Sunteți pe pagina 1din 8

DESIGN QUALIFICATION

1) Yard Layout: Option 4E


2) Soil Capacity (PBT) & Bore Hole location: Option 4E
3) Load Reaction
- 9 Module Using IFC data
- Others Module Using Bid Data
No

Module No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
21
22
23
24
27
25
26
19
20
28
29

101 CA
101 CC
101 CD
101 EB
101 EC
101 KA
*202 CA
*202 CC
*202 CD
*202 EB
202 EC
*202 KA
114 BA
114 BB
*114 GA
114 HA
114 HB
*114 JA
114 JD
101 DA
101 DB
101 JB
202 JB
202 DA
202 DB
114 JB
114 JC
101 AA
101 CB

Soil Capacity (MT/m2)


Max Reaction (MT)
Bore Hole PBT / PROBE IFC Dwg KHL Calc
40.8
13.46
40.8
122.73
40.8
41.6
40.8
53.52
40.8
40.37
40.8
27.38
40.8
40.8
40.8
40.8
40.8
40.8
40.8
17.4
40.8
39.7
40.8
40.8
77.4
40.8
66.5
40.8
40.8
77.0
10.1
94.29
10.1
108.97
34.8
165.14
34.8
45.5
45.5
11.8
59.0
11.8
73.6
11.8
17.74
11.8
64.93

COG
IFC
WCR
X
X
X
X
X
X

Foundation Req
Piling Conrete Mat
X
X
X
X
X
X

X
X
X
X

X
X
X
X

X
X
X
X

X
X
X
X

X
X
X
X

X
X
X
X

No.
Column
0
9
10
34
12
0

Pile Cap

Concrete Mat
(Purchased)

1.5 X 1.8 X 0.7


3 X 3 X 0.525

49
14

3 X 3 X 0.525
2 X 2 X 0.2

2 X 2 X 0.2
2 X 2 X 0.2

21
21

1.5 X 1.8 X 0.7


1.5 X 1.8 X 0.7

12
52
52
50

1.5 X 1.8 X 0.7


1.5 X 1.8 X 0.7
1.5 X 1.8 X 0.7

22
24
20
31

Min Required
Concrete Mat Size
2 X 2 X 0.2
3 X 3 X 0.5
2 X 2 X 0.2

2.5 X 2.5 X 0.35


2.5 X 2.5 X 0.3
2.5 X 2.5 X 0.35

3 X 3 X 0.525

(Pile Footings)
(Pile Footings)
2 X 2 X 0.15
3 X 3 X 0.3

Remark
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 2
Sector 3
Sector 3
Sector 3
Sector 3
Sector 3
Sector 3
Sector 4
Sector 4
Sector 4
Sector 4

30
31
32
33
34
35
36
46
37
38
40
41
42
43
44
39
47
45

101 EA
101 FA
101 GA
101 GB
101 JC
101 KB
101 MA
*114 FA
*202 AA
*202 CB
*202 FA
*202 GA
*202 GB
*202 JC
*202 KB
*202 EA
*114 JE
*202 MA

Pile Footings Utilisation


1.5 X 1.8 X 0.7 =

11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
12.6
12.6
12.6

378

Concrete Mat (Purchased) Utilisation


3 X 3 X 0.525 =
144

64.53
96.8
85.32
38.53
53.72
98.88
50.25

Pcs

Pcs

* Insufficient Data
Note:
KHL Calc based on BEC Weight and COG.

X
X
X
X
X
X
X

X
X
X
X
X
X
X

33
16
9
15
9
35
36

1.5 X 1.8 X 0.7


1.5 X 1.8 X 0.7

3 X 3 X 0.525
1.5 X 1.8 X 0.7
1.5 X 1.8 X 0.8

(Pile Footings)
(Pile Footings)
4 X 4 X 0.5
3 X 3 X 0.3
3 X 3 X 0.3
(Pile Footings)
(Pile Footings)

Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4
Sector 4

Project
Subject
Client
Rev.

Wheatsone Project LNG Plant


Soil Loadings
Bechtel International Inc.
A

Sheet
Prepared By
Checked By
Date

2 Nos
ROY
AGG/UAA
8/19/2013

Soil Loadings Based on BEC and KHL loadings data


Yard Layout : Option 4E
Sector : 2
Unit : Metric Tonne, MT

No.

