
6940090.5
7246059.5
7556618
7871835
8191780

Energy
Charges
billed
(In Rs.)
(E)
130416.00
130416.00
130416.00
130416.00
130416.00
130416.00
163020.00
163020.00
163020
163020
163020
163020

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
0
0
0
0
0.00
NA
0
0
0
0
0.00
NA
0
0
0
0
0.00
NA
0
0
0
0.00
0.00
NA
0
0
0
0
0
NA
0
0
0
0
0
NA
0
0
0
0
0
NA
0
0
0
0
0
NA
0
0
0
0
0
NA
0
0
0
0
0
NA
0
0
0
0
0
NA
0
0
0
0
0
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12
Note:

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

Arrears
(K=I-J)
6581455.52
6108285.52
6358802.52
0 6612061.52
500000.00 6869138.52
0 6540535.00
0
6837527.00
0
7138975.00
0
7444944
0
7755503
0
8070720
50000
8390665
(J)
0.00
0.00
0.00

divisional engineer, ocb exchange devi angan


Installation No:
5072
CT Ratio:
600/5
Computer Code:
21657
Meter Rated Current:
100 KW Capacitor Installed: Y/N
Sanctioned Load:
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
HT/TVM-3Ph
Feeder No:

B.A.M.Khan
F-6

(H)
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

(E+F+G+H=I)
115776.60
127243.00
131537.60
132312.00
122948.00
122948.00
132078.72
126925.44
137232
132078.72
121772
111465

Note:
1
2
3
4

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0

(F)
7000.00
7000.00
7000.00
7000.00
7000.00
7000
8400
8400
8400
8400
8400
8400

ED Billed
(In Rs.)
(G)
19615.00
21683.00
22457.60
23232.00
20908.00
20908
22302.7
21373.4
23232
22302.7
20444
18585

Surcharge if any
billed (In Rs.)

Max. Demand
Recorded KVA

Opening Balance
0.00
0.00
0.00
0.00
0.00
0
0
132079
0
0
0
0
0

Energy
Charges
billed
(In Rs.)
(E)
89161.60
98560.00
102080.00
102080.00
95040.00
95040.00
101376.00
97152.00
105600
101376
92928
84480

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KWH
Units
recorded
(B)
(C=B/A) (D)
25330
0.85
NA
28000
0.85
NA
29000
0.85
NA
30000.00
0.85
NA
27000.00
0.85
NA
27000.00
0.85
NA
24000.00
0.85
NA
23000.00
0.85
NA
25000
0.85
NA
24000
85
NA
22000
0.85
NA
20000
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12

KVAH
Units
KVAH
KWH
Units
Units recorded
supplied supplied
(A)
29800
25330
29800
32941.2
28000
32941.2
34117.6
29000
34117.6
35294.1
30000
35294.1
31764.7
27000
31764.7
31764.7
27000
31764.7
28235.3
24000
28235.3
27058.8
23000
27058.8
29411.8
25000
29411.8
28235.3
24000
28235.3
25882.4
22000
25882.4
23529.4
20000
23529.4

AV-Power Factor

SUB-DIVISION: Hawal

Arrears
(J)
(K=I-J)
134415.00 -18638.40
117514.00
9729.00
127243.00
4294.60
131538.00
774.00
135832.00 -12884.00
122949 122949.00
122949
132079.00
0
259004.00
259004
137232
137232
132079
132079
12772
121772
11465

rsu exchange soura, sde(frs) hariparbat at skims


Installation No:
SD / 102 CT Ratio:
200/5
Computer Code:
21658
Meter Rated Current:
45 KW
Sanctioned Load:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

Amount received
(In Rs.)

(H)
0.00
0.00
0.00
0.00
3000.00
0.00
0
0
0
0
0
0

Total Amount
Billed
(In Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0

(F)
3150.00
3150.00
3150.00
3150.00
3150.00
3150.00
3780
3780
3780
3780
3780
3780

ED Billed
(In Rs.)
(G)
3166.37
2910.00
3075.00
2416.13
1548.00
13687.37
7062
0
4088
0
631
1573

Surcharge if any
billed (In Rs.)

Opening Balance
20614.47
20708.84
18977.84
19891.46
0
0
0
643.76
0
0
3781
123

Energy
Charges
billed
(In Rs.)
(E)
14392.00
13229.00
13978.62
10982.00
7040.00
62215.30
32102
0
18585.6
0
2872
7152

Demand charges
billed (In Rs. )

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
4810.35
4088.8
4810.35
4089
0.85
NA
4421.18
3758
4421.18
3758
0.85
NA
4671.76
3971
4671.76
3971
0.85
NA
3670.59
3120
3670.59 3120.00
0.85
NA
2352.94
2000
2352.94
2000
0.85
NA
20792.9
17674
20792.9
17674
0.85
NA
8941.18
7600
8941.18
7600
0.85
NA
0
0
0
0
0.85
NA
5176.47
4400
5176.47
4400
0.85
NA
0
0
0
0
0.85
NA
800
680
800
680
0.85
NA
1991.76
1693
1991.76
1693
0.85
NA

Capicator
Charges

S.No
1
2
3
4
5
6
7
8
9
10
11
12

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(E+F+G+H=I)
20708.37
19289.00
20203.62
16548.13
14738.00
79052.67
42944
3780
26454.43
3780
7284
12505

(J)
20614.00
21020.00
19290.00
20204
16549.00
11738.00
79053
42945.00
3780
26454
0
11064

Note:
1
2
3
4

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Arrears
(K=I-J)
20708.84
18977.84
19891.46
16235.59
-1811.00
79053.00
42945.00
4424.00
26454
3781
11065
12507

director crafts development institute dch, at b.a.m. khan.


Installation No:
29647
CT Ratio:
200/5
Computer Code:
16721
Meter Rated Current:
22 KW
Sanctioned Load:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

Bagwan Pora
F-1

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
Note:

Month
Mar-11
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
1
2
3
4

16119.49
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0

(F)
680.00
680.00
680.00
680.00
680.00
680.00
680
816
816
816
816
816
816

(H)
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0

(E+F+G+H=I)
19259.99
27633.57
11409.29
15858.00
13502.31
13502.31
10624.22
17182.09
23048.26
18726
28607.48
36018
32621

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

ED Billed
(In Rs.)
(G)
3350.49
4860.57
1934.79
2737.00
2312.31
2312.31
1793.22
2951.26
4009.26
3229.68
5011..58
6348
5735

Surcharge if any
billed (In Rs.)

Demand charges
billed (In Rs. )

Energy
Charges
billed
(In Rs.)
(E)
15229.50
22093.00
8794.50
12441.00
10510.00
10510.00
8151
13414.83
18223
14680
22779.9
28854
26070

Capicator
Charges

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
3341.18
2840
3341.18
2840
0.85
NA
4847.06
4120
4847.06
4120
0.85
NA
1929.41
1640
1929.41
1640
0.85
NA
2729.41
2320
2729.41
2320
0.85
NA
2305.88
1960
2305.88 1960.00
0.85
NA
2305.88
1960
2305.88
1960
0.85
NA
1788.24
1520
1788.24
1520
0.85
NA
2494.12
2120
2494.12
2120
0.85
NA
3388.24
2880
3388.24
2880
0.85
NA
2729.41
2320
2729.41
2320
0.85
NA
4235.29
3600
4235.29
3600
0.85
NA
5364.71
4560
5364.71
4560
0.85
NA
4847.06
4120
4847.06
4120
0.85
NA

Opening Balance

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
16119.00
19549.00
28049.00
11409.00
15858
13503.00
13503.00
10624.00
17182.00
23049
18726
28608
36018

Arrears
(K=I-J)
19260.48
8084.57
-16639.71
4449.00
-2355.69
-0.69
10624.00
17182.00
2304.00
18726
28608
36018
32622

director indian institute of crafts technology at b.a.m. khan.


Installation No:
29646
CT Ratio:
200/5
Computer Code:
16722
Meter Rated Current:
25 KW
Sanctioned Load:
Capacitor Installed: Y/N
N

Supply Type:
Meter Type:
Rating of Capacitor:

3/LT
Name of 33/11KV Sub-Stations:
LT/KWH 3Ph
Feeder No:

B.A.M.Khan
F-1

S.No
1
2
3
4
5
6
7
8
9
10
11
12

Month
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12

11086.00
0.00
0.00
0.00
0
0
0
0
0
169.25
0
20404

(F)
500.00
500.00
500.00
500.00
500.00
500
600
600
600
600
600
600

(H)
500.00
500.00
500.00
500.00
500.00

(E+F+G+H=I)
19207.08
11407.86
11407.98
12893.82
14207.00
9534.61
14255.00
17135.89
11307.44
19150.23
22261
14379

Note:
1
2
3
4

Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Executive Engineer
Electric Division-IV, khanyar

Amount received
(In Rs.)

Total Amount
Billed
(In Rs.)

ED Billed
(In Rs.)
(G)
3283.24
1876.86
1876.98
2144.79
2381.00
1629
2462
2981.89
1930.85
3345.23
3906
2484

Surcharge if any
billed (In Rs.)

Demand charges
billed (In Rs. )

Energy
Charges
billed
(In Rs.)
(E)
14923.84
8531.00
8531.00
9749.03
10826.00
7405.61
11193
13554
8776.59
15205
17755
11295

Capicator
Charges

KVAH
KWH
Units
Units
KVAH
KWH
Units
Units recorded recorded
supplied supplied
(A)
(B)
(C=B/A) (D)
3274.12
2783
3274.12
2783
0.85
NA
1871.76
1591
1871.76
1591
0.85
NA
1871.76
1591
1871.76
1591
0.85
NA
2138.82
1818
2138.82 1818.00
0.85
NA
2375.29
2019
2375.29
2019
0.85
NA
15507.1
13181
15507.1
13181
0.85
NA
2081.18
1769
2081.18
1769
0.85
NA
2520
2142
2520
2142
0.85
NA
1631.76
1387
1631.76
1387
0.85
NA
2827.06
2403
2827.06
2403
0.85
NA
3301.18
2806
3301.18
2806
0.85
NA
2100
1785
2100
1785
0.85
NA

Opening Balance

Max. Demand
Recorded KVA

AV-Power Factor

SUB-DIVISION: Hawal

(J)
0.00
29793.00
10909.00
14147
12394.00
13709.00
9535.00
14256.00
17136
11308
19320
22262

Arrears
(K=I-J)
30293.08
-18385.14
498.98
-1253.18
1813.00
9535.00
9535.00
17136.00
11308
19320
22262
34784

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU DURING THE YEAR 2011-12

Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- Khanyar

Name of Installation:Ex. Engineer City Roads


CT Ratio:

N.A

Supply Type:

LT3Ph Type: Metered / Flat Rate:

Flat Rate
Khanyar

Feeder No:

F-3

Sanctioned Load:
S.N Month
o

23 KW

KWH Units
computed

Opening
Balance

Energy
Charges

Capacitor
Surcharge
Billed(In
Rs.)

Demand ED
charges Billed
billed (In (In Rs.)
Rs. )

Surcharge
for
metering
on LT
side

Late payment
surcharge billed

Name of 33/11KV Sub-Stations:

N.A

Max. Demand
Recorded KVA

N.A

Rating of Capacitor:

AV-Power Factor

Meter Type:

Capacitor Installed:NY/N

KVAH Units
computed

Meter Rated Current:


N.A

6264

KWH Units
supplied

12735

Computer Code:

KVAH Units
supplied

Installation No:

Total Amount
Billed
(In Rs.)

