Sunteți pe pagina 1din 42

Detailed Project Report (DPR)

LESPL/DPR/BAL/2012-13/0099

List of contents
1. Company Profile .......................................................................................................................................................... 02 Our Esteemed And Valuable Customers ................................................................................................................. 03 2. Executive Summary ..................................................................................................................................................... 05 3. Project Site Details ...................................................................................................................................................... 06 4. System Overview......................................................................................................................................................... 08 5 Design Parameters ....................................................................................................................................................... 09 6.Comprehensive Detail .................................................................................................................................................. 10 7. System Configuration10 8. Bill of Material ............................................................................................................................................................. 11 9. Solar PV Power plant Details ...................................................................................................................................... 12 9.1 Solar Photovoltaic Modules ...................................................................................................................................... 12 9.2 Mounting Structure................................................................................................................................................... 13 9.3 Inverter...................................................................................................................................................................... 15 9.4 Distribution Boards .................................................................................................................................................. 16 9.5 Cables ........................................................................................................................................................................ 17 9.6 Earthing & Lighning Protection ................................................................................................................................. 18 10. Estimated Generation ............................................................................................................................................... 18 Annexure-1: Drawings..................................................................................................................................................... 19 Typical Block Diagram .................................................................................................................................. 20 Earthing & Lighting Arrestor22 Annexure-2: Datasheets ................................................................................................................................................. 27 PV Module .................................................................................................................................................... 28 Inverter31

All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

1 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

1.

COMPANY PROFILE

Lanco Solar is a subsidiary of Lanco Infratech Ltd. (LITL). LITL is the flagship company of the Lanco Group and is one of the leading Organizations in the infrastructure sector in the country. LITL and its subsidiaries have strong foothold in power generation, power trading, infrastructure development, realty and construction. Lanco Solar aims to be a fully integrated sand to power pioneer throughout the entire value engineering chain in the Solar PV industry. We are at an advanced stage for the fully integrated manufacturing of high purity polysilicon, silicon ingots / wafers, solar cells and modules. The project is being set up at a total cost of Rs. 2800 Crores and is the first of its kind in India .This project is one of the projects approved under the SIPS scheme of the Semiconductor Policy 2007. Further, we have expertise in conceptualizing and implementing solar systems specific to needs of our valuable customers.

Our corporate vision is to become the most preferred, reliable and admired integrated solar enterprise and to achieve this goal, we are actively developing utility scale Solar PV power plants across the country. Lanco Solar has signed Power Purchase Agreements (PPAs) for a cumulative capacity of 141 MW in Solar PV and Solar Thermal domain with the NTPC Vidyut Vyapar Nigam Limited (NVVN) under the National Solar Mission and with the Gujarat Urja Vikas Nigam Limited (GUVNL) under the state policy. We have also signed turnkey EPC contracts for other developers in Rajasthan and Gujarat. The details of projects which are currently at advanced stage of installation and commissioning are:-

A Power Purchase Agreement (PPA) for 35 MW Solar PV projects in Gujarat is signed under the state solar policy, out of which 15 MW is successfully running while the rest of the solar projects are in line to get commissioned. The completed 5 MW project is one of the largest solar project in the country and the first such solar project in Gujarat. A PPA for 100 MW Solar Thermal and 5 MW Solar PV has also been signed under the bidding process of phase I of the Jawaharlal Nehru National Solar Mission (JNNSM) in Rajasthan. A decisive step has been taken in the small scale solar project development area by signing a PPA for 1 MW under the Rooftop and Small Solar Power Generation Programme (RPSSGP) scheme of JNNSM Turnkey EPC contracts have been signed for prestigious rooftop PV projects such as the 80 kilowatt- peak (kWp) unit Parliament building and a 100 kWp unit at Science City, Punjab and 1 MWp at Bathinda, Punjab. on the

80 kWp on the Indian Parliament premises 100 kWp at Pushpa Gujral Science City, Punjab 1 MWp at Phulokhari Bathinda, Punjab.
All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

2 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

80 kWp solar roof top project at premises of Parliament House of India was inaugurated by Mrs. Meira Kumar , First Woman Speaker of the Lok Sabha and Dr. Farooq Abdullah, Minister of New and Renewable Energy on August 09,2011.

1.1 OUR ESTEEMED AND VALUABLE CUSTOMERS

Solar Photo Voltaic Projects ( Successfully Commissioned )


Project Name Grid Connected Solar Photovoltaic System under Gujarat State Solar Policy Power Rating of PV System 5 MWp Project Location Village :Badhrada Tehsil : Patan District : Mehsana State : Gujarat Village : Phulokri District : Bhatinda State : Punjab State : Rajasthan(Lathi) Application Solar Farm

Solar farm photovoltaic System for PEDA Grid Connected Solar Photovoltaic System under RPSSGP Century Cements

1 MWp

Solar Farm

1 MWp

Solar Farm

100 kWp x 6 Nos

Century Cements Location: Raipur Pushpa Gujaral Science City PGSC ) Kapurthala State : Punjab Parliament House of India New Delhi East Zone Building Location: Rajkot U.T Secretariat Building Location: Chandigarh Haryana Raj Bhawan Location : Chandigarh Tribal Hostels and Primary Health Centres State : Chhattisgarh Gurgaon State : Haryana Various Branches (

Solar Farm

Roof top solar photo voltaic project

100 KWp

Roof Top

Roof top solar photo voltaic project

80 kWp

Roof Top

Roof top solar photovoltaic system for Rajkot Municipal Corporation Roof top solar photovoltaic system for CHANDIGARH ADMINISTRATION Roof top solar photovoltaic system for HAREDA Roof top solar photo voltaic system for CREDA Roof top solar photovoltaic system for RITES Gurgaon Gramin Bank

50 kWp

Roof top

50 kWp

Roof top

45 kWp

Roof top

42 KWp

Roof Top

25 KWp

Roof Top

2.8 kWp x 20 Nos

Rooftop

All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

3 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

Roof top solar photovoltaic system for Thane Zilla Parishad Roof top solar photovoltaic system at IFFCO, Kalol Roof top solar photovoltaic system for National Productivity Council (NPC), Chennai

50 kWp

Collectors Office Location: Thane IFFCO Location: Gujrat AT DR. AMBEDKAR INSTITUTE OF PRODUCTIVITY (AIP), Location: Chennai

Roof top

Roof top

10 KWp 10 kWp

Rooftop

Solar Photo Voltaic Projects (Under Commissioning )


Project Name Grid Connected Solar Thermal plant ( Self Owned Project by Lanco Solar Energy Pvt. Limited under JNNSM ) Grid Connected Solar Photovoltaic System under Gujarat State Solar Policy Power Rating of PV System 100 MWp Project Location State : Rajasthan Application Solar Farm

30 MWp

Grid Connected Solar Photo Voltaic Plant ( Self Owned Project by Lanco Solar Energy Pvt. Limited under JNNSM ) Grid Connected Solar Photo Voltaic Plant Roof top solar photovoltaic system for Airport Authority of India, New Delhi Roof top solar photovoltaic system for PEDA Roof top solar photovoltaic system for OREDA

5 MWp

Village : Badhrada Tehsil : Patan District : Mehsana State : Gujarat State : Rajasthan

Solar Farm

Solar Farm

75 MWp

MAHAGENCO State : Maharashtra Airport Authority of India Rajiv Gandhi Bhawan Stare: New Delhi Shivalik Public School Location: Mohali Orissa Secretariat Building Location: Bhubaneshwar

Solar Farm

250 kWp

Roof top

50 kWp

Roof top

50 kWp

Roof top

All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

4 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

2.

