Salaya Power
Project site area - 330 Ha Sea water used as cooling water Essars own jetty for importing coal 17 km of coal conveyer for transporting coal from jetty Power evacuation at 400 KV to state utility
Plot Plan
Technology
Pulverized boiler
Sub critical technology Sea water cooling Evacuation at 400 KV
Features
BTG technology from proven vendor Harbin Power, China BOP from reputed vendors
E-BOP Areva I-BOP ABB CW system Kirloskar Brothers Desalination plant IDE AHS - McNalley Bharat DM plant Thermax Ltd
Engineering Highlights
Engineering is almost completed (99.7%) Reputed consultant (TCE) is engaged for BTG BOP is engineered by Essar Engineering (EESL) 17 KM long conveyor designed in house by EESL
Procurement Highlights
Overall procurement progress is 94.5 % All Major long delivery packages ordered to globally reputed companies & material is received for major packages and balance dispatches is in advanced stage.
Short delivery packages are being ordered under umbrella contract to cut
short procurement cycle
All major equipments for BTG received from HPE All major BOP packages received at site
Construction Highlights
Overall construction progress is 71.4 % Concreting 92% completed Structural fabrication 99% completed Structural erection 87% completed
Unit-1 Turbine final box up completed Switchyard is ready for charging Boiler -2 Drum erected and 50 % Pressure parts erection completed Unit-1 Motor driven Boiler Feed Pump erection completed Chimney flue cans for unit-1 and unit-2 erection completed
10
11
2 X 660 MW Super critical PF Boilers PPA signed for 800 MW with SEB Boiler- ordered to M/S Harbin Power, China T G - ordered to M/S Toshiba
13
4 X 150 MW Sub critical CFBC Boilers Fuel - Pet coke/Imported Coal Entire capacity on Merchant Power Main Plant Equipments are in advanced stage of ordering
14
16
Project Overview
CHIMNEY
SWITCH YARD
17 17
18
19 19
TG #1 Erection
LP # 1 ROTOR
HIP ROTOR
LP # 2 ROTOR
GENERATOR STATOR
20
21 21
ESP # 1 - Overview
TRANSFORMER ERECTION IN PROGRESS INNER ROOF ERECTION IN PROGRESS (1B)
22 22
Cooling Tower # 1A
COOLING TOWER #1A
23 23
24 24
DM Plant Overview
DM PLANT MCC ROOM MISC. PUMP HOUSE STRUCTURE ERECTION IN PROGRESS
DM TANK #1
DM TANK #2
25 25
COMPRESSOR HOUSE
26 26
COAL BUNKERS
TRANFORMER YARD #2
27
28
ESP # 2 Erection
COLLECTING PLATE ERECTION IN PROGRESS
29
30