Amount received
(In Rs.)

State

Total Amount due


(in Rs.)

Category:

Arrears

E=D/C

N=H+I+J+L+M

O=G+N

Q=O-P

Apr-11

NA

NA

NA

4233.12883

0.85

NA

3693250.0

27060.00

0.00

5953.20

2460.00

0.00

0.00

35473.20

3728723.2

0.00

3728723.2

May-11

NA

NA

NA

4233.12883

0.85

NA

3726263.0

27060.00

0.00

5953.20

2460.00

0.00

0.00

35473.20

3761736.2

0.00

3761736.2

Jun-11

NA

NA

NA

4233.12883

0.85

NA

3759276.0

27060.00

0.00

5953.20

2460.00

0.00

0.00

35473.20

3794749.2

0.00

3794749.2

Jul-11

NA

NA

NA

4233.12883

0.85

NA

3792289.0

27060.00

0.00

5953.20

2460.00

0.00

0.00

35473.20

3827762.2

0.00

3827762.2

Aug-11

NA

NA

NA

4233.12883

0.85

NA

3882682.0

27060.00

0.00

5953.20

2460.00

0.00

0.00

35473.20

3918155.2

0.00

3918155.2

Sep-11

NA

NA

NA

4233.12883

0.85

NA

3974431.0

27060.00

0.00

5953.20

2460.00

0.00

0.00

35473.20

4009904.2

0.00

4009904.2

Oct-11

NA

NA

NA

4233.12883

0.85

NA

4067556.0

33825.00

0.00

7441.50

3075.00

0.00

0.00

41266.50

4108822.5

0.00

4108822.5

Nov-11

NA

NA

NA

4233.12883

0.85

NA

4140455.0

33825.00

0.00

7441.50

7441.50

0.00

0.00

41266.50

4181721.5

30000.00

4244447.0

Dec-11

NA

NA

NA

4233.12883

0.85

NA

4244447.5

33825.00

0.00

7441.50

7441.50

0.00

0.00

41266.50

4285714.0

0.00

4285714.0

10

Jan-12

NA

NA

NA

4233.12883

0.85

NA

4349999.5

33825.00

0.00

7441.50

3075.00

0.00

0.00

41266.50

4391266.0

0.00

4391266.0

11

Feb-12

NA

NA

NA

4233.12883

0.85

NA

4457135.0

33825.00

0.00

7441.50

3075.00

0.00

0.00

41266.50

4498401.5

0.00

4498401.5

12

Mar-12

NA

NA

NA

4233.12883

0.85

NA

4498401.0

33825.00

0.00

7441.50

3075.00

0.00

0.00

41266.50

4539667.5

0.00

4539667.5

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


3 KVAH and demand readings will be required for load more than 100KW only.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

In case trivector meter is not installed for load more than 100KW, please workout the KVAH

4 units by dividing recorded KWH units with power factor = 0.85


3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

AE
S/D - Khanyar

Assistant Executive Engineer


Sub-Division-Khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU DURING THE YEAR 2011-12

Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- Khanyar

Name of Installation:Maqdoom Sahib Shrine water pump


N.A

Supply Type:

LT3Ph Type: Metered / Flat Rate:

Flat Rate

N.A

Name of 33/11KV Sub-Stations:

Rating of Capacitor:

N.A

Feeder No:

Sanctioned Load:
S.N Month
o

30 KW

Opening
Balance

Energy
Charges

Capacitor
Surcharge
Billed (In
Rs.)

Demand ED
charges Billed
billed (In (In Rs.)
Rs. )

Late payment
surcharge billed

AVPower
Factor

Kathidarwaza

F-2
Surcharge for
metering on LT side

KWH Units
computed

Max. Demand
Recorded KVA

Meter Type:

Capacitor Installed:NY/N

KVAH Units
computed

Meter Rated Current:


N.A

6269

KWH Units
supplied

10805

Computer Code:

KVAH Units
supplied

Installation No:

Total Amount
Billed
(In Rs.)

Amount received
(In Rs.)

CT Ratio:

Total Amount due


(in Rs.)

state

Category:

Arrears

E=D/C

N=H+I+J+L+M

O=G+N

Q=O-P

Apr-11

NA

NA

NA

4192.22914

N.A

N.A

444080.0

33000.00

0.00

7260.00

3000.00

0.00

0.00

43260.00

487340.0

0.00

487340.0

May-11

NA

NA

NA

4192.22914

N.A

N.A

491607.0

33000.00

0.00

7260.00

3000.00

0.00

0.00

43260.00

534867.0

0.00

534867.0

Jun-11

NA

NA

NA

4192.22914

N.A

N.A

539843.0

33000.00

0.00

7260.00

3000.00

0.00

0.00

43260.00

583103.0

0.00

583103.0

Jul-11

NA

NA

NA

4192.22914

N.A

N.A

588805.0

33000.00

0.00

7260.00

3000.00

0.00

0.00

43260.00

632065.0

0.00

632065.0

Aug-11

NA

NA

NA

4192.22914

N.A

N.A

638501.0

33000.00

0.00

7260.00

3000.00

0.00

0.00

43260.00

681761.0

0.00

681761.0

Sep-11

NA

NA

NA

4192.22914

N.A

N.A

688942.0

33000.00

0.00

7260.00

3000.00

0.00

0.00

43260.00

732202.0

0.00

732202.0

Oct-11

NA

NA

NA

4192.22914

N.A

N.A

740140.0

41250.00

0.00

9075.00

3750.00

0.00

0.00

54075.00

794215.0

0.00

794215.0

Nov-11

NA

NA

NA

4192.22914

N.A

N.A

798573.0

41250.00

0.00

9075.00

3750.00

0.00

0.00

54075.00

852648.0

0.00

852648.0

Dec-11

NA

NA

NA

4192.22914

N.A

N.A

861688.0

41250.00

0.00

9075.00

3750.00

0.00

0.00

54075.00

915763.0

0.00

915763.0

10

Jan-12

NA

NA

NA

4192.22914

N.A

N.A

929498.0

41250.00

0.00

9075.00

3750.00

0.00

0.00

54075.00

983573.0

0.00

983573.0

11

Feb-12

NA

NA

NA

4192.22914

N.A

N.A

994521.0

41250.00

0.00

9075.00

3750.00

0.00

0.00

54075.00

1048596.0

0.00

1048596.0

12

Mar-12

NA

NA

NA

4192.22914

N.A

N.A

1095171.0

41250.00

0.00

9075.00

3750.00

0.00

0.00

54075.00

1149246.0

0.00

1149246.0

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


3 KVAH and demand readings will be required for load more than 100 KW only.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

In case trivector meter is not installed for load more than 100KW, please workout the KVAH

4 units by dividing recorded KWH units with power factor = 0.85


3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

AE
S/D - Khanyar

Assistant Executive Engineer


Sub-Division-Khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU DURING THE YEAR 2011-12

Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- Khanyar

Name of Installation:Maqdoom Sahib Shrine


CT Ratio:

N.A

Supply Type:

LT3Ph Type: Metered / Flat Rate:

Flat Rate

N.A

Name of 33/11KV Sub-Stations:

Rating of Capacitor:

N.A

Feeder No:

Sanctioned Load:
S.N Month
o

20 KW

AVPower
Factor

Opening
Balance

Energy
Charges

Capacitor
Surcharge
Billed(In
Rs.)

Demand ED
charges Billed
billed (In (In Rs.)
Rs. )

Kathidarwaza

F-2

Surcharge
for
metering
on LT
side

Late payment
surcharge billed

KWH Units
computed

Max. Demand
Recorded KVA

Meter Type:

Capacitor Installed:NY/N

KVAH Units
computed

Meter Rated Current:


N.A

6440

KWH Units
supplied

8597

Computer Code:

KVAH Units
supplied

Installation No:

Total Amount
Billed
(In Rs.)

Amount received
(In Rs.)

domestic

Total Amount due


(in Rs.)

Category:

Arrears

E=D/C

N=H+I+J+L+M

O=G+N

Q=O-P

Apr-11

NA

NA

NA

7265.51724

0.85

N.A

15652.00

12640.00

0.00

2781.00

0.00

0.00

0.00

15421.00

31073.0

0.00

31073.00

May-11

NA

NA

NA

7265.51724

0.85

N.A

31539.10

12640.00

0.00

2781.00

0.00

0.00

0.00

15421.00

46960.1

0.00

46960.10

Jun-11

NA

NA

NA

7265.51724

0.85

N.A

47664.50

12640.00

0.00

2781.00

0.00

0.00

0.00

15421.00

63085.5

0.00

63085.50

Jul-11

NA

NA

NA

7265.51724

0.85

N.A

64031.78

12640.00

0.00

2781.00

0.00

0.00

0.00

15421.00

79452.8

0.00

79452.78

Aug-11

NA

NA

NA

7265.51724

0.85

N.A

80644.57

12640.00

0.00

2781.00

0.00

0.00

0.00

15421.00

96065.6

0.00

96065.57

Sep-11

NA

NA

NA

7265.51724

0.85

N.A

97506.55

12640.00

0.00

2781.00

0.00

0.00

0.00

15421.00

112927.6

0.00

112927.55

Oct-11

NA

NA

NA

7265.51724

0.85

N.A

114619.98

14901.00

0.00

3278.22

0.00

0.00

0.00

18179.22

132799.2

0.00

132799.20

Nov-11

NA

NA

NA

7265.51724

0.85

N.A

134791.78

14901.00

0.00

3278.22

0.00

0.00

0.00

18179.22

152971.0

0.00

152971.00

Dec-11

NA

NA

NA

7265.51724

0.85

N.A

152971.00

14901.00

0.00

3278.22

0.00

0.00

0.00

18179.22

20474.0

152971.00

20474.00

10

Jan-12

NA

NA

NA

7265.51724

0.85

N.A

20780.00

14901.00

0.00

3278.22

0.00

0.00

0.00

18179.22

38959.2

0.00

38959.22

11

Feb-12

NA

NA

NA

7265.51724

0.85

N.A

39544.00

14901.00

0.00

3278.22

0.00

0.00

0.00

18179.22

57723.2

0.00

57723.22

12

Mar-12

NA

NA

NA

7265.51724

0.85

N.A

75902.00

14901.00

0.00

3278.22

0.00

0.00

0.00

18179.22

94081.2

0.00

94081.22

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH and demand readings will be required for load more than 100KW only.

Surcharge shall include following:


1

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

In case trivector meter is not installed for load more than 100KW, please workout the KVAH
units by dividing recorded KWH units with power factor = 0.85

4
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
RE

JE

AE
S/D - Khanyar

Assistant Executive Engineer


Sub-Division-Khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU DURING THE YEAR 2011-12

Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- Khanyar

Name of Installation:Shiraz Cinema


N.A

Supply Type:

LT3Ph Type: Metered / Flat Rate:

Flat Rate

N.A

Name of 33/11KV Sub-Stations:

Rating of Capacitor:

N.A

Feeder No:

Sanctioned Load:
S.N Month
o

20 KW

AVPower
Factor

Opening
Balance

Energy
Charges

Capacitor
Surcharge
Billed(In
Rs.)