EXECUTIVE SUMMARY

Energy plays a key role in the economic growth of the country. There is a close link between the Energy & future growth of a nation. Not only in India but in the entire world there is a never ending need for energy. Since, times immemorial, the energy are derived from one source or another. In much older periods, the demand for light & fuel was met with traditional sources like wood or animal dung or waste plants. Later they got replaced by coal, water & nuclear energy which were then available in abundance. But as the time goes on, the limitations & drawbacks are stepping forward making the hunt for alternative sources of energy a must, considering the future generation & their needs. More awareness is generating for using the environment friendly resources. Though sunlight is considered a compelling solution to the need for clean, abundant sources of energy, solar energy currently provides only 0.01 percent of the total electricity supply needs. However, recent market trends, regulatory pressures, consumer incentives, and technological advancements are together driving solar energy costs drastically down relative to conventional fossil fuel-derived energy. Compared to conventional and other renewable energy sources, solar power is especially attractive because it can be easily scaled up Solar electricity can also be generated nearer to consumers and even on site, which greatly reduces or eliminates transmission costs and losses. Furthermore, the increasing adoption of variable-pricing or net metering schemes also favors solar electricity. Under these schemes electricity rates are higher when peak demand is highest and this generally correlates to when more solar energy is available and electric output highest. Solar costs are also presently being lowered through higher volume production, improved manufacturing techniques, and alternative solar technologies that reduce the amount of semiconductor material. Total installed system costs are further being reduced through cheaper balance-of-system components such as inverters through improved design and installation techniques. Fundamentally, the solar industry as a whole has advanced and grown to the point where solar solutions are not only an environmentally friendly option but also a cost effective one. The Ministry of Power has a mandate to promote cogeneration and renewable sources for Power generation under Nodal agencies and hence it will play a major role in mainstreaming renewable energy sector.

Assuring you about our robust project design, reliability and best support, Lanco Solar Energy Private Limited has got an opportunity to closely work with you to implement this 20 kWp SPV power Plant. This Detailed Project report brings out the technical details & overall cost mitigating this project. The total power to be produced by the solar cells will be 20 kWp. The cell technology proposed here is of crystalline type.

All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

5 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

3.

PROJECT SITE DETAILS


Attributes
Site Location Latitude Longitude Elevation (m) Site Disposition Roof faade Average Irradiation (kWh/m .day) Estimated Annual Generation (kWh)
2

Details
Bajaj Auto Limited, Bajaj Nagar, Waluj, Aurangabad. 19 49 N 78 18 E 527 Rooftop Flat 5.18 20885

Global Irradiation map for India (source: NASA )

From the above distribution , the Average Global Horizontal Irradiation for Waluj Region comes out to be in the range of 5.0 kWh /m to 5.5 kWh /m .The monthly average irradiation on latitude tilt for the site is as follows:
2

All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

6 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

Month
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average (GHI)

Average Monthly Global Horizontal Irradiation (kWh /m2 .day) 4.9

5.7 6.3 6.7 6.6 4.8 4.0 3.8 4.7 5.1 4.9 4.7 5.2

Map for Global Irradiation on Latitude tilt for India (source: NASA)

The Average Global Horizontal Irradiation on latitude tilt for Waluj Region comes out to be in the range of 5.5 kWh /m to 6.0 kWh /m .The monthly average irradiation on latitude tilt for the site is as follows:
All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering
2

7 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

Month
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Average (GHI) on latitude tilt

Average Monthly Global Horizontal Irradiation on Latitude tilt (kWh /m2 .day) 6.2

6.7 6.7 6.5 5.9 4.4 3.7 3.7 4.7 5.7 6.1 6.2 5.5

4.

SYSTEM OVERVIEW

Basic Components for Solar PV systems are: SPV Modules Inverter Energy Meter Combiner Boxes (optional) Distribution Boards Cables

Number of Modules will be combined to form an array using series and Parallel configuration. The strings coming out of the array will be combined into an Array Combiner Box or Junction Box. The output of the Array Junction Box will be connected to DC Distribution Board. The DCDB output will be directed to an inverter for conversion to AC Power and make it suitable for feeding loads & transmission to local LT supply.

All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

8 |P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

Atypicalgridconnectsystem

5. DESIGNPARAMETERS
AvailabilityofShadowfreearea TypeandconditionofRoof Irradiationdataatprojectsite AmbientTemperatureatprojectsite Distanceofthecontrolroomfromthearray

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

9 |

P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

6. SYSTEM CONFIGURATION FOR 20 KWP GRID CONNECT SPVPP

(a) Module wattage (b) Number of Modules in series (c) Number parallel strings (d) Total Number of modules (e) Proposed system capacity (f) Inverter Rating (g) Array Rated Voltage-Vmp (at STC) (h) Total Array Current-Imp (at STC) (i) Array Open Circuit Voltage Voc (at STC) (j) Total Array Short Circuit Current Isc (at STC) (k) Cable Laying (l) Cable Laying (m) Cable Laying

: : : : : : : : : : : : :

280 Wp 18 4 72 20.16 kWp 20 kW 644.4 V 31.3 A 802.8 V 33.5 A Module to Inverter Inverter to ACCB ACCB to grid/LT Panel

7. COMPREHENSIVE DETAIL
Attributes Summary of 20 kWp Solar PV Plant
System Capacity (in kW) Plant Topology PV Module Technology No. of cells in PV Module Total No. of PV Modules for (20 kWp) Tilt Angle Inverter type Inverter Rating Output

Details
20 kWp Grid Connected Crystalline 72 cells 72

18 or as per requirement Grid Connected As per system capacity 400 VAC , 3 Phase

All the information given above is for indicative purpose only & is subject to changes due to site & design requirements during detailed engineering

10 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

8. BILLOFMATERIAL

BILLOFMATERIALFOR20KWPSOLARPVPOWERPLANT
S.NO. 1 ITEMDESCRIPTION SolarPVModules280Wporbelow above/for20kWpSystem ModuleMountingStructuresuitablefor accommodating20kWpcapacitySPV modulesincludingfoundation GridInteractiveInverter400VAC,50Hz withDataloggerHardware&software: aspersystemcapacity20kWp DistributionBoards QTY. 72 UOM Set Lanco MAKE

Set

Lanco

Set.

