1. PREZENTAREA STUDIULUI ACTUAL AL PROBLEMEI ANALIZATE N ROMNIA I
N LUME ............................................................................................................................ 10
1.1
Principii teoretice ale proiectarii tradiionale a cladirilor din beton armat ........... 11
1.2
1.2.1
1.2.2
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.3
2.3.1
2.3.2
3
PREZENTAREA CONINUTULUI ANALIZELOR EFECTUATE N LUCRARE I
REZULTATELE OBINUTE ............................................................................................... 41
3.1
3.2
Lista figurilor
Figura 1.1 "Cutremur n Chile"................................................................................................12
Figura 1.2 "Cutremut 7 Martie 1977"......................................................................................13
Figura 1.3 "Metoda clasic de proiectare/consolidare"............................................................14
Figura 1.4 "Metoda de proiectare/consolidare prin izolarea bazei".........................................14
Figura 1.5 "Sistemul ideal al izolarii bazei".............................................................................15
Figura 1.6 "Sistemul real al izolarii bazei"...............................................................................15
Figura 1.7 "Principiul teoretic al izolrii bazei".......................................................................15
Figura 1.8 "Cladire proiectata traditional"...............................................................................16
Figura 1.9 "Cladire izolat la baz"..........................................................................................16
Figura 1.10 "Spectrul acceleraiilor"........................................................................................16
Figura 1.11 "Spectrul deplasrilor"..........................................................................................16
Figura 1.12 "Sistemul de izolare a bazei folosit in Pasargadae (Iran)"....................................17
Figura 1.13 "Izolator din cauciuc natural" ..............................................................................18
Figura 1.14 "Izolator din cauciuc natural montat n sit"..........................................................18
Figura 1.15 "Alctuirea unui izolator din cauciuc cu proprieti de amortizare ridicat"........19
Figura 1.16 "Alctuirea unui izolator din cauciuc cu miez de plumb"....................................20
Figura 1.17 "Alctuirea unui izolator din cauciuc cu miez de plumb"....................................21
Figura 1.18 "Izolatori cu frecare de tip pendul inversai"........................................................21
Figura 2.1 "Plan cladire circulara"...........................................................................................23
Figura 2.2 "Plan cladire dreptunghiular"................................................................................24
Figura 2.3 "Plan cladire dreptunghiular"................................................................................25
Figura 2.4 "Spectru de proiectare"...........................................................................................29
Figura 2.5 "Zonele potenial plastice din perete".....................................................................38
Figura 2.6 "Diagramele de moment si for tietoare"............................................................39
Figur 2.7 "Coparaie spectre".................................................................................................43
Figura 3.1 "Drift direcia X cladire S+P+4E circular"...........................................................44
Figura 3.2 "Drift direcia Y cladire S+P+4E circular"...........................................................44
Figura 3.3 "Drift direcia X cladire S+P+4E dreptunghiular"................................................45
3
Figura 3.62 " Raportul forelor tietoare maxime pentru cldirile S+P+4E"...........................79
Figura 3.63 " Raportul forelor axiale maxime pentru cldirile S+P+4E"...............................80
Figura 3.64 " Raportul momentelor maxime pentru cldirile S+P+9E"..................................81
Figura 3.65 " Raportul forelor tietoare maxime pentru cldirile S+P+9E"...........................82
Figura 3.66" Raportul forelor axiale maxime pentru cldirile S+P+9E"................................82
Figura 3.67" Raportul momentelor maxime pentru cldirile S+P+14E".................................84
Figura 3.68" Raportul forelor tietoare maxime pentru cldirile S+P+14E"..........................85
Figura 3.69" Raportul forelor axiale maxime n perei pentru cldirile S+P+14E"................86
Figura 3.70" Raportul momentelor maxime n stlpi pentru cldirile S+P+4E"......................87
Figura 3.71" Raportul forelor taietoare maxime n stlpi pentru cldirile S+P+4E"..............87
Figura 3.72" Raportul forelor axiale maxime n stlpi pentru cldirile S+P+4E".................88
Figura 3.73" Raportul momentelor maxime n stlpi pentru cldirile S+P+9E"......................89
Figura 3.74" Raportul forelor tietoare maxime n stlpi pentru cldirile S+P+9E"..............89
Figura 3.75" Raportul forelor axiale maxime n stlpi pentru cldirile S+P+9E"..................90
Figura 3.76" Raportul momentelor maxime n stlpi pentru cldirile S+P+14E"....................92
Figura 3.77" Raportul forelor tietoare maxime n stlpi pentru cldirile S+P+14E"............92
Figura 3.78" Raportul forelor axiale maxime n stlpi pentru cldirile S+P+14E"................93
Figura 3.79" Raportul momentelor pozitive maxime n grinzi pentru cldirile S+P+4E".......94
Figura 3.80" Raportul momentelor negative maxime n grinzi pentru cldirile S+P+4E"......94
Figura 3.81" Raportul forelor tietoare maxime n grinzi pentru cldirile S+P+4E".............95
Figura 3.82" Raportul momentelor pozitive maxime n grinzi pentru cldirile S+P+9E".......96
Figura 3.83" Raportul momentelor negative maxime n grinzi pentru cldirile S+P+9E"......97
Figura 3.84" Raportul forelor tietore maxime n grinzi pentru cldirile S+P+9E"...............97
Figura 3.85" Raportul momentelor pozitive maxime n grinzi pentru cldirile S+P+14E".....99
Figura 3.86" Raportul momentelor negative maxime n grinzi pentru cldirile S+P+14E"..100
Figura 3.87" Raportul forelot tietoare maxime n grinzi pentru cldirile S+P+14E"..........100
Figura 3.88" Eforturile axiale n izolatori functie de forma i regimul de nlime al
cldirilor"...........................................................................................................101
Figura 3.88" Eforturile axiale n izolatori functie regimul de nlime al cldirilor".............101
6
Lista tabelelor
Tabel 2.1 "Incarcari nivel curent"............................................................................................27
Tabel 2.2 "Incarcari nivel curent"............................................................................................27
Tabel 2.3 "Valorile factorului de comportare q pentru structuri regulate n elevaie".............28
Tabel 3.1 "Seciuni elemente"..................................................................................................44
Tabel 3.2 "Eforturi maxime n pereii cldirilor S+P+4E".......................................................53
Tabel 3.3 "Eforturi maxime n stlpii cldirilor S+P+4E".......................................................53
Tabel 3.4 "Eforturi maxime n grinzile cldirilor S+P+4E......................................................53
Tabel 3.5 "Eforturi maxime n pereii cldirilor S+P+9E".......................................................53
Tabel 3.6 "Eforturi maxime n stlpii cldirilor S+P+9E".......................................................54
Tabel 3.7 "Eforturi maxime n grinzile cldirilor S+P+9E".....................................................54
Tabel 3.8 "Eforturi maxime n pereii cldirilor S+P+14E".....................................................54
Tabel 3.9 "Eforturi maxime n stlpii cldirilor S+P+14E".....................................................55
Tabel 3.10 "Eforturi maxime n stlpii cldirilor S+P+14E"...................................................55
Tabel 3.11 "Armarea elementelor"...........................................................................................56
Tabel 3.12 "Tipuri de izolatori HDRB"...................................................................................56
Tabel 3.13 "Tipuri de izolatori LRB".......................................................................................57
Tabel 3.14 "Tabel deplasri laterale la baz"...........................................................................67
Tabel 3.15 " Momente maxime n pereii cldirilor S+P+4E".................................................78
Tabel 3.16 " Fore taietoare maxime n pereii cldirilor S+P+4E".........................................79
Tabel 3.17 " Fore axiale maxime n pereii cldirilor S+P+4E".............................................79
Tabel 3.18 " Momente maxime n pereii cldirilor S+P+9E".................................................80
Tabel 3.19 " Fore tietoare maxime n pereii cldirilor S+P+9E".........................................80
Tabel 3.20 " Fore axiale maxime n pereii cldirilor S+P+9E".............................................81
Tabel 3.21 " Momente maxime n pereii cldirilor S+P+14E"...............................................83
Tabel 3.22 "Fore tietoare maxime n pereii cldirilor S+P+14E"........................................83
Tabel 3.23 "Fore axiale maxime n pereii cldirilor S+P+14E"............................................84
Tabel 3.24 "Momente maxime n stlpii cldirilor S+P+4E"..................................................86
Tabel 3.25 "Fore tietoare maxime n stlpii cldirilor S+P+4E"...........................................85
8
1.1
afectat, acest lucru nu este admis n cazul n care componentele adiacente sunt mai scumpe
dect nsi structura. Construciile care adpostesc utilaje de mare precizie i finee, cum ar
fi spitalele, seciile de poliie i pompieri, centrele de comunicaii, centralele electrice (hidro,
termo i nucleare) trebuie s rmn operaionale inclusiv dup un cutremur.
De asemenea proiectarea tradiionala a cladirilor se bazeaz pe implicarea
suprastructurii n preluarea total a forelor i deplasrilor seismice, n scopul evitrii apariiei
colapsului local-partial i apoi a colapsului progresiv pana la colapsul general. Implic de
obicei elemente structurale robuste care s ofere att rigiditate la deplasri orizontale ct i
capaciti de rezisten prin intermediul crora eforturile cerin ale cutremurelor s poat s
fie preluate. Aceast metod const n scderea perioadei fundamentale de vibraie.
12
13
Din figurile de mai sus se poate observa definirea conceptului de izolare a bazei i
implicit avantajul structurii izolate: deplasri relative de nivel mai mici, deformatii aproape
inexistente, elemente putin solicitate. Datorit rigiditii laterale sczute a stratului de
izolare, structura are o perioad fundamental mult mai mare dect perioada fundamental a
aceleiai structuri cu baza fix. Creterea perioadei fundamentale a structurii izolate conduce
la o reducere semnificativ a acceleraiilor impuse de seism structurii izolate (implicit a
forelor). Acest fapt poate fi observat din spectrul elastic al acceleraiilor.
Dezavantaje:
Probleme de stabilitate cnd deplasarea orizontal devine foarte mare.
Probleme din cauza mbtrnirii materialului elastomer.
Rigiditate lateral mic transpus n practic prin deplasri i pentru ncrcri mici.
18
Proprieti mecanice:
Dispozitivul este un izolator din cauciuc de tip NRB n care este introdus un miez de
plumb ce are rolul de a disipa histeretic energia indus.
LRB asigur flexibilitatea lateral (datorit proprietarilor elastice ale cauciucului)
precum i amortizare histeretic (datorit deformaiilor plastice ale plumbului).
Limitele pentru efortul unitar de compresiune maxim precum i valorile rigiditii
verticale sunt similare cu cele corespunztoare NRB.
Modelul analitic de calcul folosit uzual este un model biliniar modificat cu coeficienii
de dependen furnizai de productori n catalogul produselor.
Deformaiile maxime de proiectare i ultime sunt 400 500 mm i respectiv 600 700
mm.
Fora lateral corespunztoare curgerii este de 100 KN (100 mm diametru miez de
plumb)
Avantaje:
rigiditate lateral mare iniial (de 10 16 ori mai mare ca rigiditatea lateral postcurgere) asociat unor fore orizontale relativ sczute, produse n general de vnt.
comportament rigid-plastic al miezului de plumb la ncrcri mici
comportament histeretic foarte stabil
capacitate mare de amortizare ( = 30%)
plumbul are rezistena la oboseal ciclic ridicat
Dezavantaje:
probleme de stabilitate cnd deplasarea orizontal devine foarte mare
probleme din cauza mbtrnirii materialului elastomer
din cauza deformaiilor post elastice suferite de miezul de plumb cauciucul i
pierde capacitatea de revenire la poziia iniial
19
Proprietati mecanice:
Rigiditate iniial foarte mare
Rigiditate neglijabil dup iniierea micrii (folosite n conjuncie cu NRB, HDRB,
LRB)
n principal adoptate pentru reducerea rigiditii la deplsari mari ale cladirilor
izolate.
Coeficientul de frecare depinde n general de presiunea vertical i de viteza micrii.
Avantaje:
curba histeretic stabil
capacitate ridicat de revenire la poziia initial
rigiditate mare la ncrcri mici (vnt)
reducerea deplasrilor n stadiul ultim datorit frecrii
Dezavantaje:
cost ridicat de producie
probleme n definirea coeficientului de frecare datorit sensibilitii la coroziune
sensibilitate ridicat la ncrcri verticale mari (suprafaa oval se poate deforma)
degradarea suprafeelor de glisare dup cteva cicluri de ncrcare
20
2.1
22
Memoriu Tehnic
Cldirile au funciunea de birouri i sunt amplasate n Bucureti. Sistemul structural
este realizat din radier general, perei, stlpi i grinzi din beton armat, cu acoperi tip teras.
