CRONOGRAMA DE ADQUISICION DE MATERIALES

OBRA :

MEJORAMIENTO DE LA TRANSITALBILIDAD PEATONAL Y VEHICULAR DE LA AVENIDAD SAUSAMA - CHALLHUAHUACHO


Insumo

TOPOGRAFO
OPERARIO
OFICIAL
PEON

Unidad

Cantidad

MANO DE OBRA
hh
606.6936
hh
18,899.8536
hh
23,170.7333
hh
77,130.8607
MATERIALES

CLAVOS PARA MADERA C/C 3"


kg
CLAVO DE 4"
kg
CONEXIONES DOMICILIRIAS (AGUA)
und
PILETA CENTRAL
und
OCRE
kg
LUMINARIAS DE ALUMBRADO PUBLICO
und
APOYO CIRCULAR PARA PASTORALES
und
ALAMBRE NEGRO N16
kg
ALAMBRE NEGRO N8
kg
ACERO CORRUGADO =1/2"
kg
RIEL DE 3" x 3"
m
FIERRO ANGULAR DE 3"
m
FIERRO CORR. 5/8" G-60
kg
FIERRO CORR. 1/2" GRADO-60
kg
ARENA FINA
m3
CARTEL INFORMATIVO DE MATERIAL VITRIFICADO
und
PIEDRA CHANCADA DE 1/2"
m3
PIEDRA MEDIANA DE 4"
m3
MATERIAL BASE GRANULAR
m3
PIEDRA CHANCADA DE CANTO RODADO DE 3/4"
m3
POSTE METALICO DE 12 M
und
ARENA GRUESA
m3
PIE DERECHO
und
FLETE
kg
LISTONES DE 3"x2"
p2
MADERA EUCALIPTO
pza
ASFALTO RC-250
gln
LEA
kg
PETROLEO
gln
CABLE ELECT NYY 3 X 4 MM2
m
BARANDA METALICA 2"
m
CEMENTO PORTLAND TIPO I (42.5KG)
BOL
MANGUERA REFORZADO 3/4"
m
MATERIAL TIERRA VEGETAL
m3
TECKNOPORT E= 1"
m2
PEGAMENTO PVC
gln
YESO
BOL
SOLDADURA CELLOCORD P 3/16"
kg
MAQUINA DE SOLDAR
hm
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
est
HORMIGON
m3
HOJA DE SIERRA
und
AGUA
m3
CARTEL DE OBRA TIPO GIGANTOGRAFIA 2.40 x 3.60 (INCL. INSTAL)
und

968.7320
968.7320
25.0000
1.0000
31.8000
99.0000
33.0000
1,305.5024
256.0100
9,673.4352
1,428.7000
418.4050
14,305.4600
22,141.6000
295.1496
40.0000
2,821.9180
1,347.7670
13,654.4540
1,083.4935
33.0000
3,790.3470
360.0000
1.0000
766.1360
76.8100
538.8350
2,269.0560
61.3670
1,878.0000
62.0000
63,207.8160
1,429.5217
335.1200
95.8540
9.2500
72.8292
157.8750
91.8450
1.0000
326.0360
136.2146
4,063.0679
1.0000

Precio S/.

Parcial

Presupuestado

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

12.91
12.91
11.36
10.20

7,832.37
243,997.06
263,219.49
786,734.77

7,643.83
244,045.91
263,361.02
786,539.43

666.54
21280.80
22965.08
68586.24

1568.51
50078.22
54041.68
161397.89

2332.90
74482.81
80377.78
240051.83

1804.71
57619.24
62179.54
185701.96

772.79
24673.04
26625.80
79519.14

498.38
15911.79
17171.14
51282.37

5.00
5.00
10.00
2,500.00
20.00
450.00
200.00
5.00
5.00
2.90
28.00
20.00
2.80
2.80
50.00
150.00
50.00
30.00
20.00
50.00
650.00
50.00
4.50
63,200.00
2.80
5.00
25.00
0.50
11.00
7.50
120.00
22.00
1.50
15.00
9.00
90.00
6.00
10.00
25.00
10,000.00
50.00
4.50
0.10
1,200.00