RefuSol/Delta/OPS/Eltek/Bonfiglioli/Emerson/PPS/ SMA/ AEG/PowerOne/Vacon /other make compliant tobidspecifications (Switchgearby:ABB/Siemens/Schneider Electric/L&T/makecomplianttobidspecifications) Havells/polycab/finolex/KEI/Grandlay/CCI/other makescomplianttobid

Set

Cablesasperdesign

Set

MeteringTVM,415VLTCTbased

Set

Reputedmakecomplianttobidspecifications.

LightningArrestor

Set.

AsperBIS

EarthingKit

Set.

AsperBIS

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

11 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

9. SOLARPVPOWERPLANTDETAILS
9.1SOLARPVMODULE:
A solar panel (photovoltaic module or photovoltaic panel) is a packaged interconnected assembly of solar cells, also known as photovoltaic cells. The solar panel can be used as a component of a larger photovoltaic system to generate and supply electricityincommercialandresidentialapplications. Because a single solar panel can only produce a limited amount of power, an installation will contain several panels. This is known as a photovoltaic array. A photovoltaic installation typically includes an array of solar panels, an inverter and interconnection wiring. Solar panels use light energy (photons) from the sun to generate electricity through the photovoltaic effect.TheWattageofSPVModulesfortheproposedsystemwillbeaspersystemcapacity.ThetypeofSPVModulesprovided willbeofcrystallineSilicontypewithefficiencyofabout14%. The solar module will be made up of transmissivity glass front surface giving high encapsulation gain, employing lamination technology using established polymer (EVA) and Tedlar or Polyester back sheet and hot butyl rubber edge sealant for module protectionandmechanicalsupport.

Attributes
Nominalrating Type NumberofCells MountingArrangement SolarModuleFrameMaterial Dimensions(mm) Weight

Details
280 Wp(atSTC)oraspersite requirement Crystalline 72Cells SpeciallyDesignedStructuressuitable formountingMMS anodizedaluminum 1979x991x38 25kgs

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

12 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

SomekeyfeaturesofLancoSolarPVModules: a. b. c. d. e. f. g. h. 100%crackfree Positivetolerance GermanLaminationtechnology HighfillFactor Lessseriesresistance Lesstemperaturecoefficient Highefficiency SuitableforIndian&EuropeanClimate

9.2MOUNTINGSTRUCTURE:
A number of PV panels connected in series and in parallel give a DC output out of the incident irradiance. Orientation and tilt of thesepanelsareimportantdesignparametersaswellasshadingfromsurroundingobstructions

AtypicalmodulemountingstructureAtypicalModulemountingstructurewithModules Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

13 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

Suitable number of Array frames will be provided. The array frames proposed for the site would typically utilize design with a different tilt angle capability. This is typically achieved by changing the length of the rear support leg and the spacing between the front and rear footings. The array frames are made of MS galvanized/Aluminum and is protected against the salt mist corrosionandotherenvironmentimpacts.Thearrayframeswillbecorrosionresistant. The array frames would be certified for wind and seismic requirements of the area and most importantly, for a remote site, wouldutilizefootingsthatwillminimizethequantityofconcreterequired.Thearrayframesaredesignedforsimplicity,lowcost andeaseofinstallationatsite. The structure can be installed with a fixed inclination by selecting required angle slots available. The design will be such that any module can be replaced easily. The galvanized steel structure provides support for the photovoltaic modules and has longer life and gives them the optimum angle of inclination, dependent on the system location .The Structure consists of a set of components that can be managed and mounted in the place where the installation is going to be realized. These structures are designed to survive adverse weather conditions with minimum maintenance.The structure will besuppliedwithallmemberstobecompatibleallowingeasyinstallationattherooftopsite. Thedetailsareasunder
Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

Attributes Type Tilt Material SurfaceFinish WindSpeedTolerance Hardware Fixed

Details

23orasperrequirement MildSteel HotdippedGalvanizing 150km/hr All hardware required for fixingthe structure and solar module shall be provided PCC/RCCfoundationBlocks

Foundation

14 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

9.3 INVERTER
Solar photovoltaic is DC (Direct current) source. The DC output has to be inverterd to the grid alternating current (AC) by a power electronic device referred to as inverter/power conditioning unit. The synchronization happens automatically with availablegridvoltage&frequencyanditstartstofeedmoduleoutputintogrid. The second important job of the solar power inverter is to operate the PV system at its maximum power point (MPP) & extract maximumgeneration.TheMPPisdefinedastheoperatingpointwherecombinedvalueofvoltage&currentresultinmaximum power output. This MPP fluctuates during operation in an interval depending upon the radiation, cell temperature & the cell typeandithastobetrackedbytheinvertercontrollerunit. TheInverterforthe20kWpSPVpowerplantwillbeagridconnectwhichwillbeacombinedunitcomprisingofinverterand necessaryprotections. MeritsofaGridConnectedinverterare; Attributes Type Powercontrol Continuousrating THD MPPTRange NoofMPPtrackers Housingcabinet DataloggingSystem ACVoltage Frequency Efficiency IPdegree Quantity
Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

Easytoinstall Highefficiency Reliableoperation Robustagainstgridfluctuation

Details GridConnect(CentralorString) MPPT Aspersystemcapacity20kWp <3% 480850 1 Suitablehousingcabinet,Indooror outdoortypedependingonthesite. Included 3Phase,400VAC 50Hz(+1.5Hz,3.5Hz) 94% IP20/IP65oraspersiterequirement Aspersystemcapacity

15 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

OtherkeyfeaturesofInverterare. Automaticmorningwakeupandnightlyshutdown Mainsgridovervoltageandunderfrequencyprotection ProtectionatDCandACterminals. GraphicDisplay IntegratedDatalogger HighEfficiency etc 9.4 JUNCTIONBOX&DISTRIBUTION BOARDS: AJunctionBoxisapassivedevicewhichtakesthewiresfromseveralarraysand/orsolarpanelsandcombinesthemintoone mainbusorfeed.Fuses(andfuseholders)orbreakerscanbeincludedasperrequirement.TheArrayJunctionBoxwillbeused tocombinethestringsfromthePVarraytoonepointtoavoidcomplexcabling&losses.ThejunctionboxwillcomplyIP65 standard.Allnecessarysafetyprotectionswillbeprovidedintheenclosure. TheoutputfromeachCombinerBoxcanbefedtoaDCdistributionboard.DCdistributionboardisdesignedtoisolatethesolar modulepartfromtheinverterformaintenancepurpose. TheACDistributionBoardiskeptbetweeninverter&grid.ThepurposeofACDBismultifold.First,itprotectstheinverterfrom any surge coming from the grid & improves the MTBF (Mean time between failures). Secondly, it blocks the free flow of fault currentanditisusedtoisolateinverterfromthegridformaintenance.
Theenclosureforthejunctionboxesanddistributionboardswillbedustandverminproof.Allthecircuitbreakers,connectorsetc

willbeasperstandards. JunctionBoxes&Distribution Boards Type CableGlands Terminals weatherproof,dust&verminproof Suitablesize ConnectorterminalsforcoppercablesandBusbars.


Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

16 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

9.5 CABLES
Inordertohaveminimumlossesinthesolarphotovoltaicpowerplant,cableselectionisacriticalactivityofthedesign. Thesizeofthecableisvery carefullyselectedensuringverylimitedpower&voltagedrop.Theselectionofcableisdone consideringtheshortcircuitcurrentthatcanflowthroughcables. ThecablesusedaremultistrandCoppercables.ThecablesexposedtoenvironmentaredoublesheathedUVprotected ones.Allthecablingwillbe carriedoutasperthestandards.Thecabledetailsareasfollows: Attributes Conductor Insulation/sheath Cablelugsfortermination Temperature Range Certifications PVCInsulated Providedininstallationkit 10C70C 650/1.1KVgradeasperIS694/IS1554 ./equivalentIECstandards Details MultistrandhighconductivityCopper

9.6 EARTHING&LIGHTNINGPROTECTION
EARTHING & LIGHTNING PROTECTION SYSTEM Theearthingofalloutdoorequipment&provisionofassociatedearthingsystems,electrodes&connectionswillbeasper latestIEEEandIS3043standards.Earthelectrodeswill beprovidedthroughoutplantareasalongwiththemainearthgrid. Adequatenumberofearthelectrodesareprovidedsothatthetotalearthgridresistanceisless than1ohm&hencethe possiblefault currentistakencareof.Earthelectrodeswillbemade upofheavydutyGIpipes40mmdiameterand3.5 meterslong. Theearthelectrodeswillbeprovidedinearthpits.Theearthpitwillbeoftwotypestreatedwithearthlinks &untreated.Themainburiedgridconductorswillbeconnectedtoalltheearthelectrodestoformatotalearthgrid. Galvanizedsteelflatswillbeusedasperapproveddesign. EQUIPMENT EARTHING Theframesof allelectrical equipment&structuralworkwillbeearthedbyconnectiontotheearthgridbybranchesof samecrosssectionalareaofearthgrid
Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

17 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

LIGHTNING PROTECTION Lightningprotectionwillbe asperISStandardsandIErules. Verticalairterminationof40mmdiameterand3meterlongwillbe providedabovehighestpointofarrayto ensurefullradiusprotectiontoarray.

10

ESTIMATEDGENERATION(20KWPSPVSYSTEM)
GenerationDetails
Month January February March April May June July August September October November December total EstimatedGeneration(KWh)

3004 2866 3142 2891 2713 1973 1770 1757 2180 2730 2848 3009 30885



Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

18 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

DRAWINGS

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

19 |

P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

TYPICAL BLOCK DIAGRAM


Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

20 | P a g e

GENERAL NOTE: THIS DRAWING IS THE PROPERTY OF LANCO SOLAR ENERGY PVT LTD, GURGAON 122016 AND SHALL NOT BE COPIED OR USED IN ANY WAY WITHOUT THEIR PERMISSION,WHO RESERVE THE COPYRIGHT. ALL DIMENSIONS SHALL BE THE RELEVANT ARCHITECTURAL , STRUCTURAL AND CHECKED AND CORRELATED WITH CONSULTANTS DRAWING. ANY AMBIGUITY , DISCREPANCY OR OMISSION SHALL BE BROUGHT TO THE NOTICE OF THE CONSULTANTS IMMEDIATELY BEFORE COMMENCING. NOTES

280 Wp, 18 Module in series

18

18

18

18

1C X 4 SQ. MM CABLE (TYPICAL)

20 kW INVERTER
REFERENCE DRAWINGS

4C X 10 Sq mm

ACDB

40 A 4P, MCB

EM

40/5 CT

SPD

REV. DATE

REVISION

BY

CHECK APP

LANCO SOLAR ENERGY PVT LTD. Plot No.229,Phase-I Udyog Vihar, Gurgaon PROJECT TITLE: CLIENT: DRAWING TITLE: 20 kWp Solar PV Power Plant Bajaj Electricals, Aurangabad Single Line Diagram

TO LT PANEL (CUSTOMER SCOPE)

DRAWING No: DATE: 06-07-2012 SCALE: N.T.S

LSEPL-BE-EE-DW-332
DRAWN: AS SHT 1 OF 2 CHECKED: AU/SH SHEET SIZE A2 APPROVED: SY REV 0

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

EARTHING & LIGHTING ARRESTOR

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

22 | P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

DATASHEETS

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

27|

P a g e

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

SOLAR PV MODULES

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

28|

P a g e

High Efficiency Lanco Solar PV Poly crystalline Modules (LSP XXX)

Special Features
100% Micro Crack free Cells in PV Module Positive oriented Power Tolerance [ 02.5%] Configured with RFID Tags

Unit Electrical Data @ STC Power Max Power Output Short Circuit Current - Isc Open Circuit Voltage Voc Current at Maximum power point -Impp Voltage at Maximum power point -Vmpp System Voltage Fill Factor Module Efficiency Temp coefficient of Current Temp coefficient of Voltage Temp coefficient of Power System Voltage NOCT Series Fuse Rating Junction Box Aluminum Frame Solar Glass Product Certifications Certification Lab W

LSP 275 275

LSP 280 280

LSP 285 285


-0 + 2.5

LSP 290 290

LSP 295 295

LSP 300 300

%
A V A V V % % %/C %/C %/C V C A 0.74 14.02 0.75 14.28 8.352 44.4 7.78 35.5 8.393 44.6 7.84 35.8

8.435 44.6 7.91 36.09 1000 0.76 14.53 0.036 -0.33 -0.47 1000 46 +/- 2 15

8.477 44.81 7.98 36.39

8.52 45.22 8.04 36.7

8.562 45.62 8.11 37

German Lamination Technology


American Stringing Process

0.76 14.79

0.77 15.04

0.77 15.30

Guaranteed Performance as per Best Industry Standards


High Quality Induction Soldered Joints High Fill factor and less series Resistance Solar Modules Less Temp Coefficient Solar PV modules Suitable for Indian and European Climates. 100% Online EL Inspection System.