Demand ED
charges Billed
billed (In (In Rs.)
Rs. )

Shiraz Cinema

Surcharge
for
metering
on LT
side

Late payment
surcharge billed

KWH Units
computed

Max. Demand
Recorded KVA

Meter Type:

Capacitor Installed:NY/N

KVAH Units
computed

Meter Rated Current:


N.A

5378

KWH Units
supplied

841/M

Computer Code:

KVAH Units
supplied

Installation No:

Total Amount
Billed
(In Rs.)

Amount received
(In Rs.)

commercial CT Ratio:

Total Amount due


(in Rs.)

Category:

Arrears

E=D/C

N=H+I+J+K+L+M

O=G+N

Apr-11

NA

NA

NA

6792.45283

NA

N.A

162026.00

23496.00

0.00

5169.00

2349.60

0.00

0.00

28665.00

190691.0

0.00

190691.00

May-11

NA

NA

NA

6792.45283

NA

N.A

1673421.00

23496.00

0.00

5169.00

2349.60

0.00

0.00

28665.00

1702086.0

0.00

1702086.00

Jun-11

NA

NA

NA

6792.45283

NA

N.A

1727617.29

23496.00

0.00

5169.00

2349.60

0.00

0.00

28665.00

1756282.3

0.00

1756282.29

Jul-11

NA

NA

NA

6792.45283

NA

N.A

1782626.52

23496.00

0.00

5169.00

2349.60

0.00

0.00

28665.00

1811291.5

0.00

1811291.52

Aug-11

NA

NA

NA

6792.45283

NA

N.A

1838460.90

23496.00

0.00

5169.00

2349.60

0.00

0.00

28665.00

1867125.9

0.00

1867125.90

Sep-11

NA

NA

NA

6792.45283

NA

NA

1895132.79

23496.00

0.00

5169.00

2349.60

0.00

0.00

28665.00

1923797.8

0.00

1923797.79

Oct-11

NA

NA

NA

6792.45283

NA

NA

1952656.00

29370.00

0.00

6461.40

2937.00

0.00

0.00

35831.40

1988487.4

0.00

1988487.40

Nov-11

NA

NA

NA

6792.45283

NA

NA

2018315.00

29370.00

0.00

6461.40

2937.00

0.00

0.00

35831.40

2054146.4

0.00

2054146.40

Dec-11

NA

NA

NA

6792.45283

NA

NA

2084953.00

29370.00

0.00

6461.40

2937.00

0.00

0.00

35831.40

2120784.40

0.00

2120784.40

10

Jan-12

NA

NA

NA

6792.45283

NA

NA

2152601.00

29370.00

0.00

6461.40

2937.00

0.00

0.00

35831.40

2188432.40

0.00

2188432.40

11

Feb-12

NA

NA

NA

6792.45283

NA

NA

2221259.00

29370.00

0.00

6461.40

2937.00

0.00

0.00

35831.40

2257090.40

0.00

2257090.40

12

Mar-12

NA

NA

NA

6792.45283

NA

NA

2292922.00

29370.00

0.00

6461.40

2937.00

0.00

0.00

35831.40

2328753.40

0.00

2328753.40

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH and demand readings will be required for load more than 100KW only.

Surcharge shall include following:


1

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

In case trivector meter is not installed for load more than 100KW, please workout the KVAH
units by dividing recorded KWH units with power factor = 0.85

4
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

AE
S/D - Khanyar

Q=O-P

Assistant Executive Engineer


Sub-Division-Khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU DURING THE YEAR 2011-12

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- Khanyar

Name of Installation:Ghulam Mohd. Parray (Hotel Kah Kahshan)


Meter Rated Current:
N.A

Meter Type:

LTKWH Name of 33/11KV Sub-Stations:

Computer Code:

6328

Capacitor Installed:NY/N

Rating of Capacitor:

Sanctioned Load:
S.N Month
o

80 KW

Opening
Balance

Energy
Charges

F-2

Capacitor
Surcharge
Billed(In
Rs.)

Demand ED
charges Billed
billed (In (In Rs.)
Rs. )

Surcharge
for
metering
on LT
side

Total Amount
Billed
(In Rs.)

Amount received
(In Rs.)

AVPower
Factor

Fateh Kadal

Feeder No:

Total Amount due


(in Rs.)

KWH Units
computed

N.A

Meterd

Late payment
surcharge billed

N.A

Max. Demand
Recorded KVA

LT3Ph Type: Metered / Flat Rate:

1200/M

KVAH Units
computed

LT Indust. CT Ratio:

KWH Units
supplied

Supply Type:

Installation No:

KVAH Units
supplied

Category:

Arrears

E=D/C

N=H+I+J+K+L+M

O=G+N

Q=O-P

Apr-11

NA

NA

NA

2363.620

NA

N.A

2091614.00

95040.00

0.00

20908.00

8640.00

0.00

0.00

115948.00

2207562.0

0.00

2207562.00

May-11

NA

NA

NA

2363.620

NA

N.A

2240677.00

95040.00

0.00

20908.00

8640.00

0.00

0.00

115948.00

2356625.0

0.00

2356625.00

Jun-11

NA

NA

NA

2363.620

NA

N.A

2391975.00

95040.00

0.00

20908.00

8640.00

0.00

0.00

115948.00

2507923.0

0.00

2507923.00

Jul-11

NA

NA

NA

2363.620

NA

N.A

2545542.00

95040.00

0.00

20908.00

8640.00

0.00

0.00

115948.00

2661490.0

0.00

2661490.00

Aug-11

NA

NA

NA

2363.620

NA

N.A

2701414.00

95040.00

0.00

20908.00

8640.00

0.00

0.00

115948.00

2817362.0

0.00

2817362.00

Sep-11

NA

NA

NA

2363.620

NA

N.A

2859623.00

95040.00

0.00

20908.00

8640.00

0.00

0.00

115948.00

2975571.0

0.00

2975571.00

Oct-11

NA

NA

NA

2363.620

NA

N.A

3020205.75

118734.00

0.00

261121.48

10794.00

0.00

0.00

379855.48

3400061.2

0.00

3400061.23

Nov-11

NA

NA

NA

2363.620

NA

N.A

3212537.25

118734.00

0.00

261121.48

10794.00

0.00

0.00

144855.75

3357393.0

0.00

3357393.00

Dec-11

NA

NA

NA

2363.620

NA

N.A

3407753.00

118734.00

0.00

261121.48

10794.00

0.00

0.00

144856.00

3552609.0

0.00

3552609.00

10

Jan-12

NA

NA

NA

2363.620

NA

N.A

3605898.50

118734.00

0.00

261121.48

10794.00

0.00

0.00

144855.00

3750753.5

0.00

3750753.50

11

Feb-12

NA

NA

NA

2363.620

NA

N.A

3807015.00

118374.00

0.00

261121.48

10794.00

0.00

0.00

144855.00

3951870.0

0.00

3951870.00

12

Mar-12

NA

NA

NA

2363.620

NA

N.A

39663026.00

118374.00

0.00

261121.48

10794.00

0.00

0.00

144855.00

39807881.0

0.00

39807881.00

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH and demand readings will be required for load more than 100KW only.

Surcharge shall include following:


1

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

In case trivector meter is not installed for load more than 100KW, please workout the KVAH
units by dividing recorded KWH units with power factor = 0.85

4
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

AE
S/D - Khanyar

Assistant Executive Engineer


Sub-Division-Khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:
Installation No:
Computer Code:
Sanctioned Load:

S.No

Month

DiVision:

Nazir Ah. Zargar


LT Indust.
CT Ratio:
17510
Meter Rated Current:
9386
Capacitor Installed: Y/N
30 HP

KVAH Units KWH Units


supplied
supplied
A
B

N.A
N.A
N.A

Electric Division-IV, Khanyar

Supply Type:
Meter Type:
Rating of Capacitor:

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

LT3Ph
N.A
N.A

Demand
Energy Charges /
charges
F.R Charges billed billed (In Rs.
(In Rs.)
)
H
I

Sub-Division:- Rainawari

Type: Metered / Flat Rate:


Name of 33/11KV Sub-Stations:
Feeder No:

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Flat Rate
Rainawari
F-3

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)

Circle:

O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

N.A

N.A

20.00

N.A

N.A

145010.10

47.30

805.00

10.41

4.73

0.00

0.00

867.44

145877.54

0.00

145877.54

May-11

N.A

N.A

0.00

N.A

N.A

148061.00

0.00

805.00

0.00

0.00

0.00

0.00

805.00

148866.00

0.00

148866.00

Jun-11

N.A

N.A

80.00

N.A

N.A

151098.99

189.20

805.00

41.62

18.92

0.00

0.00

1054.74

152153.73

0.00

152153.73

Jul-11

N.A

N.A

0.00

N.A

N.A

154436.04

0.00

805.00

0.00

0.00

0.00

0.00

805.00

155241.04

0.00

155241.04

Aug-11

N.A

N.A

Locked

N.A

N.A

157569.66

118.25

805.00

26.02

10.75

0.00

0.00

960.02

158529.67

0.00

158529.67

Sep-11

N.A

N.A

Locked

N.A

N.A

160907.62

7590.00

805.00

1669.80

690.00

0.00

0.00

10754.80

171662.42

0.00

171662.42

Oct-11

N.A

N.A

Locked

N.A

N.A

174237.35

11385.00

805.00

2505.00

1035.00

0.00

0.00

13890.00

188127.35

0.00

188127.35

Nov-11

N.A

N.A

Locked

N.A

N.A

190949.26

11385.00

805.00

2505.00

1035.00

0.00

0.00

13890.00

204839.26

0.00

204839.26

Dec-11

N.A

N.A

Locked

N.A

N.A

207911.85

11385.00

805.00

2505.00

1035.00

0.00

0.00

13890.00

221801.85

0.00

221801.85

10

Jan-12

N.A

N.A

Locked

N.A

N.A

220169.58

0.00

805.00

0.00

0.00

0.00

0.00

805.00

220974.58

0.00

220974.58

11

Feb-12

N.A

N.A

Locked

N.A

N.A

224289.20

0.00

805.00

0.00

0.00

0.00

0.00

805.00

225094.20

0.00

225094.20

Locked

N.A

N.A

228470.61

0.00

805.00

0.00

0.00

0.00

0.00

805.00

229275.61

0.00

229275.61

12 Mar-12
N.A
0
N.A
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer

Executive Engineer

Rainawari

Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Executive Engineer, UEED

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

18334

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Rainawari

Computer Code:
Sanctioned Load:

10074
70 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

F-3

S.No

Month

LT Water Works

DiVision:

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH
Units
compute
d
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Demand
Energy Charges /
charges
F.R Charges billed billed (In Rs.
(In Rs.)
)
H
I

Type: Metered / Flat Rate:

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Flat Rate

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

16232.05

13797.24

16232.04619

13797.2

0.85

N.A

1943230.38

67468.50

13280.00

14843.07

6133.50

0.00

0.00

101725.07

2044955.5

0.00

2044955.5

May-11

19409.38

16497.98

19409.38289

16498

0.85

N.A

2075629.8

80675.10

13280.00

17748.52

7334.10

0.00

0.00

119037.72

2194667.5

0.00

2194667.5

Jun-11

18450.04

15682.54

18450.0421

15682.5

0.85

N.A

2227587.5

76687.60

13280.00

16871.27

6971.60

0.00

0.00

113810.47

2341398.0

0.00

2341398.0

Jul-11

18027.93

15323.74

18027.93215

15323.7

0.85

N.A

2376519.0

74933.10

13280.00

16485.28

6812.10

0.00

0.00

111510.48

2488029.4

0.00

2488029.4

Aug-11

18626.56

15832.58

18626.56081

15832.6

0.85

N.A

2525349.9

77421.30

13280.00

17032.69

7038.30

0.00

0.00

114772.29

2640122.2

0.00

2640122.2

Sep-11

18626.56

15832.58

18626.56081

15832.6

0.85

N.A

2679724.0

77421.30

13280.00

17032.69

7038.30

0.00

0.00

114772.29

2794496.3

544013.00

2250483.3

Oct-11

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2284240.5

95951.79

16600.00

21109.39

8722.89

0.00

0.00

142384.07

2426624.6

0.00

2426624.6

Nov-11

18626.56

15832.58

18626.56 15832.6

0.85

N.A

2463024.0

95632.35

16600.00

21039.12

8694.00

0.00

0.00

141965.47

2604989.44

533134.00

2071855.4

Dec-11

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2102933.3

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2244950.46

0.00

2244950.5

10

Jan-12

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2278624.7

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2420641.90

0.00

2420641.9

11

Feb-12

18626.56

15832.58

18626.56

15832.6

0.85

N.A

2456951.5

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2598968.71

0.00

2598968.7

12 Mar-12
18626.56
15832.58
18626.56
15832.6
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

0.85

N.A

2637953.2

95672.28

16600.00

21047.90

8697.00

0.00

0.00

142017.18

2779970.42

0.00

2779970.4

2
3
4
5
Note:

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Director National Institute of Technology

Category:

Central

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

11KV

Installation No:

46785

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

9943
1200 KW

Capacitor Installed: Y/N

N.A

Rating of Capacitor:

N.A

Feeder No:

KVAH Units KWH Units


supplied
supplied
A
B

S.No

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Demand
Energy Charges /
charges
F.R Charges billed billed (In Rs.
(In Rs.)
)
H
I

Type: Metered / Flat Rate:

Flat Rate
Habak
F-1

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P
2725491.0

Arrears
Q=O-P

Apr-11

447058.82

380000.00

447058.8235

380000

0.85

N.A

1394990.63

1306500.00

24000.00

0.00

0.00

0.00

0.00

1330500.00

2725490.6

May-11

447060.00

380001.00

447060

380001

0.85

N.A

0.00

1096875.00

24000.00

0.00

0.00

0.00

0.00

1120875.00

1120875.0

0.0

Jun-11

447061.18

380002.00

447061.1765

380002

0.85

N.A

1137688.13

706875.00

24000.00

0.00

0.00

0.00

0.00

730875.00

1868563.1

1851750.0

Jul-11

447062.35

380003.00

447062.3529

380003

0.85

N.A

0.00

755625.00

24000.00

0.00

0.00

0.00

0.00

779625.00

779625.0

0.0

779625.0

Aug-11

447062.35

380003.00

447062.3529

380003

0.85

N.A

791319.38

667875.00

24000.00

0.00

0.00

0.00

0.00

691875.00

1483194.4

0.0

1483194.4

Sep-11

447062.35

380003.00

447062.3529

380003

0.85

N.A

0.00

823875.00

24000.00

0.00

0.00

0.00

0.00

847875.00

847875.0

0.0

847875.0

Oct-11

256470.59

218000.00

256470.5882

218000

0.85

N.A

847875.00

1254045.00

28800.00

0.00

0.00

0.00

0.00

1282845.00

2130720.0

2130720.0

2130720.0

Nov-11

481176.47

409000.00

481176.4706

409000

0.85

N.A

0.00

2352772.50

28800.00

0.00

0.00

0.00

0.00

2381572.50

2381573.0

2381573.00

2381573.0

1120875.0
0.0

Dec-11

383529.41

326000.00

383529.4118

326000

0.85

N.A

0.00

1875315.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

1904115.00

0.0

10

Jan-12

383529.41

326000.00

383529.4118

168000

0.85

N.A

0.00

966420.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

995220.00

908895.0

11

Feb-12

383529.41

326000.00

383529.4118

166000

0.85

N.A

0.0

954915.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

983715.00

0.0

280000

0.85

N.A

0.0

1610700.00

28800.00

0.00

0.00

0.00

0.00

1904115.00

1904115.0

983715.00

0.0

12 Mar-12
383529.41 326000.00 383529.4118
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Joint Director Poultary

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

75858A

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10039
53 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

State

DiVision:

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Demand
Energy Charges /
charges
F.R Charges billed billed (In Rs.
(In Rs.)
)
H
I

Type: Metered / Flat Rate:

Flat Rate
Kathi Darwaza
F-3

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

7971.76

6776.00

7971.764706

6776

0.85

N.A

7303734.5

2667121.00

1060.00

586766.60

242465.54

0.00

0.00

3497413.14

10801147.6

0.0

10801147.6

May-11

7972.94

6777.00

7972.941176

6777

0.85

N.A

10963164.85

2673066.75

1060.00

588074.69

243006.08

0.00

0.00

3505207.52

14468372.4

0.0

14468372.4

Jun-11

7974.12

6778.00

7974.117647

6778

0.85

N.A

14685397.96

2649371.00

1060.00

582861.62

Jul-11

7975.29

6779.00

7975.294118

6779

0.85

N.A

18434122.10

2663187.00

1060.00

585901.14

Aug-11

7975.29

6779.00

7975.294118

6779

0.85

N.A

22253998.99

Sep-11

7975.29

6779.00

7975.294118

6779

0.85

N.A

26132327.73

160875.00

1060.00

Oct-11

17352.94

14750.00

17352.94118

14750

0.85

N.A

3989135.00

93334.31

Nov-11

18541.18

15760.00

18541.17647

15760

0.85

N.A

4104274.00

99725.34

Dec-11

18541.18

15760.00

18541.17647

15760

0.85

N.A

4228478.0

10

Jan-12

18541.18

15760.00

18541.17647

11000

0.85

N.A

11

Feb-12

18541.18

15760.00

18541.17647

12000

0.85

N.A

7000

0.85

N.A

12 Mar-12
18541.18
15760.00
18541.17647
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5

0.00

0.00

3476298.70

18161696.7

0.0

18161696.7

242107.91

0.00

0.00

3491000.05

21925122.2

0.0

21925122.2

241988.57

0.00

0.00

3492136.71

25746135.7

0.0

25746135.7

35392.50

14625.00

0.00

0.00

3263171.55

29395499.3

0.0

29395499.3

1272.00

20533.55

8484.00

0.00

0.00

206023.50

4195158.5

0.0

4195158.5

1272.00

21939.57

9065.00

0.00

0.00

124204.86

4228478.9

0.0

4228478.9

99725.24

1272.00

21939.57

9065.00

0.00

0.00

132001.91

4360479.9

0.0

4360479.9

4360479.9

69605.25

1272.00

15313.16

6327.75

0.00

0.00

129264.56

4489744.5

0.0

4489744.5

4489744.5

75933.00

1272.00

16705.26

6903.00

0.00

0.00

93093.41

4582837.9

0.0

4582837.9

4582837.9

46546.50

1272.00

10240.23

4231.50

0.00

0.00

98141.76

4680979.6

0.0

4680979.6

2661874.25

1060.00

585612.3

240851.91

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. JLNM Hospital

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

14260A

Meter Rated Current:

N.A

Meter Type:

N,.A

Name of 33/11KV Sub-Stations:

Rainawari

Computer Code:
Sanctioned Load:

10043
300 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

F-1

S.No

Month

State

DiVision:

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Demand
Energy Charges /
charges
F.R Charges billed billed (In Rs.
(In Rs.)
)
H
I

Type: Metered / Flat Rate:

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Flat Rate

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

119983.76

101986.20

119983.7604

101986

0.85

N.A

3792883.5

498712.50

6000.00

109716.75

45337.50

0.00

0.00

659766.75

4452650.3

0.0

4452650.3

May-11

118693.61

100889.57

118693.6124

100890

0.85

N.A

4519440.0

493350.00

6000.00

108537.00

44850.00

0.00

0.00

652737.00

5172177.0

0.0

5172177.0

Jun-11

119983.76

101986.20

119983.7604

101986

0.85

N.A

5249759.7

498712.50

6000.00

109716.75

45337.50

0.00

0.00

659766.75

5909526.4

0.0

5909526.4

Jul-11

117403.46

99792.94

117403.4645

99792.9

0.85

N.A

5998169.3

487987.50

6000.00

107357.25

44362.50

0.00

0.00

645707.25

6643876.6

0.0

6643876.6

Aug-11

118693.61

100889.57

118693.6124

100890

0.85

N.A

6743534.7

493350.00

6000.00

108537.00

44850.00

0.00

0.00

652737.00

7396271.7

0.0

7396271.7

6
7

Sep-11
Oct-11

118693.61
143529.41

100889.57
122000.00

118693.6124
143529.4118

100890
122000

0.85
0.85

N.A
N.A

7507215.8
3965135.5

493350.00
771985.50

6000.00
7200.00

108537.00
169836.81

44850.00
70180.50

0.00
0.00

0.00
0.00

652737.00
4914158.00

8159952.8
4914158.0

4148810.0
3530103.0

4011142.8
4914158.0

Nov-11

143529.41

122000.00

143529.4118

122000

0.85

N.A

1384055.0

759330.00

7200.00

167052.60

69030.00

0.00

0.00

2317638.00

2317638.0

0.0

2317638.0

Dec-11

143529.41

122000.00

143529

122000

0.85

N.A

2317638.0

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

3320250.6

0.0

3320250.6

10

Jan-12

143529.41

122000.00

143529

122000

0.85

N.A

3320250.6

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

4322863.2

3749770.0

573093.2

11

Feb-12

143529.41

122000.00

143529

122000

0.85

N.A

573093.2

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

1575705.8

0.0

1575705.8

12

Mar-12

143529.41

122000.00

143529

122000

0.85

N.A

1575705.8

759330.00

7200.00

167052.60

69030.00

0.00

0.00

1002612.60

2578318.4

0.0

2578318.4

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Joint Director Horticulture, Hazratbal

Category:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Installation No:

6162SD

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10049
32 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

State

DiVision:

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Demand
Energy Charges /
charges
F.R Charges billed billed (In Rs.
(In Rs.)
)
H
I

922056.25

41184.00

Type: Metered / Flat Rate:

