Documente Academic
Documente Profesional
Documente Cultură
C 1 FLOORING WORK Handling, lifting & fixing of ceramic tiles of specified size, approved shade and make for Flooring at all levels & heights over a cement mortar (1:4) bed of 20 mm thickness including cutting wherever required, laying slope whereever required,making recesses/drops at the shower area, making Hole for traps, pipes, comode & electric box, cladding, copla, V groove cutting & polishing, joint filling with pigments of matching colour including cleaning, curing, tools complete in all respect as per drawing and specifications and as directed and to the satisfaction of the Project Manager (Including all but excluding the cost of grey cement & tiles to be issued by CMGL). Sqm 2 Handling, lifting & fixing of ceramic tiles of specified size, approved shade and make for Dado at all levels & heights over a cement mortar (1:3) bed of 15 mm thickness including cutting wherever required, making Hole for traps, pipes, comode & electric box, cladding, copla, V groove cutting & polishing, joint filling with pigments of matching colour including cleaning, curing, tools complete in all respect as per drawing and specifications and as directed and to the satisfaction of the Project Manager (Including all but excluding the cost of grey cement & tiles to be issued by CMGL). Sqm 3 Handling, lifting & fixing of ceramic tiles of specified size, approved shade and make for Skirting (100mm high) at all levels & heights over a cement mortar (1:4) bed of 12 mm thickness including cutting wherever required, making Hole for traps, pipes, comode & electric box, cladding, copla, V groove cutting & polishing, joint filling with pigments of matching colour including cleaning, curing, tools complete in all respect as per drawing and specifications and as directed and to the satisfaction of the Project Manager (Including all but excluding the cost of grey cement & tiles to be issued by CMGL). RM 4 Handling, lifting, cutting & laying/fixing Marble (of approved shade) tiles & slabs at all levels in Floor with a layer of white cement slurry over cement mortar base (CM 1:4) of 20mm thick, finished to all shapes (curved or straight) and filling the joints with matching colour pigment including making Hole for traps, pipes, comode & electric box, cladding, copla, V groove, cutting, polishing, grinding and cleaning with acid as per drawings, curing etc. as per specifications and directions of the Project Manager (Including all, but excluding the cost of grey cement Sqm & marble). DESCRIPTION UNIT QTY
Rate
Amount
5881
223
1311463
2750
233
640750
6365
40
254600
1500
380
570000
BOQ/Price schedule
CMGL
Phase III (Tower II) Finishing works Unit No. 5 DESCRIPTION UNIT Handling, lifting, cutting & laying/fixing Marble (of approved shade) tiles & slabs at all levels in Skirting (100mm high) with a layer of white cement slurry over cement mortar base (CM 1:4) of 12mm thick, finished to all shapes (curved or straight) and filling the joints with matching colour pigment including making Hole for traps, pipes, comode & electric box, cladding, copla, V groove, cutting, polishing, grinding and cleaning with acid as per drawings, curing etc. as per specifications and directions of the Project Manager (Including all but excluding the cost of grey cement & marble). RM Handling, lifting & fixing of ceramic & vitrified tiles of specified size, approved shade and make for Skirting (150mm high) at all levels & heights over a cement mortar (1:4) bed of 12 mm thickness including cutting wherever required, making Hole for traps, pipes, comode & electric box, cladding, copla, V groove cutting & polishing, pointing with pigments of matching colour including cleaning, curing, tools complete in all respect as per drawing and specifications and as directed and to the satisfaction of Project Manager (Including all but excluding the cost of grey cement & tiles to be issued by CMGL). RM 7 Handling, lifting & fixing of vitrified tiles of specified size, approved shade and make for corridor floor at all levels & heights over a cement mortar (1:4) bed of 20 mm thickness including cutting wherever required, making Hole for traps, pipes, comode & electric box, cladding, copla, V groove cutting & polishing, pointing with pigments of matching colour including cleaning, curing, tools complete in all respect as per drawing and specifications and as directed & to the satisfaction of the Project Manager (Including all but excluding the cost of grey cement & tiles to be issued by CMGL). SQM 8 Handling, lifting & fixing of ceramic tiles of specified size, approved shade and make for Corridor wall opp. lift well at all levels & heights over a cement mortar (1:3) bed of 15 mm thickness including cutting wherever required, making Hole for pipes, dedectors, electric box, cladding, copla, V groove cutting & polishing, pointing with pigments of matching colour including cleaning, curing, tools complete in all respect as per drawing and specifications and as directed & to the satisfaction of the Project Manager (Including all but excluding the cost of grey cement & tiles to be issued by CMGL). Sqm 150 QTY
Rate
Amount
2000
55
110000
1148
40
45900
1450
233
337734
235
35250
BOQ/Price schedule
CMGL