IP66 AL 6063 T5 High Transmittance 3.2mm Textured & Tempered Glass IEC 61215, IEC 61730 , IEC 61701 , Intertek

Plant Certifications

ISO 9001:2008,ISO 14001 and OHSAS 18001:2007

Power Warranty 25 Years Power degradation warranty (5 Years 95%, 12 Years 90%, 18 years 85%, 25 years 80%)

CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. May 2011 Lanco solar Pvt limited. All rights reserved. Specifications included in this datasheet are subject to change without notice

Last updated Date: 23rd Mar 2012

High Efficiency Lanco Solar PV Poly crystalline Modules (LSP XXX)

Special Features
100% Micro Crack free Cells in PV Module Positive oriented Power Tolerance [ 02.5%] Configured with RFID Tags

Mechanical & Packing Details LSP 275 to LSP 300 Module size Module Mounting Dimensions 1979 x 991 x 40 mm +/- 1mm
1360 X 941 +/- 3mm & 860 X 941 +/- 3mm Dia of Hole : 9 x 14mm (8 Nos)

Frame Joint & Drain Hole details No. of Modules in pallet


25 Nos

German Lamination Technology


American Stringing Process

Dimensions of PV Module LSP 275 to LSP 300


EL Image Solar PV Module Mounting Dimensions
991

Guaranteed Performance as per Best Industry Standards


High Quality Induction Soldered Joints High Fill factor and less series Resistance Solar Modules Less Temp Coefficient Solar PV modules Suitable for Indian and European Climates. 100% Online EL Inspection System.

1360 860 1979

941

IV Details of PV Module LSP 275 to LSP 300


Power Warranty 25 Years Power degradation warranty (5 Years 95%, 12 Years 90%, 18 years 85%, 25 years 80%)

CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. May 2011 Lanco solar Pvt limited. All rights reserved. Specifications included in this datasheet are subject to change without notice

Last updated Date: 23rd Mar 2012

Detailed Project Report (DPR)


LESPL/DPR/BAL/2012-13/0099

INVERTER

Alltheinformationgivenaboveisforindicativepurposeonly&issubjecttochangesduetosite&designrequirementsduringdetailedengineering

31|

P a g e

Three-phase String Inverter Stringwechselrichter dreiphasig

Refusol 008-020K Light, compact and extremely powerful! Thanks to IP65 protection, the three phase string inverters in the 8-20 kW power classes are suitable for interior and exterior installations, from the 8 kW rooftop system through to the megawatt park. Their low weight and volume ensure simply handling and saved space during the installation. This is simplified further by a plug & play functionality together with an integrated RS485 interface and Ethernet. Even at a low irradiation, the inverters achieve a peak efficiency of up to 98.2%. This is ensured by an excellent MPP-tracking and a wide input voltage range of up to 380-850 V. Through the very low levels of loss over the complete input voltage range, the REFUsol 008K-020K can be configured for convection cooling only. With the integrated data logger it is possible to monitor your system around the clock. These data can be transferred via the standard cable or an optional wireless connection via our new REFUconnect radio module. Learn more about our REFUlog monitoring system on page 22. Thanks to the largely insignificant voltage fluctuations against earth, the transformerless devices can also be used for numerous thin film modules.

Refusol 008-020K Leicht, kompakt und extrem leistungsstark! Die dreiphasigen Stringwechselrichter in den Leistungsklassen 8-20 kW sind von der 8 kW Aufdachanlage bis zum Megawattpark, dank IP65, fr Innen- und Auenaufstellungen geeignet. Ihr geringes Gewicht und Volumen sorgen fr ein einfaches Handling und Platzersparnis bei der Installation. Weiter vereinfacht wird dies durch eine Plug & Play-Funktion zusammen mit den integrierten Schnittstellen RS485 und Ethernet. Schon bei geringer Einstrahlung erzielen die Wechselrichter einen Spitzenwirkungsgrad von bis zu 98,2%. Dafr sorgt ein hervorragendes MPP-Tracking und ein breiter Eingangsspannungsbereich von bis zu 380-850 V. Durch den sehr geringen Verlust ber den kompletten Eingangsspannungsbereich sind die Refusol 008K-020K mit reiner Konvektionskhlung ausfhrbar. Mit dem integrierten Datenlogger kann Ihre Anlage rund um die Uhr berwacht werden. Diese Daten knnen kabelgebunden oder optional kabellos ber unser neues Funkmodul Refuconnect zur Visualisierung und Auswertung bertragen werden. Erfahren Sie mehr zu unserer berwachungsfunktion Refulog auf Seite 22. Dank der kaum nennenswerten Spannungsschwankungen gegen Erde, sind die trafolosen Gerte auch fr zahlreiche Dnnschichtmodule einsetzbar.

Technical data Technische Daten

Refusol 008K1) DC data Max. PV power MPPT range Max. DC voltage Max. DC current MPP tracking Number of DC connections DC-disconnection switch Internal overvoltage protection AC data Rated AC power Max. AC power AC grid connection Cos Max. AC current Distortion factor THD Max. efficiency European efficiency Infeed starting at Internal consumption in night operation Internal overvoltage protection Cooling, ambient conditions, EMC Cooling Ambient temperature Elevation Noise Emitted interference Certification Interference immunity Environmental classif. SZS or grid protection Interfaces Mechanical Type of protection Dimensions Width / Height / Depth Weight DC Daten Max. PV-Leistung MPPT-Bereich Max. DC Spannung Max. DC Strom MPP Tracking Anzahl DC-Anschlsse DC-Trennschalter Interner berspannungsschutz AC Daten AC-Bemessungsleistung AC max. Leistung AC Netzanschluss Max. AC Strom Klirrfaktor THD Max. Wirkungsgrad Europ. Wirkungsgrad Einspeisung ab Eigenverbrauch Nacht Interner berspannungsschutz Khlung, Umgebungsbedingungen, EMV Khlung Umgebungstemperatur Aufstellhhe Gerusch Straussendung Zertifikate Strfestigkeit Umweltklassen ENS Schnittstellen Mechanik Schutzart Abmessungen Breite / Hhe / Tiefe Gewicht 8.25 kW 8.25 kW 8.8 kW 430 ... 850V

Refusol 010K 11 kW 380 ... 850 V

Refusol 013K

Refusol 017K

Refusol 020K

13.6 kW 18.1 kW 21.2 kW 420 ... 850 V 445 ... 850 V 480 ... 850 V 1000 V 20.5 A 29 A 30 A 38.5 A 41 A One fast, precise MPP tracker Ein schneller, prziser MPP-Tracker 3 4 6 Yes Type 3 Ja Typ 3

12 A < 2.5% 98.0%2) 97.5%2)

10 kW 12.4 kW 16.5 kW 19.2 kW 10 kW 12.4 kW 16.5 kW 19.2 kW 3 AC 400 V + N. 50-60 Hz 0.9i ...1... 0.9c 18 A 29 A < 1.8% 98.0% 98.0% 98.2% 98.2% 97.4% 97.5% 97.8% 97.8% 20 W < 0.5 W Type 3 Typ 3

