NAMA PROYEK
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL PT. PERTADAYA GAS PT. WIJAYA KARYA PESANGGARAN - MAKASAR DELIVERABLE LIST
: : : :
REV 0
DATE 22 Jan 13
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 2 / 20
Rekaman Perubahan
Rev. No.
Paragraph
No. Hal.
Deskripsi Perubahan
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 3 / 20
DELIVERABLE LIST FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGRAHAN & MAKASAR) N o 1
Document Number GENERAL PROCEDURES GENERAL 1 - GEN - GEN - 001 2 - GEN - GEN - 002 3 - GEN - GEN - 003 4 - GEN GEN -004 5 - GEN GEN -005 6 - GEN GEN -006 7 - GEN GEN -007 8 - GEN GEN -008 9 - GEN GEN -009 10 - GEN - GEN -0010 11 - GEN - GEN -0011 12 - GEN - GEN -0012 13 - GEN - GEN -0013 14 - GEN - GEN -0014 15 - GEN - GEN -0015 16 - GEN - GEN -0016 17 - GEN - GEN -0017 18 - GEN - GEN -0018 19 - GEN - GEN -0019 20 - GEN - GEN
Description
Procedure for Numbering System Project Execution Plant Project Quality Plant Project Strategy - Philosophy Quality Level - Philosophy Key Technical Issue - Philosophy Equipment Design condition Philosophy Emergency Shutdown - Philosophy Isolation Equipment & Zonal Relief Philosophy Relief System - Philosophy Comminication - Philosophy Plant layout - Philosophy Fire & Gas Detection / Protection Philosophy Sparing - Philosophy Maintenance - Philosophy Loss Controll - Philosophy Manning - Philosophy Power Supply & Back Up Power Supply - Philosophy Effluent Disposal - Flaring /Venting/Drainning - Philosophy Environmental Impact - Philosophy
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 4 / 20
-0020 21 - GEN - GEN Major cable Routing - Philosophy -0021 2 2 - GEN - GEN - 022 Basic Engineering Desaign Data 2 GEOPHYSISCS AND GEOTECHNICS STUDY Topographic And Bathymetric Survey 1 - GT - RPT - 001 Result 2 - GT - RPT - 002 Metocean Survey Result 3 - GT - RPT - 003 Tidal Observation Result 4 - GT - RPT - 004 Weather Observation Result 5 - GT - RPT - 005 Geotechnical Survey Result 6 - GT - RPT - 006 Summary of All Work Activities 3 PROCESS GENERAL 1 - PRO - GEN - 001 Process Design Basis 2 - PRO - GEN - 002 Process Control Phylosophy 3 - PRO - GEN - 003 Material Selection Phylosophy 4 - PRO - GEN - 004 Utility Desaign Basis 5 - PRO - GEN - 005 Utility Design Philosophy 6 - PRO - GEN - 006 Detailed Prcess Description Regasification Process Technology 7 - PRO - GEN - 007 Selection Process Operating & Control 8 - PRO - GEN - 008 Philosophy REPORT 1 - PRO - RPT - 004 Process Simulation Report 2 - PRO - RPT - 005 Blowdown Simulation Report 3 - PRO - RPT - 006 Hydraulic Analysis CALCULATION 1 - PRO - CAL - 001 Line Sizing 2 - PRO - CAL - 002 Equipment Sizing 3 4 5 6 7 8 8 - PRO - CAL - 003 - PRO - CAL - 004 - PRO - CAL - 005 - PRO - CAL - 006 - PRO - CAL - 007 - PRO - CAL - 008 - PRO - CAL - 008 Power Supply Calculation (Compresor, Pump, Electricity Instrument/Utility Calculation Note ???? Utility Pump Sizing Utility Line Sizing (sizing artinya sudah mencakup kalkulasi) Flare System Sizing PSV Sizing Process Calculation - PSV Sizing
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 5 / 20