4,843.65
4,843.65
250.00
2,500.00
636.00
44,550.00
6,600.00
6,527.50
1,280.05
28,052.98
40,003.60
8,368.00
40,055.29
61,996.48
14,757.50
6,000.00
141,096.00
40,433.10
273,089.00
54,174.50
21,450.00
189,517.50
1,620.00
63,200.00
2,145.19
384.05
13,471.00
1,134.53
675.07
14,085.00
7,440.00
1,390,572.04
2,144.28
5,026.80
862.65
832.50
436.98
1,578.80
2,296.00
10,000.00
16,302.00
612.95
406.31
1,200.00

4,843.66
4,843.66
250.00
2,500.00
636.00
44,550.00
6,600.00
6,527.51
1,280.05
28,071.93
40,003.60
8,368.10
40,055.29
61,996.48
14,757.48
6,000.00
141,095.91
40,433.01
273,089.08
54,174.68
21,450.00
189,517.35
1,620.00
63,200.00
2,145.18
384.05
13,470.88
1,134.53
675.04
14,091.30
7,440.00
1,390,571.96
1,994.68
5,026.80
862.68
832.50
728.28
1,578.75
2,296.13
10,000.00
16,301.80
681.07
353.00
1,200.00

422.37
422.37
21.80
218.00
55.46
3884.76
575.52
569.20
111.62
2447.87
3488.31
729.70
3492.82
5406.09
1286.85
523.20
12303.56
3525.76
23813.37
4724.03
1870.44
16525.91
141.26
5511.04
187.06
33.49
1174.66
98.93
58.86
1228.76
648.77
121257.87
173.94
438.34
75.23
72.59
63.51
137.67
200.22
872.00
1421.52
59.39
30.78
104.64

993.92
993.92
51.30
513.00
130.51
9141.66
1354.32
1339.45
262.67
5760.36
8208.74
1717.13
8219.35
12721.68
3028.23
1231.20
28952.88
8296.85
56037.88
11116.64
4401.54
38888.96
332.42
12968.64
440.19
78.81
2764.22
232.81
138.52
2891.53
1526.69
285345.37
409.31
1031.50
177.02
170.83
149.44
323.96
471.17
2052.00
3345.13
139.76
72.44
246.24

1478.29
1478.29
76.30
763.00
194.11
13596.66
2014.32
1992.20
390.67
8567.55
12209.10
2553.94
12224.87
18921.33
4503.98
1831.20
43062.47
12340.15
83346.79
16534.11
6546.54
57840.70
494.42
19288.64
654.71
117.21
4111.31
346.26
206.02
4300.66
2270.69
424402.56
608.78
1534.18
263.29
254.08
222.27
481.83
700.78
3052.00
4975.31
207.86
107.74
366.24

1143.59
1143.59
59.03
590.25
150.16
10518.26
1558.26
1541.15
302.22
6627.78
9444.85
1975.71
9457.05
14637.37
3484.24
1416.60
33312.74
9546.23
64476.33
12790.64
5064.35
44745.05
382.48
14921.52
506.48
90.67
3180.47
267.86
159.38
3326.96
1756.58
328314.04
470.94
1186.83
203.68
196.55
171.95
372.74
542.12
2361.00
3848.85
160.80
83.34
283.32

489.69
489.69
25.28
252.75
64.30
4504.01
667.26
659.93
129.41
2838.07
4044.36
846.01
4049.59
6267.84
1491.98
606.60
14264.80
4087.78
27609.31
5477.06
2168.60
19160.20
163.78
6389.52
216.88
38.83
1361.91
114.70
68.25
1424.63
752.18
140586.83
201.66
508.21
87.22
84.17
73.63
159.61
232.14
1011.00
1648.11
68.86
35.69
121.32

