Code No: A107320105 Set No. 1 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD III B.Tech. II Sem., II Mid-Term Examinations, March 2011 ESTIMATING AND COSTING Objective Exam Name: ______________________________ Hall Ticket No. A I 1. Choose the correct alternative: Clear cover in R.C.C Roof slab should be a. Not less than 15mm or dia of the reinforce in bar which ever is greater b. Half the diameter of the rod irrespective of dia of rod. c. Not less than 25mm d. Not less than 40mm Hook is provided in reinforcement bars to reduce the a. Length of lap b. Dia of rod c. Tensile stress d. Bond stress [

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20.

2.

3.

Contract means a. It is a term to be used for the contractor to take up the work. b. It is a system for taking up a work c. It is an agreement which is enforceable by law d. It is an agreement in between two parties but not enforceable by law

4.

Nominal Muster roll is nothing but [ a. Daily labour report b. Record of the payment of the work made daily c. Measurement book d. It is record of complete attendance, payment made, unpaid wages and out-turn of work etc., Curing for the plastering shall be commenced after a. Second day of finishing the plastering b. First day of finishing the plastering c. Third day of finishing the plastering d. Fourth day of finishing the plastering The minimum curing for concrete work is a. 28 days b. 21 days c. 14 days d.7 days

5.

6.

7.

Earnest money deposit is fixed sum on the tender value of the work in order to be [ ] a. A guarantee which shall be deposited by the contractor while filing the tender to ensure that he will not back out later b. A secured deposit for his tender c. To return the same after the tenders d. To return the same after entering into agreement Measurement book is [ ] a. A original record of all kinds of works which are susceptible measurements and becomes basis for payment. b. It is a book in which estimate is prepared. c. It is a book where levels are recorded after conducting survey d. It is a book in which lead of materials will be recorded Cont..2

T N

W U

R O

D L

8.

www.jntuworld.com

www.jntuworld.com

www.jwjobs.net

Code No: A107320105 9.

:2:

Set No.1 ]

Secured advance to the contractor is [ a. Advance payment to the contractor for entering into agreement. b. Advance payment on the security of materials brought by the contractor to the site of work. c. Payment made to the contractor for the work done but not measured d. Payment made to the work charged establishment who were engaged on the work. Comparative statement on tenders will be prepared [ a. To arrive at the lowest tenderer and the tender value and its percentage excess are less. b. To enter into agreement. c. To issue work order. d. To finalize the schedule of rates. Fill in the blanks: In beams the shear reinforcement will be supplemented by providing --------------The ____________ of bars is the list of reinforcement bars in the tabular form. A person who lends money on mortgage is called ----------------------N.M.R means ----------------------D.L.R means ----------------------M.B means ----------------------E.M.D means-----------------------

10.

II 11. 12. 13. 14. 15. 16. 17. 18.

If L is length of the bar having diameter d then the total length of the bar when it is hooked on both sides will be ___________ ___________ Means the actual cost of construction of purchase. Value depends on the __________ and ____________

19. 20.

T N

W U
-oOo-

R O

D L

www.jntuworld.com

www.jntuworld.com

www.jwjobs.net

Code No: A107320105 Set No. 2 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD III B.Tech. II Sem., II Mid-Term Examinations, March 2011 ESTIMATING AND COSTING Objective Exam Name: ______________________________ Hall Ticket No. A I 1. Choose the correct alternative: Nominal Muster roll is nothing but [ a. Daily labour report b. Record of the payment of the work made daily c. Measurement book d. It is record of complete attendance, payment made, unpaid wages and out-turn of work etc., Curing for the plastering shall be commenced after a. Second day of finishing the plastering b. First day of finishing the plastering c. Third day of finishing the plastering d. Fourth day of finishing the plastering The minimum curing for concrete work is a. 28 days b. 21 days c. 14 days d.7 days [

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20.

2.

3.

4.