Pereii exteriori i interiori sunt realizai din zidrie de BCA. Tmplria este realizat din
PVC cu geam termopan, pardoselile vor fi finisate cu gresie n spaiile umede i parchet i
plci ceramice n rest. Circulaia pe vertical este asigurat de o scr n dou rampe i o un
lift.
n conformitate cu normativul P100-1/2006, cldirea se ncadreaz n clasa de
importan III cu =1.
Din punct de vedere al aciunii seismice, conform Codului de proiectare seismic
Partea I Prevederi de proiectare pentru cldiri, perioada de col corespunztoare oraului
23
Bucureti este Tc=1,6 sec, iar valoarea acceleraiei terenului pentru proiectare ag, pentru un
cutremur cu IMR de 100 de ani este ag=0.24g, acceleraia gravitaional g=9.81 m/sec2;
Conform codului de proiectare Evaluarea aciunii zpezii asupra construciilor,
indicativ CR1-1-3-2005, valoarea caracteristic a ncrcrilor din zpad la sol pentru
2
24
Pentru oeluri
- PC52
2
Incarcare
PLACA
NIVEL
CURENT
GRINZI
Val.
Carcat.
niGF
3.25
1.50
0.50
0.50
1.35
1.35
1.35
1.35
Val.
Calcul
GF
4.39
2.03
0.68
0.68
1.00
1.00
1.00
1.00
Val.
Calcul
GS
3.25
1.50
0.50
0.50
2.00
1.50
3.00
0.40
0.80
10.63
1.35
14.34
1.00
10.63
niGS
GRINZI
PLACA
ULTIMUL
NIVEL
GRINZI
Pereti
Inchidere
Gr. Pr. Placa
Termi-Hidro
Zapada
Instalatii
Atic
Val.
Carcat.
niGF
Val.
Calcul
GF
niGS
Val.
Calcul
GS
10.63
3.75
3.00
2.00
0.50
5.00
1.35
1.35
1.35
1.35
1.35
1.35
14.34
5.06
4.05
2.70
0.68
6.75
1.00
1.00
1.00
0.40
1.00
1.00
10.63
3.75
3.00
0.80
0.50
5.00
25
= 1 +
=
26
Spectru de proiectare
2.5
2
1.5
1
(T)
0.5
0
0
T (s)
! =
(,*+, = 0.5
$
hwl = 0.5 m
27
Predimensionare stlpi
Se adopt o seciune constant a stlpilor pe nlimea construciei, pentru a evita
variaia (slbirea) accentuat a rigiditii i rezistenei etajelor.
Dimensiunile sectiunilor stalpilor se determina din conditia limitarii efortului axial
normalizat:
N/ 23 x 45 <=; La limita: 23 =N/ x 45 , unde:
2! aria inimilor peretilor structurali pe una din directiile principale alea constructiei
0! grosimea inimilor peretilor pe directia considerate
! inaltimea sectiunii orizontale a peretilor pe directia considerate
Fb forta taietoare la baza cladirii sau forta seismica
media estimata a rapoartelor =7 /=9 (=7 - momentele de rasturnare capabile ale
peretilor structurali si =9 momente de rasturnare rezultate din calculul structurii) definite
conform CR2-1-1.1 pct. 6.2.2 1.25
7 - factor de corectie a fortei taietoare - 1.2
:56 - rezistenta de proiectare a betonului la intindere
2.2.4 Proiectarea la fore laterale a structurii
Se are n vedere verificarea la dou stri limit, respectiv starea limit de serviciu (SLS) i
starea limit ultim (ULS) (Anexa E cod P100-1/2006).
Verificarea la starea limit de serviciu (SLS)
Verificarea la starea limit de serviciu are drept scop meninerea funciunii principale a
cldirii n urma unor cutremure, ce pot aparea de mai multe ori n viaa construciei, prin
controlul degradrilor elementelor nestructurale i al componentelor instalaiilor aferente
construciei. Cutremurul asociat acestei stri limit este un cutremur moderat ca intensitate,
28
avnd o probabilitate de apariie mai mare dect cel asociat starii limit ultime (perioada
medie de revenire 30 ani).
Verificarea la deplasare se face pe baza expresiei
drSLS= q dr < draSLS
dr - deplasarea relativ de nivel sub aciunea seismic asociata SLS
- factor de reducere care ine seama de perioada de revenire mai mic a
cutremurului
Valoarea factorului este: 0,4 pentru cladirile ncadrate n clasa III de
importan.
q - factorul de comportare specific tipului de structur
dr - deplasarea relativ a aceluiai nivel, determinat prin calcul static elastic sub
ncrcri seismice de proiectare
draSLS- valoarea admisibil a deplasrii relative de nivel
Valorile deplasrilor dr se calculeaz folosind ipoteze de calcul a rigiditii
elementelor structurale conforme cu starea efectiv de fisurare a acestora, functie de gradul
de interaciune ntre elementele structurale i cele nestructurale (compartimentri i
nchideri). La aciunea unui cutremur moderat ca intensitatea este de presupus ca legturile
ntre elementele de nchidere i compartimentare i stlpi i grinzi s nu fie compromise, iar
degradrile elementelor nestructurale n discuie s fie nesemnificative ca urmare a condiiilor
de limitare a deplasrilor laterale. n aceste condiii, este justificat considerarea aportului
elementelor nestructurale la rigiditatea global a structurii. ntruct nu se pot construi modele
riguroase dar suficient de simple ale conlucrrii structura elemente de compartimentare
pentru practica proiectrii, se permite, n mod simplificat, evaluarea global a rigiditii
structurii prin considerarea proprietilor de deformaie a seciunilor nefisurate (stadiul I de
comportare) a elementelor structurale i neglijarea n compensaie, a aportului elementelor
nestructurale. n cazul n care elementele nestructurale nu se deformeaz solidar cu structur,
rigiditatea structurii se evalueaz considernd proprietile de deformaie a elementelor
structurale n stadiul fisurat.
Aadar, n cazul de fa valorile dr se estimeaz n ipoteza rigiditii secionale a
elementelor structurale n stadiul nefisurat:
(EI)conv = Ec Ic
unde:
Ec - Modulul de elasticitate al betonului
Ic - Momentul de inerie al seciunii brute de beton
Perioada corespunztoare modului propriu de vibraie este T = 0.998 sec.
Valorile admisibile ale deplasrii relative de nivel pentru cazul n care sunt
ataate elemente nestructurale cu cedare fragil: 0.005 h (h nlimea etajului).
Verificarea la starea limit ultim (ULS)
Verificarea de deplasare la starea limit ultim are drept scop principal prevenirea
prabuirii nchiderilor i compartimentrilor, limitarea degradrilor structurale i a efectelor
de ordinul III.
Cutremurul asociat acestei stri limit este cutremurul considerat pentru calculul
rezistenei la fore laterale a structurii cutremurul de cod.
29
AS1AS1nec
D
ABC
FC G
,M
$
% + 2> :N K
?@5
=
=$+H > =9 IJ < 2$ iar 2>$
E
AS2AS2nec
S
ABC
FC G
$A
V
?@5
2>$
=
HE
WC
Y
ABC3V ,M EWC" M %
EFC Z
,M
$
% + 2> :N K
Armare transversal
Ruperea din for tietoare este o rupere de tip fragil cu caracter neductil, care poate
mpiedica mobilizarea mecanismului de plastificare dorit, astfel dimensionarea la fora
tietoare se face superior celei de moment incovoietor cu sau fr for axial. n calcule se
va ine cont de forele tietoare asociate mecanismului de plastificare, nu cele rezultate din
calculul structural determinate cu ajutorul programului ETABS.
Algoritm de calcul
a. Determinarea forei tietoare de calcul
[+\
5+5J
@]*
89
= 89 + 89
[+\
Unde: 89 - se ia din ETABS din combinaia de incrcare de lung durat (VLD)
31
@]*
89
= ^7
a
H
A_`
cA_`
= =73
ef "1, A _W % = =73
=73
_`
$
$
$
=73
= =73
ef "1, A _W % = =73
_`
Concluzia este valabil deoarece n concepia noastr de proiectare grinzile sunt mai
slabe dect stlpii in vederea obinerii mecanismului de plastificare pe structur.
b. Calculul efectiv la for tietoare
WijWMj
hBC
,
=3
g*+,
V EWkC
,
,
Dac g*+,
1 folosim mai departe :56
= :56
=
,
1\miY
,
Dac g*+,
1 etrierii se dispun constructiv
,
,
2 n zonele critice, se mrete seciunea de beton astfel nct g*+,
<2
g*+,
,
,
g*+,
4 n zonele curente, se mrete seciunea de beton astfel nct g*+,
<4
o=3
pG
100 [%]
V
,
\miY
o@ =
Verificare: s = U
$.$r
EWkC
EFC
100 [%]
r
rt
EWkC
.EFC
2.5
?t pGk
rt 3V
etr 6 mm
Lcr = 1.5h
Zona curent
Pe 0.1 %
s min(3/4hw, 300 mm, 15dbl)
dbl diametrul armturii longitudinale comprimate
etr 6 mm
Dimensionarea stlpilor
Armare longitudinal
Calculul stlpului se face la ncovoiere cu for axial.
Algoritm de calcul
A
Unde: ^7
BC`
=95
- moment ncovoietor efectiv rezultat din calculul structural
A_`
ABC`
=v
33
Unde : w]? =
GtsGm
hBC
y_C
Verificare: z = 3
{BCW
W | EWC
0.4
W EWC
}~V
ABCW {BCW
ABCW c{BCW
EFC|~V
}~V
H
Y
H
EFC|~V
89 =
ACW,~G cACW,GMG
d
Unde: Mdc,jos i Mdc,sus reprezint momentele capabile ale stlpului pentru calculul
forei tietoare.
A
A_`
A_W
articulaiei plastice n grind, aceasta nu mai poate prelua un efort mai mare,
iar momentul trece la stlp.
1.5; 89
89 89
89
- fora tietoare rezultat din calculul structural sub ncrcrile seismice de
proiectare.
Verificare: g*+,
2
Condiii constructive
Dimensionare perei
La proiectarea constructiilor cu pereti structurali se va avea n vedere satisfacerea
unor conditii care s confere acestor elemente o ductilitate suficient, iar pentru structura n
ansamblu s permit dezvoltarea unui mecanism structural de disipare a energiei favorabil.
Principalele masuri legate de dimensionarea i armarea peretilor structurali prin care se
urmarete realizarea acestei cerine sunt urmatoarele:
adoptarea unor valori ale eforturilor de dimensionare care sa asigure, cu un grad mare
de credibilitate, formarea unui mecanism structural de plastificare ct mai favorabil;
moderarea eforturilor axiale de compresiune n elementele vertical i, mai general,
limitarea dezvoltrii zonelor comprimate ale sectiunilor;
eliminarea fenomenelor de instabilitate;
35
36
, , c
| |c|
|
M ; |M
| -Valorile absolute ale momentelor capabile in sectiunile de la
extremitatile grinzii de cuplare;
2.3
raportul dintre perioada izolat i fixat la baz trebuie s fie mai mare decat 3
efortul unitar mediu de compresiune n izolatori trebuie sa fie aproximativ egal cu
15N/mm2
s se realizeze o amotizare ntre 20-30%
39
H A
H
alegei tipul de izolator, innd cont ca suma tuturor izolatorilor sa fie in jurul
valori rigiditii toatele, determinat cu formula de mai sus, de asemenea
trebuie avut n vedere respectarea eforturilor axiale capabile ale izolatorului i
deplasarea maxim.
dispunei izolatorii n structur astfel ncat centrul maselor sa fie pe cat posibil
de aproape de centrul de rigiditate. n acest fel n timpul cutrmurului o sa fie
activate doar modurile de translaie n timp ce modurile de torsiune se vor
neglija. Modurile de translaie au avantajul de a solicita toi izolatorii n
acelai fel;
o data ce izolatorii au fost alei trebuie s modificai spectrul de raspuns prin
inserarea amortizrii efective a izolatorilor, folosind urmatorul factor:
Fb = I a g Teff M
Izolatorii alei n acest studiu au amortizri de 16% ce HDRB i 28% cei LRB.