LIST 1 2 1 2 3 4 5 6 7 8 - PRO - LIST - 001 - PRO - LIST - 002 PFD & UFD - PRO - PFD - 001 - PRO - PFD - 002 - PRO - PID - 003 - PRO - PID - 004 - PRO - PID - 005 - PRO - PID - 006 - PRO - PID - 007 - PRO - PID - 008 HMB EJGT - PRO - HMB 008 P&ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 HSE - PRO - PID - 001 - PRO - PID - 002 - PRO - PID - 003 - PRO - PID - 004 - PRO - PID - 005 - PRO - PID - 006 - PRO - PID - 007 - PRO - PID - 008 - PRO - PID - 009 - PRO - PID - 010 - PRO - PID - 011 - PRO - PID - 012 - PRO - PID - 013 - PRO - PID - 014 - PRO - PID - 015 - PRO - PID - 016 - PRO - PID - 017 - PRO - PID - 018 P&ID-Drawing Index P&ID-Legend and Symbol P&ID-Loading Arm P&ID-LNG Tank P&ID-LNG Pump P&id-LNG Vaporizer P&ID-BOG Compressor P&ID-Gas PipeLine & LBCV P&ID-Gas Metering P&ID-Flare System P&ID-Fuel (Gas/Diesel) System P&ID-Instrument and Utility Air System P&ID-Fire Water System P&ID-Utility & Portable Water System P&ID-Waste Water System P&ID-Fire Water Ring Main P&ID-Closed Drain System P&ID-Nitrogen System PFD -LNG Receiving Facility PFD-Pipe Line & Metering System UFD- Fuel System UFD -Instrument and Utility Air System UFD -Fire Water System UFD -Utility and Potable Water System UFD- Waste Water System UFD -Nitrogen System Equipment List Line List
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 6 / 20
GENERAL 1 2 3 4 5 - HSE - GEN - 001 - HSE - GEN - 002 - HSE - GEN - 003 - HSE - GEN - 004 - HSE - GEN - 005 CALCULATION 1 2 3 4 - HSE - CAL - 001 - HSE - CAL - 002 - HSE - CAL - 003 - HSE - CAL - 004 SPECIFICATION 1 2 3 4 5 6 7 - HSE - SPC - 001 - HSE - SPC - 002 - HSE - SPC - 003 - HSE - SPC - 004 - HSE - SPC - 005 - HSE - SPC - 006 - HSE - SPC - 007 DATA SHEET 1 2 3 4 5 - HSE - DTS - 001 - HSE - DTS - 002 - HSE - DTS - 003 - HSE - DTS - 004 - HSE - DTS - 005 LIST - HSE - LIST - 001 Delugas Valves Data Sheet Hydrant Data Sheet Fire Monitor Data Sheet Eye Wash & Safety Shower Data Sheet Fire Extinghuiser Data Sheet Specification for Personal Protection Equipment Environmental Management and Monitoring System Safety Specification for Fire Fighting Equipment Safety Spesification for Fire & Gas Detector Safety Spesification for Passive Fire Protection Safety Spesification for Automatic Deluge Valves Noise Level In Residential And Plant Area (Change to Spec Equipment Noise) Fire Extinguisher Calculation Fire Water Supply Calculation Fire Water Pump Sizing Fire Supresion Calculation Health, Safety & Environment Fire Fighting Supresion Safety Loss Prevention Hazid Study Quantitative Risk Asessment Study
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 7 / 20
2 1 2 3 4 5 5
- HSE - LIST - 002 DRAWING - HSE - DWG - 001 - HSE - DWG - 002 - HSE - DWG - 003 - HSE - DWG - 004 - HSE - DWG - 005 MECHANICAL GENERAL - MEC - DB - 001 SPECIFICATION - MEC - SPC - 001 - MEC - SPC - 002 - MEC - SPC - 003 - MEC - SPC - 004 - MEC - SPC - 005 - MEC - SPC - 006 - MEC - SPC - 007 - MEC - SPC - 008 - MEC - SPC - 009 - MEC - SPC - 010 - MEC - SPC - 011 - MEC - SPC - 012 - MEC - SPC - 013 - MEC - SPC - 014 - MEC - SPC - 015 - MEC - SPC - 016 - MEC - SPC - 017 - MEC - SPC - 018
Hazardous Material List Escape Ways Layout Fire and Gas Detector Layout Technical Building Fire and Gas Detection Layout Fire Fighting Equipment Layout Fire Water Layout