Earnest money deposit is fixed sum on the tender value of the work in order to be [ ] a. A guarantee which shall be deposited by the contractor while filing the tender to ensure that he will not back out later b. A secured deposit for his tender c. To return the same after the tenders d. To return the same after entering into agreement Measurement book is [ ] a. A original record of all kinds of works which are susceptible measurements and becomes basis for payment. b. It is a book in which estimate is prepared. c. It is a book where levels are recorded after conducting survey d. It is a book in which lead of materials will be recorded Secured advance to the contractor is [ a. Advance payment to the contractor for entering into agreement. b. Advance payment on the security of materials brought by the contractor to the site of work. c. Payment made to the contractor for the work done but not measured d. Payment made to the work charged establishment who were engaged on the work. Comparative statement on tenders will be prepared [ a. To arrive at the lowest tenderer and the tender value and its percentage excess are less. b. To enter into agreement. c. To issue work order. d. To finalize the schedule of rates. Clear cover in R.C.C Roof slab should be a. Not less than 15mm or dia of the reinforce in bar which ever is greater b. Half the diameter of the rod irrespective of dia of rod. c. Not less than 25mm d. Not less than 40mm [

5.

6.

T N

W U

R O

D L

7.

8.

Cont..2

www.jntuworld.com

www.jntuworld.com

www.jwjobs.net

Code No: A107320105 9.

:2:

Set No.2 [ ]

Hook is provided in reinforcement bars to reduce the a. Length of lap b. Dia of rod c. Tensile stress d. Bond stress Contract means a. It is a term to be used for the contractor to take up the work. b. It is a system for taking up a work c. It is an agreement which is enforceable by law d. It is an agreement in between two parties but not enforceable by law Fill in the blanks: N.M.R means ----------------------D.L.R means ----------------------M.B means ----------------------E.M.D means-----------------------

10.

II 11. 12. 13. 14. 15.

If L is length of the bar having diameter d then the total length of the bar when it is hooked on both sides will be ___________ ___________ Means the actual cost of construction of purchase. Value depends on the __________ and ____________ In beams the shear reinforcement will be supplemented by providing --------------The ____________ of bars is the list of reinforcement bars in the tabular form. A person who lends money on mortgage is called -----------------------

16. 17. 18. 19. 20.

T N

W U
-oOo-

R O

D L

www.jntuworld.com

www.jntuworld.com

www.jwjobs.net

Code No: A107320105 Set No. 3 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD III B.Tech. II Sem., II Mid-Term Examinations, March 2011 ESTIMATING AND COSTING Objective Exam Name: ______________________________ Hall Ticket No. A I 1. Choose the correct alternative: The minimum curing for concrete work is a. 28 days b. 21 days c. 14 days d.7 days [

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20.

2.

Earnest money deposit is fixed sum on the tender value of the work in order to be [ ] a. A guarantee which shall be deposited by the contractor while filing the tender to ensure that he will not back out later b. A secured deposit for his tender c. To return the same after the tenders d. To return the same after entering into agreement Measurement book is [ ] a. A original record of all kinds of works which are susceptible measurements and becomes basis for payment. b. It is a book in which estimate is prepared. c. It is a book where levels are recorded after conducting survey d. It is a book in which lead of materials will be recorded Secured advance to the contractor is [ a. Advance payment to the contractor for entering into agreement. b. Advance payment on the security of materials brought by the contractor to the site of work. c. Payment made to the contractor for the work done but not measured d. Payment made to the work charged establishment who were engaged on the work. Comparative statement on tenders will be prepared [ a. To arrive at the lowest tenderer and the tender value and its percentage excess are less. b. To enter into agreement. c. To issue work order. d. To finalize the schedule of rates. Clear cover in R.C.C Roof slab should be a. Not less than 15mm or dia of the reinforce in bar which ever is greater b. Half the diameter of the rod irrespective of dia of rod. c. Not less than 25mm d. Not less than 40mm Hook is provided in reinforcement bars to reduce the a. Length of lap b. Dia of rod c. Tensile stress d. Bond stress Contract means a. It is a term to be used for the contractor to take up the work. b. It is a system for taking up a work c. It is an agreement which is enforceable by law d. It is an agreement in between two parties but not enforceable by law [

3.

4.

5.

T N

W U

R O

D L

6.

7.

8.

Cont..2

www.jntuworld.com

www.jntuworld.com

www.jwjobs.net

Code No: A107320105 9.