Natural convection Natrliche Konvektion -13 ... +113F -25 ... +55C -13 ... +131F -25 ... +45C Up to 2000 m above sea level Bis 2000 m ber NN < 45 dBa EN 61000-6-4: 2007 CE (UL and CSA in preparation) CE (UL und CSA in Vorbereitung) EN 61000-6-2:2005 4K4H acc. to DIN IEC 721-3-4 4K4H nach DIN IEC 721-3-4 Acc. to VDE 0126-1-1 Nach VDE 0126-1-1 Ethernet & RS485 IP65 as per EN 60529 IP65 nach EN 60529 535 mm / 601 mm / 277 mm 35.5 kg 41.5 kg

535 mm / 601 mm / 271 mm 30 kg

1) 2)

Available as from Q3 2011  Interim values, verification by measuring

1) 2)

Verfgbar ab Q3 2011 Vorlufige Werte, Besttigung durch Messung

20 TL
EU

Version: EU, Language: en

20 kW transformerless solar inverter

SOLIVIA - The new generation of solar inverters from Delta offer high-efciency string and central inverters. SOLIVIA stands for Solar inverters for versatile and intelligent applications.

One model for all countries One unit can be used in more than eight European countries (e. g. DE, IT, ES, FR, CZ, BE, GR, PT, etc.) simply by the click of a button! The multi-country models will help our customers to save costs in warehousing and logistics.

Temperature & design improvements The SOLIVIA solar inverters from Delta are dust tight (IP54/IP65) and operate over a wide range of temperatures. A very high efciency of 98.1 %, a wide input voltage range of 200 up to 1000 V as well as 2 MPP trackers give you ultimate exibility when designing your system.

INPUT (DC) Max. recommended PV power Nominal power Voltage range MPP range
No. of MPP trackers

GENERAL SPECIFICATION 25.0 kWP 20.4 kW 200 ... 1000 V 350 ... 800 V
2

MECHANICAL DESIGN SOLIVIA 20 EU G3 TL EOE48010224 98.1 % > 97.5 % -20 ... +60 C -20 ... +80 C 0 ... 90 % Size (L x W x D) Weight Cooling AC connector DC connector Communication DC disconnector Display 952.0 x 624.7 x 278.0 mm 65.0 kg Fan Amphenol C16-3 4 pairs Multi-Contact MC4 2 RJ45 / RS485 Integrated Black/white graphical LCD

Model name Part number Delta Max. efficiency Efficiency EU Operating temperature Storage temperature Humidity

Max. current

60 A (30 A x 2)

OUTPUT (AC) Max. power Nominal power Voltage range (3 phase, 3 wire) * Nominal current Max. current Nominal frequency Frequency range * Power factor Total harmonic distortion (THD) 21.0 kW 20.0 kW 3 x 400 V (-20 % / +20 %) 29 A 30 A 50 / 60 Hz 50 Hz: 47.0 ... 53.0 Hz 60 Hz: 57.0 ... 63.0 Hz > 0.99 @ nominal power < 3 % @ nominal power

STANDARDS / DIRECTIVES Protection degree Safety class Configurable trip parameters Insulation monitoring Overload behavior Safety Anti-islanding protection EMC IP54 / IP65 1 Yes Yes Current limitation; power limitation EN60950-1; EN50178; IEC62103; IEC62109-1 / -2 DIN VDE 0126-1-1; RD 1663; RD 661; ENEL G.L. 2010; UTE 15712-1; Synergrid C10/11; EN 50438 EN61000-6-2; EN61000-6-3; EN61000-3-11; EN61000-3-12

* AC voltage and frequency range will be programmed according to the individual country requirements. AC output is Delta grid without neutral.

Delta Energy Systems (Germany) GmbH Tscheulinstrasse 21 79331 Teningen Germany Email: sales@solar-inverter.com Sales Hotline: 0180 10 SOLAR (76527) www.solar-inverter.com

Mondays to Fridays from 8 am to 5 pm (apart from ofcal Bank Holidays) (3,9 ct/min)

06 September 2011 - All information and specications are subject to change without notice.

vacon 8000 solar inverter a driving force in solar energy

vacon a driving force in renewable energy

vacon solar offering products, services and solution support

Vacon was founded in Vaasa, Finland in 1993. It has a long history of producing high-quality inverters, power converters and AC drives for demanding renewable energy and industrial applications and operating environments. We have a solid foundation to lean on and we thrive on actively driving the industry forward.
a reliable performance
To date, over 5000 MW of renewable peak power capacity has been enabled by Vacon inverters. To put these numbers into perspective, a typical nuclear power plant can produce up to 1000 MW of capacity. And with an R&D team dedicated solely to the development of new solar energy applications, we continue to strengthen the position of renewable energy as one of the corner-stones of our company strategy. In accordance with our long history of producing reliable solutions, all the Vacon 8000 SOLAR products are extensively tested before delivery.

a strong global presence


Vacon is an established and international company with production on three different continents. A large and continuous flow of parts improves the availability of our products and solutions. We have a global service network: Vacon has offices in 27 countries and with our extensive partner network we have 83 service locations in 50 countries.

vacon truly global

harnessing the sun


Vacons offering for the solar energy industry is not just li-mited to our inverter products. Based on our long experience in serving our customers in the renewable energy field, as well as other demanding industries, we can offer you the whole package from products to maintenance services and support for planning and commissioning. Solar inverters, such as the Vacon 8000 SOLAR, are a vital part of the configuration between solar panels and the general grid. The function of an inverter is simply to convert the captured photovoltaic power into AC, and feed it into the grid. The Vacon 8000 SOLAR covers all the needs of the commercial, industrial and utility sectors. Our products have been designed with ease in mind. They are easy to install, use and maintain. The modular set-up and additional tools give you an enjoyable user experience with numerous benefits. We take care of all your solar inverter needs. Our wide power range of solar inverters is supported by a variety of string connection boxes as well as medium voltage outdoor stations. We also understand how essential it is to be able to provide first-class commissioning- and maintenance services at any location where you decide to install your solar power plant.