Mechanical Design Basis Specification for Design and Fabrication of Pressure Vessels Specification for Centrifugal Pump for Non Hydrocarbon Services Spesification Centrifugal Pump Hydrocarbon Services Specification for Over head Crane Specification for Diesel Driven Fire Water Pump Specification Diesel Engine Generator Specification for Open Rack Vaporizer Specification for Ambient Air Vaporizer Specification for BOG Return Boiler Spesification for LNG Pump Specification of Heat Exchanger Spesification for Cyrogenic Loading Arm Spesification for Cyrogenic Loading Hose Spesification for Atmospheric LNG Tank Spesification for lso LNG Tank Spesification for General Weldding Spesification for Nitrogen System (Bottle Bank) Mechanical-Specification Instrumen Air Compressor Package
1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 8 / 20
1 9 2 0 2 1
Mechanical-Specification Nitrogen Generation Package Specification for CO2 Fire Extinguishing System Specification Painting
DATA SHEET 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 - MEC - DTS - 001 - MEC - DTS - 002 - MEC - DTS - 003 - MEC - DTS - 004 - MEC - DTS - 005 - MEC - DTS - 006 - MEC - DTS - 007 - MEC - DTS - 008 - MEC - DTS - 009 - MEC - DTS - 010 - MEC - DTS - 011 - MEC - DTS - 012 - MEC - DTS - 013 - MEC - DTS - 014 - MEC - DTS - 015 - MEC - DTS - 016 - MEC - DTS - 017 - MEC - DTS - 018 Mechanical Data Mechanical Data Pump Mechanical Data Compressor Mechanical Data Tank Sheet LNG Vaporizer Sheet LNG Loading Sheet BOG Sheet LNG Storage
Mechanical Data Sheet Diesel Fuel Distribution Pumps Mechanical Data Storage Tank Mechanical Data Generator Mechanical Data Vessel Mechanical Data Exchanger Mechanical Data Loading Arm Mechanical Data Loading Hose Sheet Diesel Fuel Sheet Engine Sheet Pressure Sheet Heat Sheet Cryogenic Sheet Cryogenic
Mechanical Data Sheet Cryogenic Tank Instrument Air Compressor & Dryer Package Data Sheet Instrument Air Receiver Data Sheet Utility Air Receiver Data Sheet Mechanical Data Sheet Deep Well Water Pumps Mechanical Data Sheet Utility Water Pumps Mechanical Data Sheet Potable Water Treatment Package
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 9 / 20
1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6
- MEC - DTS - 019 - MEC - DTS - 020 - MEC - DTS - 021 - MEC - DTS - 022 - MEC - DTS - 023 - MEC - DTS - 024 - MEC - DTS - 025 - MEC - DTS - 026
Mechanical Data Sheet Nitrogen (N2) Bottle Package Mechanical Data Sheet Firewater Pumps Mechanical Data Sheet Jockey Pumps Mechanical Data Sheet Potable Water Tank Mechanical Data Sheet Overhead Crane Mechanical Data Sheet Pig Receiver Mechanical Data Sheet Pig Launcher Mechanical Data Sheet CO2 Snuffing Package
CALCULATION 1 1 6 - MEC - CAL - 001 MTO - MEC - MTO - 001 CIVIL & STRUKTURAL GENERAL 1 - CIV - GEN - 001 SPECIFICATION 1 2 3 4 5 6 7 8 - CIV - SPC - 001 - CIV - SPC - 002 - CIV - SPC - 003 - CIV - SPC - 004 - CIV - SPC - 005 - CIV - SPC - 006 - CIV - SPC - 007 - CIV - SPC - 008 Civil Specification for Design Load Structure Civil Specification for Structural Steel Design and Material Civil Specification for Concrete Design and Material Civil Specification for Building Design and Material Civil Specification for Foundation Civil Specification for Fencing and Gates Materials Civil Specification for Roads, Parking, and Grading Areas Civil Specification for Masonry Construction Civil and Structural - Design Basis Design Criteria Mechanical MTO - Material Take Off Mechanical Calculation LNG Tank