315.81
315.81
16.30
163.00
41.47
2904.66
430.32
425.59
83.46
1830.29
2608.23
545.60
2611.60
4042.17
962.19
391.20
9199.45
2636.23
17805.41
3532.19
1398.54
12356.53
105.62
4120.64
139.87
25.04
878.30
73.97
44.01
918.75
485.09
90665.29
130.05
327.75
56.25
54.28
47.48
102.93
149.71
652.00
1062.88
44.41
23.02
78.24

1,301,590.19

2,851,601.47

CRONOGRAMA DE ADQUISICION DE MATERIALES


OBRA :

MEJORAMIENTO DE LA TRANSITALBILIDAD PEATONAL Y VEHICULAR DE LA AVENIDAD SAUSAMA - CHALLHUAHUACHO


Insumo

Unidad

Cantidad

PRUEBAS DE CALIDAD DE CONCRETO ROTURA


und
BANCA DE MADERA CON ESTRURAS DE PLATINAS DE 2" DE 6 X 0.50MT
pza
ROLLIZO DE EUCALIPTO DE 4" x 10'
pza
MADERA CORRIENTE
p2
ESTACA DE MADERA
p2
MADERA CORRIENTE 1 1/2"X8"X10'
p2
MADERA CORRIENTE DE 2"X3"X10'
p2
TAPA FF PARA BUZON DE D= 0.60 M. ( INCLUYE MARCO)
pza
PINTURA ESMALTE SINTETICO
gln
PINTURA ANTICORROSIVA
gln
PINTURA PARA TRAFICO BLANCA
gln
TUBERIA PVC SAP A-10 DE 3/4"
m
TUBERIA PVC SAP C-7.5 DE 3"
m
TUBERIA PVC SAP C-10 DE 2" INCLUIDO ACCESORIOS
m
TUBERIA PVC SAP C-10 DE 1/2"
m
CODO PVC SAP DE 1/2"
pza
VALVULA DE PASO PVC SAP DE 3/4"
pza
VALVULA DE PASO PVC SAP DE 1/2"
pza
ADAPTADORES PVC SAP DE 3/4"
pza
ADAPTADORES PVC SAP DE 1/2"
pza
CAJA DE CONCRETO DE 0.30X0.30
und
TAPA METALICADE 0.30X0.30
und
TUBERIA PVC SAL 8" INCLUIDO ANILLOS
m
LOZETA CERAMICA DE 0.30 x 0.30
m2
PORCELANA
kg
TUBO PVC SEL (E/C) 3/4" X 3.00 M.
pza
TUBO PVC SEL (E/C) 1" X 3.00 M.
pza
PLANTAS ORNAMENTALES
und
PRUEVA DE PROCTOR MODIFICADO
GLB
DISEO DE MEZCLAS
und
ADOQUINES DE CONCRETO DE 5X20X3CM
m2

Precio S/.

Parcial

Presupuestado

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

40.0000
114.0000
2,399.1100
1,041.5560
1,456.5828
23,881.1500
14,740.6100
36.0000
6.1500
8.5800
20.0000
1,246.5000
874.8000
150.0000
112.0000
112.0000
56.0000
56.0000
112.0000
112.0000
58.8000
58.8000
150.0000
47.8800
13.6800
480.0000
441.0000
304.5900
2.0000
4.0000
510,185.0000

45.00
470.00
2.80
3.20
0.80
2.80
2.80
160.00
45.00
45.00
98.00
2.50
5.50
5.50
2.00
2.00
55.00
35.00
1.50
1.50
35.00
45.00
30.00
25.00
6.00
2.50
7.00
15.00
1,600.00
350.00
0.20

1,800.00
53,580.00
6,717.51
3,332.99
1,165.26
66,867.22
41,273.71
5,760.00
276.75
386.10
1,960.00
3,116.25
4,811.40
825.00
224.00
224.00
3,080.00
1,960.00
168.00
168.00
2,058.00
2,646.00
4,500.00
1,197.00
82.08
1,200.00
3,087.00
4,568.85
3,200.00
1,400.00
102,037.00

