P&C SLD Selecting protection Relays

30% 30%

Metering SLD Selecting ITs and Meters

Protection Philosophy Protection Relays Typical EWD Relay Panels Specification CT & VT Calculation

30% 60% 60% 30% Control & Metering Panel Specification Review Ctrl & Metering Panel Vendor Doc.

Review Relay Panels Vendor Doc.

90% Control & Metering EWD

Protection Relays EWD Protection Relays CWD

90% Control & Metering CWD 90%

Color code for Division of engineering works between T&D sections Power System & Equipment (S&E) Protection & Control (P&C) Electrical Arrangement (EA) Transmission Line & Dist. Network (Line) Civil Structure (C&S)

30% 30%

Interlocking Function Diagram Function diagram of HV Equipment Control Function diagram of Voltage Regulator Function diagram of Synchronizing Alarm/Trip Matrix

60% 60%

LVAC Station Service SLD

LVAC Load Calculation 60% LVAC Voltage Drop and Selectivity Calculation 60% LVAC Interlocking Scheme 60% LVAC Panel Specification 60% Review LVAC Panel Vendor Doc. 90%

90% 90%

P&C, LVAC & LVDC Cable sizing & Spec. Marshaling Panels Specification

Review P&C and LV Cablesl Vendor Doc.

Switching SLD

60%

LVDC Station Service SLD

30%

Size & Specification of MV Switchgear

60% 60% 60% 60%

LVDC Load Calculation

60%

Review MV Switchgear Vendor Doc.

LVDC Voltage Drop and Selectivity Calculation 60% LVDC Panel Specification Battery Sizing Battery Chatger Sizing 60% 60% 60% 60%

90% Battery & Charger Specification

Review DC Panel Vendor Doc.

90%

Review Battery& Charger Vendor Doc.

60% 60%

90%

Review Marshaling Panel Vendor Doc.

90%

30%

Insulation Coordination & SA selection

Size & Specification of HV equipment

30%

30%

Rview HV equipment Vendor Doc.

60% Switchyard Section

60% Sag & Tension Calc. of Guard Wire Shielding Protection Design

Dimension/Outline of Structurs Static/Short circuit Load Calc. on Structures Design of Steel Structure 90% Review Steel Structure Design Specification of Steel Structure

Review Steel Structure Vendor Doc.

30%

60%

Preliminary Key Plan of Foundation

60% 60%

Busbar & Stranded Bare Conductor Sizing

60%

Plan of String Location List of String Insulator String Insulator Fittings Details

60% 60% 60%

Clamp Location Layout Clamp Location Section

90% 90%

Temporary Grounding Layout 60% Temporary Grounding Calculation 60% Temp. GND Fittings/ Accessories BOM 90% Clamps & Fitting BOM & Details 90%

Review Clamp & Fittings Vendor Doc.

90%

Switcchyard Layout

30%

30%

Location of Labels Details of Labels

60% 60% 60%

90% Material List of Labels 90% 90% Substation General Layout 30%

Grounding System Calculation

30%

Outdoor Lighting Calculation Outdoor Lighting Layout

90% 90% 90%

General Grounding Layout Grounding Details Grounding Material List

30% Installation Details of Lighting Fixture& Cables 60% 60% Outdoor Lighting Material List

Review of grounding Material Vendor Doc.

90%

Review of Lighting Vendor Doc.

P&C,DC, Battery & Charger Panels Dimensions 30%

LVAC and MV Panels Dimensions

Panels Arrangement

30%

Panels Arrangement

Control Building General Layout

30%

Opening/ Cable Gallery and Tray Arrangement

60%

90% 90% 90%

Cable Ducts, Conduits& Trenches Routing Cable Ducts, Conduits& Trenches Sizing Cable Tray Arrangement Cable Tray Sizing & Details

60% 60% 60% 60% 90%

90% Ducts,Conduit,Trench &Tray Material List 90% Review of Raceways & Tray Vendor Doc. 90%

30%

30%

P&C,DC, Battery & Charger Cables

90%

MV & LV Power Cables Calculation

Material List of Control Cables

90%

Material List of Power Cables & Accessories

Review of Cables & Accessories Vendor Doc. 90%

Review of Cables & Accessories Vendor Doc.

Color code for Division of engineering works between T&D sections Power System & Equipment (S&E) Protection & Control (P&C) Electrical Arrangement (EA) Transmission Line & Dist. Network (Line) Civil Structure (C&S)

60%

90%

90%