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 10 / 20
9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8
- CIV - SPC - 009 - CIV - SPC - 010 - CIV - SPC - 011 - CIV - SPC - 012 - CIV - SPC - 013 - CIV - SPC - 014 - CIV - SPC - 015 - CIV - SPC - 016 - CIV - SPC - 017 - CIV - SPC - 018
Civil Specification for Grouting Design and Material Civil Specification for Interior Plumbing and Material Civil Specification for Sewer and Drainage System Civil Specification for Water Pond Civil Specification for Site Prepaation Civil Specification for Earthworks & Soil Mix Desaign Civil Specification for Piles and Sheet Pile Civil Specification for Landscape Civil Specification for Topography Civil Specification for Civil Investigation
CALCULATION 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 - CIV - SPC - 001 - CIV - SPC - 002 - CIV - SPC - 003 - CIV - SPC - 004 - CIV - SPC - 005 - CIV - SPC - 006 - CIV - SPC - 007 - CIV - SPC - 008 - CIV - SPC - 009 - CIV - SPC - 010 - CIV - SPC - 011 - CIV - SPC - 012 Civil Calculation Sheet - Telecom, Battery, MCC & Control Room Civil Calculation Sheet Office/Administration Building Civil Calculation Sheet and Workshop Building Civil Calculation Sheet Guard Post Civil Calculation Sheet Shelter Civil Calculation Sheet Air / Landfall-Shelter Civil Calculation Sheet Pond Civil Calculation Sheet Pump Shelter Civil Calculation Sheet Werehouse Security / Gen-set Instrument Fire Water Water Jockey Vent Stack
Civil Calculation Sheet - Piperack Steel Framing & Foundation Civil Calculation Sheet - Vent Stack Foundation Civil Calculation Sheet - Piling Capacity Design
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 11 / 20
1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3
- CIV - SPC - 013 - CIV - SPC - 014 - CIV - SPC - 015 - CIV - SPC - 016 - CIV - SPC - 017 - CIV - SPC - 018 - CIV - SPC - 019 - CIV - SPC - 020
Civil Calculation Sheet - Pipe Sleeper Foundation Civil Calculation Sheet - Diesel Fuel Storage Tank Support Foundation Civil Calculation Sheet - Tie In Gas Metering Foundation Civil Calculation Sheet - Utility & Instrument Air Receiver Foundation Civil Calculation Sheet - Slab On Grades Plan Civil Calculation Sheet - Portable Water Storage Tank Tower Foundaton Civil Calculation Sheet - Gas Manifold Foundation Civil Calculation Sheet - Diesel Fuel Pump & Filter and Potable Water Treatment Foundation (Slabe on Grade) Civil Calculation Sheet - Flexible Road Pavement (Asphalt) Civil Calculation Sheet - Rigid Road Pavement (Concrete) Civil Calculation Sheet - Culvet & UDitch
DRAWING 1 2 3 4 5 6 7 8 9 - CIV - DRW- 001 - CIV - DRW- 002 - CIV - DRW- 003 - CIV - DRW- 004 - CIV - DRW- 005 - CIV - DRW- 006 - CIV - DRW- 007 - CIV - DRW- 008 - CIV - DRW- 009 General Note, Abrreviation & Symbol for Civil, Structures & Architecture Pilling Plan Foundation Plan Fence and Gate Plan Telecom, Battery, MCC & Control Room-Plans, View and Section Telecom, Battery, MCC & Control Room-Roofing, Floor Plan, Columm & Beam Schedule and Detail Office Administration, Building-Plans, View and Sections Office Administration, BuildingRoofing, Floor Slab, Columm & Beam Schedule and Detail Ware House & Workshop Building Plan, View and Sections
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 12 / 20