40
Comparatie spectre
3.5
3
(T)
2.5
2
Sd HDRB (16%)
1.5
Spectru proiectare
Sd LRB (28%)
0.5
0
0
T (s)
3.1
Circulara
Dreptunghiulara
Patrata
Sectiuni S+P+4E S+P+9E S+P+14E S+P+4E S+P+9E S+P+14E S+P+4E S+P+9E S+P+14E
Pereti
15cm
25cm
30cm
15cm
25cm
30cm
15cm
25cm
30cm
Stalpi 35x35cm 50x50cm 60x60cm 35x35cm 50x50cm 60x60cm 35x35cm 50x50cm 60x60cm
0.0002
0.0004
0.0006
0.0008
0.001
E4
E3
Drift x
SLS
E2
SLU
E1
P
0.0002
0.0004
0.0006
0.0008
E4
E3
Drift Y
SLS
E2
SLU
E1
P
42
0.0002
0.0004
0.0006
0.0008
E4
E3
Drift x
SLS
E2
SLU
E1
P
0.0002
0.0004
0.0006
0.0008
E4
E3
E2
Drift Y
SLS
SLU
E1
P
43
0.0002
0.0004
0.0006
0.0008
0.001
E4
Drift X
E3
SLS
E2
SLU
E1
P
0.0002
0.0004
0.0006
0.0008
0.001
E4
E3
Drift Y
SLS
E2
SLU
E1
P
44
0.0005
0.001
0.0015
0.002
0.0025
E9
E8
E7
E6
Drift X
E5
SLS
E4
SLU
E3
E2
E1
P
0.0005
0.001
0.0015
0.002
0.0025
E9
E8
E7
E6
Drift Y
E5
SLS
E4
SLU
E3
E2
E1
P
45
0.0005
0.001
0.0015
0.002
E9
E8
E7
E6
Drift X
E5
SLS
E4
SLU
E3
E2
E1
P
0.0005
0.001
0.0015
0.002
0.0025
E9
E8
E7
E6
Drift Y
E5
SLS
E4
SLU
E3
E2
E1
P
46
0.0005
0.001
0.0015
0.002
0.0025
E9
E8
E7
E6
Drift X
E5
SLS
E4
SLU
E3
E2
E1
P
0.0005
0.001
0.0015
0.002
0.0025
E9
E8
E7
E6
Drift Y
E5
SLS
E4
SLU
E3
E2
E1
P
47
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Drift X
SLS
SLU
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Drift Y
SLS
SLU
48
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Drift X
SLS
SLU
Drift Y
SLS
SLU
49
0.0010
0.0020
0.0030
0.0040
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Drift X
SLS
SLU
0.0010
0.0020
0.0030
0.0040
Drift Y
SLS
SLU
50
E4
E3
E2
E1
P
Circulara P5
M [kNm] V [kN] N [kN]
1281.713 471.81
-427.49
3438.277 796.63
-838.64
6188.765 1019.21 -1243.76
9364.081 1173.9 -1644.08
12765.28 1229.37 -2036.53
Dreptunghiulara P10
M [kNm] V [kN] N [kN]
642.895
261.92
-536.65
1669.5
439
-1027.69
2962.693
551.5
-1511.25
4573.064 662.46 -1986.01
6518.477 748.63 -2447.85
Patrata P8
M [kNm] V [kN]
608.648
162.75
1720.798 347.55
3209.613
488.9
5032.192 609.51
7105.622 682.43
N [kN]
-284.32
-558.64
-829.36
-1097.67
-1362.52
E4
E3
E2
E1
P
Circulara C4
Dreptunghiulara C40
Patrata C9
M [kNm] V [kN] N [kN] M [kNm] V [kN] N [kN] M [kNm] V [kN]
36.563
26.34
-191.1
37.309
28.59
-139.58
34.229
25.92
33.074
21.76
-411.68
31.196
20.26
-294.54
29.15
19.01
33.056
21.95
-631.78
30.618
20.35
-449.57
28.828
19.09
33.639
21.79
-851.35
29.533
18.94
-606.36
28.255
18.03
14.812
12.36
-1067.84 15.339
11.43
-765.24
15.094
11.05
N [kN]
-137.86
-287.55
-438.79
-592.93
-751.94
E4
E3
E2
E1
P
Circulara B13
Dreptunghiulara B71
Patrata C10
M+ [kNm]M - [kNm] V [kN] M+ [kNm]M - [kNm] V [kN] M+ [kNm]M - [kNm]
101.545 -108.716
104.7
49.939 -101.866
96.95
46.655 -111.236
101.518 -147.199 126.54
46.835
-98.077
91
44.334 -101.312
102.553 -140.571 124.86
46.14
-92.599
88.35
44.045
-97.049
102.467 -132.394 122.38
46.097
-85.795
85.4
44.601
-89.393
104.313 -119.315 119.02
45.489
-76.223
81.03
44.832
-80.438
V [kN]
99.57
91.32
89.36
86.31
82.56
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Circulara P6
M [kNm] V [kN] N [kN]
983.244
290.27
-501.03
2030.905 653.72
-969.91
3911.67 1002.46 -1432.94
6773.159 1337.22 -1892.51
10583.13 1648.83 -2348.95
15285.84 1933.29 -2803.74
20804.09 2179.9 -3258.66
27006.91 2367.71 -3715.89
33711.18 2477.57 -4178.08
40567.08 2449.58 -4646.28
M [kNm]
987.515
1283.737
1987.953
3302.395
5096.286
7331.978
10028.56
13215.88
16977.84
21178.25
Patrata P2
V [kN]
197.57
472.6
666.81
817.3
948.4
1076.72
1203.46
1324.8
1460.42
1532.27
N [kN]
-633.92
-1220.57
-1804.27
-2383.85
-2957.81
-3524.71
-4083.02
-4631.16
-5167.33
-5690.25
51
Circulara C9
Dre ptunghiulara C18
Patrata C16
M [kNm] V [kN] N [kN] M [kNm] V [kN] N [kN] M [kNm] V [kN] N [kN]
147.529
113.73
-167.77 115.782
90.72
-134.18 117.353
92.51
-193.18
136.951
90.63
-358.97 103.181
67.73
-289.5
104.541
68.4
-355.05
139.593
93.63
-550.63 106.245
71.44
-443.2
109.426
73.58
-519.6
138.867
92.46
-743.68
105.57
70.26
-596.99 109.441
72.61
-686.77
135.05
89.19
-938.98 102.824
67.81
-751.18 107.523
70.63
-857.81
127.187
83.04
-1137.51 97.012
63.12
-906.46
102.29
66.2
-1033.71
114.58
73.57
-1340.34 87.598
55.88
-1063.66 93.312
59.1
-1215.57
96.543
60.29
-1548.68 74.127
45.73
-1223.76 79.661
48.75
-1404.55
70.441
42.07
-1763.96 54.177
31.59
-1387.94 60.153
34.59
-1601.73
57.101
27.33
-1987.37 42.708
19.56
-1557.47 47.237
21.45
-1809.44
Circulara B19
Dre ptunghiulara B36
Patrata B7
M+ [kNm]M - [kNm] V [kN] M+ [kNm]M - [kNm] V [kN] M+ [kNm]M - [kNm]
87.129 -221.367
92.06
73.675 -168.171
77.51
74.608 -170.852
113.942 -270.858 111.27
95.356 -181.855
78.41
107.197 -185.964
112.327 -268.976 112.15
93.807 -181.917
79.48
105.366 -186.233
111.577 -267.813 113.21
93.087 -180.796
80.81
105.012 -185.615
107.963 -262.223 113.55
89.552 -176.231
81.25
100.928 -181.431
100.996 -251.518 112.86
83.191 -167.743
80.6
93.053 -173.159
89.976 -234.567 110.83
73.383 -154.568
78.55
80.489 -159.935
74.278
-210.37
107.16
59.606 -135.992
74.83
62.47
-140.946
53.157 -178.022 101.58
41.407 -111.325
69.13
38.249 -115.376
27.395 -136.689
94.23
18.334
-79.633
61.47
7.284
-82.28
V [kN]
108.29
112.71
112.36
112.14
110.31
106.72
100.99
92.76
81.7
67.46
Circulara P6
M [kNm] V [kN] N [kN]
2852.705 646.75
-767.86
4668.414 472.51 -1574.26
5520.025 649.02 -2378.25
5678.265 989.33 -3183.73
5928.97 1360.44 -3988.65
7428.605 1717.01 -4790.57
10667.05 2051.01 -5586.5
15396.04 2365.18 -6372.98
21346.37 2663.6 -7146.02
28374.7 2948.42 -7901.19
36398.81 3215.89 -8633.61
45335.05 3453.16 -9337.9
55050.51 3636.73 -10008.2
65358
3742.5
-10638
75838.89 3690.46 -11221.1
Dre ptunghiulara P9
M [kNm] V [kN] N [kN]
2415.263 469.67
-675.86
2996.79
395.01 -1303.57
3061.522 622.04
-1929.3
2974.29
793.96 -2553.09
3140.67
949.97 -3174.08
3980.779 1093.45 -3791.66
5582.972 1229.86 -4405.14
7831.007 1359.51 -5013.79
10619.28 1479.67 -5616.89
13891.32 1592.62 -6213.68
17632.01 1700.95 -6803.35
21854.94 1807.12 -7385.09
26623.9 1926.28 -7957.99
32100.17 2086.17 -8521.21
37882.26 2087.6 -9073.39
M [kNm]
2534.532
3276.733
3336.684
3024.186
2711.289
3199.497
4878.081
7409.548
10547.72
14193.34
18312.33
22917.1
28090.93
34027.35
40354.65
Patrata P7
V [kN]
498.19
339.93
582.88
766.98
944.13
1117.53
1280.85
1430.67
1566.67
1689.99
1804.49
1918.56
2049.91
2228.01
2258.96
N [kN]
-684.14
-1321.86
-1957.91
-2591.88
-3222.9
-3850.24
-4473.14
-5090.8
-5702.39
-6307.06
-6903.88
-7491.87
-8069.99
-8637.12
-9192.08
52
Circulara C1
Dreptunghiulara C3
Patrata C20
M [kNm] V [kN] N [kN] M [kNm] V [kN] N [kN] M [kNm] V [kN] N [kN]
293.34
226.05
-171.01 232.969
128.8
-134.71 231.541
136.94
-129.14
269.195
177.78
-370.34 142.843
95.48
-291.52 151.147
101.11
-279.4
276.533
186.14
-572.26 148.515
101.87
-446.12 158.359
108.81
-428.94
281.032
188.68
-776.04 154.431
105.37
-599.96 164.842
112.4
-579.35
284.496
190.65
-982.31 160.217
108.41
-752.98 171.666
116.08
-730.89
285.593
190.81 -1191.41 165.081
110.46
-905.42 177.526
118.6
-883.98
283.551
188.71 -1403.57 168.38
111.11 -1057.61 181.759
119.66 -1038.99
277.588
183.84 -1618.91 169.523
110
-1210.03 183.657
118.78 -1196.29
266.983
175.72 -1837.42 167.96
106.77 -1363.23 182.57
115.54 -1356.15
251.022
163.88 -2059.03 163.161
101.05 -1517.91 177.88
109.56
-1518.8
228.989
147.83 -2283.53 154.612
92.51
-1674.87 169.021
100.44 -1684.42
200.176
127.09 -2510.65 141.766
80.75
-1835.03 155.33
87.76
-1853.23
163.825
101.12 -2740.02 124.272
65.46
-1999.47 136.586
71.26
-2025.54
116.701
68.53
-2971.3
96.048
44.29
-2169.37 105.496
48.11
-2201.74
85.549
40.2
-3203.42 103.217
35.44
-2346.42 115.955
39.68
-2382.57
Circulara B10
Dre ptunghiulara B27
Patrata B7
M+ [kNm]M - [kNm] V [kN] M+ [kNm]M - [kNm] V [kN] M+ [kNm]M - [kNm]
201.707 -367.711 154.83
174.253 -248.336 137.17
166.545 -258.154
264.947 -443.159 189.59
203.893 -277.057 159.74
203.752
-276.4
263.228
-443.4
189.36
204.09 -279.313
160.3
205.672 -280.659
269.149 -449.397 191.22
207.832 -282.898 161.96
211.087 -285.999
273.047 -453.514 192.47
210.221 -285.347 163.06
214.725 -289.847
274.494 -455.09
192.94
210.869 -285.971 163.35
216.603 -291.788
272.28 -452.824 192.24
208.967 -283.978 162.47
215.793 -290.983
265.406 -445.634 190.05
203.86
-278.68
160.1
211.597 -286.696
252.909 -432.487 186.06
194.912 -269.421 155.97
203.301 -278.195
233.853 -412.38
179.96
181.51 -255.565 149.77
190.221 -264.775
207.3
-384.309 171.46
163.041 -236.482 141.24
171.689 -245.748
172.289 -347.251 160.24
138.883 -211.528 130.07
147.045 -220.434
127.842 -300.152 145.98
108.388 -180.039 115.99
115.602 -188.138
72.78
-241.96
128.35
70.894 -141.335
98.67
76.697 -148.143
65.275 -172.028
107.4
26.607
-94.908
78.05
30.018
-99.493
V [kN]
149.91
156.35
157.75
160.2
161.9
162.77
162.4
160.47
156.65
150.63
142.1
130.74
116.25
98.32
76.66
53
Nr. Etaje
S+P+4E
S+P+9E
S+P+14E
Forma
Bulb
Pere te
Inima
Transve rsal
Long.
