Documente Academic
Documente Profesional
Documente Cultură
UK/Ireland Infrastructure plan to deliver highways projects from Kolkata, adding the office as a third UK/Ire ID HVEC. The intention is to repeat the Mahape 2 success, an office which delivers UK/Ire Highways projects with a flexible resource deploying on ID or local projects. This paper discusses the proposed projects for FY13/FY14, current skills and the training and investment in IT hardware/software necessary for ID.
b) ID Projects
Backlog: N60 Manulla c.4,000hrs, programme late early Aug 2013 start; Current backlog being examined for an early opportunity once team established; The following significant prospects are earmarked for Kolkata delivery should we be successful: M8 DBFO 20,000hrs+, programme TBC. Likely Sept 2013 if won; BP Khazzan Roads 20,000hrs+. Oct 2013 commencement if won; Once team established other projects may also be shared with Kolkata.
e) Current IT Position
Software InRoads software licences and capability are already established in Kolkata. No MX Road licences or skills are present but the alignment knowledge exists which may be transferred. Specific drainage, signing and lining software is not utilised for local projects and is therefore not in place. STAADPro licences are available for structures design. UK delivery will require MX Roads but also 3D modelling utilising Civil 3D. Autotrack will be required for swept path analysis. Microstation 2D may be required for the delivery of certain international projects. Hardware Current hardware is capable of running alignment design tools, can handle every day email correspondence and basic word and number processing. New MX Roads, signing, lining and drainage software can be run on existing hardware. Hardware will require to be upgraded to allow the use of Civil 3D. Selective other machines may also need upgrading and TBC via an audit. The sharing of significant sized 3D models with UK/Ireland will require an electronic data management system such as Autodesk VAULT. In the short term staff are able to map to existing servers within the Kolkata office.
26/06/2013
Kolkata Highways IT Requirements for UK/Ireland Project Delivery Integrated Delivery & IT f) Software Toolsets Required
The following represents the minimum required at inception; additional software will be required as the team grows.
Min Licence Req
Vendor
Software Name
Discipline
Uses
Bentley
Microstation
Multiple
2D & 3D design/drafting 3D modelling Alignment design Prep of Sign faces Drainage design
Current licences 0 0 0 0 15 0 0 0 0
Cost $/
Civil3D 2013 MX Roads KeySIGN & KeyLINE WinDes incl: *System 1 *Source Control *Simulation *APT etc STAADPro KeyPOST HoleBASE incl: Reporter KeyHOLE Navisworks AutoTRACK
4 4 1
Microdrainage
Highways/ Drainage
$0 - Enterprise Licence Server (ELS) $0 - Token system $0 - ELS $0 WAN Licence imminent* $18,770.00 (excl VAT)
Structural analysis Signpost design Ground data for design and AutoCAD interface. Design Review Swept Path Analysis
2 1 1
Autodesk Savoy
Multiple Highways
4 1
Note Highlighted toolsets required urgently. Already available within Kolkata. Other packages may be installed in a phased manner. Refer to Section (i).
g) Hardware Required
The following represents the minimum required at inception; additional hardware will be required as the team grows. Server Autodesk VAULT for sharing 3D models. Not immediate. Existing servers exist to which the Highways team have access and may be mapped for UK ID projects. Machine Specifications Dell Precision T3600 Convertible MiniTower E5-1650 Xeon/3.2GHz, 12MB Six-Core, 16GB 1600MHz DDR3 ECC SDRAM Memory 4X4GB, AMD FirePro V5900 2GB, 500GB SATA 7200 RPM, 8X DVD-ROM SATA, Windows 7 Professional 64bit ($1,796.45 + 10% tax + 10% shipping); U2412M Ultrasharp 24 Widescreen Dell monitor ($250 + 10% tax + 10% shipping); MS Office 2010 license Per machine ($280 each); Above have been CERed and are in process of procurement.
26/06/2013
Kolkata Highways IT Requirements for UK/Ireland Project Delivery Integrated Delivery & IT h) Training
Software Name Microstation Training Required Top up Cost / $650.00 Training Body Bentley Learn via EDS Comments Base training completed 6&7/09/2012. Costs to administer Bentley Learn training. 6 days on site. 3 x 1 day training and 1 day practicing. Up to six people
Comprehensive
Team already competent with InRoads transferable skill UK Highways secondment Advanced JI user trains team. Structures team already competent Superstress query to be resolved. UK Secondment UK Secondment
UK Highways UK or Mahape Geotech Comprehensive indirect UK or Mahape UK Secondment Highways Not required $0 Not required KnowledgeSmart Assessment Full time/part time on-site EDS support required as the team builds. &
Comprehensive Comprehensive
indirect indirect
i) Summary of Costs
Phased application: Phase 1 (June to end July 2013) 1. Hardware 4xDell T3600 all in = $10,224.40 In progress. 8 weeks desk ready; 2. Software Install MX software on 4 machines. Access to Andheri licence server = $0. 3. Software Install KeyLine/Sign, provide access to WAN Licence in Leeds/Winnersh = $0; 4. Software Microdrainage 1 x user on existing network licence = $18,770.00 excl VAT; 5. Training MX Road training via Mahape team, top-up from UK secondment = $0; 6. Training KeySign and KeyLine via Mahape team, top-up from UK secondment = $0; 7. Training WinDes via Mahape team = $0 - possible to use new Mahape network seat once acquired. Total Hardware = $10,224.40 Total Software = $18,770.00; Total Training = $0 1. 2. 3. 4. Phase 2 (August 2013 to October 2013) Software Savoy Autotrack 1 x licence = $4,000.00 (exact cost TBC); Software KeySolutions KeyPOST 1 x licence = $2,434.00; Training Incl within UK/Ire secondment costs or short term Mahape secondment; Training Civil 3D = $5,636.00 (may be reduced using local Autodesk partners ); Total Software = $6,434.00 Total Training = $5,636.00
Phase 3 (Q1 FY14) 1. Software HoleBASE and KeyHOLE 1 x licence = $9,650.00; 2. Training Microstation top up training = $650.00; Total Software = $9,650.00 Total Training = $650.00
26/06/2013
PIC/General Manager
Sumeet Chakraborty
PIC/General Manager
Krishnakali Ghosal
DVD/TD
P5
Rajib Das
Kasturi Sarkar
P3/P2
P1
EDS Support T4
Arun Mitra
T1/T2/T3
SC
P5
P4
P3/P2
EDS Support
PIC/General Manager
Sumeet Chakraborty
DVD/TD
CONTRACTS/ QS
PM/Deputy General Manager Soumya Brato Das PM/Deputy General Manager Sourav Talukdar UK/Ire Senior Engineer Tommy Cleary
DRAINAGE TEAM
Senior Engineer Rajib Das Anup Jangada (P2) Eng/Diploma Engineer Anup Jangada Abhiroop Moitra Kakali Ghosh (P2) Anup Jangada (P2) Anup Jangada (P2) Anup Jangada (P2) Senior CAD Tech Highways Anup Jangada (P2) Jayanta Bhattacharya Senior CAD Tech Structures/Hways Karimul Haque
P1
P4
P1/P2
Anup Jangada (P2) Anup Jangada (P2) N60 Core Highways Anup Jangada (P2) Team: 5 Engineers & CAD QS Support: 1 General Manager Civil Structural Support: 1 Jangada General Manager & 1 multi-purpose Highways/Structures CAD Anup Jangada (P2) Anup (P2) Drainage: TBC = Mahape 2 or Ahmedabad Support Anup Jangada (P2)
T4