1 0 1 1 1 2 1 3 1 4
- CIV - DRW- 010 - CIV - DRW- 011 - CIV - DRW- 012 - CIV - DRW- 013 - CIV - DRW- 014 SHELTERS
Ware House & Workshop Building Floor, Roofing Plan Columm & Bean Schedule and Detail Power Feeder Station (PLN House) Plan, Views and Section Power Feeder Station (PLN House) Roofing Plan, Collum and Beam Schedule and Details Security / Guard Post Plan, View and Section Security / Guard Post Roofing Plan, Columm and Beam Schedule and Details Genset Shelter - Structure Plans, Foundation Plan, Views Section and Details Genset Shelter - Roofing Plan Instrument Air Shelter - Structure Plans, Foundation Plan, View Section and Details Instrument Air Shelter - Roofing Plan Landfall Sheller - Structure Plans, Foundation Plans, Views Section and Details Landfall Sheller - Roofing Plan Pond Fire Water Jockey Pumps Sheller - Roofing Plan Pond Fire Water Jockey Pumps Sheller - Structure Plans, Foundation Plan, Views Section and Details
1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2
- CIV - DRW- 015 - CIV - DRW- 016 - CIV - DRW- 017 - CIV - DRW- 018 - CIV - DRW- 019 - CIV - DRW- 020 - CIV - DRW- 021 - CIV - DRW- 022
UTILITIES 2 3 2 4 2 5 2 6 2 7 - CIV - DRW- 023 - CIV - DRW- 024 - CIV - DRW- 025 - CIV - DRW- 026 - CIV - DRW- 027 Typical Vessel Support Plan, Section and Table Vent Stack Support Structure - Plan, Section and Details Vent Structure Foundation - Plan and Section Details Piperack - Plan, Elevation and Steel Member Shcedule (1/2) Piperack - Plan, Elevation and Steel Member Shcedule (2/2)
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 13 / 20
2 8 2 9 3 0 3 1 3 2 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 4 4 4 5 LIST 1
- CIV - DRW- 028 - CIV - DRW- 029 - CIV - DRW- 030 - CIV - DRW- 031 - CIV - DRW- 032 - CIV - DRW- 033 - CIV - DRW- 034 - CIV - DRW- 035 - CIV - DRW- 036 - CIV - DRW- 037 - CIV - DRW- 038 - CIV - DRW- 039 - CIV - DRW- 040 - CIV - DRW- 041 - CIV - DRW- 042 - CIV - DRW- 043 - CIV - DRW- 044 - CIV - DRW- 045
Piperack - Pilling and Foundation Plan Typical Pipe Support and Pipe Sleeper Plan Elevation and Section Instrument Air Shelter - Piling, Foundation and Roofing Plan Typical Pipe Support and Pipe Sleeper Plan Elevation and Section Potable Water Storage Tank Tower Plan, Elevation and Stell Member Schedule Potable Water Storage Tank Tower Piling & Foundation Details Diesel Fuel Storage Tank Support Plan, Section and Details Slab on Grades Plan, Section and Table Tie In Gas Metering Foundation - Plan and Section Details Utility & Instrument Air Receiver Foundation - Plan and Section Details Diesel Fuel Pump & Filter and Potable Water Treatment Foundation (Slab on Grade) Condensate Drum and Pump Foundation - Plan and Section Details Road and Pavement - Plan, Section and Details Culvert / Bridge - Plan, Section and Details Fence and Gate Plan Fences - Sections and Details Gates - Section and Details Sewer & Drainege System - Plan, Section & Details Drawing List Civil, Structure and Architecture
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 14 / 20
1 1 2 3 4 1 2 3 4 5 6 7 8 1 1 8 1 2 3 4 5
GENERAL EJGT - PIP - DB - 001 SPECIFICATION - PIP - SPC - 001 - PIP - SPC - 002 - PIP - SPC - 003 - PIP - SPC - 004 DATA SHEET - PIP - DTS DRAWING - PIP - DRW - PIP - DRW - PIP - DRW - PIP - DRW - PIP - DRW - 001 001 002 003 004 005