1,800.00
53,580.00
6,717.46
3,332.98
1,456.59
66,867.22
41,273.72
5,760.00
276.75
386.10
1,960.00
3,121.90
4,811.40
825.00
224.00
224.00
3,080.00
1,960.00
168.00
168.00
2,058.00
2,646.00
4,500.00
1,197.00
82.08
1,200.00
3,087.00
4,568.85
3,200.00
1,400.00
102,037.00

156.96
4672.18
585.76
290.64
127.01
5830.82
3599.07
502.27
24.13
33.67
170.91
272.23
419.55
71.94
19.53
19.53
268.58
170.91
14.65
14.65
179.46
230.73
392.40
104.38
7.16
104.64
269.19
398.40
279.04
122.08
8897.63

369.36
10994.62
1378.42
683.93
298.89
13721.15
8469.37
1181.95
56.79
79.23
402.19
640.61
987.30
169.29
45.96
45.96
632.02
402.19
34.47
34.47
422.30
542.96
923.40
245.62
16.84
246.24
633.45
937.53
656.64
287.28
20937.99

549.36
16352.62
2050.17
1017.23
444.55
20407.88
12596.74
1757.95
84.46
117.84
598.19
952.80
1468.44
251.79
68.36
68.36
940.02
598.19
51.27
51.27
628.10
807.56
1373.40
365.32
25.05
366.24
942.15
1394.41
976.64
427.28
31141.69

424.98
12650.24
1585.99
786.92
343.90
15787.35
9744.73
1359.94
65.34
91.16
462.76
737.08
1135.97
194.78
52.89
52.89
727.19
462.76
39.66
39.66
485.89
624.72
1062.45
282.61
19.38
283.32
728.84
1078.71
755.52
330.54
24090.94

181.98
5416.94
679.14
336.96
147.26
6760.28
4172.77
582.34
27.98
39.03
198.16
315.62
486.43
83.41
22.65
22.65
311.39
198.16
16.98
16.98
208.06
267.51
454.95
121.02
8.30
121.32
312.10
461.91
323.52
141.54
10315.94

117.36
3493.42
437.98
217.31
94.97
4359.74
2691.05
375.55
18.04
25.17
127.79
203.55
313.70
53.79
14.60
14.60
200.82
127.79
10.95
10.95
134.18
172.52
293.40
78.04
5.35
78.24
201.27
297.89
208.64
91.28
6652.81

4.8000

0.10

747.3400
21.0000
2,571.5595
216.8494
604.2039
28.8000
36.0000
2,612.8000
1,888.0000
433.6986
449.2530
320.0337
435.2928
433.6986
17.2800
606.6936

20.00
80.00
20.00
100.00
100.00
25.00
10.00
4.50
5.00
150.00
150.00
150.00
15.00
170.00
25.00
5.00

0.48
41,836.51
14,946.80
1,680.00
51,431.20
21,685.00
60,420.00
720.00
360.00
11,757.60
9,440.00
65,055.00
67,387.50
48,004.50
6,529.35
73,729.00
432.00
3,033.45

0.00
41,836.51
14,946.80
1,680.00
51,411.13
21,684.94
60,420.39
720.00
360.00
11,757.60
9,440.00
65,054.80
67,387.95
48,125.38
6,529.40
73,769.29
432.00
3,033.46

0.00
3648.14
1303.36
146.50
4483.05
1890.93
5268.66
62.78
31.39
1025.26
823.17
5672.78
5876.23
4196.53
569.36
6432.68
37.67
264.52

0.00
8584.85
3067.08
344.74
10549.56
4449.75
12398.26
147.74
73.87
2412.66
1937.09
13349.24
13828.01
9875.33
1339.83
15137.46
88.65
622.47

0.00
12768.50
4561.76
512.74
15690.68
6618.24
18440.30
219.74
109.87
3588.42
2881.09
19854.72
20566.80
14687.87
1992.77
22514.39
131.85
925.81

0.00
9877.60
3528.94
396.65
12138.17
5119.81
14265.25
169.99
85.00
2775.97
2228.78
15359.44
15910.29
11362.40
1541.59
17416.93
102.00
716.20

