Contaminated Soil Investigations and Groundwater Monitoring Plan Following the Water Leak at H4 Area

August 23, 2013 Tokyo Electric Power Company

1. Flow Chart of Investigations and Consideration of Countermeasures


Confirmation of the groundwater Identification of the contaminated range Confirmation of contamination immediately conditions deep under the ground Dose investigation on the ground surface: beneath the leaking tank Investigation <A> Already conducted Boring deeper than the
Boring and soil analysis beneath the tank foundation: Investigation <D> Shallow boring and soil analysis in areas surrounding the identified contaminated range : Investigation <C> groundwater level, water quality analysis and groundwater level measurement: Investigation <E> Groundwater flow analysis

Investigation and collection in heavily contaminated locations: Investigation <B> Conducted from August 23

Confirmation of the range and degree of spreading of the contamination

Consideration on countermeasures based on the results of the investigations and analyses (Enclosure of the contaminated areas, collection and immobilization of the contamination, etc.)

2. Investigation Plans (Tentative)


Investigations to identify the contaminated range
(1) Identification of the contaminated range (In the planar direction): Dose measurement on the ground surface Investigation <A> (In the depth direction): Investigation and collection of heavily contaminated soil Investigation <B> (Both in the planar direction and in the depth direction): Shallow boring and soil analysis in areas surrounding the identified contaminated range Investigation <C> (2) Confirmation of contamination immediately beneath the leaking tank: Boring and soil analysis beneath the tank foundation Investigation <D> (3) Confirmation of the groundwater conditions deep under the ground (confirmation of influences on the environment): Boring deeper than the groundwater level, and water quality analysis and groundwater level measurement (requiring continuous monitoring) Investigation <E> * Boring locations will be determined based on results of the groundwater analysis and
investigations listed above as (1) and (2).

3. Outflow Routes and Range of the Contaminated Water and Schematic Plan of Investigations on the Routes and Range (Tentative)
Possible outflow routes
Route (1): Water flowed out from a valve to the outside of the dike Route (2): Water flowed out directly from the foundation of the tank Route (3): Water flowed out to the outside of the dike from between the foundation concrete and the ground-improved part

Tank No.5 E C

Route (1)

A,B Route (3) Influence (1) Influence (2)


Foundation concrete (thickness: 0.2m) Ground-improved part (Cement mixture, thickness: 1m)

Route (2)
Surface of groundwater (approx. 5-7m below the ground surface)

Influences of the outflows Influence (1): Mainly flowed out into a drainage channel flowed out into the ocean Influence (2): Mainly flowed out into groundwater has an influence on the groundwater bypass

4. Dose investigation on the ground surface: Investigation <A>


August 12 (Wed), 2013 2: 30 PM or later
Surface dose equivalent rates on the side-ditch concrete wall 70m dose equivalent rate ( ray): 5.8mSv/h at the maximum 1cm dose equivalent rate ( ray): 0.2mSv/h at the maximum Air dose equivalent rates in the side ditch 70m dose equivalent rate ( ray): 0mSv/h at the maximum 1cm dose equivalent rate ( ray): 0.06mSv/h at the maximum

Covered with blue sheets for protection (Installed on August 20) Switch board

Rubber mats installed on August 20 5


65 66 67 68 69

Tank
6
70 71

7
72 73

74

75

76

54 (side-dich bottom) 53 77
Side ditch
78

61

62

63

64

50 9 37 38 39 40 41 42 43
Sand sedimentation pond 23m15m
H4 E

55

Switch board (concrete floor)


Side-ditch concrete wall

4 13 30 14 33 10 11 12 22 26 16 19
Radio relay station

34 15

35 36

47 48 49

17 20 18 21 56 57

273 31 2 32 1 24 28 25 29 59 58 60

23

44

45
astI

46

H4 E

astII I

Sandbags

51

Measurement point 53-60 Date and time of measurement: 2:30 3:10 PM on August 21, 2013 Weather: Sunny Measurement point 61-78 Date and time of measurement: 2:40 4:20 PM on August 22, 2013 Weather : Sunny

Measurement point 1-15 Date and time of measurement: 4:00 5:00 PM on August 19, 2013 Weather: Sunny Measurement point 16-52 Date and time of measurement: 4:00 5:00 PM on August 20, 2013 Weather: Rainy

52

Measurement point of surface dose rate Measurement point of ambient dose rate

* Measurement device: Shallow ionization chamber survey meter (AE-133B)

Dose rate measurement results


Measurement point 1-15 Date and time of the measurement: 4:00 5:00 PM on August 19, 2013
Measure ment point Measure ment date

Unit: [mSv/h]
Weather Note

Measurement point 16-30 Date and time of the measurement: 4:00 5:00 PM on August 20, 2013
Measure ment point Measure ment date

Unit: [mSv/h]
Weather Note

Dose rate
Dose equivalent rate measured from 70m ( ray) Dose equivalent rate measured from 1cm ( ray)

Dose rate
Dose equivalent rate measured from 70m ( ray) Dose equivalent rate measured from 1cm ( ray)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19 8/19