Piping Design Basis Piping - Spesification Piping Design Piping - Specification Piping Material Class (Include All Piping Accessories) Piping - Specification Piping Plan Layot Piping - Specification Stress Design Basis Specially Item Data Sheet General Plot Plan Equipment Layout Key Plan ORF Piping GA - Overall System ORF Piping GA - Slug Catcher ORF Fire Water System and Utility Water Pump Wall Thickness Calculation Material Take Off Piping
- PIP - DRW - 006 CALCULATION - PIP - CAL - 001 MTO - PIP - MTO - 001 ELECTRICAL GENERAL - ELE - DB - 001 - ELE - DB - 002 - ELE - DB - 003 - ELE DB - 004 - ELE - DB - 005 REPORT - ELE - RPT - 006 SPECIFICATION
Electrical Design Basis Electrical Power Distribution System Hazardous Area Classification Design Electrical Control System Electrical Power System Electrical Report - ETAP Power Study Report Specification of General Electrical Instalation (Code and Standard Electrical) Electrical Instalation Specification Electrical Specification - Electrical Requirements For Package Unit Electrical - Specification Power Generator
1 2 3 4
- ELE - SPC - 001 - ELE - SPC - 002 - ELE - SPC - 003 - ELE - SPC - 004
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 15 / 20
5 6
Electrical - Specification Induction Motor Specification of Low Voltage Switchgear & Motor Control Center Electrical Specification - Electrical and Instrument Cable Electrical Specification - Electrical and Instrument Cable Trays Electrical Specification - DC Battery System Electrical Specification Uninterruptable Power System (UPS) Electrical Specification - Lighting and Accessories Electrical Specification - Grounding / Bounding System Electrical Specification System / EMC Base Electrical Specification Protection System Electrical Specification Power Transformer Electrical Specification Protection - Grounding - Lighting - Oil Immerse - Catodic
7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 2 3 4 5 6 7 8 9 1 0 1 1 1
- ELE - SPC - 007 - ELE - SPC - 008 - ELE - SPC - 009 - ELE - SPC - 010 - ELE - SPC - 011 - ELE - SPC - 012 - ELE - SPC - 013 - ELE - SPC - 014 - ELE - SPC - 015 - ELE - SPC - 016 CALCULATION - ELE - CAL - ELE - CAL - ELE - CAL - ELE - CAL - ELE - CAL - ELE - CAL 001 002 003 004 005 006
- ELE - CAL - 007 - ELE - CAL - 008 - ELE - CAL - 009 - ELE - CAL - 010 - ELE - CAL - 011 DATA SHEET - ELE - DTS - 001
Electrical Calculation - Cable Sizing Electrical Calculation - Voltage Drop Electrical Calculation - Short Circuit Electrical Calculation - Load Flow Electrical Calculation - Lighting Electrical Calculation - UPS Electrical Calculation - Battery Charger 24 VDC Generator Capacity Calculation Electrical Calculation - Power Consumption Short Circuit Calculation Grounding Calculation Data Sheet Gas Engine Driven Generator
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 16 / 20
2 3 4 5 6 7 8 9 1 0
- ELE - DTS - 002 - ELE - DTS - 003 - ELE - DTS - 004 - ELE - DTS - 005 - ELE - DTS - 006 - ELE - DTS - 007 - ELE - DTS - 008 - ELE - DTS - 009 - ELE - DTS - 010
Data Sheet Diesel Engine Generator Electrical Data Sheet LV Switchgear Data Sheet MCC Data Sheet Power & Distribution Transformer Data Sheet 220 VAC Uninterruptible UPS & DC Baterry System Data Sheet 24 VDC Baterry Charger Data Sheet Earthing and Lighting Protection System Data Sheet Panel Distribution Board Data Sheet Cable