Flat Rate
Habak
F-1

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

640.00

9060.48

3744.00

0.00

0.00

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

54628.48

976684.7

0.0

976684.73

Apr-11

9908.34

8422.09

9908.336341

8422.09

0.85

N.A

May-11

9908.34

8422.09

9908.336341

8422.09

0.85

N.A

991335.0

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1045963.5

0.0

1045963.48

Jun-11

9908.34

8422.09

9908.336341

8422.09

0.85

N.A

1061652.9

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1116281.4

0.0

1116281.41

Jul-11

9908.34

8422.09

9908.336341

8422.09

0.85

N.A

1133025.6

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1187654.1

0.0

1187654.11

Aug-11

9908.34

8422.09

9908.336341

8422.09

0.85

N.A

1205468.9

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1260097.4

0.0

1260097.41

Sep-11

9908.34

8422.09

9908.336341

8422.09

0.85

N.A

1278998.9

41184.00

640.00

9060.48

3744.00

0.00

0.00

54628.48

1333627.3

0.0

1333627.35

Oct-11

12179.00

10352.15

12178.99675

10352.1

0.85

N.A

1353631.8

50622.00

768.00

11136.84

4602.00

0.00

0.00

67128.84

1420760.6

0.0

1420760.60

Nov-11

12179.00

10352.15

12178.99675

10352.1

0.85

N.A

1442072.0

50622.00

768.00

11136.84

4602.00

0.00

0.00

67128.84

1509200.8

0.0

1509200.85

Dec-11

12179.00

10352.15 12178.99675

10352.1

0.85

N.A

1531838.9

50622.00

768.00

11136.84

4602.00

0.00

0.00

67128.84

1598967.7

0.0

1598967.70

10

Jan-12

12179.00

10352.15

12178.996

7680

0.85

N.A

1512598.3

48597.12

768.00

10691.37

4602.00

0.00

0.00

64658.49

1577256.7

0.0

1577256.74

11

Feb-12

12179.00

7680.00

12178.996

7680

0.85

N.A

1598967.7

48597.12

768.00

10691.37

4602.00

0.00

0.00

64658.49

1663626.2

0.0

1663626.19

7680

0.85

N.A

1688580.6

48597.12

768.00

10691.37

4602.00

0.00

0.00

64658.49

1753239.1

0.0

1753239.06

12 Mar-12
12179.00
7680.00
12178.996
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO DEC, 2011.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Joint Director Poultary Briolers

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

Installation No:

90SD

Meter Rated Current:

N.A

Meter Type:

LTKWH

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10040
53 KW

Capacitor Installed: Y/N

Rating of Capacitor:

S.No

Month

State

Electric Division-IV, Khanyar

KVAH Units KWH Units


supplied
supplied
A
B

KVAH Units
recorded /
computed
C

KWH
Units
COMPUT
ED
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

N.A

Energy
Charges / F.R
Charges billed
(In Rs.)

Category:

DiVision:

Flat
Kathi Darwaza

Feeder No:

F-3

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

15701.10

13345.94

15701.10069

13345.9

0.85

N.A

1212543.38

65261.63

1060.00

14357.56

5932.88

0.00

0.00

86612.06

1299155.44

0.00

1299155.44

May-11

15689.75

13336.28

15689.74705

13336.3

0.85

N.A

1318642.77

65214.43

1060.00

14347.18

5928.59

0.00

0.00

86550.20

1405192.97

0.00

1405192.97

Jun-11

15733.61

13373.57

15733.61241

13373.6

0.85

N.A

1426270.87

65396.76

1060.00

14387.29

5945.16

0.00

0.00

86789.21

1513060.08

0.00

1513060.08

Jul-11

15708.33

13352.08

15708.32583

13352.1

0.85

N.A

1535755.98

65291.66

1060.00

14364.16

5935.61

0.00

0.00

86651.43

1622407.41

0.00

1622407.41

Aug-11

15710.39

13353.83

15710.38961

13353.8

0.85

N.A

1646743.52

65300.23

1060.00

14366.05

5936.39

0.00

0.00

86662.68

1733406.19

0.00

1733406.19

Sep-11

15710.39

13353.83

15710.38961

13353.8

0.85

N.A

1759407.29

65300.23

1060.00

14366.05

5936.39

0.00

0.00

86662.68

1846069.96

300000.00

1546069.96

Oct-11

16858.82

14330.00

16858.82353

14330

0.85

N.A

1569261.01

90676.66

1272.00

19948.87

8243.33

0.00

0.00

120140.86

1689401.87

0.00

1689401.87

Nov-11

18435.29

15670.00

18435.29412

15670

0.85

N.A

1714742.90

99155.84

1272.00

21814.29

9014.17

0.00

0.00

131256.30

1845999.19

0.00

1845999.19

Dec-12

18435.29

15670.00

18435.29412

15670

0.85

N.A

1873689.18

99155.84

1272.00

21814.29

9014.17

0.00

0.00

131256.30

2004945.48

0.00

2004945.48

10

Jan-12

18435.29

15670.00

18435.29412

7000

0.85

N.A

1172412.50

46546.50

1272.00

21814.29

9014.17

0.00

0.00

78646.96

1251059.46

0.00

1251059.46

11

Feb-12

18435.29

15670.00

18435.29412

7000

0.85

N.A

1251059.46

46546.50

1272.00

21814.29

9014.17

0.00

0.00

78646.96

1329706.42

0.00

1329706.42

10000

0.85

N.A

1329706.42

66495.00

1272.00

21814.29

9014.17

0.00

0.00

98595.46

1428301.88

705000.00

723301.88

12 Mar-12
18435.29
15670.00
18435.29412
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


3 KVAH and demand readings will be required for load more than 100KW only.
4 In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ex. Engineer LAWDA, Habak

Category:

State

DiVision:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

LTKWH

Name of 33/11KV Sub-Stations:

LAWDA2

Meter Rated Current:

N.A

Meter Type:

Computer Code:
Sanctioned Load:

10085
200 KW

Capacitor Installed: Y/N

Rating of Capacitor:

S.No

Month

Sub-Division:- Rainawari

CT Ratio:200/5A

Installation No:

KVAH Units KWH Units


supplied
supplied
A
B

Electric Division-IV, Khanyar

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

N.A

Demand
Energy Charges /
charges
F.R Charges billed billed (In Rs.
(In Rs.)
)
H
I

Metered

Kathi Darwaza

Feeder No:

F-3

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Surcharge
Late
for
payment Total Amount
metering surchar
Billed
on LT side ge biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

9412.94

8001.00

9412.941176

8001

0.85

N.A

5277467

123337.50

4000.00

27134.25

11212.50

0.00

0.00

165684.25

5443151.3

0.0

5443151.3

May-11

9414.12

8002.00

9414.117647

8002

0.85

N.A

5524798.52

134062.50

4000.00

29493.75

12187.50

0.00

0.00

179743.75

5704542.3

0.0

5704542.3

Jun-11

9415.29

8003.00

9415.294118

8003

0.85

N.A

5790110.40

139425.00

4000.00

30673.50

12675.00

0.00

0.00

186773.50

5976883.9

0.0

5976883.9

Jul-11

9416.47

8004.00

9416.470588

8004

0.85

N.A

6066537.16

150150.00

4000.00

33033.00

13650.00

0.00

0.00

200833.00

6267370.2

0.0

6267370.2

Aug-11

9416.47

8004.00

9416.470588

8004

0.85

N.A

6361380.71

0.00

4000.00

0.00

0.00

0.00

0.00

4000.00

6365380.7

0.0

6365380.7

Sep-11

9416.47

8004.00

9416.470588

8004

0.85

N.A

6460861.42

246675.00

4000.00

54268.50

22425.00

0.00

0.00

327368.50

6788229.9

0.0

6788229.9

Oct-11

32352.94

27500.00

32352.94118

27500

0.85

N.A

6548885.50

174013.00

4800.00

38282.00

31638.00

0.00

0.00

248733.00

6797618.5

0.0

6797618.5

Nov-11

32352.94

27500.00

32352.94118

27500

0.85

N.A

6763581.00

174013.00

4800.00

38282.00

21638.00

0.00

0.00

238733.00

7002314.0

496125.0

6506189.0

Dec-11

14117.65

12000.00

14117.64706

12000

0.85

N.A

6978277.00

47916.00

4800.00

10541.52

4356.00

0.00

0.00

105657.00

7083934.0

0.0

7083934.0

10

Jan-12

24705.88

21000.00

24705.88235

21000

0.85

N.A

6308644.50

83853.00

47200.00

18447.66

5808.00

0.00

0.00

239161.66

6547806.2

925518.0

5622288.2

11

Feb-12

18823.53

16000.00

18823.52941

16000

0.85

N.A

5622288.16

63888.00

47200.00

14055.36

5808.00

0.00

0.00

194839.36

5817127.5

100000.0

5717127.5

26000

0.85

N.A

5717127.52

108966.00

47200.00

23972.52

5808.00

0.00

0.00

294912.52

6012040.0

240543.0

5771497.0

12 Mar-12
30588.24
26000.00
30588.23529
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ex. Engineer LWDA, Hazratbal

Category:

State

DiVision:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

LTKWH

Name of 33/11KV Sub-Stations:

LAWDA1

Meter Rated Current:

N.A

Meter Type:

Computer Code:
Sanctioned Load:

10084
200 KW

Capacitor Installed: Y/N

Rating of Capacitor:

Month

Sub-Division:- Rainawari

CT Ratio:200/5A

Installation No:

S.No

Electric Division-IV, Khanyar

KVAH Units
supplied
A

KWH Units
supplied
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

N.A

Metered

Kathi Darwaza

Feeder No:

F-3

Opening
Balance
G

Energy Charges /
F.R Charges billed
(In Rs.)
H

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge payment
Total Amount
for metering surcharg
Billed
on LT side
e biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P
870169.05

Apr-11

12942.35

11001.00

12942.35294

11001

0.85

N.A

774782.3

69712.50

4000.00

15336.75

6337.50

0.00

0.00

95386.75

870169.05

0.0

May-11

12943.53

11002.00

12943.52941

11002

0.85

N.A

883221.59

69712.50

4000.00

15336.75

6337.50

0.00

0.00

95386.75

978608.34

0.00

978608.34

Jun-11

12944.71

11003.00

12944.70588

11003

0.85

N.A

993287.46

85800.00

4000.00

18876.00

7800.00

0.00

0.00

116476.00

1109763.46

0.00

1109763.46

Jul-11

12945.88

11004.00

12945.88235

11004

0.85

N.A

1126409.91

85800.00

4000.00

18876.00

7800.00

0.00

0.00

116476.00

1242885.91

0.00

1242885.91

Aug-11

12945.88

11004.00

12945.88235

11004

0.85

N.A

1261529.20

0.00

4000.00

0.00

0.00

0.00

0.00

4000.00

1265529.20

0.00

1265529.20

6
7

Sep-11
Oct-11

12945.88
17647.06

11004.00
15000.00

12945.88235
17647.05882

11004
15000

0.85
0.85

N.A
N.A

1284512.14
1401209.00

150150.00
94916.00

4000.00
4800.00

33033.00
20881.00

13650.00
4425.00

0.00
0.00

0.00
0.00

200833.00
125022.00

1485345.14
1526231.00

0.00
0.00

1485345.14
1526231.00

Nov-11

17647.06

15000.00

17647.05882

15000

0.85

N.A

1519407.00

94916.00

4800.00

20881.00

4425.00

0.00

0.00

125022.00

1644429.00

0.00

1644429.00

Dec-11

8235.29

7000.00

8235.294118

7000

0.85

N.A

1637605.00

27951.00

4800.00

6149.22

2541.00

0.00

0.00

81300.00

1718905.00

0.00

1744689.00

10

Jan-12

8235.29

7000.00

8235.294118

7000

0.85

N.A

1380887.75

27951.00

4800.00

7027.68

2904.00

0.00

0.00

81300.00

1462187.75

536254.00

925933.75

11

Feb-12

9411.76

8000.00

9411.764706

8000

0.85

N.A

925933.75

31944.00

4800.00

7376.16

3048.00

0.00

0.00

81300.00

1007233.75

86957.00

920276.75

12

Mar-12

9411.76

8000.00

9411.764706

8000

0.85

N.A

920276.75

31944.00

4800.00

7376.16

3048.00

0.00

0.00

81300.00

1001576.75

201571.00

800005.75

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Registrar Kashmir University

