Sunteți pe pagina 1din 22

SAP Software: The Great Enabler

of Wawa’s Transformation

1
SAPPHIRE 08 OR3785
1803 to 2008
• Privately held
• $6 billion in revenue
• 570 stores in mid-
Atlantic
– PA to VA
• 16,000 associates
• 4th generation
business
– Foundry, Mill
– Dairy, Markets
• Today, 3 distinct
businesses under one
roof

3
SAPPHIRE 08 OR3785
High Volume Foodservice

4
SAPPHIRE 08 OR3785
High Volume Convenience

5
SAPPHIRE 08 OR3785
High Volume Gasoline

6
SAPPHIRE 08 OR3785
Our Core Ideology
• Convenience is
doing well
– Everyone wants a
piece

• FIQE is
aspirational

• Economic Engine is
rusty

7
SAPPHIRE 08 OR3785
Economic Engine is Rusty
• Customer count is down
• Growth is flat
• Key drivers have slowed
– Cigarettes, Coffee, ATM
• Costs are rising faster
than gross profit
• Infrastructure costs are
too high

8
SAPPHIRE 08 OR3785
Competition is “Heating” Up
• New emerging competition
• Low barrier to entry
• Low cost structures
– real estate, operating, people

9
SAPPHIRE 08 OR3785
The Challenge

• Integrate three business segments


• Compete with low cost competitors

The Change
Process Centricity

Process Centricity
10
SAPPHIRE 08 OR3785
Process Centricity
• The journey continues with SAP

11
SAPPHIRE 08 OR3785
The Scope of N-Zone encompassed the
following functionality and involved 100 Wawa
Associates and 35 SAP consultants

ƒ ERP 2005 -- A/P, A/R, G/L, Treasury, controlling, Fixed assets,


Procurement and Project Systems
ƒ SRS – Store Retail System
ƒ Handheld Solution -- Select Retail Store Transactions
ƒ POSDM – POS Data Management
ƒ Space Management – JDA Intactics
ƒ Netweaver 7.0 (2004s) – Enterprise Portal, XI and BW
ƒ SCM – Advanced Forecasting and Replenishment
ƒ MAP – Merchandise Assortment Planning for budgeting
ƒ SAP Solution Manager

12
SAPPHIRE 08 OR3785
N-Zone Program Time Line

ƒ Project Prep May 2005


ƒ Project Blueprint (Financials & Retail) October 2005
ƒ Project Realization April 2006
ƒ Project Go-Live (Financials) May 2006
ƒ Project Pilot (Retail 55 stores) September 2006
ƒ Project Go-Live (Retail) June 2007 – December 2007
ƒ Mainstreamed Support March 2008

13
SAPPHIRE 08 OR3785
The Burning Platform -
Implement SAP to Prime
our Economic Engine
Challenges Process Capabilities
Integrate Three • Less time ordering
Core Ideology Business Segments due to Forecasting
(Enable Managers to and Replenishment
Focus on the (F&R)
Customer) • Streamlined
perpetual inventory
processes

Compete with Low • Cost Accounting –


Cost Competitors true cost by article,
(Better Understanding accurate margin
of the Business) calculations
• One Version of the
Truth – one reporting
system for Store
Operations and
Marketing
Compete with Low • Space Mgt.
Cost Competitors • Promotions Mgt.
(Retailing Capabilities)

Drive out Costs • Centralize


Procurement
• Control Spend

14
SAPPHIRE 08 OR3785
Benefits Achieved - richer data has enabled improvements in
three key areas

„ Improved understanding of the Business


• Foodservice portioning
• Wawa branded nut distribution
• Inventory process - increased visibility & awareness
„ Improved Decision Making and Focus
• Focus on shrink and spoilage at category / item level
• Loss Prevention
„ Improved processes
• Leveraging F&R – holiday film & batteries, beverages
• Leveraging JDA – Distribution compliance, Real-time floor plans and
plan-o-grams
• Leveraging SAP – Tobacco allocations, Promotions Capabilities, paying
off the database
15
SAPPHIRE 08 OR3785
Our Focus is to leverage data in SAP to improve decision
making

Wawa
Positioning Enterprise Performance Management
Metrics, Strategy and Goals
Determine if we on target to achieve strategy
Strategic
Future

Leverage Data to Make Decisions


Looking at data over time to
identify trends in specific areas to improve
Analytical performance and financial results

Build Trust in the System


Today

Transactional Validation of system inputs and


outputs, reporting transactions

16
SAPPHIRE 08 OR3785
Our BW Governance Model has enterprise focus to
maximize resources
Role
Exec Information Owners • Ensure process is followed
• Break Ties
Chris Gheysens & • Ensure focus on highest
Neil McCarthy value work
• Right technology tools

Role
IT Build Function Steering Committee • Lead by Finance
Consists of Project Requests
Cross functional Director • Validates business
Managers for ABAP & Level Group Consisting of value of requests
BW Scoped Requests Finance, Marketing, Ops, • Ensures work is not
duplicated
Status & Workload S/C, IT
• Sets priority of work
Role
• Manage resources that are Prioritized Requests
shared among multiple
departments requests
• Define toolkit and template
standards
Role
• Complete request templates
IT Relationship Managers and Functional SuperUsers • Validate BW / ABAP /
queries

Undefined Requests - BW / ABAP / Query

Store Supply
Finance Marketing
Ops Chain 17
SAPPHIRE 08 OR3785
Benefit Measurement Approach –
Re-Think Business Case

Cost
Foodservice Key Deliverables
Management
Management
$33.3 Million •Value Maps
$21.0 Million
Store Order
•Process Metrics
Management
Cycle •Benefit Scorecards
$10.6 Million
Category
Management Information
$31.7 Million Management Project Scope
$11.3 Million •Revenue Optimization
Original Benefit $107.9 Million •Space & Assortment Optimization
•Out of Stocks
•Direct Product Profitability (DPP)

Today’s
Knowledge
Applied

Near Future
Value Engineering defines new
18
activities and $ benefit
SAPPHIRE 08 OR3785
Work in Progress to define new activities and value
„ Assortment Optimization
• Define a process for category clustering & assortments
• Improve assortment rationalization
„ Space Optimization
• Deploy system supported floor plans to drive GP
• Optimize store design by integrating POG and space learning's into Real
Estate and Asset Mgt. processes
„ Implementing “One Version of Truth” to make data actionable
– DPP
– Sales Units / Hour
– Dynamic Margin Analysis
– Market Basket Reporting
– Competitive Analysis
„ Managing discontinued inventory more efficiently
19
SAPPHIRE 08 OR3785
The Role of the CEO

• Transform the Culture


– Re-orient Leaders – empower executives to change the status
quo and mobilize the organization to become process centric
• Define the Playing Field
– Face the brutal facts – ensure that everyone see’s the current
problems and opportunities
• Set the Course
– Gain Alignment – align strategies and programs to attack the
problems
• Mobilize the Organization
– Prophet – Advocate process to the organization
• Mainstream a new way of thinking

20
SAPPHIRE 08 OR3785
SA eat er
G r a bl

P
En 21
SAPPHIRE 08 OR3785
Access SAPPHIRE ’08
Orlando Online
Watch video recordings, download audio files
in MP3 format, and view the slides from
all keynotes and presentation sessions.

www.sap.com/us/sapphire

S-ar putea să vă placă și