1 2 1 2 3 4 5 6 7 8 9
LIST - ELE - LIST - 001 - ELE - LIST - 002 DRAWINGS - ELE - DWG - 001 - ELE - DWG - 002 - ELE - DWG - 003 - ELE - DWG - 004 - ELE - DWG - 005 - ELE - DWG - 006 - ELE - DWG - 007 - ELE - DWG - 008 - ELE - DWG - 009 MTO
List - Electrical Equipment Electrical List - Load List Equipment Layot Hazardous Area ORF Grati Electrical Legend and Symbol Electrical Overall One Line Diagram Electrical Lighting Protection Layout Outdoor Lighting Layout ORF Grati Electrical Cable Ladder and Cable Routing Layout Building for E/t Telecom Layout Electrical Typical Installation Detail Power and Control Works (35 Sheets) Electrical MCC Arrangement Layout in Control Room at Building MTO - Material Take Off Electrical
1 9 1
Instrument Design Basis - Instrument & Control Design Basis Instrument Spesification - Instrument Mounted on Packages
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 17 / 20
2 3 4 5 6 7 8 9 1 0 1 1
- INS - SPC - 002 - INS - SPC - 003 - INS - SPC - 004 - INS - SPC - 005 - INS - SPC - 006 - INS - SPC - 007 - INS - SPC - 008 - INS - SPC - 009 - INS - SPC - 010 - INS - SPC - 011
Instrument Spesification - Instrument Design & Instalation Instrument Spesification - Process Control System Instrument Spesification - ESD Specification Instrument Spesification - Instrument Inspection & Testing Spesification Instrument Spesification - Gas Metering Specifcation Instrument Spesification - Gas Analyzer CCTV, Paging and Alarm System Specification Personal Announcement Jetty Emergency Shutdown System Surge Arrester Specification
DATA SHEET 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 - INS - DTS - 001 - INS - DTS - 002 - INS - DTS - 003 - INS - DTS - 004 - INS - DTS - 005 - INS - DTS - 006 - INS - DTS - 007 - INS - DTS - 008 - INS - DTS - 009 - INS - DTS - 010 - INS - DTS - 011 - INS - DTS - 012 Instrument Data Sheet - Orifice Plate and Restriction Orifice Instrument Data Sheet Transmitter Instrument Data Sheet Transmitter Instrument Data Sheet Gauge Instrument Data Sheet Transmitter Instrument Data Sheet Differential Gauge Instrument Data Sheet Transmitter Instrument Data Sheet Indicator Instrument Data Sheet and Blowdown Valves Instrument Data Sheet Cromatography - DP Flow - Level - Temperature - Temperature - Pressure - Pressure - Pessure - Shutdown - Gas
Instrument Data Sheet - Gas Detector Instrument Data Sheet - Flame Detector
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 18 / 20
1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5
- INS - DTS - 013 - INS - DTS - 014 - INS - DTS - 015 - INS - DTS - 016 - INS - DTS - 017 - INS - DTS - 018 - INS - DTS - 019 - INS - DTS - 020 - INS - DTS - 021 - INS - DTS - 022 - INS - DTS - 023 - INS - DTS - 024 - INS - DTS - 025
Instrument Data Alarm Call Point Instrument Data Detector Instrument Data Detector Instrument Data Panel Instrument Data Valve
Sheet - Manual Sheet - Heat Sheet - Smoke Sheet - Fire Alarm Sheet - Control
Instrument Data Sheet - Junction Box Instrument Data Sheet - Gas Metering Instrument Data Sheet - Alarm Bell Instrument Cable Schedule Instrument Data Sheet - Pressure Safety Valve Instrument Data Sheet - Pressure Switch Instrument Data Sheet - Level Glass Instrument Data Sheet - Differential Pressure Level Transmitter