Phase III (Tower II) Finishing works Unit No. 9 DESCRIPTION UNIT Handling, lifting, cutting and laying/fixing prepolished Granite (of approved shade) over RCC kitchen counter at all levels & heights, over cement mortar base (CM 1:4) of 20mm thick, finished to all shapes (curved or straight), making Hole for traps, pipes, electric box, cutting openings for Kitchen sink, Cladding, copla, V groove cutting & polishing and filling the paper joints with matching colour pigment, curing etc as per drawings, specifications direction & satisfaction of the Project Manager (Including all but excluding the cost of granite and grey cement). Sqm 9A Handling, lifting, cutting and laying/fixing prepolished Granite (of approved shade) over vertical cuddapah stone at all levels & heights, by groove cutting in brick masonary, inserting granite min. 1", jamming by cement mortar & fixing by araldite on the top edge of the cudappah stone, finished to all shapes (curved or straight), making Hole for traps, pipes, electric box, cutting openings for Kitchen sink, Cladding, copla, V groove cutting & polishing and filling the paper joints with matching colour pigment, curing etc as per drawings, specifications direction & satisfaction of the Project Manager (Including all but excluding the cost of granite and grey cement). Sq.m 9B Handling, lifting, cutting and laying/fixing vertical cuddapah stone at all levels & heights as supports for kitchen counter, by groove cutting in brick masonary, inserting stone min. 1", jamming by cement mortar, finished to all shapes (curved or straight), making Hole for traps, pipes, electric box, cutting openings for Kitchen sink, Cladding, copla, V groove cutting & polishing and filling the paper joints with matching colour pigment, curing etc as per drawings, specifications direction & satisfaction of the Project Manager (Including all but excluding the cost of cuduppah stone and grey cement). Sq.m 10 Handling, lifting and laying/fixing pre-polished Granite (of approved shade) skirting/facia at all levels & heights of kitchen counter, with a uniform layer of araldite and POP on top of granite for holding till araldite dries, finished to all shapes (curved or straight) making Holes, Cladding, copla, V groove cutting & polishing and filling the paper joints with matching colour pigment as per drawings, specifications, direction & to the satisfaction of the Project Manager (Including all but excluding the cost of granite). RM 439 R.O. R.O. QTY
Rate
Amount
226
385
87106
385
385
90
39510
BOQ/Price schedule
CMGL
Phase III (Tower II) Finishing works Unit No. 11 DESCRIPTION UNIT Handling, lifting and laying/fixing flamed Granite (of approved shade) at all levels & heights on vertical surface of corridor wall, with a uniform layer of araldite and POP on top of granite for holding till araldite dries, finished to all shapes (curved or straight) making Holes, Cladding, copla, V groove cutting & polishing and filling the paper joints with matching colour pigment, as per drawings, specifications, direction & to the satisfaction of the Project Manager (Including all but excluding the cost of granite). SQM Handling, lifting & Fixing of door sills (Marble / Granite / Jaisalmir Stone) of varying width from 65mm to 360mm as required in floor at all levels with cement mortar (1:4) of 20mm thick and a layer of white cement slurry including cutting, polishing, curing etc. complete as per the direction of the Project Manager, including all but excluding the cost of cement & stone Rm QTY
Rate
Amount
125
400
50000
12
747
42
31364
13 Handling, lifting & Fixing of Kota Stone in stair case over a cement mortar (1:4) bed of 20mm thickness including pointing with pigments of matching colour etc. complete as per the direction of the Project Manager, excluding the cost of grey cement & kota stone supplied by CMGL. Sqm 14 Handling, lifting & Fixing of broken tiles in deck level over a cement mortar (1:4) bed of 20mm thickness including pointing with pigments of matching colour, breaking of tiles etc. complete as per the direction of the Project Manager, excluding the cost of grey cement & tiles supplied by CMGL. Sqm 15 Handling, lifting & Fixing of Jaisalmir Stone coping on stair case railing over a cement mortar (1:4) bed of 20mm thickness including pointing with pigments of matching colour, cutting & finishing to all shapes (curved or straight) etc. complete as per the direction of the Project Manager, excluding the cost of grey cement & stone supplied by CMGL. Sqm 16 Providing and laying IPS flooring in stair case, deck, ramp including finishing, with red oxide pigment as required etc.all complete as per the directionof the Project Manager, excluding the cost of grey cement to be supplied by CMGL. a) b) c) 17 25 mm thick 40 mm thick 50 mm thick Providing floor protection for all kinds of flooring works by laying polythene sheet allover the flat and spreading plaster of paris with minimum thickness of 25mm over the sheet so as to keep it intact and on handover removing the sheet & POP, cleaning the flat and disposing the rubbish outside the site as per the direction of the Project manager Sqm Sqm Sqm 176 771 1050
36
315
11261
105
263
27615
30
263
7890
78 87 96
BOQ/Price schedule
CMGL
Phase III (Tower II) Finishing works Unit No. a) b) DESCRIPTION For A, B, C type flat For D & Duplex type flat UNIT Flat Flat QTY R.O. R.O.