>98.5 5.4 0.03 0 0 0 0 0 0.135 89.64 95.55 89.65 0.28 0.01 0.009

1.5 0.1 0.05 0.04 0.06 0.06 0.045 0.06 0.015 0.36 0.45 0.35 0.07 0.11 0.015

Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny

No rubber mat, approx. 50cm above the ground No rubber mat No rubber mat

16 17 18 19 20 21 22 23 24

8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20

8.96 0.03 0.02 1.96 0.02 0.09 0.12 2.90 0.04 1.24 0 0.04 0.08 0.8 0.02

0.04 0.10 0.08 0.04 0.08 0.08 0.03 0.10 0.16 0.06 0.11 0.03 0.03 1.2 0.12

Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy

On concrete

On concrete

On rubber mat

No sheet No sheet No sheet

25 26 27 28 29 30

Same as No.3 On rubber mat On rubber mat

* Measurement device: Shallow ionization chamber survey meter (AE-133B)

Dose rate measurement results


Measurement point 31-52 Date and time of the measurement: 4:00 5:00 PM on August 20, 2013
Measure ment point

Unit: [mSv/h]
Weather Note

Measurement point 53-60 Date and time of the measurement: 2:30 3:10 PM on August 21, 2013
Measure ment point Measure ment date

Unit: [mSv/h]
Weather Note

Dose rate
Measure ment date
Dose equivalent rate measured from 70m ( ray) Dose equivalent rate measured from 1cm ( ray)

Dose rate
Dose equivalent rate measured from 70m ( ray) Dose equivalent rate measured from 1cm ( ray)

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/20

4.89 15 0 0.06 0.01 0 0.03 0.01 0 0.03 0 0 0.06 0 0

0.11 1 0.06 0.02 0.02 0.02 0.04 0.04 0.04 0.03 0.03 0.03 0.03 0.03 0.03

Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy Rainy

On rubber mat, same as No.2 On rubber mat, same as No.1

46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

8/20 8/20 8/20 8/20 8/20 8/20 8/20 8/21 8/21 8/21 8/21 8/21 8/21 8/21 8/21

0.01 0 0 0.03 0.04 0.02 0.02 5.80 0 0.02 0 0.01 0.01 0.01 0

0.02 0.04 0.04 0.03 0.03 0.03 0.03 0.20 0.06 0.08 0.05 0.04 0.04 0.04 0.05

Rainy Rainy Rainy Rainy Rainy Rainy Rainy Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny

* Measurement device: Shallow ionization chamber survey meter (AE-133B)

Dose rate measurement results


Measurement point 61-78 Date and time of the measurement: 2:40 4:20 PM on August 22, 2013
Dose rate
Measure ment date
Dose equivalent rate measured from 70m ( ray) Dose equivalent rate measured from 1cm ( ray)

Unit: [mSv/h]
Measure ment point Measure ment date

Unit: [mSv/h]
Dose rate
Dose equivalent rate measured from 70m ( ray) Dose equivalent rate measured from 1cm ( ray)

Measure ment point

Weather

Note

Weather

Note

61 62 63 64 65 66 67 68 69

8/22 8/22 8/22 8/22 8/22 8/22 8/22 8/22 8/22

0.005 0.004 0.005 0.004 0.001 0.002 0 0.002 0.003

0.010 0.010 0.011 0.011 0.011 0.011 0.012 0.013 0.011

Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny

70 71 72 73 74 75 76 77 78

8/22 8/22 8/22 8/22 8/22 8/22 8/22 8/22 8/22

0.001 0.001 0.002 0 0.001 0.001 0 0.143 0.002

0.011 0.011 0.011 0.010 0.010 0.009 0.010 0.007 0.008

Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny


Same as No.53

* Measurement device: Shallow ionization chamber survey meter (AE-133B)

4. Investigation and Collection of Heavily Contaminated Soil: Investigation <B>


conditions of contamination in the depth direction and collecting contaminated soil. Check dose rates after drilling to the depth of approx. 50cm. Conduct further drilling in a case where there is contamination.

Conduct experimental drilling in the contaminated range for the purposes of confirming the

Drainage channel

Sandbags
Radio relay station

(B)

Concrete dike

Areas for investigation and collection of contaminated soil

(A)

Work records on August 23 (A): Drilling of approx. 40cm (B): Drilling of approx. 20cm

Leaking tank (No.5)


Drive way (already existing)

5. Shallow Boring, and Boring and Soil Analysis Immediately Beneath the Tank Foundation: Investigations <C> and <D>

: Shallow boring : Confirmation of contamination immediately beneath the leaking tank


(C)GeoEye/Japan Space Imaging Corporation Fukushima Daiichi Nuclear Power Station (As of March 12, 2013)

Leaking tank

6. Boring deeper than the groundwater levels, water quality analysis and groundwater level measurement: Investigation <E>
: Groundwater bypass pump wells (already existing) : Investigation holes (already existing) : Holes to be bored deeper than the ground water level to make monitoring holes
No.5

No.1 No.4

No.8

No.10 No.11 No.12

(a) (b) (c)

(C)GeoEye/Japan Space Imaging Corporation Fukushima Daiichi Nuclear Power Station (As of March 12, 2013)

Leaking tank