Ericsson Internal
1 (4)
Remote Deployment
Michael Sderberg J / Drivers are Perf Manager functions To secure more cost efficient SW delivery through reinforced remote delivery - PA NDI, DM NDI, Every GSDC delivering SWDP & Integration for NDI, All GDP programs
Scope e.g.
Organization
Target values
Measurement unit (e.g. MSEK) and lower limit of
Target levels: Measurement Units: percent Gauge limits for intermediate SI Charging EMA MM OSS UM ASE MMS MN-OSS IMT AXE WL MSC M-MGW GSN WRAN BSC
Robust:
NRO
over time
End period limits: Remote deployment as defined in this specification refers to all software deliveries executed by a GSDC engineer in his/her HOME office/center with or without remote assistance from the MU resources. The softwa deliveries considered for this measurement are: - First Integration (FI), (SWDP Deliveries) - Software upgrades, all subsequent post-FI SW deliveries (executed by GSDC engineers) - SWDP Cold Starts deliveries, (start up by GSDC engineers, when wpplicable for M-MGw, WRAN, GSN) The measuremnt is also limited to the following NDI Products:AXE WL, MSC, M-MGW, GSN, WRAN, BSC
Measurement Description
How to measure, incl calculations and data sources
The percentage is calculated monthly by each GSDC according with their assigned deliveries. Note 1 : Final OPM reporting figure for year end will be based on the last 6 months average (namely July 1st, 2007 to December 31st, 2007). Note 2: PA SI deliveries are not measured for this OPM - however - If wanted the proposed nodes to follow is highlighted above. Note 3: Deliveries to customer commercial and non commercial environments are counted. Note 4: SW updates are not counted. SWDP process adherance ( entry / exit ) & node specific processes, log reasons preventing remote delivery
Actions
Date: 2007-07-05
E
Target Specification Performance follow-up Reporting
Ericsson Internal
2 (4)
Remote Deployment
Michael / Drivers Perf Manager functions MonthlySderberg reporting J from PQM are at GSDC to PC and via GDP projects - or - when no GDP exists - month from PQM at GSDC consolidated on PC level. Reporting to Forum For Performance Reviews GSDC MT, NRO DM MT, GDP SG & GDP PSG, GSD Regional MT meetings
Approved by:
Date: 2007-07-05
Ericsson Internal
3 (4)
ote Deployment
ns
Commitment:
Stretched:
o all software deliveries executed by a GSDC ote assistance from the MU resources. The software
(executed by GSDC engineers) rs, when wpplicable for M-MGw, WRAN, GSN)
Date: 2007-07-05
Ericsson Internal
4 (4)
ote Deployment
Date: 2007-07-05