Stalpi
Transv.
Circular
814
8/100 12/10/150/300
816
10/100/200
Drept.
814
8/150
10/150/300
816
10/100/200
Patrat
814
8/100
10/150/300
816
10/100/200
Circular
1625
16/100 14/12/100/250
1220
10/100/200
Drept.
1220
12/100
10/100/300
1220
10/100/200
Patrat
1225
8/100
10/100/300
1220
10/100/200
Circular
3225
316/10 14/12/100/200
1625
10/100/200
Drept.
2825
314/100
10/100/300
1625
10/100/200
Patrat
3225
314/100
10/100/200
1625
10/100/200
Grinzi
Long.
Transv
320 sus
8/100/200
316 jos
320 sus
8/100/200
316 jos
320 sus
8/100/200
316 jos
425 sus
8/100/200
416 jos
325 sus
8/10/20
320 jos
325 sus
8/10/20
320 jos
625 sus
8/10/20
425 jos
425
+216 sus 8/10/20
425 jos
425
+216 sus 8/10/20
425 jos
3.2
Circulara
Tip izolator
PmaxSLU
HDH800x128 PmaxSeism
S+P+4E
Nr. Izolatori
Kr
4
Smax [mm]
Tip izolator
PmaxSLU
HDH1000x180 PmaxSeism
S+P+9E
Nr. Izolatori
Kr
8
Smax [mm]
Tip izolator
PmaxSLU
HDH1200x168 PmaxSeism
S+P+14E Nr. Izolatori
Kr
8
Smax [mm]
22050
19500
5.5
16
260
36050
26600
6.11
16
360
47600
47600
9.42
16
340
Dreptunghiulara
Tip izolator
PmaxSLU
HDH750x135 PmaxSeism
Nr. Izolatori
Kr
4
Smax [mm]
Tip izolator
PmaxSLU
HDH800x128 PmaxSeism
Nr. Izolatori
Kr
8
Smax [mm]
Tip izolator
PmaxSLU
HDH1100x154 PmaxSeism
Nr. Izolatori
Kr
8
Smax [mm]
20150
14700
4.58
16
270
22050
19800
5.5
16
260
40050
40050
8.64
16
310
Patrata
Tip izolator
PmaxSLU
HDH750x165 PmaxSeism
Nr. Izolatori
Kr
4
Smax [mm]
Tip izolator
PmaxSLU
HDH750x150 PmaxSeism
Nr. Izolatori
Kr
8
Smax [mm]
Tip izolator
PmaxSLU
HDH900x144 PmaxSeism
Nr. Izolatori
Kr
8
Smax [mm]
54
18900
10900
3.75
16
330
20650
12450
4.12
16
300
28000
25200
6.19
16
290
Circulara
Tip izolator
PmaxSLU
LRN900x162 PmaxSeism
S+P+4E
Nr. Izolatori
Kr
8
Smax [mm]
Tip izolator
PmaxSLU
LRN1400x252 PmaxSeism
S+P+9E
Nr. Izolatori
Kr
8
Smax [mm]
Tip izolator
PmaxSLU
LRN1200x116 PmaxSeism
S+P+14E Nr. Izolatori
Kr
12
Smax [mm]
14800
10800
5.23
28
330
36250
26750
8.16
28
510
26450
19450
6.99
28
440
Dreptunghiulara
Tip izolator
PmaxSLU
LRS450x96 PmaxSeism
Nr. Izolatori
Kr
48
Smax [mm]
Tip izolator
PmaxSLU
LRS750x135 PmaxSeism
Nr. Izolatori
Kr
48
Smax [mm]
Tip izolator
PmaxSLU
LRS900x144 PmaxSeism
Nr. Izolatori
Kr
48
Smax [mm]
2000
1150
0.89
28
200
5350
3900
1.8
28
270
7500
6750
2.4
28
290
Patrata
Tip izolator
PmaxSLU
LRS1000x180 PmaxSeism
Nr. Izolatori
Kr
8
Smax [mm]
Tip izolator
PmaxSLU
LRN1000x200 PmaxSeism
Nr. Izolatori
Kr
8
Smax [mm]
Tip izolator
PmaxSLU
LRN1200x192 PmaxSeism
Nr. Izolatori
Kr
8
Smax [mm]
Tiz_c HDRB=3.04
Tiz_c LRB=2.208
55
9650
7100
240
28
360
18900
11600
5.23
28
400
25550
25550
7.87
28
390
Comparatie spectre
4
3.5
3
Sd
2.5
Sd HDRB (16%)
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_c HDRB=3.04
Tneiz_c=0.1568
Tiz_c LRB=2.208
0.5
0
0
T (s)
Tiz_d HDRB=3.22
Tiz_d LRB=2.11
56
Comparatie spectre
4
3.5
3
Sd
2.5
Sd HDRB (16%)
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_d HDRB=3.22
Tneiz_d=0.152
Tiz_d LRB=2.11
0.5
0
0
T (s)
Tiz_p HDRB=3.055
Tiz_p LRB=2.70
57
Comparatie spectre
4
3.5
3
Sd
2.5
Sd HDRB (16%)
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_p HDRB=3.055
Tneiz_p=0.157
Tiz_p LRB=2.70
0.5
0
0
T (s)
Tiz_c HDRB=3.056
Tiz_c LRB=2.703
58
Comparatie spectre
4
3.5
3
Sd
2.5
Sd HDRB (16%)
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_c HDRB=3.056
Tneiz_c=0.329
Tiz_c LRB=2.703
0.5
0
0
T (s)
Tiz_d HDRB=3.028
Tiz_d LRB=2.170
59
Comparatie spectre
4
3.5
3
Sd
2.5
Sd HDRB (16%)
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_d HDRB=3.028
Tneiz_d=0.340
0.5
Tiz_d LRB=2.170
0
0
T (s)
Tiz_p HDRB=3.006
Tiz_p LRB=2.671
60
Comparatie spectre
4
3.5
3
Sd HDRB (16%)
Sd
2.5
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_p HDRB=3.006
Tneiz_p=0.347
Tiz_p LRB=2.671
0.5
0
0
T (s)
Tiz_c HDRB=3.052
Tiz_c LRB=3.003
61
Comparatie spectre
4
3.5
3
Sd HDRB (16%)
Sd
2.5
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_c HDRB=3.052
Tneiz_c=0.578
Tiz_c LRB=3.003
0.5
0
0
T (s)
Tiz_d HDRB=3.054
Tiz_d LRB=2.385
62
Comparatie spectre
4
3.5
3
Sd
2.5
Sd HDRB (16%)
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_d HDRB=3.054
Tneiz_d=0.568
0.5
Tiz_d LRB=2.385
0
0
T (s)
Tiz_p HDRB=3.10
Tiz_p LRB=2.757
63
Comparatie spectre
4
3.5
3
Sd HDRB (16%)
Sd
2.5
Spectru proiectare
Sd LRB (28%)
1.5
Tiz_p HDRB=3.10
Tneiz_p=0.577
Tiz_p LRB=2.757
0.5
0
0
T (s)
15
DTHDRB
DTLRB
Poly. (DTHDRB)
10
Poly. (DTLRB)
5
y = 0.098x2 - 2.99x + 27.5
R = 1
0
0
10
15
20
25
30
64
x
0.2092
0.1913
0.1919
LRB
y
Dmax_LRB
0.1941
0.33
0.1914
0.2
0.1919
0.36
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.05
0.1
0.15
0.2
0.25
0.3
0.35
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.05
0.1
0.15
0.2
0.25
0.3
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.1
0.2
0.3
0.4
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.1
0.2
0.3
0.4
0.5
0.6
0.7
66
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.05
0.1
0.15
0.2
0.25
0.3
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.1
0.2
0.3
0.4
0.5
67
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.1
0.2
0.3
0.4
0.5
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.05
0.1
0.15
0.2
0.25
0.3
0.35
68
Dmax_iz_LRB
Dmax_iz_HDRB
DmaxLRB
DmaxHDRB
0.1
0.2
0.3
0.4
0.5
15P
15D
15C
10P
10D
HDRB
10C
LRB
5P
5D
5C
0
10
20
30
40
50
60
70
69
HDRB
LRB
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
E4
E3
E2
Drift X_neizolat
Drift X_HDRB
Drift X_LRB
E1
P
70
E4
E3
Drift X_neizolat
Drift X_HDRB
E2
Drift X_LRB
E1
P
E4
E3
E2
Drift X_neizolat
Drift X_HDRB
Drift X_LRB
E1
P
71
0.00005
0.0001
0.00015
0.0002
0.00025
E9
E8
E7
E6
Drift X_neizolat
E5
Drift X_HDRB
E4
Drift X_LRB
E3
E2
E1
P
0.00005
0.0001
0.00015
0.0002
0.00025
0.0003
E9
E8
E7
E6
Drift X_neizolat
E5
Drift X_HDRB
E4
Drift X_LRB
E3
E2
E1
P
72
0.00005
0.0001
0.00015
0.0002
0.00025
E9
E8
E7
E6
Drift X_neizolat
E5
Drift X_HDRB
E4
Drift X_LRB
E3
E2
E1
P
0.0001
0.0002
0.0003
0.0004
0.0005
Drift X_neizolat
Drift X_HDRB
Drift X_LRB
0.0001
0.0002
0.0003
0.0004
0.0005
E14
E13
E12
E11
E10
E9
Drift X_neizolat
E8
Drift X_HDRB
E7
Drift X_LRB
E6
E5
E4
E3
E2
E1
P
0.0001
0.0002
0.0003
0.0004
0.0005
Drift X_neizolat
Drift X_HDRB
Drift X_LRB
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
E4
P+4E D HDRB/NEIZ
P+4E D LRB/NEIZ
P+4E D LRB/HDRB
E3
P+4E C HDRB/NEIZ
P+4E C LRB/NEIZ
E2
P+4E C LRB/HDRB
P+4E P HDRB/NEIZ
P+4E P LRB/NEIZ
E1
P+4E P LRB/HDRB
P
Figura 3.57 " Raportul deplasrilor relative de nivel pentru cldirile S+P+4E"
0.00
0.50
1.00
1.50
2.00
2.50
3.00
E9
E8
E7
P+9E D HDRB/NEIZ
P+9E D LRB/NEIZ
E6
P+9E D LRB/HDRB
P+9E C HDRB/NEIZ
E5
E4
P+9E C LRB/NEIZ
P+9E C LRB/HDRB
P+9E P HDRB/NEIZ
E3
P+9E P LRB/NEIZ
P+9E P LRB/HDRB
E2
E1
P
Figura 3.58 " Raportul deplasrilor relative de nivel pentru cldirile S+P+9E"
75
0.00
0.50
1.00
1.50
2.00
2.50
3.00
E14
E13
E12
E11
P+14E D HDRB/NEIZ
E10
P+14E D LRB/NEIZ
E9
P+14E D LRB/HDRB
E8
P+14E C HDRB/NEIZ
P+14E C LRB/NEIZ
E7
P+14E C LRB/HDRB
E6
P+14E P HDRB/NEIZ
E5
P+14E P LRB/NEIZ
P+14E P LRB/HDRB
E4
E3
E2
E1
P
Figura 3.59 " Raportul deplasrilor relative de nivel pentru cldirile S+P+14E"
S-au obinut urmtoarele eforturi n elementele structurale:
E4
E3
E2
E1
P
Dre ptunghiulara
Neizolata HDRB
LRB
642.895 217.906
252.43
1669.5
890.329 1206.407
2962.693 1938.017 2832.863
4573.064 3207.521 5205.792
6518.477 4378.952 8677.503
Circulara
Ne izolata HDRB
1281.713 680.11
3438.277 2254.427
6188.765 4707.779
9364.081 7859.779
12765.28 11331.96
LRB
1087.778
3589.311
7461.123
12374.42
17618.74
Ne izolata
608.648
1720.798
3209.613
5032.192
7105.622
Patrata
HDRB
LRB
266.873
294.97
1015.046 1095.384
2298.216 2435.44
4175.411 4281.551
6779.988 6485.193
76
Dreptunghiulara
Circulara
Neizolata HDRB
LRB
Neizolata HDRB
261.92
112.78
149.64
471.81
265.64
439
272.19
396.66
796.63
575.87
551.5
395.16
618.39
1019.21
866.21
662.46
462.22
858.1
1173.9
1092.2
748.63
414.52
1202.81 1229.37 1184.22
E4
E3
E2
E1
P
LRB
Neizolata
422.92
162.75
912.95
347.55
1365.77
488.9
1702.34
609.51
1789.92
682.43
Patrata
HDRB
45.94
210.93
389.92
587.15
824.87
LRB
149.64
396.66
618.39
858.1
1202.81
E4
E3
E2
E1
P
Circulara
Patrata
Neizolata HDRB
LRB
Neizolata HDRB
LRB
-427.49 -430.33 -425.72 -284.32 -287.61 -286.91
-838.64
-845.8
-833.78 -558.64 -566.12
-564.3
-1243.76 -1254.4 -1235.01 -829.36 -840.48 -837.55