0.00
4229.67
1511.12
169.85
5197.67
2192.35
6108.50
72.79
36.40
1188.69
954.38
6577.04
6812.92
4865.48
660.12
7458.08
43.68
306.68

0.00
2727.74
974.53
109.54
3352.01
1413.86
3939.41
46.94
23.47
766.60
615.49
4241.57
4393.69
3137.77
425.72
4809.76
28.17
197.78

EQUIPOS
CORDEL
HERRAMIENTAS MANUALES
PLANCHA COMPACTADORA
NEUPRENO PARA PUENTE
MEZCLADORA DE CONCRETO DE 9 -11P3
CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000
CAMION VOLQUETE DE 10M3
SOLDADORA ELECT. MONOF. ALTERNA 225 AMP.
MOLDE METALICO PARA BUZON
MOLDE METALICO PARA TAPAS
MOLDE METALICO PARA SARDINEL
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T.
TRACTOR DE ORUGAS DE 140-160 HP
CARGADOR FRONTAL CAT 950B 155 HP 2.40 m3.
VIBRADOR DE CONCRETO 4 HP 1.50"
MOTONIVELADORA DE 125 HP
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
MIRAS Y JALONES

m
%MO
hm
m
hm
hm
hm
hm
m2
m2
m2
hm
hm
hm
hm
hm
hm
hm

512,669.99

CRONOGRAMA DE ADQUISICION DE MATERIALES


OBRA :

MEJORAMIENTO DE LA TRANSITALBILIDAD PEATONAL Y VEHICULAR DE LA AVENIDAD SAUSAMA - CHALLHUAHUACHO


Insumo

NIVEL TOPOGRAFICO
VIBRADOR DE CONCRETO 4 HP-1.50"

Unidad

Cantidad

hm
hm

Precio S/.

Parcial

Presupuestado

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

606.6936
834.2272

10.00
15.00

6,066.90
12,513.45

6,066.93
12,513.41

529.04
1091.17

1244.93
2567.75

1851.63
3819.09

1432.40
2954.42

613.37
1265.11

395.56
815.87

1.0000
1.0000

10,000.00
5,500.00

10,000.00
5,500.00

10,000.00
5,500.00

872.00
479.60

2052.00
1128.60

3052.00
1678.60

2361.00
1298.55

1011.00
556.05

652.00
358.60

4,665,861.65

406863.14
8.72%

957434.81
20.52%

1424020.98
30.52%

1101609.94
23.61%

471718.61
10.11%

304214.18
6.52%

SUBCONTRATOS
TALLER DE CAPACITACION A BENEFICIARIOS DIRECTOS
GLB
TALLER DE CAPACITACION A DIRIGENTES Y AUTORIDADES LOCALES
GLB
Total
PORCENTAJE

S/.
%

0.0872
0.2052
0.3052
0.2361
0.1011
0.0652

PROYECTO: MEJORAMIENTO DE LA TRANSITALBILIDAD PEATONAL Y VEHICULAR DE LA


AVENIDAD SAUSAMA - CHALLHUAHUACHO

FORMULA POLINOMICA
#
1
2
3
4

Simbolo
MA
ME
MO
GI

#
1
2
3

Simbolo
A
C
P

0.531

Descripcin de todos los rubros


Total de Materiales
Total de Equipos y herramientas
Total de Mano de Obra
Gastos Indirectos

MAr
MAo

0.096

MEr
MEo

Costo S/.
2,851,601.470
512,669.990
1,301,590.190
699,879.25
5,365,740.90
0.243

Descripcin insumos mayor incidencia


Agregados
Cemento
ADOQUINES DE CONCRETO DE 50x20x3cm

MOr
MOo

Factor
0.531
0.096
0.243
0.130
1.000

0.130

Costo S/.
603,702.34
1,390,571.96
102,037.00
2,096,311.30

GIr
GIo
Factor
0.288
0.663
0.049
1.000

Para proyectos pequeos slo se actualizar el rubro correspondiente a Materiales y Equipos y


herramientas, considerando que la Mano de Obra no incluye beneficios sociales y los Costos
Indirectos son fijos. Entonces, la estructura de la siguiente frmula polinmica es la que usaremos:
K