DRAWING 1 2 3 4 5 6 7 8 9 - INS - DWG - 003 - INS - DWG - 004 - INS - DWG - 005 - INS - DWG - 006 - INS - DWG - 007 - INS - DWG - 008 - INS - DWG - 009 DIAGRAM - INS - DWG - 001 - INS - DWG - 002 Instrument - Instrument Index ORF Grati Hook up Pressure Lead Tubing and Instrument Air Tubing (Typical) Shutdown Valve Instrument Layout of Fire and Gas Detection Cable Routing Instrument Main Cable Way & Main Cable Routing & Junction Box ORF Grati Layout Field Instrument Location & Cable Routing Instrument Hook Up (Typical) Temperature Transmitter Instrument Block Diagram Instrument Hierarchy Instrument Battery Limit
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 19 / 20
- INS - DWG - 009 1 0 TELECOMMUNICATION GENERAL 1 2 3 1 2 3 - INS - GEN - 001 - INS - GEN - 002 - INS - GEN - 003 SPECIFICATION - INS - SPC - 001 - INS - SPC - INS - SPC CALCULATIONS DRAWING - INS - DRW - INS - DRW - 002 - 003
Design Basis Supervisory Control and Data Acquisition Gas Management System Coastal Radio Gas Management System Specification Radio Data and Voice Specification Network System Specification IPBX Specification
1 2 3 4 5 1 1 1 2 3 4
- 001 - 002
- INS - DRW - 003 - INS - DRW - 004 - INS - DRW - 005 PIPELINE SPESIFIKASI - PL - SPC - 001 - PL - SPC - 002 - PL - SPC - 003 - PL - SPC - 004
Overall System Configuration RTU Configuration INSTRUMENT & TELECOM - SYSTEM CONFIGURATION RTU -TYPICAL BLOCK DIAGRAM METERING SCADA ARCHITECTURE
Pipeline Onshore External Pipe Coating Field Joint Coating Hot Induction Bend
5 6 7 8 9 1 0 1 1 1
- PL - SPC - 005 - PL - SPC - 006 - PL - SPC - 007 - PL - SPC - 008 - PL - SPC - 009 - PL - SPC - 010 - PL - SPC - 011 - PL - SPC - 012
Spesification Pipeline Offshore Construction Spesification for Internal Coating Epoxy Paint Spesification Wrapping Spesification For Concrete Coating Spesification For Insulating Joint Spesification Pipeline Welding Spesification Pre-Commissioning Spesification Painting Pipeline Onshore
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASAR)
DOC.NO : FEED-GEN-GEN-024
DELIVERABLE LIST
REVISI HALAMAN
: 0 : 20 / 20
2 1 2 3 4 5 6 7 1 2 1 2 3 4 5 1 2 1 1 3 CALCULATION - PL - CAL - 001 - PL - CAL - 002 - PL - CAL - 003 - PL - CAL - 004 - PL - CAL - 005 - PL - CAL - 006 - PL - CAL - 007 DATA SHEET - PL - DTS - 001 - PL - DTS - 002 DRAWINGS - PL - DRW - 001 - PL - DRW - 002 - PL - DRW - 003 - PL - DRW - 004 - PL - DRW - 005 MATERIAL TAKE OFF - PL - MTO - 001 Perhitungan Ketebalan Pipeline Perhitungan Field Bending Perhitungan Buckling, Collapse Pipeline Analysis Pipeline Perhitungan Pipeline Stability dan Bouyancy Perhitungan Freespan Pipeline Offshore Perhitungan On Bottom Stability Analysis Offshore Perhitungan Bending Stress Offshore Data Sheet for Pipeline Valve Data Sheet for Pipeline Special Item Key Plan Pipeline Route Pipeline Alignment Sheet 1 : 2000 Horizontal, 1 : 5000 Vertical Typical Anode Drawing Typical Pipeline Freespan Correction Typical Road Crossing
SCHEDULE & COST - SCH - 001 1 2 - SCH - 002 3 - SCH - 003 4 - SCH - 004 - EC - 002 5
Project Schedule List of Longlead Items & Construction services Delivery Periode for All Major Items of Equipment Vendor List Engineering Cost Estimate