-1644.08 -1656.89 -1630.64 -1097.67 -1111.62 -1107.64
-2036.53 -2049.16 -2017.99 -1362.52
-1378
-1372.65
0.5
1.5
2.5
Dreptunghiulara
MHDRB/Mneizol
E4
Dreptunghiulara
MLRB/Mneiz
E3
Dreptunghiulara
MLRB/MHDRB
E2
Circulara MHDRB/Mneizol
E1
Circulara MLRB/Mneiz
Circulara MLRB/MHDRB
Figura 3.60 " Raportul momentelor maxime n petei pentru cldirile S+P+4E"
0
E4
4
Dreptunghiulara
VHDRB/Vneizol
Dreptunghiulara VLRB/Vneiz
E3
Dreptunghiulara VLRB/VHDRB
E2
Circulara VHDRB/Vneizol
E1
Circulara VLRB/Vneiz
Circulara VLRB/VHDRB
Figura 3.62 " Raportul forelor tietoare maxime n perei pentru cldirile S+P+4E"
77
0.96
0.97
0.98
0.99
1.01
1.02
Dreptunghiulara NHDRB/Nneizol
Dreptunghiulara NLRB/Nneiz
E4
Dreptunghiulara NLRB/NHDRB
E3
Circulara NHDRB/Nneizol
Circulara NLRB/Nneiz
E2
Circulara NLRB/NHDRB
Patrata NHDRB/Nneizol
E1
Patrata NLRB/Nneiz
Patrata NLRB/NHDRB
Figura 3.63 " Raportul forelor axiale maxime n perei pentru cldirile S+P+4E"
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
910.957 780.605 1214.427
1247.835 647.019 1010.928
1991.456 646.256 991.612
3227.297 1022.773 1523.491
4900.981 2548.431 3812.149
6976.785 4576.993 6839.032
9460.469 7165.017 10727.13
12372.76 10391.52 15749.47
15799.13 14412.76 22667.44
19585.9 19802.24 33232.69
Neizolata
983.244
2030.905
3911.67
6773.159
10583.13
15285.84
20804.09
27006.91
33711.18
40567.08
Circulara
HDRB
733.173
594.032
473.368
2592.802
5803.468
10126.39
15518.45
21779.46
28489.52
34871.34
LRB
822.641
666.667
531.811
2907.485
6503.1
11341.83
17376.12
24385.25
31906.25
39092.34
Neizolata
987.515
1283.737
1987.953
3302.395
5096.286
7331.978
10028.56
13215.88
16977.84
21178.25
Patrata
HDRB
890.81
881.693
331.63
1006.529
2653.887
4852.904
7661.773
11188.81
15780.16
22255.15
LRB
899.654
888.849
331.436
1019.203
2683.915
4905.249
7741.685
11302.38
15936.81
22472.19
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Circulara
Neizolata HDRB
LRB
Neizolata HDRB
194.77
111.44
173.15
290.27
116.14
464.25
216.13
335.06
653.72
208.37
634.46
377.81
581.87
1002.46
527.59
774.51
531.57
812.27
1337.22
876.65
895.34
687.61
1041.84 1648.83 1240.16
1007.8
851.07
1281.75 1933.29 1606.88
1116.64 1026.89
1553
2179.9
1952.85
1222.52
1220.5
1902.54 2367.71 2223.57
1347.71 1455.32 2490.04 2477.57 2343.33
1396.62 1868.22 3639.66 2449.58 2194.91
LRB
Neizolata
129.32
197.57
234.08
472.6
591.8
666.81
982.56
817.3
1389.11
948.4
1798.96 1076.72
2185.8
1203.46
2489.53
1324.8
2626.59 1460.42
2471.31 1532.27
Patrata
HDRB
142.35
225.41
401.52
570.12
742.56
922.34
1114.56
1333.62
1656.55
2237.99
LRB
143.64
227.89
405.93
576.25
750.34
931.72
1125.55
1346.43
1672.16
2258.9
78
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
-621.83 -621.81 -621.81
-1196.42 -1196.38 -1196.38
-1767.67 -1767.61 -1767.61
-2335.37 -2335.29 -2335.29
-2898.06 -2897.96 -2897.96
-3454.58 -3454.46 -3454.46
-4003.63 -4003.5 -4003.5
-4543.88 -4543.72 -4543.72
-5074.03 -5073.89 -5073.89
-5592.24 -5592.14 -5592.15
Neizolata
-501.03
-969.91
-1432.94
-1892.51
-2348.95
-2803.74
-3258.66
-3715.89
-4178.08
-4646.28
Circulara
HDRB
-517.04
-1007.47
-1492.07
-1972.48
-2448.08
-2919.37
-3387.28
-3853.29
-4320.37
-4787.78
LRB
-511.18
-993.91
-1470.67
-1943.11
-2410.71
-2874.17
-3334.69
-3794.08
-4255.73
-4719.72
Neizolata
-633.92
-1220.57
-1804.27
-2383.85
-2957.81
-3524.71
-4083.02
-4631.16
-5167.33
-5690.25
Patrata
HDRB
-634.39
-1221.46
-1805.54
-2385.46
-2959.71
-3526.84
-4085.33
-4633.6
-5169.77
-5693.91
LRB
-634.37
-1221.43
-1805.49
-2385.41
-2959.64
-3526.76
-4085.24
-4633.51
-5169.67
-5693.81
0.5
1.5
E9
E8
E7
Dreptunghiulara MHDRB/Mneizol
Dreptunghiulara MLRB/Mneiz
E6
Dreptunghiulara MLRB/MHDRB
Circulara MHDRB/Mneizol
E5
Circulara MLRB/Mneiz
Circulara MLRB/MHDRB
E4
Patrata MHDRB/Mneizol
E3
Patrata MLRB/Mneiz
Patrata MLRB/MHDRB
E2
E1
P
Figura 3.64 " Raportul momentelor maxime n perei pentru cldirile S+P+9E"
79
0.5
1.5
2.5
E9
E8
Dreptunghiulara VHDRB/Vneizol
E7
Dreptunghiulara VLRB/Vneiz
Dreptunghiulara VLRB/VHDRB
E6
Circulara VHDRB/Vneizol
E5
Circulara VLRB/Vneiz
Circulara VLRB/VHDRB
E4
Patrata VHDRB/Vneizol
Patrata VLRB/Vneiz
E3
Patrata VLRB/VHDRB
E2
E1
P
Figura 3.65 " Raportul forelor tietoare maxime n perei pentru cldirile S+P+9E"
0.94
0.96
0.98
1.02
1.04
1.06
E9
E8
E7
Dreptunghiulara NHDRB/Nneizol
Dreptunghiulara NLRB/Nneiz
Dreptunghiulara NLRB/NHDRB
E6
Circulara NHDRB/Nneizol
E5
Circulara NLRB/Nneiz
E4
Circulara NLRB/NHDRB
Patrata NHDRB/Nneizol
E3
E2
Patrata NLRB/Nneiz
Patrata NLRB/NHDRB
E1
P
Figura 3.66" Raportul forelor axiale maxime n perei pentru cldirile S+P+9E"
80
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
2415.263 2036.086 2677.733
2996.79 2622.627 3440.517
3061.522 2666.389 3485.517
2974.29 2294.683 2983.003
3140.67 1509.017 1938.713
3980.779 340.714 409.679
5582.972 1441.198 1930.501
7831.007 3618.254 4751.221
10619.28 6331.722 8231.747
13891.32 9618.808 12407.52
17632.01 13535.85 17357.73
21854.94 18161.54 23250.07
26623.9 23595.99 30454.2
32100.17 30172.09 40153.53
37882.26 38793.35 54374.47
Neizolata
2852.705
4668.414
5520.025
5678.265
5928.97
7428.605
10667.05
15396.04
21346.37
28374.7
36398.81
45335.05
55050.51
65358
75838.89
Circulara
HDRB
2399.668
4054.142
4818.178
4594.53
3362.577
1161.476
2456.347
6868.098
12478.99
19359.35
27562.61
37031.63
47451.32
58171.79
68060.87
LRB
2151.141
3631.338
4312.055
4107.425
2999.992
1026.431
2232.195
6182.842
11199.75
17344.1
24665.8
33127.98
42486.15
52227.38
61399.81
Neizolata
2534.532
3276.733
3336.684
3024.186
2711.289
3199.497
4878.081
7409.548
10547.72
14193.34
18312.33
22917.1
28090.93
34027.35
40354.65
Patrata
HDRB
2071.147
2844.378
3042.594
2793.101
2096.914
947.383
1084.39
3304.779
6106.699
9512.188
13569.56
18358.06
24049.45
31322.97
41186.87
LRB
2091.418
2869.429
3065.778
2809.626
2102.435
938.395
1112.863
3356.702
6185.118
9620.426
13710.88
18535.85
24267.8
31590
41518.68
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Circulara
Neizolata HDRB
LRB
Neizolata HDRB
469.67
402.74
528.81
646.75
550.85
395.01
111.44
150.34
472.51
249.94
622.04
299.85
399.45
649.02
51.35
793.96
449.51
596.63
989.33
383.86
949.97
598.75
791.99
1360.44
732.95
1093.45
752.96
991.99
1717.01 1084.97
1229.86
913.5
1197.38 2051.01 1443.68
1359.51 1080.21 1406.68 2365.18 1816.21
1479.67 1252.99 1618.75
2663.6
2209.21
1592.62 1432.91 1835.75 2948.42 2623.91
1700.95
1623.2
2068.42 3215.89 3047.91
1807.12
1829.3
2343.85 3453.16 3441.57
1926.28 2056.29 2726.77 3636.73 3716.36
2086.17 2379.15 3485.79
3742.5
3757.73
2087.6
2987.72 4897.56 3690.46 3408.89
LRB
Neizolata
491.78
498.19
221.03
339.93
47.45
582.88
346.36
766.98
658.94
944.13
973.91
1117.53
1294.32 1280.85
1626.48 1430.67
1976.07 1566.67
2344.33 1689.99
2721.62 1804.49
3076.53 1918.56
3337.58 2049.91
3412.85 2228.01
3156.91 2258.96
Patrata
HDRB
420.3
81.88
275.88
429.16
585.95
751.09
924.38
1104.45
1289.9
1480.4
1678.53
1892.32
2150.43
2619.8
3408.46
LRB
424.24
83.41
279.71
434.7
593.04
759.63
934.26
1115.55
1302.1
1493.55
1692.52
1907.11
2166.15
2637.66
3431.02
81
Dreptunghiulara
Neizolata HDRB
LRB
-675.86 -675.83 -675.83
-1303.57 -1303.52 -1303.52
-1929.3 -1929.22 -1929.22
-2553.09 -2552.98 -2552.98
-3174.08 -3173.95 -3173.95
-3791.66 -3791.51 -3791.51
-4405.14 -4404.95 -4404.95
-5013.79 -5013.58 -5013.58
-5616.89 -5616.65 -5616.65
-6213.68 -6213.4 -6213.4
-6803.35 -6803.05 -6803.05
-7385.09 -7384.75 -7384.75
-7957.99 -7957.62 -7957.62
-8521.21 -8520.84 -8520.84
-9073.39 -9073.2 -9073.2
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Neizolata
-767.86
-1574.26
-2378.25
-3183.73
-3988.65
-4790.57
-5586.5
-6372.98
-7146.02
-7901.19
-8633.61
-9337.9
-10008.2
-10638
-11221.1
Circulara
HDRB
-735.27
-1498.55
-2258.91
-3020.5
-3781.94
-4541.69
-5297.71
-6047.43
-6787.75
-7514.99
-8224.91
-8912.6
-9572.45
-10197.3
-10780.4
LRB
-724.95
-1474.57
-2221
-2968.29
-3715.05
-4459.8
-5200.61
-5935.09
-6660.36
-7373.05
-8069.21
-8744.35
-9393.32
-10009.5
-10588.6
Neizolata
-684.14
-1321.86
-1957.91
-2591.88
-3222.9
-3850.24
-4473.14
-5090.8
-5702.39
-6307.06
-6903.88
-7491.87
-8069.99
-8637.12
-9192.08
Patrata
HDRB
-685.85
-1325.15
-1962.69
-2598.1
-3230.49
-3859.12
-4483.2
-5101.93
-5714.47