Module

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

101 CA
101 CC
101 CD
101 EB
101 EC
101 KA
202 CA
202 CC
202 CD
202 EB
202 EC
202 KA
114 BA
114 BB
114 GA
114 HA
114 HB
114 JA
114 JD
Subtotal

Number of
Column

Module
Weight

0
9
10
34
12
0
0
9
10
34
12
0
49
14

130.72
700.90
266.32
1362.14
367.13
363.18
141.08
755.63
288.55
1470.05
396.21
391.36
630.50
441.95
100.67
1054.15
996.77
627.53
854.95
11339.79

21
21
12
259

Max
Reaction,
DL

Wind
Load, WL

13.46

1.33

122.73
53.52
40.37
27.38
14.54
132.55
45.03
57.80
43.60
29.57
17.36
39.70

2.14
8.15
9.70
8.66
0.75
1.33
2.14
8.15
9.70
8.66
0.75
4.34
9.93

77.37
66.51

19.34
16.63

41.69

Reaction Accuracy, Fabrication Load,


Total Load, Min Concrete
RA
FL
PL
Mat Size
(15% of DL+ WL)
(10% of DL)
2.22
1.35
18.35
2 X 2 X 0.2
18.73
12.27
155.88
3 X 3 X 0.5
7.48
4.17
61.49
2 X 2 X 0.2
9.48
5.35
78.06
(Pile Footings)
7.35
4.04
60.42
3 X 3 X 0.525
4.22
2.74
35.09
2 X 2 X 0.2
2.38
1.45
19.69
20.20
13.26
168.15
7.98
4.50
65.66
10.13
5.78
83.41
7.84
4.36
64.46
4.55
2.96
37.83
3.26
1.74
26.69
2 X 2 X 0.2
7.44
3.97
61.04
2 X 2 X 0.2

DL, WL
Data
Source
BFLD
BFLD
BFLD
BFLD
BFLD
BFLD
RWCR
RWCR
RWCR
RWCR
RWCR
RWCR
RWCR
RWCR

118.95
102.26

(Pile Footings)
(Pile Footings)

RWCR
RWCR

118.42
1275.84

2.5 X 2.5 X 0.35

Remarks

NFP
14.51
12.47

7.74
6.65

NFP
77.02
900.20

19.26
130.95

14.44
154.67

7.70
90.02

RWCR

Notes:
Loading datas from BEC will supercede loading datas calculated by KHL when available.
Maximum Reaction, DL is the maximum reaction at 1 point for every module.
Wind Load are calculated at every Maximum Reaction, DL.
Module Weight Reference:
Appendix 6A: ISBL Module Weight Summary
BEC Doc. No.: WS1-000-TEC-RPT-BEC-000-00081-000
Rev.: 5

BFLD : Bechtel Foundation Loading Diagram


RWCR : Reaction By Weight Control Report
NFP : No Foot Print

Project
Subject
Client
Rev.

Wheatsone Project LNG Plant


Soil Loadings
Bechtel International Inc.
A

Sheet
Prepared By
Checked By
Date

2 Nos
ROY
AGG/UAA
8/19/2013

Soil Loadings Based on BEC and KHL loadings data


Yard Layout : Option 4E
Sector : 4
Unit : Metric Tonne, MT

No.

Module

Number of
Column

Module
Weight

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

101 AA
101 CB
101 EA
101 FA
101 GA
101 GB
101 JC
101 KB
101 MA
114 FA
202 AA
202 CB
202 FA
202 GA
202 GB
202 JC
202 KB
202 EA
114 JE
202 MA
**114 JB
**114 JC
Subtotal

20
31
33
16
9
15
9
35
36
20
31
16
9
15
9
35
33
36
22
24
512

431.59
848.74
1804.31
1280.48
551.24
401.01
114.43
3199.83
1147.15
2246.47
465.78
925.89
1399.67
597.95
432.78
129.20
3456.71
1946.00
761.78
1237.97
1297.32
1369.20
26045.50

Max
Reaction,
DL
17.74
64.93
64.53
101.50
85.32
38.53
53.72
98.88
50.25
0.00
19.16
70.13
109.62
92.15
41.61
58.02
106.79
69.69
0.00
54.27
59.00
53.72
1511.33

Wind
Load, WL
5.40
1.83
7.65
25.38
17.64
3.36
1.84
4.59
2.75
0.00
5.40
1.83
25.38
17.64
3.36
1.84
4.59
7.65
0.00
2.75
14.75
13.43
219.50

