OF THE MONTH – IAMGOLD ROSEBEL
The rose of
DRILLING
Production drilling is accomplished by a fleet of
10 drills, drilling 150 mm-diameter holes. The drill
fleet consists of four Driltech (Sandvik) D40s and
six Driltech D45s.
Suriname
Some of the rock, chiefly laterite and saprolite,
is so highly weathered that it does not require
blasting in order to be excavated. All rock,
however, must be drilled and sampled to
delineate the ore zones.
The soft rock is drilled using rotary bits, while
transition and hard rock (beneath the saprolite) is
IAMGOLD’s recently-acquired Rosebel mine has drilled using down-the-hole hammer bits.
Transition and hard rock requires blasting.
expanded its reserves and is presently evaluating its Explosives are manufactured on site by Orica.
second major expansion since start-up in 2004 During wet weather, a blend of 70:30 (emulsion
to ANFO) is used. In the dry season, it is possible
T
to use ANFO in some areas. Explosives
HE Rosebel mine lies in the former Dutch consumption is typically 0.20 kg/t.
colony of Suriname in northeast South
America, some 100 km south of the capital, US$95 million. Only 14 months elapsed from the
Paramaribo. The site represents the most pouring of the first concrete to the pouring of the
significant mining operation in the country first gold.
aside from the bauxite operations of Suralco at Mo- Throughput was then increased to 22,000 t/d in
engo. 2005 following debottlenecking and a circuit
The Rosebel mine was acquired in November 2006 expansion programme to process harder ores as the
when IAMGOLD bought Cambior. Cambior had pit deepened.
begun its involvement in the Rosebel project in 1994 IAMGOLD owns 95% of the participating share
by earning a 50% interest through the funding of capital of the operating company, Rosebel Gold
exploration and development. In 2002, it acquired Mines NV, while the remaining 5% is held by the
the remaining interest in the project from Golden government of Suriname.
“The Rosebel mine was Star Resources Ltd. A Mineral Agreement, amended in March 2003,
acquired in November In 2003, the final construction and development of
a 14,000 t/d mine began, which were completed on
provides the main legal framework for activities at
Rosebel.
2006 when IAMGOLD time and on budget in February 2004, at a cost of Continued on page 12
bought Cambior”
above budget levels excluding the impact of the facilities and tailings disposal facilities at a total
strike. estimated cost of US$60-70 million. A road and
IAMGOLD is currently evaluating plans to further equipment maintenance programme, which includes
increase production by expanding the grinding a project to improve tyre life, is expected to bring
A conveyor belt connects the circuit at a cost of some US$30 million. The retention potential savings of US$1.25 million.
hard ore stockpile to the plant time of the ore in the improved plant will be A scoping study is due for completion in August.
increased, leading to improved gold recoveries. The move would give Rosebel more operational
tailings deposition into one or more of the six mining In the mine, further expansion of the mostly flexibility, improve recovery, lower production costs
areas as they become mined out. Caterpillar mining fleet is planned as well as a new and boost production. The expansion aside, the
truck maintenance shop, fuel storage area, camp continuing life-of-mine figure will be 275,000 oz/y.
UTILITIES SUPPLY
All of the water used at the processing plant is now
recycled, so there is no need to take water from the “A
re pub
environment. Due to the relatively high average proputa licat
glo vid tion ion
ba ing an wit
annual rainfall of 2.2 m, some water (including rain l m tr d e h
ini ust sta a si
ng wo bl gn
falling on the tailings for example) needs to be act rth ish ific
iv y ed an
– E ities info bac t
treated before it can be released into the environ- ero
Ha
” rm kgr
ma ati ou
on nd
lain
ment. This is done in several steps, the last of which is en,
etsoM
on
Min
a large freshwater holding pond. More than 90% of era
ls
now recycled, so there In-depth articles examining a variety of products and techniques so you can stay
ahead of your competitors.
is no need to take water If you want to succeed in the mining industry,
from the environment” this is essential reading for YOU!
FUTURE INVESTMENTS
In print… An annual subscription costs just
£95/€160/US$170 for 12 issues
In 2006, Rosebel produced 301,000 oz and the Tel: +44 (0)20 8421 9237
Fax: +44 (0)20 8421 8244
projected figure for 2007 is 255,000 oz. This is
E-mail: subscriptions@mining-journal.com
down slightly on the original projected figure of or visit our new and improved website:
270,000 oz. www.mining-journal.com
www.mining-journal.co
During the March quarter of 2007, the Rosebel
mine produced 48,000 oz of gold at a cash cost of online…
US$505/oz, although production and costs were
adversely affected by the strike at site.