-6319.92
-6917.38
-7505.87
-8084.35
-8651.61
-9208.27
LRB
-685.8
-1325.05
-1962.54
-2597.91
-3230.26
-3858.85
-4482.89
-5101.58
-5714.08
-6319.51
-6916.94
-7505.41
-8083.87
-8651.12
-9207.77
0.5
1.5
E14
E13
Dreptunghiulara
MHDRB/Mneizol
E12
Dreptunghiulara MLRB/Mneiz
E11
Dreptunghiulara MLRB/MHDRB
E10
E9
E8
Circulara MHDRB/Mneizol
Circulara MLRB/Mneiz
E7
Circulara MLRB/MHDRB
E6
E5
E4
Patrata MHDRB/Mneizol
Patrata MLRB/Mneiz
E3
E2
Patrata MLRB/MHDRB
E1
P
0.5
1.5
2.5
E14
E13
E12
E11
E10
Dreptunghiulara VHDRB/Vneizol
Dreptunghiulara VLRB/Vneiz
E9
E8
Dreptunghiulara VLRB/VHDRB
Circulara VHDRB/Vneizol
Circulara VLRB/Vneiz
E7
E6
Circulara VLRB/VHDRB
Patrata VHDRB/Vneizol
Patrata VLRB/Vneiz
E5
Patrata VLRB/VHDRB
E4
E3
E2
E1
P
Figura 3.68" Raportul forelor tietoare maxime n perei pentru cldirile S+P+14E"
83
0.88
0.9
0.92
0.94
0.96
0.98
1.02
E14
E13
E12
E11
Dreptunghiulara NHDRB/Nneizol
E10
Dreptunghiulara NLRB/Nneiz
Dreptunghiulara NLRB/NHDRB
E9
Circulara NHDRB/Nneizol
E8
Circulara NLRB/Nneiz
E7
Circulara NLRB/NHDRB
E6
Patrata NHDRB/Nneizol
E5
Patrata NLRB/Nneiz
Patrata NLRB/NHDRB
E4
E3
E2
E1
P
Figura 3.69" Raportul forelor axiale maxime n perei pentru cldirile S+P+14E"
Eforturi stlpi
Etaj
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
37.309
33.515
39.515
31.196
27.652
33.503
30.618
27.201
33.322
29.533
28.776
34.077
15.339
8.811
5.532
Neizolata
36.563
33.074
33.056
33.639
14.812
Circulara
HDRB
32.216
29.141
29.518
32.47
8.324
LRB
38.088
34.871
35.104
37.572
7.094
Neizolata
34.229
29.15
28.828
28.255
15.094
Patrata
HDRB
31.548
26.59
26.428
28.746
4.449
LRB
31.778
26.799
26.688
28.698
7.81
Dreptunghiulara
Neizolata HDRB
LRB
28.59
25.82
30.26
20.26
17.99
21.86
20.35
18.27
22.25
18.94
18.27
21.62
11.43
4.65
5.97
Neizolata
26.34
21.76
21.95
21.79
12.36
Circulara
HDRB
23.23
19.18
19.7
20.9
5.79
LRB
27.34
23
23.42
24.21
6.31
Neizolata
25.92
19.01
19.09
18.03
11.05
Patrata
HDRB
24
17.39
17.71
18.13
4.23
LRB
24.17
17.53
17.88
18.17
4.67
84
Etaj
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
-139.58 -141.04 -138.57
-294.54 -298.35 -291.82
-449.57 -455.37
-444.9
-606.36 -613.52 -599.58
-765.24 -773.04 -756.44
Circulara
Neizolata HDRB
LRB
Neizolata
-191.1
-188.42 -193.34 -137.86
-411.68 -404.66 -415.93 -287.55
-631.78 -620.87
-638.3
-438.79
-851.35 -837.55 -860.46 -592.93
-1067.84 -1051.47 -1078.02 -751.94
Patrata
HDRB
-139.64
-292.06
-445.54
-601
-761.05
LRB
-139.51
-291.74
-445.06
-600.44
-760.63
0.5
1.5
2
Dreptunghiulara MHDRB/Mneizol
Dreptunghiulara MHDRB/Mneizol
E4
Dreptunghiulara MLRB/MHDRB
E3
Circulara MHDRB/Mneizol
Circulara MLRB/Mneiz
E2
Circulara MLRB/MHDRB
Patrata MHDRB/Mneizol
E1
Patrata MLRB/Mneiz
Patrata MLRB/MHDRB
0.2
0.4
0.6
0.8
1.2
1.4
Dreptunghiulara VHDRB/Vneizol
E4
Dreptunghiulara VLRB/Vneiz
Dreptunghiulara VLRB/VHDRB
E3
Circulara VHDRB/Vneizol
Circulara VLRB/Vneiz
E2
E1
Circulara VLRB/VHDRB
Patrata VHDRB/Vneizol
Patrata VLRB/Vneiz
Patrata VLRB/VHDRB
Figura 3.71" Raportul forelor taietoare maxime n stlpi pentru cldirile S+P+4E"
85
0.94
0.96
0.98
1.02
1.04
Dreptunghiulara NHDRB/Nneizol
Dreptunghiulara NLRB/Nneiz
E4
Dreptunghiulara NLRB/NHDRB
E3
Circulara NHDRB/Nneizol
Circulara NLRB/Nneiz
E2
Circulara NLRB/NHDRB
Patrata NHDRB/Nneizol
E1
Patrata NLRB/Nneiz
Patrata NLRB/NHDRB
Figura 3.72" Raportul forelor axiale maxime n stlpi pentru cldirile S+P+4E"
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Circulara
Neizolata HDRB
LRB
Neizolata HDRB
115.782 116.838 127.915 147.529 116.838
103.181 106.979 117.925 136.951 106.979
106.245
109.45
120.651 139.593
109.45
105.57
109.768 121.245 138.867 109.768
102.824 108.361 119.896
135.05
108.361
97.012
104.069 115.395 127.187 104.069
87.598
95.762
106.512
114.58
95.762
74.127
84.952
94.901
96.543
84.952
54.177
49.681
55.393
70.441
49.681
42.708
0
0
57.101
0
LRB
Neizolata
127.915 117.353
117.925 104.541
120.651 109.426
121.245 109.441
119.896 107.523
115.395
102.29
106.512
93.312
94.901
79.661
55.393
60.153
0
47.237
Patrata
HDRB
97.881
86.657
91.201
92.276
92.342
89.923
84.419
74.371
59.876
0
LRB
98.723
87.421
92.011
93.104
93.178
90.742
85.191
75.056
60.421
0
Dreptunghiulara
Neizolata HDRB
LRB
90.72
75.31
108.61
67.73
55.96
81.39
71.44
59.52
86.7
70.26
59.28
86.82
67.81
58.29
85.76
63.12
55.52
82.06
55.88
50.52
75
45.73
42.65
63.71
31.59
31.38
46.17
19.56
4.47
8.01
Neizolata
113.73
90.63
93.63
92.46
89.19
83.04
73.57
60.29
42.07
27.33
Circulara
HDRB
90.08
70.72
73.7
73.56
72.21
68.71
62.37
53.43
32.28
15.77
LRB
98.58
78.08
81.25
81.25
79.86
76.1
69.22
59.44
35.81
17.88
Neizolata
92.51
68.4
73.58
72.61
70.63
66.2
59.1
48.75
34.59
21.45
Patrata
HDRB
77.2
56.77
61.66
61.71
61.28
58.89
54.19
46.25
34.92
5.96
LRB
77.86
57.27
62.21
62.27
61.83
59.42
54.68
46.67
35.23
6.01
86
Dreptunghiulara
Neizolata HDRB
LRB
-134.18 -137.96 -130.33
-289.5
-295.91 -282.99
-443.2
-452.44 -433.44
-596.99 -608.87 -583.49
-751.18 -765.39 -733.33
-906.46 -922.54 -883.71
-1063.66 -1081.05 -1035.68
-1223.76 -1241.87 -1190.61
-1387.94 -1406.39 -1350.49
-1557.47 -1575.12 -1516.41
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Neizolata
-167.77
-358.97
-550.63
-743.68
-938.98
-1137.51
-1340.34
-1548.68
-1763.96
-1987.37
Circulara
HDRB
-160.25
-340.12
-520.16
-700.73
-882.82
-1067.69
-1256.95
-1452.54
-1657.15
-1872.53
LRB
-143.2
-300.02
-456.7
-612.91
-770.1
-930.09
-1095.35
-1268.97
-1455.37
-1657.27
Neizolata
-193.18
-355.05
-519.6
-686.77
-857.81
-1033.71
-1215.57
-1404.55
-1601.73
-1809.44
Patrata
HDRB
-194.56
-357.32
-522.84
-690.94
-862.83
-1039.48
-1221.94
-1411.34
-1608.67
-1816.14
LRB
-194.47
-357.18
-522.63
-690.66
-862.48
-1039.07
-1221.47
-1410.82
-1608.11
-1815.56
0.5
1.5
E9
Dreptunghiulara
MHDRB/Mneizol
Dreptunghiulara MLRB/Mneiz
E8
Dreptunghiulara MLRB/MHDRB
E7
E6
Circulara MHDRB/Mneizol
E5
E4
Circulara MLRB/Mneiz
E3
Circulara MLRB/MHDRB
E2
E1
Patrata MHDRB/Mneizol
0.5
1.5
E9
Dreptunghiulara VHDRB/Vneizol
E8
Dreptunghiulara VLRB/Vneiz
E7
Dreptunghiulara VLRB/VHDRB
E6
Circulara VHDRB/Vneizol
E5
Circulara VLRB/Vneiz
E4
Circulara VLRB/VHDRB
E3
Patrata VHDRB/Vneizol
E2
Patrata VLRB/Vneiz
E1
Patrata VLRB/VHDRB
Figura 3.74" Raportul forelor tietoare maxime n stlpi pentru cldirile S+P+9E"
87
0.2
0.4
0.6
0.8
1.2
E9
Dreptunghiulara NHDRB/Nneizol
E8
Dreptunghiulara NLRB/Nneiz
E7
Dreptunghiulara NLRB/NHDRB
E6
Circulara NHDRB/Nneizol
E5
Circulara NLRB/Nneiz
E4
Circulara NLRB/NHDRB
Patrata NHDRB/Nneizol
E3
Patrata NLRB/Nneiz
E2
Patrata NLRB/NHDRB
E1
P
Figura 3.75" Raportul forelor axiale maxime n stlpi pentru cldirile S+P+9E"
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Circulara
Neizolata HDRB
LRB
Neizolata HDRB
232.969 188.833 238.846
293.34
230.443
142.843 105.648
147.17
269.195 210.712
148.515 109.983 153.047 276.533 216.356
154.431 115.402 159.892 281.032 220.346
160.217 121.374 167.446 284.496 224.242
165.081 127.309
174.85
285.593 226.969
168.38
132.612 181.335 283.551
227.82
169.523 136.687 186.111 277.588 226.024
167.96
138.914 188.362 266.983 220.794
163.161 138.643 187.227 251.022
211.26
154.612 135.151 181.774 228.989 196.546
141.766 127.801 171.089 200.176
175.15
124.272
116.44
155.863 163.825 150.285
96.048
92.637
116.761 116.701
88.228
103.217
7.81
17.281
85.549
0
LRB
Neizolata
214.253 231.541
195.458 151.147
200.661 158.359
204.165 164.842
207.57
171.666
209.861 177.526
210.415 181.759
208.529 183.657
203.477
182.57
194.468
177.88
180.681 169.021
160.879
155.33
137.065 136.586
84.678
105.496
0
115.955
Patrata
HDRB
181.814
109.55
114.907
120.603
127.221
133.8
139.77
144.476
147.243
147.355
143.992
136.754
123.048
105.784
2.262
LRB
183.439
110.896
116.314
122.056
128.724
135.343
141.339
146.051
148.799
148.862
145.412
138.051
124.167
106.713
2.246
88
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
128.8
95.09
94.27
95.48
70.96
70.37
101.87
76.02
75.39
105.37
79.69
79.04
108.41
83.37
82.68
110.46
86.66
85.95
111.11
89.17
88.43
110
90.47
89.72
106.77
90.13
89.37
101.05
87.69
86.93
92.51
82.62
81.88
80.75
74.43
73.7
65.46
62.68
62.22
44.29
43.72
41.34
35.44
2.02
4.29
Neizolata
226.05
177.78
186.14
188.68
190.65
190.81
188.71
183.84
175.72
163.88
147.83
127.09
101.12
68.53
40.2
Circulara
HDRB
177.5
139.18
145.86