:2:

Set No.3 ]

Nominal Muster roll is nothing but [ a. Daily labour report b. Record of the payment of the work made daily c. Measurement book d. It is record of complete attendance, payment made, unpaid wages and out-turn of work etc., Curing for the plastering shall be commenced after a. Second day of finishing the plastering b. First day of finishing the plastering c. Third day of finishing the plastering d. Fourth day of finishing the plastering Fill in the blanks: M.B means ----------------------E.M.D means----------------------[

10.

II 11. 12. 13.

If L is length of the bar having diameter d then the total length of the bar when it is hooked on both sides will be ___________ ___________ Means the actual cost of construction of purchase. Value depends on the __________ and ____________

14. 15. 16. 17. 18. 19. 20.

In beams the shear reinforcement will be supplemented by providing --------------The ____________ of bars is the list of reinforcement bars in the tabular form. A person who lends money on mortgage is called ----------------------N.M.R means ----------------------D.L.R means -----------------------

T N

W U
-oOo-

R O

D L

www.jntuworld.com

www.jntuworld.com

www.jwjobs.net

Code No: A107320105 Set No. 4 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD III B.Tech. II Sem., II Mid-Term Examinations, March 2011 ESTIMATING AND COSTING Objective Exam Name: ______________________________ Hall Ticket No. A I 1. Choose the correct alternative:

Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 20.

Measurement book is [ ] a. A original record of all kinds of works which are susceptible measurements and becomes basis for payment. b. It is a book in which estimate is prepared. c. It is a book where levels are recorded after conducting survey d. It is a book in which lead of materials will be recorded Secured advance to the contractor is [ a. Advance payment to the contractor for entering into agreement. b. Advance payment on the security of materials brought by the contractor to the site of work. c. Payment made to the contractor for the work done but not measured d. Payment made to the work charged establishment who were engaged on the work. Comparative statement on tenders will be prepared [ a. To arrive at the lowest tenderer and the tender value and its percentage excess are less. b. To enter into agreement. c. To issue work order. d. To finalize the schedule of rates. Clear cover in R.C.C Roof slab should be a. Not less than 15mm or dia of the reinforce in bar which ever is greater b. Half the diameter of the rod irrespective of dia of rod. c. Not less than 25mm d. Not less than 40mm Hook is provided in reinforcement bars to reduce the a. Length of lap b. Dia of rod c. Tensile stress d. Bond stress Contract means a. It is a term to be used for the contractor to take up the work. b. It is a system for taking up a work c. It is an agreement which is enforceable by law d. It is an agreement in between two parties but not enforceable by law

2.

3.

4.

5.

6.

T N

W U

R O

D L

7.

Nominal Muster roll is nothing but [ a. Daily labour report b. Record of the payment of the work made daily c. Measurement book d. It is record of complete attendance, payment made, unpaid wages and out-turn of work etc., Curing for the plastering shall be commenced after a. Second day of finishing the plastering b. First day of finishing the plastering c. Third day of finishing the plastering d. Fourth day of finishing the plastering [

8.

Cont..2

www.jntuworld.com

www.jntuworld.com

www.jwjobs.net

Code No: A107320105 9.

:2:

Set No.4 [ ]

The minimum curing for concrete work is a. 28 days b. 21 days c. 14 days d.7 days

10.

Earnest money deposit is fixed sum on the tender value of the work in order to be [ ] a. A guarantee which shall be deposited by the contractor while filing the tender to ensure that he will not back out later b. A secured deposit for his tender c. To return the same after the tenders d. To return the same after entering into agreement Fill in the blanks: If L is length of the bar having diameter d then the total length of the bar when it is hooked on both sides will be ___________ ___________ Means the actual cost of construction of purchase. Value depends on the __________ and ____________

II 11.

12. 13.

14. 15. 16. 17. 18. 19. 20.

In beams the shear reinforcement will be supplemented by providing --------------The ____________ of bars is the list of reinforcement bars in the tabular form. A person who lends money on mortgage is called ----------------------N.M.R means ----------------------D.L.R means ----------------------M.B means -----------------------

T N

W U
-oOo-

R O

D L

E.M.D means-----------------------