Production and R&D

Vacon PLC

Vacon own sales offices

manufacturing
and R&D on 3 continents

vacon sales
and services in 27 countries

service centers
in 50 countries (including partners)

Vacon solution support will provide you with the needed documentation for your outdoor medium voltage station.

vacon solar services

vacon 8000 solar inverter

predictable and reliable power generation


Vacon has a well-established global service network which ensures that your inverters keep generating power to the grid. The services, which are designed to meet the requirements of the entire life cycle of the plant and the inverters, are available whenever needed. Services are also available upon request to customers with no service agreement. The availability and performance of services can be further ensured with a service agreement that offers an extended coverage of the standard product warranty, scheduled maintenance with guaranteed parts availability and condition based monitoring. With the service agreement Vacon is responsible for providing the necessary and appropriate services in accordance with the requirements set by the site conditions and usage of the inverters. Vacon can help you to optimize your power generation through the analysis of inverter capacity and energy production. By securing inverter availability and performance with the service agreement, you can minimize risks and uncertainty.

heading for time line


life cycle phase vacon expertise Start payback Proper commissioning: On-time as planned start Optimize payback Ambient monitoring Operating hour monitor Energy monitor Capacity analysis 1 year Secure production Scheduled maintenance Condition based maintenance Ambient monitoring Capacity update analysis 2 years 5 years 10 years 15 years 20 years

time

Start

vacon services
Maintenance - Site visits to ensure the wellbeing of the inverter

vacon service agreement


5 to 20 years from delivery

easy installation and commissioning


Saves time and

efficient operations
Unique Solar Multimaster concept secures maximum inverter efficiency Superior active front end (AFE)

maintenance without downtime


Modular concept allows maintenance and replacement of a single unit while the inverter is still generating power for the network Remote monitoring software allows

Availability and performance of the services Spare parts - Availability of spare parts for inverters Capacity analysis Exchange units - With an exchange unit a single inverter module can be replaced quickly and the system can be recovered fast Troubleshooting and repair - In cases of malfunction the inverter will be analysed and fixed and put back into operation Inverter availability - Guaranteed inverter capacity availability - Ensuring inverter capacity is properly utilized (listed left)

resources Flexible physical layout due to modular inverter concept 10 100 kW units with isolation Intuitive graphical touch screen interface Factory set up requires very little, if any further adjustment on site Robust voltage transient protection to minimize downtime transformer: limits EMC related disturbances and prohibits DC current to grid technology enables the very low harmonic content of the output power

status checks. Enables fast response and reduces traveling costs Modular set up within individual units allows easy and fast access to single components

vacon 8000 solar with multimaster: keeps your sun shining even during service
ease and reliability through modularity
The Solar Multimaster is a unique concept that improves efficiency, reliability and functionality in all large-scale applications. The concept allows a series of one to twelve separate inverter units to be connected together in sequence. This means that only the optimal needed number of inverter modules is powered up for minimal power loss. By rotating the inverters in use we can ensure reduced and equal runtime, thereby ex- tending the entire set-ups overall lifetime. The entire set-up is centrally controlled via the touch screen on the control unit. This modular approach creates numerous advantages compared to conventional single inverter set-ups. In addition to allowing for optimisation according to sunlight, the modularity allows for repairs and maintenance to be carried out without complete shutdowns. The charging fuse disconnectors allow single units to be safely connected and disconnected while the set-up is up and running. The 1 MW Vacon 8000 SOLAR Multimaster consists of 5 parallel inverter modules that are started up only when the available power from solar panels require it. In practice, during mornings, evenings and cloudy days only some of the units are active. This reduces the running hours of each module by 40% on a typical installation site. Reduced running hours will result in a longer lifetime and a lower failure rate.

solar multimaster benefits

40% lower wear and tear of each inverter module

operational hours
5000 4000 3000 2000 Hours Single unit inverter

5 unit multimaster

better availability through redundancy


If one inverter module in the 1 MW Vacon 8000 SOLAR is not operating due to maintenance work or unit failure, the loss of production is only 4%. Typically only 4% of the accumulated energy per year is generated with peak capacity provided by the 5th module. This means that with the Vacon 8000 SOLAR you will reach 99% availability even if one of the modules is down for 3 months. The modules are installed in individual cabinet sections. In case of a failure in one of the cabinets, the other modules are protected and the failure is isolated into only one section. The amount of spare parts needed to guarantee fast service is also smaller and less expensive due to the lower power per module.

energy loss comparison


100 80 60 Power %

by rotating inverter units in use we ensure equal usage and extend their lifetime

Single unit inverter 07:00 12:00 17:00

100 80 60

power

day

night simple transformer design


Vacon has patented a switching algorithm that minimizes

Power %

String/array inverter 07:00 12:00 17:00

day 1

the circulating currents between inverters and the trans1 1 2 1 2 3 4 1 2 1

former. This allows you to use a transformer with single secondary winding when connected to the Vacon 8000 SOLAR with Multimaster. 100 80 60 Power %

First unit to start power-up sequence of the day

day 2

First unit to start power-up sequence of the day

Vacon 1 MW multimaster 07:00 12:00 17:00

day 3

First unit to start power-up sequence of the day

Energy loss percentage resulting from a single module being switched off (time span 7-17 hrs)

x Power/No of active inverter units.

technical data
approvals: grid codes
Country Low voltage
VDE 0126-1-1 EN 50438 CEI 11-20 R.D. 1663/2000 EN 50438 EN 50438 EN 50438 AS 4777.2; AS 4777.3 IEC-62116

string box for 8 strings


Medium voltage
BDEW 2008 Arrt du 23 avril 2008 Allegato 17. Terna P.O. 12.2; P.O. 12.3

ut cu N rr o in o en pu f tI ts DC D C (1 M M P % ax P T) .e ffi ci en E cy % uro ef fic ie nc Po y W w er co ns .a tn ig I ht m n ve m rt er di m en si on s In W v kg er xH te xD r w ei gh A t m 3 ir f / h low re qu ire Ou m m tg en m o /k in t g g A (o C pt c io ab na in l) et

AC

Germany France Italy Spain Czech UK Belgium Australia Anti-Islanding

Type code
STG 08 STG 08+ASM STG 08+IMC

Max. Strings voltage


8 8 8 1000 V 1000 V 1000 V

Fuse/ MC3 Remote string connector monitoring


10 A 10 A 10 A Yes Yes -

IP
54 54 54

er

ow

tp

pu

ut tp ou

cu po PV w er

pe

ty

lo

ut

er

al

rr

en

tI na rt in N kW om i N A om M k W ax . In ve

M A ax (* . i

np

NXV0010 NXV0015 NXV0020 NXV0025 NXV0030 NXV0040 NXV0050 NXV0080 NXV0100 NXV0125 NXV0200 NXV0400 NXV0600 NXV0800 NXV1000

10 15 20 25 30 40 50 80 100 125 200 400 600 800 1000

14 22 29 36 43 58 72 115 144 258 412 825 1240 1650 2060

12 18 24 30 36 48 60 96 120 150 240 480 720 960 1200

29 44 59 74 88 118 147 235 294 305 488 976 1460 1950 2440

2 2 2 2 2 2 2 4 4 4 4 10 10 18 18

94 94 94 94 94 95 96 96 96 97 98 98 98 98 98

93 93 93 93 93 94 96 96 96 96 97 98 98 98 98

5 5 5 5 5 30 30 30 30 30 30 30 30 30 30

600x1481x600 600x1481x600 600x1481x600 600x1481x600 600x1481x600 800x1881x600 800x1881x600 800x2281x600 800x2281x600 800x2281x600 800x2281x600 2200x2281x600 3000x2281x600 4000x2281x600 4800x2281x600