Category:

State

DiVision:

CT Ratio:60/5A

N.A

Supply Type:

11KV

HTKWH

Installation No:

222M

Meter Rated Current:

N.A

Meter Type:

Computer Code:
Sanctioned Load:

10060

Capacitor Installed: Y/N

Rating of Capacitor:

S.No

Month

Electric Division-IV, Khanyar

KVAH Units
supplied
A

KWH Units
supplied
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

N.A

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

Habak

Feeder No:

F-1

Opening
Balance
G

Energy Charges /
F.R Charges billed
(In Rs.)
H

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge payment
Total Amount
for metering surcharg
Billed
on LT side
e biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

574677.65

488476.00

574677.6471

488476

0.85

N.A

4273098.5

2218125.0

40340.0

487987.5

0.00

0.00

0.00

2746452.5

7019551

0.0

7019551

May-11

574678.82

488477.00

574678.8235

488477

0.85

N.A

7124844

1852500.0

40340.0

407550.0

0.00

0.00

0.00

2300390.0

9425234

6884551.0

2540683

Jun-11

574680.00

488478.00

574680

488478

0.85

N.A

2578794

1974375.0

40340.0

434362.5

0.00

0.00

0.00

2449077.5

5027871

0.0

5027871

Jul-11

574681.18

488479.00

574681.1765

488479

0.85

N.A

5103289

1998750.0

40340.0

439725.0

0.00

0.00

0.00

2478815.0

7582104

3000000.0

4582104

Aug-11

574681.18

488479.00

574681.1765

488479

0.85

N.A

4650836

1941858.8

40340.0

427208.9

0.00

0.00

0.00

2409407.7

7060243

3884551.0

3175692

Sep-11

574681.18

488479.00

574681.1765

488479

0.85

N.A

3223328

1941858.8

40340.0

427208.9

0.00

0.00

0.00

2409407.7

5632735

0.0

5632735

Oct-11

521176.47

443000.00

521176.4706

443000

0.85

N.A

5717226

2548357.5

65342.5

560638.6

0.00

0.00

0.00

3157404.0

3157404

0.0

3157404

Nov-11

555294.12

472000.00

555294.1176

472000

0.85

N.A

3204765

2715180.0

65342.5

597339.6

0.00

0.00

0.00

6518332.0

6518332

6884551.0

-366219
5138282

Dec-11

555294.12

472000.00

555294.1176

472000

0.85

N.A

-371712

2715180.0

65342.5

597339.6

0.00

0.00

0.00

9825259.0

9825259.0

4686977.0

10

Jan-12

705882.35

600000.00

705882.3529

600000

0.85

N.A

5215356

3451500.0

65342.5

759330.0

0.00

0.00

0.00

4276172.5

9491528.7

0.0

9491529

11

Feb-12

607058.82

516000.00

607058.8235

516000

0.85

N.A

9633902

2968290.0

65342.5

653023.8

0.00

0.00

0.00

3686656.3

13320558.0

0.0

13320558

455000

0.85

N.A

13520366

2617387.5

65342.5

575825.3

0.00

0.00

0.00

3258555.3

16778921.6

11644000.0

5134922

12 Mar-12
535294.12 455000.00 535294.1176
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. JLNM Hospital

Category:

State

DiVision:

Electric Division-IV, Khanyar

CT Ratio:

N.A

Supply Type:

LT3Ph

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Flat Rate

Installation No:

14260

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Rainawari

Computer Code:
Sanctioned Load:

10042
90 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

F-1

S.No

Month

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Energy Charges /
F.R Charges billed
(In Rs.)
H

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge payment
Total Amount
for metering surcharg
Billed
on LT side
e biled
(In Rs.)
L
M
N=H+I+J+K+L+M

KVAH Units
supplied
A

KWH Units
supplied
B

KVAH Units
recorded /
computed
C
1109009.984

942658

0.85

N.A

6172863

4609600.00

1800.00

1014112.00

10237.50

0.00

0.00

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

5635749.50

11808613

1473000.00

10335613

Apr-11

1109009.98

942658.49

May-11

206327.44

175378.32

206327.439

175378

0.85

N.A

10490647

857600.00

1800.00

188672.00

10237.50

0.00

0.00

1058309.50

11548956

0.00

11548956

Jun-11

219222.90

186339.47

219222.9039

186339

0.85

N.A

11722191

911200.00

1800.00

200464.00

10237.50

0.00

0.00

1123701.50

12845892

0.00

12845892

Jul-11

216643.81

184147.24

216643.8109

184147

0.85

N.A

13038580

900480.00

1800.00

198105.60

10237.50

0.00

0.00

1110623.10

14149204

1946810.00

12202394

Aug-11

209003.97

177653.37

209003.9697

177653

0.85

N.A

12385429

868725.00

1800.00

191119.50

78975.00

0.00

0.00

1140619.50

13526049

0.00

13526049

Sep-11

209003.53

177653.00

209003.5294

177653

0.85

N.A

13728940

868725.00

1800.00

191119.50

78975.00

0.00

0.00

1140619.50

14869559

0.00

14869559

Oct-11

23529.41

20000.00

23529.41176

20000

0.85

N.A

10322005

126555.00

2160.00

27842.10

11505.00

0.00

0.00

168062.10

10490067

1254985.00

9235082

Nov-11

17647.06

15000.00

17647.05882

15000

0.85

N.A

9223577

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9350164

0.00

9350164

Dec-11

17647.06

15000.00

17647.05882

0.85

N.A

9350164

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9476750

0.00

9476750

10

Jan-12

17647.06

15000.00

17647.05882

15000

0.85

N.A

9476750

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9603337

291567.00

9311770

11

Feb-12

17647.06

15000.00

17647.05882

15000

0.85

N.A

9311770

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9438356

0.00

9438356

15000

0.85

N.A

9438356

94916.25

2160.00

20881.57

8628.75

0.00

0.00

126586.57

9564943

0.00

9564943

12 Mar-12
17647.06
15000.00
17647.05882
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

15000

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. Mental Hospital

Category:

State

DiVision:

Electric Division-IV, Khanyar

CT Ratio:

N.A

Supply Type:

LT3Ph

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Installation No:

46827

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10045
51 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

Flat Rate

Kathi Darwaza
F-3

KVAH Units
supplied
A

KWH Units
supplied
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Energy Charges /
F.R Charges billed
(In Rs.)
H

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge payment
Total Amount
for metering surcharg
Billed
on LT side
e biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

19352.22

16449.39

19352.21942

16449.4

0.85

N.A

11950800.00

80437.50

1020.00

17696.25

7312.50

0.00

0.00

106466.25

12057266.25

0.00

##########

May-11

19997.29

16997.70

19997.2934

16997.7

0.85

N.A

12238125.24

83118.75

1020.00

18286.13

7556.25

0.00

0.00

109981.13

12348106.37

0.00

##########

Jun-11

16126.85

13707.82

16126.84951

13707.8

0.85

N.A

12533327.96

67031.25

1020.00

14746.88

6093.75

0.00

0.00

88891.88

12622219.84

0.00

##########

Jul-11

15675.30

13324.00

15675.29773

13324

0.85

N.A

12811553.14

65154.38

1020.00

14333.96

5923.13

0.00

0.00

86431.47

12897984.60

700000.00

##########

Aug-11

14836.70

12611.20

14836.70155

12611.2

0.85

N.A

12380954.37

61668.75

1020.00

13567.13

5606.25

0.00

0.00

81862.13

12462816.50

0.00

##########

Sep-11

14836.70

12611.20

14836.70155

12611.2

0.85

N.A

12649758.75

61668.75

1020.00

13567.13

5606.25

0.00

0.00

81862.13

12731620.87

0.00

##########

Oct-11

23164.71

19690.00

23164.70588

19690

0.85

N.A

12882332.00

124593.40

1224.00

27410.55

11326.67

0.00

0.00

164554.62

13046886.62

0.00

##########

Nov-11

24552.94

20870.00

24552.94118

20870

0.85

N.A

13231093.00

132060.14

1224.00

29053.23

12005.47

0.00

0.00

174342.84

13405435.84

0.00

##########

Dec-11

24552.94

20870.00

24552.94118

20870

0.85

N.A

13594332.00

102509.55

1224.00

22552.10

9319.05

0.00

0.00

135604.70

13729936.70

0.00

##########

10

Jan-12

47258.82

40170.00

47258.82353

40170

0.85

N.A

13720618.00

254185.72

1224.00

55920.86

23107.79

0.00

0.00

334438.37

14055056.37

0.00

##########

11

Feb-12

28858.82

24530.00

28858.82353

24530

0.85

N.A

14055056.37

155219.70

1224.00

34148.34

14110.88

0.00

0.00

204702.92

14259759.28

0.00

##########

12

Mar-12

20000.00

17000.00

20000

17000

0.85

N.A

14259759.28

113041.50

1224.00

24869.13

10276.50

0.00

0.00

149411.13

14409170.41

0.00

##########

Note:

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

Surcharge shall include following:

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.