Rate
Amount
TOTAL (C)
D 1
Handling, lifting and Fixing of main door (panelled) made of 2nd class Teak wood having single leaf at all levels including fixing all accessories like brass handle on both side, door stopper, buffer, hinges, godrej tribolt lock etc. including polishing complete, as per the direction & to the satisfaction of the Project Manager including supply of S.S. screws but excluding cost of accessories & main door 2 Handling, lifting & Fixing of internal flush doors of different sizes at all levels including fixing all accessories like hinges, buffer, cylindrical locks, supply & application of two coats of synthetic enamel paint (ICI/Berger/Asian Paint make) over two coats of primer complete as per the direction of the Project Manager, including supply of S.S. screw but excluding cost of accessories & flush door. 3 Handling, lifting & fixing of balcony doors fully glazed (2 shutters) of different sizes at all levels including fixing all accessories like hinges, SS handle, tower bolt, buffer, supply & application of two coats of synthetic enamel paint (ICI/Berger/Asian Paint make) over two coats of primer complete as per the direction of the Project Manager, including supply of S.S. screws but excluding cost of glass, accessories & door shutters.
No
98
1060
103350
No
600
580
348000
No 3A Handling, lifting & fixing of balcony doors fully glazed (3 shutters) of different sizes at all levels including fixing all accessories like hinges, SS handle, tower bolt, buffer, supply & application of two coats of synthetic enamel paint (ICI/Berger/Asian Paint make) over two coats of primer complete as per the direction of the Project Manager, including supply of S.S. screws but excluding cost of glass, accessories & door shutters. No. 4 a Handling, lifting and Fixing of glass in balcony shutter glazed doors at all levels including applying putty etc. complete asper the direction of the project manager, but excluding cost of wooden bead. (overall area of door shutter shall be measured) Sqm
138
620
85560
35
750
26250
523
80
41840
BOQ/Price schedule
CMGL
Phase III (Tower II) Finishing works Unit No. b DESCRIPTION UNIT Supply of 5mm thick clear Modi float glass including wooden beading of good quality and same as that of the door wood quality and to the satisfaction of the Project Manager (overall area of door shutter shall be measured) Sq.m. Handling, lifting and Fixing of fire door (flush door) at all levels with accessories like hinges, lock, door closure, supply & application of two coats of synthetic enamel paint (ICI/Berger/Asian Paint make) over two coats of primer complete, as per the direction of the Project Manager, including supply of S.S. screw but excluding cost of accessories & flush door. Handling, lifting and Fixing of Electrical panel door (teak wood or marbau) at all levels with accessories like hinges, lock, buffer, supply & application of two coats of synthetic enamel paint (ICI/Berger/Asian Paint make) over two coats of primer complete, as per the direction of the Project Manager, including supply of S.S. screw but excluding cost of accessories & door. QTY
Rate
Amount
523
350
183050
No
34
580
19720
No
34
580
19720
Supplying, handling lifting and fixing of Teak wood moulding (size 50mm x 12.5mm ) all around the door frames including polishing at all levels & heights as per the direction and satisfaction of the Project Manager. (Sample of moulding to be approved by CMGL) RM Supplying, handling, lifting and fixing of Badam wood or equivalent approved moulding (size 50mm x 12.5mm ) all around the door frames including two coats of synthetic enamel paint over a coat of primer at all levels and heights as per the direction & satisfaction of the Project Manager. RM Providing & fixing PHE duct covering with frame, shutter, moulding etc. complete (9mm ply & frame 75mm X 50mm) as per the drawing and direction of the Project Manager in "B" type flat kitchen and Dining area (size 850mm X 600mm approx.) and Duplex area as per site requirement with supply 7 application of 2 coats of synthetic enamel paint over Nos. a coat of approved primer. FALSE CEILING Providing and fixing to the required profile and shape with 12mm thick gypsum board suspended from the RCC ceiling with 18 gauge T,U & L galvanized sections spaced at 600 mm c/c both ways. Entire work to be finished smooth and painted Sqm with 2 coats of white cement primer and 2 coats of paint of approved shade & brand. Entire work shall be of high quality finish and shall be as per direction & to the satisfaction of the PM OR
530
88
46640
5019
65
326219
40
800
32000
10 10a
978
590
BOQ/Price schedule
CMGL
Phase III (Tower II) Finishing works Unit No. 10b DESCRIPTION UNIT Providing and fixing to the required profile and shape with 12mm thick POP board suspended from the RCC ceiling with 18 gauge T,U & L galvanized sections spaced at 600 mm c/c both ways. Entire work to be finished smooth and painted with 2 coats Sqm of white cement primer and 2 coats of paint of approved shade & brand. Entire work shall be of high quality finish and shall be as per direction & to the satisfaction of the PM. OR Providing and fixing to the required profile and shape with 6mm thick E board suspended from the RCC ceiling with 18 gauge T,U & L galvanized sections spaced at 600 mm c/c both ways. Entire work to be finished smooth and painted with 2 coats of white cement primer and 2 coats of paint of approved shade & brand. Entire work shall be of high quality finish and shall be as per direction & to the satisfaction of the PM. QTY
Rate
Amount
978
585
10c
Sqm
978
600
586950
11
Supplying & Fixing of anodized aluminum frame (Section - 2" X 1") of size 420mm X 620mm with taper clips, 4mm thick pin head glass, in electrical rooms including sealing the joints with silicon sealant from outside as per the direction of the Project Manager (sample to be approved by CMGL). Nos Providing and fixing anodized aluminum frame (section 2"X1") for approx. opening size of 700mm X 800mm of AC cutout including supply & fixing of 4mm thick pin head opaque glass with silicon sealant from outside for water proofing etc. complete as per the direction of the Project Nos Manager and sample approved. Fixing of Flush Door at the entrance of flat at all levels inlcuidng lifting on temporary basis for security reasons with all fittings like hinge, hatch bolt, screws etc. complete including supply as per the direction of the EIC (Flush door to be supplied by CMGL) No. Dismantling of the temporary doors, returnig the doors to CMGL store and repairing the frames with wooden piece and putty so as to give a smooth neat finish before fixing the teak main door No. Total for Wood Work ( D)
204
500
102000
12
286
780
223275
13
R.O.
240
14
R.O.
80 2,144,574
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
BOQ/Price schedule
CMGL
HILAND PARK - A PROJECT OF CALCUTTA METROPOLITAN GROUP LTD. COMPARATIVE STATEMENT OF PACKAGES (PHASE III FINISHING) Sr. No. Description Rahul Beria Amal Mukherjee 0 3,399,805 585,000 3,517,958 1,984,283 9,487,046 0 2,724,014 585,000 4,035,972 2,209,740 9,554,725 Base Construction 0 2,763,947 1,323,750 3,741,987 2,027,580 9,857,264 Base Proposed Unit Construction 0 2,301,718 1,170,000 5,653,845 3,117,885 12,243,448 Kanjilal & Co. 0 2,120,734 900,000 5,214,408 11,624,635 19,859,777 S.K. Plaza SPCL
1 2a 2b 3 4
Brickwork, Plastering, Painting etc. Fabrication works (Building) Fabrication works (Lift shaft) Flooring works Wood Work
11,464,068
1,402,592