Reaction Accuracy, Fabrication Load,


Total Load, Min Concrete
RA
FL
PL
Mat Size
(15% of DL+ WL)
(10% of DL)
3.47
1.77
28.39
2 X 2 X 0.15
10.02
6.49
83.28
3 X 3 X 0.3
10.83
6.45
89.46
(Pile Footings)
19.03
10.15
156.06
(Pile Footings)
15.44
8.53
126.94
4 X 4 X 0.5
6.28
3.85
52.03
3 X 3 X 0.3
8.33
5.37
69.27
3 X 3 X 0.3
15.52
9.89
128.88
(Pile Footings)
7.95
5.03
65.98
(Pile Footings)
0.00
0.00
0.00
3.68
1.92
30.16
2 X 2 X 0.15
10.79
7.01
89.77
(Pile Footings)
20.25
10.96
166.21
(Pile Footings)
16.47
9.21
135.47
4 X 4 X 0.5
6.75
4.16
55.88
3 X 3 X 0.3
8.98
5.80
74.64
3 X 3 X 0.3
16.71
10.68
138.77
(Pile Footings)
11.60
6.97
95.91
(Pile Footings)
0.00
0.00
0.00
8.55
5.43
71.00
(Pile Footings)
11.06
5.90
90.71
(Pile Footings)
(Pile Footings)
10.07
5.37
82.59
259.62
151.13
2141.58

DL, WL
Data
Source
BFLD
BFLD
BFLD
RWCR
BFLD
BFLD
BFLD
BFLD
BFLD

Remarks

NFP
RWCR
RWCR
RWCR
RWCR
RWCR
RWCR
RWCR
RWCR
NFP
RWCR
RWCR
RWCR

Notes:
Loading datas from BEC will supercede loading datas calculated by KHL when available.
Maximum Reaction, DL is the maximum reaction at 1 point for every module.
Wind Load are calculated at every Maximum Reaction, DL, point.
Module Weight Reference:
Appendix 6A: ISBL Module Weight Summary
BEC Doc. No.: WS1-000-TEC-RPT-BEC-000-00081-000
Rev.: 5

** Modules relocated from Sector 2 to Sector 4


BFLD : Bechtel Foundation Loading Diagram
RWCR : Reaction by Weight Control Report
NFP : No Foot Print
Plat Bearing Test result used for Sector 4: 11.8 MT/m2
Reference:
Plate Bearing Test Report by Asia Pile Testing Services (M) Sdn. Bhd
Serial No.: 4957-PBT-R5
Issued Date: 03/11/2012

Project
Subject
Client
Rev.

Wheatsone Project LNG Plant


Soil Loadings
Bechtel International Inc.
C

Sheet
Prepared By
Checked By
Date

2 Nos
ROY
AGG/UAA
8/19/2013

Soil Loadings Based on BEC and KHL loadings data


Yard Layout : Option 4E
Sector : 1
Unit : Metric Tonne, MT, m

No.

Module

Number of
Column

1
2
3
9
10
11
12
18
19
20
21
22

101 AA
101 CB
101 EA
101 MA
114 FA
202 AA
202 CB
202 EA
114 JE
202 MA
114 JB
114 JC
Subtotal

20
31
33
36
22
24
166

Module
Max Reaction, Wind Load, Reaction Accuracy, RA
Weight, MT
DL , MT
WL, MT
(15% of DL+ WL), MT
431.59
848.74
1804.31
1147.15
2246.47
465.78
925.89
1946.00
761.78
1237.97
1297.32
1369.20
14482.20

17.74
64.93
64.53
50.25
59.00
53.72
310.17

5.40
1.83
7.65
2.75
14.75
13.43
45.81

3.47
10.02
10.83
7.95
11.06
10.07
53.40

Fabrication Load,
FL
(10% of DL), MT
1.77
6.49
6.45
5.03
5.90
5.37
31.02

Total Load,
PL, MT

Min Concrete
Mat Size, m

DL, WL Data
Source

28.39
83.28
89.46
65.98
90.71
82.59
440.40

1.5 X 1.5 X 0.2


2.5 X 2.5 X 0.3
2.5 X 2.5 X 0.3
2 X 2 X 0.2
2.5 X 2.5 X 0.3
2.5 X 2.5 X 0.3

BFLD
BFLD
BFLD
BFLD
RWCR
RWCR

Remarks

NFP
Incomplete Data
Incomplete Data
Incomplete Data
NFP
Incomplete Data

Notes:
Loading datas from BEC will supercede loading datas calculated by KHL when available.
Maximum Reaction, DL is the maximum reaction at 1 point for every module.
Wind Load are calculated at every Maximum Reaction, DL, point.
Module Weight Reference:
Appendix 6A: ISBL Module Weight Summary
BEC Doc. No.: WS1-000-TEC-RPT-BEC-000-00081-000
Rev.: 5
BFLD : Bechtel Foundation Loading Diagram
RWCR : Reaction by Weight Control Report
NFP : No Foot Print
Assumed soil bearing pressure at Sector 1: 20 MT/m2

S-ar putea să vă placă și