0.531

MAr
MAo

Donde:
0.531

0.096

MEr

0.373

MEo

es el coeficiente del primer monomio que representa la incidencia del rubro de


materiales respecto al costo total del proyecto

0.096

es el coeficiente del segundo monomio que representa la incidencia del rubro de


equipos y herramientas respecto al costo total del proyecto

0.373

es el coeficiente que representa la incidencia de los dems rubros del presupuesto, y


que por no tener variaciones de considerar como un factor de la Frmula
Polinmica

MAo

es el denominador del primer monomio y corresponde al valor originalmente


presupuestado del rubro de materiales, y se calcula como sigue:
=
MAo
0.288 Ao
+ 0.663 Co
+ 0.049 Po

Ao, Co, Po

son los Indices Unificados de Precios de los tres insumos con mayor incidencia
correspondiente al mes de elaboracin del presupuesto

MAr

es el numerador del primer monomio y corresponde al valor reajustado del rubro de


materiales, y se calcula como sigue:
MAr
=
0.288 Ar
+ 0.663 Cr
+ 0.049 Pr

PROYECTO: MEJORAMIENTO DE LA TRANSITALBILIDAD PEATONAL Y VEHICULAR DE LA


AVENIDAD SAUSAMA - CHALLHUAHUACHO

FORMULA POLINOMICA
son los Indices Unificados de Precios de los tres insumos con mayor incidencia
Ar, Cr, Pr
correspondiente al mes de actualizacin del presupuesto
MEo

es el denominador del segundo monomio y corresponde al valor originalmente


presupuestado del rubro de equipos y herramientas, es decir el Indice Unificado de
Precios del rubro correspondiente al mes de actualizacin del presupuesto

MEr

es el numerador del segundo monomio y corresponde al valor originalmente


presupuestado del rubro de equipos y herramientas, es decir el Indice Unificado de
Precios del rubro correspondiente al mes de elaboracin del presupuesto

PROYECTO: MEJORAMIENTO DE LA TRANSITALBILIDAD PEATONAL Y VEHICULAR DE LA AVENIDAD


SAUSAMA - CHALLHUAHUACHO

#
1
2
3
4

Simbolo
MA
ME
MO
GI

Descripcin de todos los rubros


Total de Materiales
Total de Equipos y herramientas
Total de Mano de Obra
Gastos Indirectos

Costo S/.
2,851,601.470
512,669.990
1,301,590.190
699,879.25
5,365,740.90

Factor
0.531
0.096
0.243
0.130
1.000

#
1
2
3

Simbolo
A
C
P

Descripcin insumos mayor incidencia


Agregados
Cemento
ADOQUINES DE CONCRETO DE 50x20x3cm

Costo S/.
603,702.34
1,390,571.96
102,037.00
2,096,311.30

Factor
0.288
0.663
0.049
1.000

Donde:
0.531

0.531

MAr
MAo

0.096

MEr
MEo

0.243

MOr
MOo

0.130

IU r

IU o

334.67

329.16

IU
3
21
56

IU r
808.91
404.62
652.82

IU o
808.08
404.62
641.13

0.872

Glr
Glo

es el coeficiente del primer monomio que representa la incidencia del rubro de materiales respecto
al costo total del proyecto

0.096

es el coeficiente del segundo monomio que representa la incidencia del rubro de equipos y
herramientas respecto al costo total del proyecto

0.243

es el coeficiente que representa la incidencia de los dems rubros del presupuesto, y que por no
tener variaciones de considerar como un factor de la Frmula Polinmica

MAo

0.288 Ao
232.713

0.663 Co
268.402

MAr

0.288 Ar
232.952

0.663 Cr
268.402

Mer

MEo

329.2

MEr

334.7

IU
48

0.531

Po

532.322

0.049
Pr
31.77571687

533.130

0.049
31.207

0.288
232.713

533.130
532.322

Presupuesto Reajustado

0.096

334.67
329.16

= Presupuesto

0.243

4,678,772.08