220 220 300 300 300 550 550 850 850 450 645 1425 2035 2795 3405

300 300 425 425 425 700 700 800 800 800 1000 2000 3000 4000 5000

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 600/215 600/215 600/320 600/320

monitoring box
Type code
STG 00

No of inverter nodes
99

No string box nodes / inverter


99

Max. No modbus nodes


230

IP
54

vacon nxv-0010-4-a-2-l-a1a2d700xx
Options, monitoring 00 = not used or C2 = used EMC emission level L = Fulfils standard EN 61800-3, 2nd environment, restricted distribution T = Fulfils standard EN 61800-3 for IT networks Enclosure class 2 = IP21 Control keypad and display on the cabinet door A = Alpha-numeric (default) B = No local keypad F = Dummy keypad G = Graphical keypad 2 = No galvanic isolation transformer, output 3 x 280 VAC 4 = Galvanic isolation transformer, output 3 x 400 VAC

Input MPP voltage range 10 - 100 kW MPP voltage range 125 - 1000 kW Max. input voltage Min. input voltage Max. open circuit voltage Output Nominal output voltage 10 - 100 kW Nominal output voltage 125 - 1000 kW Output frequency Power factor AC overvoltage protection AC current harmonics Aux power Aux power supply (if from outside) Auxiliary power fuse Ambient Temperature range 10 - 100 kW Temperature derating 10 - 100 kW Temperature range 125 - 1000 kW Temperature derating 125 - 1000 kW Relative humidity Max. installation altitude -10 to 40 C 1% / 1 C up to 50 C -10 to 40 C 1% / 1 C up to 60 C 95%, no condensation allowed 2000 m 1 ph, 230 VAC, 50/60 Hz, 10 A 25 A 400 V, 3 phase 280 V, 3 phase 50 / 60 Adjustable 0,1-1 leading/lagging Yes <2.5% 340 - 800 VDC 410 - 800 VDC 900 VDC 350 VDC 850 VDC

Safety / protection IP class Ground fault monitoring Overload behaviour Over temperature behaviour Forced stop Circuit breaker AC side Circuit breaker DC side Control interface Communication Analog inputs Analog outputs Digital inputs Relay outputs Certificates EMC Safety EN 61000-6-2, EN 61000-6-4 EN 62109-1
STRING N 410-900 VDC MONITOR (*

IP21 Yes Power limiting Power limiting Yes Optional Yes


STRING 1 8 OR 16 STRINGS

Nominal power e.g. 0010 = 10 kW, 0100 = 100 kW Vacon NXV = Solar power inverter

PV panels

String boxes

Incoming box / incoming section

Solar inverter

Grid

RS-485, Ethernet, GPRS 2 1 6 2 x RO, 1 x DO


8/16 STRING 2

4-20 INPUTS 340-900 VDC MONITOR (*

10 kW 100 kW 400 VAC

LC

RFI

125 kW 200 kW 280 VAC 400 V 20 kV

LC(L)

400 kW 1000 kW 410-900 VDC


Parallel unit 1 Parallel unit 2

LC

280 VAC

400 V 20 kV

(* Max. continuous input current at lowest DC voltage.


(* OPTION

Parallel unit 3 Parallel unit N

tools make planning and use easier

references

remote monitoring for vacon 8000 solar


The remote monitoring function allows you to follow the system status and power generation of your inverters online. This function is especially important for inverters in remote sites. Remote monitoring functions can create considerable savings over time by reducing travel related costs for regular check-ups and maintenance. The remote monitoring of the Vacon 8000 SOLAR Inverters produces a data archive (daily, monthly and yearly). When combined with Vacons remote monitoring stringboxes, it is possible to monitor individual string intensity for diagnostic purposes. This way bad strings can be found and serviced in order to achieve the highest possible energy production. The system delivers an immediate SMS alarm message to minimize downtime, and provides a report on all the latest events.

Vacons installed base of solar applications now totals more than 200 MW in Europe alone. Deliveries have been made to: Australia, Belgium, China, The Czech Republic, Finland, India, Italy and Spain. There have been many successful solar energy cases completed for customers around the world.

a long term customer trusted vacons renewable energy products and personnel, and received a high-quality solar inverter solution for their facilities. Marco Beltrami Deputy Managing Director Vacon SpA, Italy

case: health city fitness center, merksem, belgium


This case, in Merksem, Belgium is an exemplary success story for Vacon. Health City is a fitness center group with facilities in Belgium, The Netherlands and Germany. The Merksem centers environmental concerns and interest in renewable energy resulted in an on-site solar installation of 60 kW in total, consisting of 2 times 30 kW. The original installed PV inverters, when put online, were found to cause disturbances in the wireless heart monitoring systems, used in cardiac training and safe intensive workouts. The customers complained that the equipment didnt work as intended and the inverters had to be switched off during such fitness sessions. The situation could not be allowed to continue. The system integrator contacted Vacon wanting to know whether the Vacon 8000 SOLAR inverter could be the solution. Based on Vacons experience with drives in sensitive environments, Vacon was confident that it could offer a solution for this particular case.

case: vetreria di borgonovo, italy


The Vetreria di Borgonovo glassware factory, established in the 1950s, is located near the town of Piacenza in northern Italy. Vacon provided all the needed inverters, which have been connected to solar panels mounted onto the factorys

Initially one Vacon 8000 SOLAR 30 kW unit was shipped to Merksem in order to test it for this particular case. The wireless heart monitoring devices worked perfectly, even when the Vacon inverter was enabled. The results were very satisfying. The system integrator found a solution for the special needs of a sensitive environment and the Health City Fitness Center in Merksem is now able to get a return on their investment, without the risk of any disturbance in their wireless heart monitoring systems. A second Vacon 8000 SOLAR 30 kW unit is about to replace the other inverter that still gets switched off every time the heart monitoring system is used.

plc touch screen panel


The PLC touch screen panel on the control unit provides a simple and clear user interface for the entire system. By using the panel, you can monitor the status of the entire system. You can see the actual power generated in graphical form and choose to view daily, weekly or even monthly figures. Regardless of the number of units in your system, you can use one single touch screen to adjust or control set-up. The touch screen is available as standard in 600 1000 kW units.

roof. The Vacon 8000 SOLAR is a vital part of the configuration between the solar panels and the grid: it converts photovoltaic DC power into AC power, and feeds it into the grid. Vacons Multimaster software has made it possible to connect one to eight inverter modules, based on the amount of sunshine, thus ensuring that the glassware factorys solar power plant operates with the best possible efficiency.

10

11

Vacon Partner

www.vacon.com
Subject to changes without prior notice.

BC00414E