Document No: 1kI-SUkL-LU 1kG Manua| (1kI]LM]S.0) - 00S kev. 00



End User Training Manual

for

SAP PM Plant maintenance


Process Name: Reconditioning / Shutdown


Process No: TRF/EPM/5.0




Control Copy No: TRF/EPM/5.0/



Document Change Contro|
Doc Version Description Prepared by Date Reviewed by Approved by
00 Original Palani Dorai 18.12.2009




Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 2 of 23


Introduction


Enterprise Plant maintenance process in TRF has the following business processes.

S|. No. 1kI Lnterpr|se rocess No. rocess Name
1 18l/LM/1.0 Preventive Maintenance process

2 18l/LM/2.0 Equipment Calibration processes

3 18l/LM/3.0 Unplanned / Breakdown Maintenance processes

4 18l/LM/4.0 External services processes

3 18l/LM/3.0 Reconditioning / Shutdown processes.

For each of the above processes, there are separate End User Training Manuals are
available


This document covers sl. No. 5. Of the above list, that is Reconditioning / Shut down
Process.


This End User Training manual on Reconditioning / Shut down Process consists of the
following sequence of sub-processes
1. Creation of an Order - Transaction code IW31
2. Order Confirmation - Transaction code IW44
3. Technical Completion - Transaction code IW32














Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 3 of 23

1. Creation of an Order - Transaction code IW31

Procedural Steps
Purpose
Creation of an Order for Reconditioning / shut down process
Transaction Code
IW31
Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance
Processing > Order > IW31 (Create (General)
Procedure
Enter the Transaction code IW31 in the command field as shown in the screen
below




Or go as per the navigation shown below and click IW31 - Create



Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 4 of 23




Press <Enter> or click on the check mark icon in the top left side corner of the

Screen, the following screen will appear


Key-in the Order type and the equipment NO (since the user knows for which equipment he is
creating the order)
Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 5 of 23



.
Click on the check mark icon, the following window appears

Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 6 of 23




Key-in data in to the fields as shown in the following screen. Use drop down list to get the
values.




Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 7 of 23






After keying-in of the above data, click on the operation tab, the following screen appears.




Key-in data
in this field
Key-in data in this field
Key-in data
in this field
Key-in data
in this field
Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 8 of 23




If date is to be changed, Select the line, (refer screen below), and









Click on the Act date push button, the following screen appears

Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 9 of 23








Click on the date tab, the following screen appears

Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 10 of 23




Enter the required details in the two fields as shown in the screen below





Return back to the screen by clicking .

Key-in date
Key-in option
Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 11 of 23

Repeat the same for all other operations
Click on the components tab, the following screen appears.



Click on the List push button, the following screen appears showing all the parts
of the equipment,


Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 12 of 23

Select and double click on the required items, it will get populated on the screen(s) as shown
below.





Repeat the same, for all the required items. For our example we have selected (two items s,
As shown in the screen(s) below







Release the order by clicking the release button , and


Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 13 of 23


Note the message at the status line, as shown in the screen below.




Save the data by clicking the save button . the following screen appears



Note the message at the status line of the screen above, which is shown in the screen
below,, and note down the Order NO released.




End of document on T-code IW31

Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 14 of 23












Manual Process

The following three sub-processes are done
manually outside the SAP Plant maintenance
system. They are

a) The material is ordered, received, inspected
and binned in stores,

And then

b) Component is issued from stores,

c) Upon receipt of the components
The tasks of the order are performed
And the
Order is completed












Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 15 of 23

2. Order Confirmation - Transaction code IW44
Procedural Steps
Purpose
To Confirm the Order
Transaction Code
IW44
Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance
Processing > Complete Confirmation > Entry > Collective Time confirmation >
IW44 (without Selection)
Procedure
Enter the Transaction code IW44 in the command field as shown in the screen
below




Or go as per the navigation shown below and click IW44- Order Confirmation



Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 16 of 23




Press <Enter> or click on the check mark icon in the top left side corner of the

Screen, the following screen will appears.





Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 17 of 23






ln Lhe above screen,
a) key-ln Lhe Crder no, ln our example lL ls 46002S ln Lhe order fleld
b) key-ln Lhe operaLlon no ln Lhe operat|on f|e|d as shown ln Lhe screen above and
c) Check mark ln Lhe check box of Lhe I|na| conf|rmat|on f|e|d as shown above

ln order Lo geL Lhe operaLlon no, cllck on Lhe operaLlon fleld, a drop down lcon appears aL Lhe
end of Lhe fleld, (as shown below)


Key-in the order
Number in this field Key-in t he operation
number in this field
Check mark
this field
Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 18 of 23

And cllck LhaL drop down |con Lo geL a drop down llsL of operaLlons (see screen below)



ln Lhe above screen selecL Lhe, LhaL ls operaLlon no 0010, double cllck on lL Lo geL lL populaLed on Lhe
operaLlon fleld of Lhe screen. Also Check mark ln Lhe check box of Lhe I|na| conf|rmat|on f|e|d as
shown below

Check mark this Final
Confirmation Field
Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 19 of 23

Click the check mark icon , the following screen appears population the other values of the
operation in their respective fields,



In the above screen note the confirmation number.

and then press the save icon to save the document.. Check for the confirmation message in the
status line as shown in the below screen.





Return back to the Home Screen or SAP Easy Access screen.


End of document of T-code IW44

Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 20 of 23

3. Technical Completion - Transaction code IW32
Procedural Steps
Purpose
To complete the order
Transaction Code
IW32
Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance
Processing > Order > IW32
Procedure
Enter the Transaction code IW32 in the command field as shown in the screen
below




Or go as per the navigation shown below and click IW32 Change Order



Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 21 of 23




Press <Enter> or click on the check mark icon in the top left side corner of the

Screen, the following screen will appears.


In that screen, Key-in the order number in the order field.



Click on the check mark icon to get the following screen

Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 22 of 23



Click on the Technical completion push button.



The following complete pop up window appears
Project: MISSION SURE



1kI-SUkL-LU 1kG Manua| (TRF/EPM/5.0) - 00S kev. 00

Page 23 of 23



If required change the Reference date and Reference time.

Click the check mark icon,, the following screen appears,



Check for the confirmation message, at the status line which is shown in the below screen


and then press the save icon to save the document.

End of document on T-code IW32


End of Training Manual on Reconditioning / Shut down process,