148.35
150.87
152.4
152.52
150.7
146.4
139.02
127.95
112.26
92.89
55.07
23.41
LRB
165.06
129.03
135.27
137.43
139.63
140.91
140.88
139.06
134.96
128.04
117.72
103.21
85
52.33
18.99
Neizolata
136.94
101.11
108.81
112.4
116.08
118.6
119.66
118.78
115.54
109.56
100.44
87.76
71.26
48.11
39.68
Patrata
HDRB
99.04
73.61
79.5
83.14
87.22
90.84
93.68
95.26
95.11
92.72
87.52
79.08
65.94
49.37
4.2
LRB
100.28
74.51
80.46
84.13
88.24
91.88
94.72
96.28
96.1
93.65
88.37
79.82
66.54
49.8
4.1
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
-134.71 -139.97 -140.09
-291.52 -300.43 -300.63
-446.12 -459.09 -459.38
-599.96 -617.02 -617.41
-752.98
-774.1
-774.6
-905.42 -930.44 -931.07
-1057.61 -1086.26 -1087.03
-1210.03 -1241.89 -1242.81
-1363.23 -1397.8 -1398.88
-1517.91 -1554.59 -1555.85
-1674.87 -1713.02 -1714.47
-1835.03 -1874.02 -1875.69
-1999.47 -2038.72 -2040.64
-2169.37 -2208.58 -2210.72
-2346.42 -2384.6 -2387.09
Neizolata
-171.01
-370.34
-572.26
-776.04
-982.31
-1191.41
-1403.57
-1618.91
-1837.42
-2059.03
-2283.53
-2510.65
-2740.02
-2971.3
-3203.42
Circulara
HDRB
-223.18
-474.05
-728.3
-987.96
-1253.59
-1525.51
-1803.59
-2087.26
-2375.49
-2666.78
-2959.08
-3249.74
-3535.44
-3811.78
-4074.29
LRB
-216.49
-459.81
-706.26
-957.66
-1214.54
-1477.25
-1745.7
-2019.43
-2297.6
-2578.89
-2861.55
-3143.28
-3421.16
-3691.4
-3949.37
Neizolata
-129.14
-279.4
-428.94
-579.35
-730.89
-883.98
-1038.99
-1196.29
-1356.15
-1518.8
-1684.42
-1853.23
-2025.54
-2201.74
-2382.57
Patrata
HDRB
-131.86
-284.33
-436.47
-589.39
-743.14
-897.92
-1054
-1211.65
-1371.22
-1533.08
-1697.64
-1865.37
-2036.77
-2212.52
-2392.1
LRB
-109.3
-261.77
-413.9
-566.82
-720.56
-875.35
-1031.42
-1189.07
-1348.64
-1510.5
-1675.06
-1842.8
-2014.2
-2189.95
-2369.54
89
0.5
1.5
2.5
E14
Dreptunghiulara
MHDRB/Mneizol
E13
Dreptunghiulara MLRB/Mneiz
E12
Dreptunghiulara MLRB/MHDRB
E11
E10
Circulara MHDRB/Mneizol
E9
E8
Circulara MLRB/Mneiz
E7
Circulara MLRB/MHDRB
E6
E5
Patrata MHDRB/Mneizol
E4
E3
Patrata MLRB/Mneiz
E2
Patrata MLRB/MHDRB
E1
P
0.5
1.5
2.5
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
Dreptunghiulara VHDRB/Vneizol
Dreptunghiulara VLRB/Vneiz
Dreptunghiulara VLRB/VHDRB
Circulara VHDRB/Vneizol
Circulara VLRB/Vneiz
Circulara VLRB/VHDRB
Patrata VHDRB/Vneizol
Patrata VLRB/Vneiz
Patrata VLRB/VHDRB
E3
E2
E1
P
Figura 3.77" Raportul forelor tietoare maxime n stlpi pentru cldirile S+P+14E"
90
0.2
0.4
0.6
0.8
1.2
1.4
E14
E13
E12
Dreptunghiulara NHDRB/Nneizol
E11
Dreptunghiulara NLRB/Nneiz
E10
Dreptunghiulara NLRB/NHDRB
E9
Circulara NHDRB/Nneizol
E8
Circulara NLRB/Nneiz
E7
Circulara NLRB/NHDRB
E6
Patrata NHDRB/Nneizol
E5
Patrata NLRB/Nneiz
E4
Patrata NLRB/NHDRB
E3
E2
E1
P
Figura 3.78" Raportul forelor axiale maxime n stlpi pentru cldirile S+P+14E"
Eforturi grinzi:
Etaj
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
49.939
49.94
49.94
46.835
46.836
46.836
46.14
46.134
46.134
46.097
46.138
46.138
45.489
45.306
45.306
Neizolata
101.545
101.518
102.553
102.467
104.313
Circulara
HDRB
101.548
101.518
102.569
102.37
105.016
LRB
Neizolata
101.548
46.655
101.518
44.334
102.569
44.045
102.37
44.601
105.016
44.832
Patrata
HDRB
46.656
44.337
44.038
44.644
44.644
LRB
46.656
44.337
44.038
44.644
44.644
Etaj
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
-101.866 -101.865 -101.865
-98.077 -98.079 -98.079
-92.599 -92.593 -92.593
-85.795 -85.859 -85.859
-76.223 -76.027 -76.027
Neizolata
-108.716
-147.199
-140.571
-132.394
-119.315
Circulara
HDRB
-108.703
-147.189
-140.539
-132.512
-118.436
Patrata
LRB
Neizolata HDRB
LRB
-109.924 -111.236 -111.229 -111.229
-146.944 -101.312 -101.3
-101.3
-140.891 -97.049 -97.051 -97.051
-129.614 -89.393 -89.288 -89.288
-106.37 -80.438
-80.59
-80.59
91
Etaj
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
96.95
96.95
96.95
91
91.01
91.01
88.35
88.34
88.34
85.4
85.45
85.45
81.03
80.86
80.86
Neizolata
104.7
126.54
124.86
122.38
119.02
Circulara
HDRB
104.7
126.53
124.86
122.39
118.96
LRB
79.55
98.53
96.99
93.83
87.87
Neizolata
99.57
91.32
89.36
86.31
82.56
Patrata
HDRB
99.57
91.32
89.36
86.28
82.54
LRB
99.57
91.32
89.36
86.28
82.54
0.995
1.005
1.01
M+HDRB/M+neizol
M+LRB/M+neiz
E4
M+LRB/M+HDRB
E3
M+HDRB/M+neizol
M+LRB/M+neiz
E2
M+LRB/M+HDRB
M+HDRB/M+neizol
E1
M+LRB/M+neiz
M+LRB/M+HDRB
Figura 3.79" Raportul momentelor pozitive maxime n grinzi pentru cldirile S+P+4E"
0.8
0.85
0.9
0.95
1.05
Dreptunghiulara M-HDRB/Mneizol
E4
Dreptunghiulara M-LRB/M-neiz
E3
Dreptunghiulara M-LRB/M-HDRB
E2
Circulara M-HDRB/M-neizol
E1
Circulara M-LRB/M-neiz
Circulara M-LRB/M-HDRB
Figura 3.80" Raportul momentelor negative maxime n grinzi pentru cldirile S+P+4E"
92
0.2
0.4
0.6
0.8
1.2
Dreptunghiulara VHDRB/Vneizol
E4
Dreptunghiulara VLRB/Vneiz
Dreptunghiulara VLRB/VHDRB
E3
Circulara VHDRB/Vneizol
Circulara VLRB/Vneiz
E2
Circulara VLRB/VHDRB
Patrata VHDRB/Vneizol
E1
Patrata VLRB/Vneiz
Patrata VLRB/VHDRB
Figura 3.81" Raportul forelor tietoare maxime n grinzi pentru cldirile S+P+4E"
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Circulara
Neizolata HDRB
LRB
Neizolata HDRB
73.675
96.95
88.069
87.129
75.315
95.356
78.937
114.287 113.942
95.37
93.807
77.876
113.382 112.327
94.501
93.087
77.917
114.316 111.577
94.548
89.552
75.97
112.549 107.963
93.167
83.191
71.855
107.765 100.996
89.854
73.383
64.797
98.876
89.976
83.944
59.606
54.043
84.732
74.278
74.717
41.407
38.697
64.347
53.157
61.194
18.334
18.192
35.534
27.395
44.425
LRB
78.25
99.193
98.321
98.469
97.116
93.731
87.599
77.954
63.781
45.952
Neizolata
74.608
107.197
105.366
105.012
100.928
93.053
80.489
62.47
38.249
7.284
Patrata
HDRB
57.637
85.925
84.658
85.358
83.457
78.665
69.859
55.933
35.799
7.709
LRB
55.134
80.333
79.927
80.843
79.354
75.054
66.857
53.654
34.248
8.899
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
-168.171 -148.677 -190.473
-181.855 -159.482 -207.835
-181.917 -159.843 -209.242
-180.796 -159.829 -210.339
-176.231 -157.454 -208.205
-167.743 -152.076 -201.873
-154.568 -142.701 -189.936
-135.992 -128.287 -170.877
-111.325 -107.646 -143.158
-79.633 -79.719 -104.288
Neizolata
-221.367
-270.858
-268.976
-267.813
-262.223
-251.518
-234.567
-210.37
-178.022
-136.689
Circulara
HDRB
-192.506
-237.089
-235.771
-235.945
-233.186
-226.573
-214.685
-196.009
-169.104
-132.192
LRB
-199.095
-244.659
-243.395
-243.741
-241.014
-234.231
-221.866
-202.308
-174.041
-135.086
Neizolata
-170.852
-185.964
-186.233
-185.615
-181.431
-173.159
-159.935
-140.946
-115.376
-82.28
Patrata
HDRB
-151.357
-163.688
-164.251
-164.794
-162.917
-157.916
-148.681
-134.058
-112.862
-83.373
LRB
-145.905
-156.929
-157.975
-158.857
-157.504
-153.148
-144.69
-130.972
-110.772
-83.409
93
Etaj
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
77.51
69.48
86.69
78.41
68.72
89.65
79.48
69.99
91.22
80.81
71.78
93.51
81.25
73.17
95.01
80.6
73.86
95.29
78.55
73.45
93.78
74.83
71.53
89.85
69.13
67.54
82.83
61.47
61.36
71.84
Neizolata
92.06
111.27
112.15
113.21
113.55
112.86
110.83
107.16
101.58
94.23
Circulara
HDRB
83.64
100.98
102.07
103.51
104.72
105.27
104.78
102.81
98.86
93.01
LRB
85.57
103.29
104.38
105.89
107.1
107.61
106.98
104.74
100.38
93.91
Neizolata
108.29
112.71
112.36
112.14
110.31
106.72
100.99
92.76
81.7
67.46
Patrata
HDRB
100.19
103.03
102.87
103.15
102.31
100.13
96.12
89.78
80.6
67.8
LRB
74.06
74.17
75.52
77.32
78.63
79.11
78.33
75.83
71.04
64.19
0.5
1.5
2.5
Dreptunghiulara
M+HDRB/M+neizol
E9
Dreptunghiulara M+LRB/M+neiz
E8
E7
Dreptunghiulara
M+LRB/M+HDRB
E6
Circulara M+HDRB/M+neizol
E5
Circulara M+LRB/M+neiz
E4
E3
E2
Circulara M+LRB/M+HDRB
Patrata M+HDRB/M+neizol
E1
Patrata M+LRB/M+neiz
P
Figura 3.82" Raportul momentelor pozitive maxime n grinzi pentru cldirile S+P+9E"
94
0.2
0.4
0.6
0.8
1.2
1.4
E9
Dreptunghiulara M-HDRB/Mneizol
Dreptunghiulara M-LRB/M-neiz
E8
Dreptunghiulara M-LRB/M-HDRB
E7
E6
Circulara M-HDRB/M-neizol
E5
Circulara M-LRB/M-neiz
E4
E3
Circulara M-LRB/M-HDRB
E2
Patrata M-HDRB/M-neizol
E1
Patrata M-LRB/M-neiz
P
Figura 3.83" Raportul momentelor negative maxime n grinzi pentru cldirile S+P+9E"
0.2
0.4
0.6
0.8
1.2
1.4
E9
E8
E7
Dreptunghiulara VHDRB/Vneizol
Dreptunghiulara VLRB/Vneiz
Dreptunghiulara VLRB/VHDRB
E6
Circulara VHDRB/Vneizol
E5
Circulara VLRB/Vneiz