3 KVAH and demand readings will be required for load more than 100KW only.

2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85

3 Surcharge on HT consumers for having metering on LT.

5 Please attach circle-wise and Divisional wise Abstracts with each energy account.

Note:

1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer

Executive Engineer

Rainawari

Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. Central Jail, Kathi Darwaza

Category:

State

DiVision:

Electric Division-IV, Khanyar

CT Ratio:

N.A

Supply Type:

LT3Ph

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Installation No:

5531M

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10030
360 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

KVAH Units
supplied
A

KWH Units
supplied
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Flat Rate

Kathi Darwaza
F-3

Opening
Balance
G

Energy Charges /
F.R Charges billed
(In Rs.)
H

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge payment
Total Amount
for metering surcharg
Billed
on LT side
e biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

172789.51

146871.08

172789.5104

146871

0.85

N.A

2.27E+07

718199.60

7200.00

158003.91

16741.25

0.00

0.00

900144.76

23574494.8

0.0

23574494.8

May-11

122564.06

104179.45

122564.0563

104179

0.85

N.A

23928112.2

509437.50

7200.00

112076.25

11875.00

0.00

0.00

640588.75

24568700.9

0.0

24568700.9

Jun-11

108153.10

91930.14

108153.1036

91930.1

0.85

N.A

24937231.4

449538.38

7200.00

98898.44

10478.75

0.00

0.00

566115.57

25503347.0

0.0

25503347.0

Jul-11

108372.43

92116.56

108372.4287

92116.6

0.85

N.A

25885897.2

450450.00

7200.00

99099.00

10500.00

0.00

0.00

567249.00

26453146.2

0.0

26453146.2

Aug-11

87730.06

74570.55

87730.06135

74570.6

0.85

N.A

26849943.4

364650.00

7200.00

80223.00

8500.00

0.00

0.00

460573.00

27310516.4

600000.0

26710516.4

Sep-11

87704.26

74548.62

87704.25839

74548.6

0.85

N.A

27111174.2

364542.75

7200.00

80199.41

8497.50

0.00

0.00

460439.66

27571613.8

0.0

27571613.8

Oct-11

86270.59

73330.00

86270.58824

73330

0.85

N.A

27985188.0

464013.90

8640.00

102083.06

42183.08

0.00

0.00

616920.04

28602108.1

0.0

28602108.1

Nov-11

188235.29

160000.00

188235.2941

160000

0.85

N.A

29031139.7

1012440.00

8640.00

222736.80

92040.00

0.00

0.00

1335856.80

30366996.5

0.00

30366996.5

Dec-11

188235.29

160000.00

188235.2941

160000

0.85

N.A

30822501.4

1012440.00

8640.00

222736.80

92040.00

0.00

0.00

1335856.80

32158358.2

0.00

32158358.2

10

Jan-12

226023.53

192120.00

226023.5294

192120

0.85

N.A

32640733.6

1215687.38

8640.00

1215687.38

110517.03

0.00

0.00

2550531.79

35191265.4

1000000.00

34191265.4

11

Feb-12

164564.71

139880.00

164564.7059

139880

0.85

N.A

34704134.4

885125.70

8640.00

885125.70

80465.97

0.00

0.00

1859357.37

36563491.7

0.00

36563491.7

102000

0.85

N.A

37111944.1

678249.00

8640.00

678249.00

61659.00

0.00

0.00

1426797.00

38538741.1

71700.00

38467041.1

12 Mar-12
120000.00 102000.00
120000
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. Central Jail

Category:

State

DiVision:

Electric Division-IV, Khanyar

CT Ratio:

N.A

Supply Type:

LT3Ph

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Installation No:

5531A

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

10031
47.25 KW

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

KVAH Units
supplied
A

KWH Units
supplied
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Flat Rate

Kathi Darwaza
F-3

Opening
Balance
G

Energy Charges /
F.R Charges billed
(In Rs.)
H

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge payment
Total Amount
for metering surcharg
Billed
on LT side
e biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

1496.57

1272.09

1496.571635

1272.09

0.85

N.A

1010431.13

6220.50

960.00

1368.51

565.50

0.00

0.00

9114.51

1019545.6

0.00

1019545.6

May-11

1935.22

1644.94

1935.221942

1644.94

0.85

N.A

1034838.8

8043.75

960.00

1769.63

731.25

0.00

0.00

11504.63

1046343.4

0.00

1046343.4

Jun-11

1470.77

1250.15

1470.768676

1250.15

0.85

N.A

1062038.6

6113.25

960.00

1344.92

555.75

0.00

0.00

8973.92

1071012.5

0.00

1071012.5

Jul-11

1935.22

1644.94

1935.221942

1644.94

0.85

N.A

1087077.7

8043.75

960.00

1769.63

731.25

0.00

0.00

11504.63

1098582.3

0.00

1098582.3

Aug-11

1586.88

1348.85

1586.881992

1348.85

0.85

N.A

1115061.1

6595.88

960.00

1451.09

599.63

0.00

0.00

9606.60

1124667.7

200000.00

924667.7

Sep-11

1586.88

1348.85

1586.881992

1348.85

0.85

N.A

938537.7

6595.88

960.00

1451.09

599.63

0.00

0.00

9606.60

948144.3

0.00

948144.3

Oct-11

1552.94

1320.00

1552.941176

1320

0.85

N.A

866958.8

8352.63

1152.00

1837.58

759.33

0.00

0.00

11342.00

878300.8

0.00

878300.8

Nov-11

8623.53

7330.00

8623.529412

7330

0.85

N.A

878300.0

46382.41

1152.00

10204.13

4216.58

0.00

0.00

57738.00

936038.0

0.00

936038.0

Dec-11

11764.71

10000.00

11764.70588

10000

0.85

N.A

936038.0

63277.50

1152.00

13921.05

5752.50

0.00

0.00

78350.00

1014388.0

0.00

1014388.0

10

Jan-12

14611.76

12420.00

14611.76471

12420

0.85

N.A

1014390.3

78590.66

1152.00

17289.94

5752.50

0.00

0.00

78350.00

1092740.3

0.00

1092740.3

11

Feb-12

15976.47

13580.00

15976.47059

13580

0.85

N.A

1109131.4

85930.84

1152.00

18904.79

5752.50

0.00

0.00

78350.00

1187481.4

0.00

1187481.4

12

Mar-12

9411.76

8000.00

9411.764706

8000

0.85

N.A

1205293.6

53196.00

1152.00

11703.12

5752.50

0.00

0.00

78350.00

1283643.6

83000.00

1200643.6

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ghulam Mohd. Zaroo

Category:

LT Indust.

DiVision:

Electric Division-IV, Khanyar

Sub-Division:- Rainawari

CT Ratio:

N.A

Supply Type:

LT3Ph

Type: Metered / Flat Rate:

Installation No:

420SM

Meter Rated Current:

N.A

Meter Type:

N.A

Name of 33/11KV Sub-Stations:

Computer Code:
Sanctioned Load:

8482
26 HP

Capacitor Installed: Y/N

Rating of Capacitor:

N.A

Feeder No:

S.No

Month

KWH
Units
recorded

AV-Power
Factor

Max.
Demand
Recorded
KVA

Flat Rate

Khanyar
F-8

Opening
Balance

Energy Charges /
F.R Charges billed
(In Rs.)

Demand
charges
billed (In Rs.
)

ED Billed
(In Rs.)

Capacitor
Surcharge
Billed(In Rs.)

Late
Surcharge payment
for metering surcharg
on LT side
e biled

KVAH Units
supplied

KWH Units
supplied

KVAH Units
recorded /
computed

E=D/C

Total Amount
Billed
(In Rs.)

Total Amount
due
(in Rs.)

Amount
received (In
Rs.)

Arrears

N=H+I+J+K+L+M

O=G+N

Q=O-P

Apr-11

2640.00

2244.00

2640

2244

0.85

N.A

187540.313

4578.64

700.00

1007.30

416.24

0.00

0.00

6702.18

194242.49

0.00

194242.49

May-11

1980.00

1683.00

1980

1683

0.85

N.A

197156.13

4396.54

700.00

967.24

399.69

0.00

0.00

6463.46

203619.59

0.00

203619.59

Jun-11

1540.00

1309.00

1540

1309

0.85

N.A

206673.89

0.00

700.00

0.00

0.00

0.00

0.00

700.00

207373.89

0.00

207373.89

Jul-11

4982.35

4235.00

4982.352941

4235

0.85

N.A

210484.50

4292.48

700.00

944.34

390.23

0.00

0.00

6327.05

216811.55

0.00

216811.55

Aug-11

2290.59

1947.00

2290.588235

1947

0.85

N.A

220063.72

4682.70

700.00

1030.19

425.70

0.00

0.00

6838.59

226902.31

0.00

226902.31

Sep-11

2290.59

1947.00

2290.588235

1947

0.85

N.A

230305.85

4812.78

700.00

1058.81

437.53

0.00

0.00

7009.12

237314.96

0.00

237314.96

Oct-11

711.76

605.00

711.7647059

605

0.85

N.A

237952.60

1643.79

800.00

361.63

149.44

0.00

0.00

2954.86

240907.46

0.00

240907.46

Nov-11

2329.41

1980.00

2329.411765

1980

0.85

N.A

244369.38

5379.66

800.00

1183.53

489.04

0.00

0.00

7852.23

252221.60

0.00

252221.60

Dec-11

2329.41

1980.00

2329.411765

1980

0.85

N.A

252221.00

5379.66

800.00

1183.53

489.04

0.00

0.00

7852.23

260073.23

0.00

260073.23

10

Jan-12

1164.71

990.00

1164.705882

990

0.85

N.A

256308.55

2689.83

800.00

591.76

489.04

0.00

0.00

4570.63

260879.18

0.00

260879.18

11

Feb-12

517.65

440.00

517.6470588

440

0.85

N.A

260879.18

1195.48

800.00

263.01

489.04

0.00

0.00

2747.53

263626.71

0.00

263626.71

0.85

N.A

263626.71

0.00

800.00

0.00

489.04

0.00

0.00

1289.04

264915.75

70000.00

194915.75

12 Mar-12
0.00
0.00
0
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU FROM APRIL, 2011 TO MAR, 2012.

Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Ex. Engineer PHE, Pokhribal

Category:

State

DiVision:

CT Ratio:

N.A

11KV
HT
Trivector

100-SD

Meter Rated Current:

N.A

Meter Type:

Computer Code:

10021

Capacitor Installed: Y/N

Rating of Capacitor:

Sanctioned Load:

760kws

Month

Sub-Division:- Rainawari

Supply Type:

Installation No:

S.No

Electric Division-IV, Khanyar

N.A

Type: Metered / Flat Rate:

Flat Rate

Name of 33/11KV Sub-Stations:

Kathi Darwaza

Feeder No:

F-3

KVAH Units
supplied
A

KWH Units
supplied
B

KVAH Units
recorded /
computed
C

KWH
Units
recorded
D

AV-Power
Factor
E=D/C

Max.
Demand
Recorded
KVA
F

Opening
Balance
G

Energy Charges /
F.R Charges billed
(In Rs.)
H

Demand
charges
billed (In Rs.
)
I

ED Billed
(In Rs.)
J

Capacitor
Surcharge
Billed(In Rs.)
K

Late
Surcharge payment
Total Amount
for metering surcharg
Billed
on LT side
e biled
(In Rs.)
L
M
N=H+I+J+K+L+M

Total Amount
due
(in Rs.)
O=G+N

Amount
received (In
Rs.)
P

Arrears
Q=O-P

Apr-11

144496.57

122822.09

144496.5716

122822

0.85

511.01

4088142

600600.00

8260.00

132132.00

54600.00

0.00

0.00

795592.0

4883734

0.0

4883734.0

May-11

152237.46

129401.84

152237.4594

129402

0.85

511.01

4956990.0

632775.00

8260.00

139210.50

57525.00

0.00

0.00

837770.5

5794761

0.0

5794760.5

Jun-11

148367.02

126111.96

148367.0155

126112

0.85

511.01

5881681.9

616687.50

8260.00

135671.25

56062.50

0.00

0.00

816681.3

6698363

0.0

6698363.2

Jul-11

138045.83

117338.96

138045.8318

117339

0.85

511.01

6798838.6

573787.50

8260.00

126233.25

52162.50

0.00

0.00

760443.3

7559282

0.0

7559281.9

Aug-11

145786.72

123918.71

145786.7196

123919

0.85

511.01

7672671.1

605962.50

8260.00

133311.75

55087.50

0.00

0.00

802621.8

8475293

0.0

8475292.8

Sep-11

140626.13

119532.21

140626.1278

119532

0.85

511.01

8602422.2

584512.50

8260.00

128592.75

53137.50

0.00

0.00

774502.8

9376925

2988757.0

6388168.0

Oct-11

160000.00

136000.00

160000

136000

0.85

511.01

6483990.5

860574.00

9912.00

189326.28

20060.00

0.00

0.00

1059812.3

7543803

0.0

7543802.8

Nov-11

152941.18

130000.00

152941.1765

130000

0.85

511.01

7656959.8

822607.50

9912.00

180973.66

19175.00

0.00

0.00

1013493.1

8670453

1468221.00

7202231.9

Dec-11

122352.94

104000.00

122352.9412

104000

0.85

511.01

7310265.4

658060.00

144773.00

18437.50

0.00

0.00

8113098

0.00

8113098.4

10

Jan-12

165882.35

141000.00

165882.3529

141000

0.85

511.01

8234794.9

892212.75

9912.00

123433.31

81110.25

0.00

0.00

802833.0

9037628

0.00

9037627.9

11

Feb-12

107058.82

91000.00

107058.8235

91000

0.85

511.01

9173192.3

561060.50

9912.00

113938.44

51005.50

0.00

0.00

802833.0

9976025

1911187.00

8064838.3

84000

0.85

511.01

8185810.9

517902.00

9912.00

166769.45

47082.00

0.00

0.00

802833.0

8988644

698102.00

8290541.9

12 Mar-12
98823.53
84000.00
98823.52941
Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5
Note:
1

9912

802833

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
1 except for domestic, street lighting and loads where KVAH billing done.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
3 Surcharge on HT consumers for having metering on LT.

Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Note:
11KV Trivector Meter not commissioned/Tested yet

Asstt. Exe. Engineer

Executive Engineer

Rainawari

Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MOU DURING THE YEAR 2011-12 ENDING March, 2012
Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- K.K.Moulla

Name of Installation:- 100 KVA Dewatering S/Stn


N.A

Supply Type:

LT3Ph Type: Metered / Flat Rate:

Meter Type:

LTKWH Name of 33/11KV Sub-Stations:


100 KVA Dewatering S/Stn

ED Billed
(In Rs.)

Capacitor
Surcharge
Billed(In Rs.)

D E=D/C

Apr-11

N/A

N/A

N/A

N/A

N/A

N/A

2030407

36300

May-11

N/A

N/A

N/A

N/A

N/A

N/A

2077993

36300

Jun-11

N/A

N/A

N/A

N/A

N/A

N/A

Jul-11

N/A

N/A

N/A

N/A

N/A

N/A

Aug-11

N/A

N/A

N/A

N/A

N/A

N/A

Sep-11

N/A

N/A

N/A

N/A

N/A

N/A

Oct-11

N/A

N/A

N/A

N/A

N/A

N/A

Nov-11

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Metered

F-1

Demand charges billed


(In Rs. )

Feeder No:

Energy Charges

N.A

Opening Balance

KWH Units
supplied

Max. Demand
Recorded KVA

KVAH Units
supplied

S.No

Month

Sanctioned Load:

AV-Power Factor

2857 2859
Capacitor Installed:
N Y/NRating of Capacitor:
43.35
HP

KWH Units
recorded

Computer Code:

KVAH Units
recorded / computed

1251-R61
Meter Rated Current:
N.A

7986

3300

7986

3300

Late
payment
surcharge
billed

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount received (In


Rs.)

State/Central CT Ratio:

Installation No:

Surcharge for metering on


LT side

Category:

Arrears

N=H+I+J+L+M

O=G+N

Q=O-P

N/A

31170

47586

2077993

2077993

78756

2156749

2156749

Assesment had been stopped due to augumentation of sub station in progress.

Dec-11

N/A

N/A

N/A

N/A

N/A

N/A

10

Jan-12

N/A

N/A

N/A

N/A

N/A

N/A

11

Feb-12

N/A

N/A

N/A

N/A

N/A

N/A

12

Mar-12

N/A

N/A

N/A

N/A

N/A

N/A

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
1 except for domestic, street lighting and loads where KVAH billing done.
3 KVAH
and demand readings will be required for load more than 100KW only.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
In case trivector meter is not installed for load more than 100KW, please workout
4 the KVAH units by dividing
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


K.K.Moulla

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU DURING THE YEAR 2011-12 ENDING March, 2012
Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- K.K.Moulla

Name of Installation:- I.T.I B.D Khan


N.A

228M R2
Meter Rated Current:
N.A

Computer Code:

2230
118
KW

S.No

Month

Sanctioned Load:

Supply Type:

LT3Ph Type: Metered / Flat Rate:

Metered

Meter Type:

LTKWH Name of 33/11KV Sub-Stations:

630 KVA B.D Khan

Capacitor Installed:
N Y/NRating of Capacitor:

KVAH
Max.
KVA
Units
Deman
H
KWH record KWH
d
Units Units ed / Units AV- Recor Openin
suppl suppl compu recor Power ded
g
ied
ied
ted
ded Factor KVA Balance

D E=D/C

N.A

Feeder No:

F-1

Deman
d
charge ED
s billed Billed
Capacitor
(In Rs.
(In
Surcharge
)
Rs.) Billed(In Rs.)

Late
payment
surcharge
billed

N=H+I+J+L+M

O=G+N

Energy
Charges

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount received (In


Rs.)

State/Central CT Ratio:

Installation No:

Surcharge for metering


on LT side

Category:

Arrears

Q=O-P

Apr-11

N/A

N/A

N/A

N/A

N/A

N/A

384331

93350

8260

20537

8486

N/A

5765

136398

520729

520728.965

May-11

N/A

N/A

N/A

N/A

N/A

N/A

520729

105598

8260

23231

8486

N/A

7811

153386

674115

674114.935

Jun-11

N/A

N/A

N/A

N/A

N/A

N/A

674115

105600

9600

23232

8486

N/A

10112

157030

831145

831144.725

Jul-11

N/A

N/A

N/A

N/A

N/A

N/A

831145

105600

9600

23232

6432

N/A

12467

147731

978876

978876

Aug-11

N/A

N/A

N/A

N/A

N/A

N/A

978876

105600

9600

23232

6432

N/A

14683

149947

1128823

1128823

Sep-11

N/A

N/A

N/A

N/A

N/A

N/A

1128823

105600

9600

23232

6432

N/A

16932

152196

1281019

Oct-11

N/A

N/A

N/A

N/A

N/A

N/A

1181019.35

105600

9600

23232

6432

N/A

17715

152979

1333999

Nov-11

N/A

N/A

N/A

N/A

N/A

N/A

1333998.64

105600

9600

23232

6432

N/A

20010

155274

1489273

400000.00

1089273

Dec-11

N/A

N/A

N/A

N/A

N/A

N/A

1089272.61

105600

9600

23232

6432

N/A

16339

151603

1240876

0.00

1240876

10

Jan-12

N/A

N/A

N/A

N/A

N/A

N/A

1240875.70 126720.00

9912.00

#######

11520.00

N/A

23956

190074

1430950

11

Feb-12

N/A

N/A

N/A

N/A

N/A

N/A

1430949.70 126720.00

9912.00

#######

11520.00

N/A

23956

190074

1621024

12

Mar-12

N/A

N/A

N/A

N/A

N/A

N/A

1621023.70 126720.00

9912.00

#######

11520.00

N/A

23956

190074

1811098

100000

1181019
1333999

1430950
1621024
400000

1411098

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
1 except for domestic, street lighting and loads where KVAH billing done.
3 KVAH
and demand readings will be required for load more than 100KW only.
2 Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
In case trivector meter is not installed for load more than 100KW, please workout
4 the KVAH units by dividing
3 Surcharge on HT consumers for having metering on LT.
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


K.K.Moulla

Executive Engineer
Electric Division-IV, khanyar

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE MoU DURING THE YEAR 2011-12 ENDING March, 2012
Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Sub-Division:- K.K.Moulla

Name of Installation:- Gousia Hospital


Category:

Gen. Purpse. Bulk


CT Ratio:

N.A

Supply Type:

LT3Ph Type: Metered / Flat Rate:

Installation No:

266 R2 Meter Rated Current:


N.A

Computer Code:

2857 2859
Capacitor Installed:
N Y/NRating of Capacitor:
60
KW

Sanctioned Load:

Meter Type:

KVAH
Max.
KVA
Units
Deman
H
KWH record KWH
d
Units Units ed / Units AV- Recor
suppl suppl compu recor Power ded Opening
ied
ted
ded Factor KVA Balance
S.No Month ied

Energy
Charges

N.A

Name of 33/11KV Sub-Stations:

N.A

Feeder No:

Flat Rate
100 KVA gousia Hospital
F-5

Deman
d
Surchar
charge ED
Late
ge for
s billed Billed
payment
Capacitor
meterin
(In Rs.
(In
Surcharge
g on LT surcharge
side
)
Rs.) Billed(In Rs.)
billed

Total Amount
Billed
(In Rs.)

Total
Amount
due
(in Rs.)

Amount
receive
d (In
Rs.)
Arrears

N=H+I+J+L+M

O=G+N

Q=O-P

92749

400362

0.00

400362

D E=D/C

Apr-11

N/A

N/A

N/A

N/A

N/A

N/A

307613

70752

N/A

15565

6432

N/A

May-11

N/A

N/A

N/A

N/A

N/A

N/A

400362

70752

N/A

15565

6432

N/A

6005

98754

499116

0.00

499116

Jun-11

N/A

N/A

N/A

N/A

N/A

N/A

499116

70752

N/A

15565

6432

N/A

7487

100236

599352

300000.00

299352

Jul-11

N/A

N/A

N/A

N/A

N/A

N/A

299352

70752

N/A

15565

6432

N/A

4490

97239

396591

0.00

396591

Aug-11

N/A

N/A

N/A

N/A

N/A

N/A

392101

70752

N/A

15565

6432

N/A

5882

98631

490732

0.00

490732

Sep-11

N/A

N/A

N/A

N/A

N/A

N/A

490732

70752

N/A

15565

6432

N/A

7361

100110

590842

0.00

590842

Oct-11

N/A

N/A

N/A

N/A

N/A

N/A

590842.0

70752

N/A

15565

6432

N/A

8863

101612

692454

0.00

692454

Nov-11

N/A

N/A

N/A

N/A

N/A

N/A

692453.61

70752

N/A

15565

6432

N/A

10387

103136

795589

300000.00

495589

Dec-11

N/A

N/A

N/A

N/A

N/A

N/A

495589.41

70752

N/A

15565

6432

N/A

7434

100183

595772

120000.00

475772

10

Jan-12

N/A

N/A

N/A

N/A

N/A

N/A

475772.26

88440.00

N/A

#######

8040.00

N/A

8224.00

124160

599932

0.00

599932

11

Feb-12

N/A

N/A

N/A

N/A

N/A

N/A

599932.26

88440.00

N/A

#######

8040.00

N/A

10149.00

126085

726017

0.00

726017

12

Mar-12

N/A

N/A

N/A

N/A

N/A

N/A

726017.26

88440.00

N/A

#######

8040.00

N/A

12041.00

127977

853994

100000.00

753994

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2
3
4
5

Surcharge shall include following:

Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout
the KVAH units by dividing

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

Please attach circle-wise and Divisional wise Abstracts with each energy account.

Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


K.K.Moulla

Executive Engineer
Electric Division-IV, khanyar

S-ar putea să vă placă și