E4
Circulara VLRB/VHDRB
Patrata VHDRB/Vneizol
E3
E2
Patrata VLRB/Vneiz
Patrata VLRB/VHDRB
E1
P
Figura 3.84" Raportul forelor tietore maxime n grinzi pentru cldirile S+P+9E"
95
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Circulara
Neizolata HDRB
LRB
Neizolata HDRB
174.253 139.951 178.863 201.707 159.075
203.893 163.199 209.639 264.947 210.836
204.09
163.454 210.378 263.228 209.293
207.832 167.156 215.535 269.149 214.651
210.221 170.288 220.129 273.047
219.14
210.869 172.546 223.693 274.494 222.359
208.967 173.178 225.241
272.28
223.214
203.86
171.495 223.861 265.406 220.686
194.912 166.762 218.581 252.909 213.697
181.51
158.202 208.368 233.853 201.095
163.041 144.976 192.107
207.3
181.604
138.883 126.181 168.587 172.289 153.837
108.388 100.791 136.472 127.842 116.177
70.894
67.774
93.894
72.78
66.647
26.607
24.446
43.721
65.275
46.599
LRB
Neizolata
141.646 166.545
187.757 203.752
186.055 205.672
190.58
211.087
194.212 214.725
196.63
216.603
196.864 215.793
194.014 211.597
187.126 203.301
175.178 190.221
157.045 171.689
131.504 147.045
97.146
115.602
52.257
76.697
42.076
30.018
Patrata
HDRB
125.868
156.178
157.715
162.589
166.624
169.856
171.474
170.791
167.037
159.394
146.992
128.895
104.074
71.24
30.688
LRB
127.198
157.732
159.295
164.22
168.296
171.557
173.186
172.49
168.692
160.971
148.449
130.188
105.152
72.046
31.171
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Dreptunghiulara
Neizolata HDRB
LRB
-248.336 -210.522 -253.508
-277.057 -235.267 -283.094
-279.313 -237.272 -285.978
-282.898 -240.874 -291.017
-285.347 -244.105 -295.736
-285.971 -246.403 -299.359
-283.978 -247.032 -300.912
-278.68 -245.271 -299.439
-269.421 -240.362 -293.936
-255.565 -231.5 -283.329
-236.482 -217.817 -266.456
-211.528 -198.374 -242.051
-180.039 -172.134 -208.721
-141.335 -138.003 -164.847
-94.908 -93.813 -111.131
Neizolata
-367.711
-443.159
-443.4
-449.397
-453.514
-455.09
-452.824
-445.634
-432.487
-412.38
-384.309
-347.251
-300.152
-241.96
-172.028
Circulara
HDRB
-318.583
-386.289
-386.402
-391.93
-396.743
-400.249
-401.276
-398.721
-391.43
-378.158
-357.53
-328.03
-287.928
-235.474
-169.345
LRB
-298.204
-361.707
-361.436
-366.114
-370.026
-372.69
-373.064
-370.181
-363.014
-350.464
-331.317
-304.245
-267.74
-220.247
-160.932
Neizolata
-258.154
-276.4
-280.659
-285.999
-289.847
-291.788
-290.983
-286.696
-278.195
-264.775
-245.748
-220.434
-188.138
-148.143
-99.493
Patrata
HDRB
-214.185
-227.912
-231.336
-236.167
-240.412
-243.751
-245.444
-244.769
-240.934
-233.1
-220.371
-201.79
-176.324
-142.834
-100.411
LRB
-215.622
-229.497
-232.962
-237.843
-242.131
-245.501
-247.205
-246.515
-242.636
-234.721
-221.869
-203.119
-177.431
-143.664
-100.904
96
Dreptunghiulara
Neizolata HDRB
LRB
137.17
120.78
139.4
159.74
141
162.42
160.3
141.51
163.24
161.96
143.17
165.56
163.06
144.62
167.68
163.35
145.65
169.31
162.47
145.94
170.02
160.1
145.15
169.37
155.97
142.96
166.92
149.77
139
162.18
141.24
132.89
154.65
130.07
124.2
143.76
115.99
112.46
128.89
98.67
97.2
109.24
78.05
77.31
85.63
Etaj
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
E1
P
Neizolata
154.83
189.59
189.36
191.22
192.47
192.94
192.24
190.05
186.06
179.96
171.46
160.24
145.98
128.35
107.4
Circulara
HDRB
95.51
117.06
118.74
121.58
124.82
128.11
131.13
133.55
135.03
135.22
133.71
130.06
123.77
114.29
101.8
LRB
89.63
109.64
111.24
113.81
116.78
119.82
122.63
124.95
126.47
126.87
125.8
122.88
117.67
109.68
99.14
Neizolata
149.91
156.35
157.75
160.2
161.9
162.77
162.4
160.47
156.65
150.63
142.1
130.74
116.25
98.32
76.66
Patrata
HDRB
130.67
134.52
135.64
137.85
139.73
141.22
141.98
141.67
139.94
136.43
130.71
122.38
110.95
95.88
77.02
LRB
131.3
135.23
136.37
138.6
140.5
142.01
142.77
142.45
140.71
137.15
131.39
122.97
111.45
96.25
77.24
0.5
1.5
Dreptunghiulara
M+HDRB/M+neizol
Dreptunghiulara M+LRB/M+neiz
E11
Dreptunghiulara
M+LRB/M+HDRB
E10
Circulara M+HDRB/M+neizol
E9
E8
Circulara M+LRB/M+neiz
E7
E6
Circulara M+LRB/M+HDRB
E5
E4
E3
Patrata M+HDRB/M+neizol
Patrata M+LRB/M+neiz
E2
E1
Patrata M+LRB/M+HDRB
Figura 3.85" Raportul momentelor pozitive maxime n grinzi pentru cldirile S+P+14E"
97
0.2
0.4
0.6
0.8
1.2
1.4
E14
Dreptunghiulara M-HDRB/Mneizol
E13
Dreptunghiulara M-LRB/M-neiz
E12
Dreptunghiulara M-LRB/M-HDRB
E11
E10
Circulara M-HDRB/M-neizol
E9
E8
Circulara M-LRB/M-neiz
E7
Circulara M-LRB/M-HDRB
E6
E5
Patrata M-HDRB/M-neizol
E4
E3
Patrata M-LRB/M-neiz
E2
E1
Patrata M-LRB/M-HDRB
Figura 3.86" Raportul momentelor negative maxime n grinzi pentru cldirile S+P+14E"
0
0.2
0.4
0.6
0.8
1.2
1.4
E14
E13
E12
E11
E10
E9
E8
E7
E6
E5
E4
E3
E2
Dreptunghiulara VHDRB/Vneizol
Dreptunghiulara VLRB/Vneiz
Dreptunghiulara VLRB/VHDRB
Circulara VHDRB/Vneizol
Circulara VLRB/Vneiz
Circulara VLRB/VHDRB
Patrata VHDRB/Vneizol
Patrata VLRB/Vneiz
Patrata VLRB/VHDRB
E1
P
Figura 3.87" Raportul forelot tietoare maxime n grinzi pentru cldirile S+P+14E"
98
5C
5D
5P
10C
10D
10P
15C
15D
15P
Din urmatoarea figur se pot observa eforturile axiale capabile i efective ale
izolatorilor.
LRB
HDRB
LRB
HDRB
LRB
HDRB
LRB
HDRB
Pef. Seism
LRB
Pef. SLU
HDRB
PmaxSeism
LRB
PmaxSLU
HDRB
LRB
HDRB
LRB
HDRB
LRB
HDRB
0
10000
20000
30000
40000
50000
15 LRB
15 HDRB
Pef. Seism
10 LRB
Pef. SLU
10 HDRB
PmaxSeism
PmaxSLU
5 LRD
5 HDRB
0
10000
20000
30000
40000
50000
99
45000
40000
30000
y = 141.1x2 - 1244.x + 14913
R = 1
Pmax,SLU
Pmax,seism
25000
Pef.,SLU
Pef.,seism
Poly. (Pmax,SLU)
20000
Poly. (Pmax,seism)
Poly. (Pef.,SLU)
Poly. (Pef.,seism)
15000
10000
5000
0
0
10
15
20
100
25000
y = -233.6x2 + 5775x - 14217
R = 1
y = -151.9x2 + 3944x - 7520.
R = 1
20000
y = -91.33x2 + 2916.x - 5950
R = 1
15000
Pmax,SLU
Pmax,seism
Pef.,SLU
Pef.,seism
Poly. (Pmax,SLU)
Poly. (Pmax,seism)
Poly. (Pef.,SLU)
10000
Poly. (Pef.,seism)
5000
0
0
10
15
20
101
CONCLUZII
102
Niv.
5
10
15
Eforturile sectionale de tip momente incovoietoare si forte taietoare, la peretii din b.a.,
in cazul utilizarii izolatorilor seismici, se reduc la circa 48-93% din eforturile
corespunzatoare structurii neizolate;
- Eforturile sectionale de tip forte axiale practic raman cu aceleasi valori;
- Eforturile sectionale scad mai mult in cazul utilizarii izolatorilor seismici de tip
HDRB fata de LRB.
Pentru stalpii din b.a:
-
Momente incovoietoare
Forte taietoare
Forte axiale
HDRB/ LRB/ LRB/H HDRB/ LRB/ LRB/H HDRB/ LRB/ LRB/H
NEIZ
NEIZ
DRB
NEIZ
NEIZ
DRB
NEIZ NEIZ
DRB
0.83
0.92
1.12
0.82
0.93
1.13
1.00
1.00
1.00
0.68
0.98
1.03
0.83
0.98
1.19
0.99
0.94
0.94
0.76
0.84
1.10
0.76
0.74
0.98
1.11
1.07
0.97
Tabel 4.2 "Rapoarte eforturi maxime n stlpi"
Niv.
5
10
15
Eforturile sectionale de tip momente incovoietoare si forte taietoare, la stalpii din b.a.,
in cazul utilizarii izolatorilor seismici, se reduc la circa 68-98% din eforturile
corespunzatoare structurii neizolate;
- Eforturile sectionale de tip forte axiale practic raman cu aceleasi valori;
- Eforturile sectionale scad mai mult in cazul utilizarii izolatorilor seismici de tip
HDRB fata de LRB.
Pentru grinzilei din b.a:
-
Niv.
5
10
15
cladirile cu mai mult de 5 niveluri. Cu cat cladirea are mai multe niveluri se constata o
scadere din ce in ce mai mare (86-95% la 10 niveluri).
De asemenea se constata ca (in sensul celor prezentate mai sus) eforturile scad mai
mult in cazul utilizarii izolatorilor seismici de tip HDRB fata de cei de tip LRB.
Avand in vedere toate cele prezentate anterior, pentru cladirile care se proiecteaza cu
structura duala din b.a. cu regim mic si mediu de inaltime (pana in 15 niveluri) se constata ca
izolatorii seismici de tip HDRB sunt mai eficienti fata de izolatorii seismici de tip LRB.
DIRECTII PRINCIPALE DE STUDIU PENTRU VIITOR:
-
Realizarea de studii comparative de caz, pentru cladiri existente cu structura din b.a.,
proiectate in concordanta cu codurile de tip P13-63; P13-70; P100-78; P100-82 si
P100-92, in cazul alegerii solutiei de izolare seismica a bazei;
Realizarea de studii comparative cu privire la izolarea seismica a bazei unor tronsoane
alaturate ale cladirilor existente cu structura duala. Evitarea ciocnirilor intre tronsoane
prin utilizarea unor dispozitive speciale de atenuare a acestora sau prin cuplarea
tronsoanelor.
104
BIBLIOGRAFIE
105