1. Installing the BBU in the APM30 ...8

2. Installing the BBU in the APM30H15

3. Installing the BBU in the APM30 (+24 V) 16

4. Installing the BBU in the 19-Inch Cabinet17

5. Installing the BBU on the Wall ..19

6. Installing the BBU in the PS4890 Cabinet.....23

7. Installing the BBU in the OMB Cabinet25

8. Installing the BBU in the TMC ..28

9. Installing the BBU in the TMC11H........30

Installation Tools

BBU Hardware a
Appearance of the BBU

Configuration Principles of the BBU Boards


Board Mandatory/O ptional Mandatory Full Configuration 2 Installation Slot Slot 6 and slot 7 Remarks

WMPT

Preferentially configured in slot 7 in the case of a single WMPT Only configured in slot 2 and slot 3 in the case that the WBBP transmits CPRI signals Preferentially configured in the PWR2 slot Only configured in the FAN slot Configured in slots 0 to 5 Preferentially configured in slot 4 in the case of a single UELP Preferentially configured in slot 4 in the case of a single UFLP Only configured in the PWR1 slot

WBBP

Mandatory

Slots 0 to 5

UPEU

Mandatory

PWR1 and PWR2 slots FAN slot

UBFA

Mandatory

UTRP UELP

Optional Optional

5 2

Slots 0 to 5 Slot 0 and slot 4

UFLP

Optional

Slot 0 and slot 4

UEIU

Optional

PWR1

BBU Hardware c
Typical Configurations of the BBU
Slots on the BBU panel

Configuration 1: without the UELP

Configuration 2: with the UELP

Installation Scenarios

In the APM30/APM30H/APM30 (+24 V)

On the wall

In the 19-inch cabinet

In the TMC/TMC11H

In the PS4890 cabinet 6

In the OMB cabinet

Installation Procedure

Installing the BBU in the APM30 a


Installing the BBU Case
Slide the BBU case along the guide rails into the 2 U space below the PDU. Then, tighten the four M6 screws.

PDU

Installing the BBU Cables


Cable connections of the BBU

The FE transmission and E1 transmission cannot be used simultaneously.

For details on the BBU cables, see page 31 Cable List. 8

Installing the BBU in the APM30


b
Installing the BBU Cables
Install the power cable. Connect the OT terminal of the power cable to the LOAD3 terminal of the PDU, and then fix the 3W3 connector of the power cable to the PWR port on the BBU.
LOAD3

PWR

Install the CPRI optical cable. a. Insert the optical module into the CPRI0, CPRI1, or CPRI2 port, and then turn outwards the puller on the optical module. b. Insert one end of the CPRI optical cable into the optical module, and then lead the CPRI optical cable out of the cabinet along the right side of the cabinet. c. Wrap the fiber tail with the winding pipe. d. Connect the other end of the CPRI optical cable to the CPRI_W port on the RRU.
Puller Optical module

Winding pipe

Installing the BBU in the APM30 b


Installing the BBU Cables
Install the E1 cable and the E1 surge protection transfer cable. a. Fix the DB26 connector of the E1 cable to the OUTSIDE port on the UELP. b. Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the WMPT. c. Strip the jacket off the E1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer.
E1 cable

d. Thread the E1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1 cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the grounding bolt of the APM30.
Shielding layer of the E1 cable

Grounding clip

10

Installing the BBU in the APM30 c


Installing the BBU Cables
Install the FE cable and the FE transfer cable. a. Connect one end of the FE transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the WMPT. b. Connect one end of the FE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.

11

Installing the BBU in the APM30 c


Installing the BBU Cables
Install the monitoring signal cable between the APMI and the BBU. Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU.

Install the EMUA monitoring signal cable. a. When the MON0 port on the BBU is available, fix the RJ45 connector of the EMUA monitoring signal cable to the MON0 port on the UPEU, and the DB9 connector to the corresponding port on the EMUA.

12

Installing the BBU in the APM30 C


Installing the BBU Cables
b. When the MON0 port on the BBU is unavailable, cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed bare wires to the RX+, RX-, TX+, and TX- ports on the APMI. For the relationship between the ports and wires, see page 39 EMUA Monitoring Signal Cable. Fix the DB9 connector to the corresponding port on the EMUA.

Install the alarm cable. Connect one end of the alarm cable to the EXT-ALM port on the UPEU, and the other end to the associated alarm device.

13

Installing the BBU in the APM30


c
Checking the Power-On Status of the BBU

14

Installing the BBU in the APM30H


The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 814. The only difference is that the monitoring signal cable between the APMI and the BBU is installed in the APM30 whereas the monitoring signal cable between the HEUA and the BBU is installed in the APM30H. One end of the monitoring signal cable between the HEUA and the BBU is connected to the COM IN port on the HEUA and the other end is connected to the MON1 port on the BBU. The following figure shows the cable connections of the BBU in the APM30H.

CPRI optical cable E1 transfer cable Monitoring signal cable between the HEUA and the BBU BBU power cable E1 cable 15

Installing the BBU in the APM30 (+24 V)


The procedure for installing the BBU case in the APM30 (+24 V) is the same as that in the APM30. For details, see pages 814. The following figure shows the cable connections of the BBU in the APM30 (+24 V).

Connect the orange and white twisted pair to the OUT- and OUT+ on the APMI. Connect the brown and white twisted pair to the alarm wiring terminal of the PSU. Connect the blue and white twisted pair to the door status sensor. Connect the green and white twisted pair to the surge protection alarm wiring terminal on the DCDU-03C. Fix the RJ45 connector to the EXT_ALM port on the BBU. E1 cable BBU power cable E1 transfer cable CPRI optical cable 16

Installing the BBU in the 19-Inch Cabinet


a
Space Requirements

1. 25 mm on the left of the BBU for ventilation 2. 25 mm on the right of the BBU for ventilation 3. 70 mm in front of the BBU for cabling

Installing the BBU Case


Slide the BBU case into the cabinet. Then, tighten the four M6 screws.

17

Installing the BBU in the 19-Inch Cabinet c


Installing the BBU Cables
Routing of the BBU cables

1. The procedure for installing the BBU cables in the 19-inch cabinet is the same as that in the APM30. For details, see pages 814 Installing the BBU cables. 2. For details on the cable connections of the BBU, see page 8 Cable Connections of the BBU.

Checking the Power-On Status of the BBU

For details, see page 14 Checking the Power-On Status of the BBU.

18

Installing the BBU on the Wall a


Space Requirements
A single BBU BBU+DCDU-03C

BBU

DCDU-03C

Installing the BBU Case


Install the mounting ears for wall installation. Then, use the screws to join the mounting ears for wall installation and the mounting ears on the BBU case.

Mounting ears for wall installation

Mounting ears on the BBU case

19

Installing the BBU on the Wall b


Installing the BBU Case
Place the BBU against the wall, and then use the marking pen to mark the holes of the mounting ears for wall installation.
Wall

BBU

Install the expansion bolts.

Mount the BBU on the wall.

20

Installing the BBU on the Wall c


Installing the DCDU-03C
Turn the mounting ears on the DCDU-03C by 90 degrees. Place the DCDU-03C against the wall, and then use the marking pen to mark the anchor points of the mounting ears for wall installation.
Wall

Install the expansion bolts. Mount the DCDU-03C on the wall.

21

Installing the BBU on the Wall d


Installing the BBU Cables

RRU power cable CPRI optical cable BBU power cable DCDU-03C PGND cable

1. The procedure for installing the BBU cables is the same as that in the APM30. For details, see pages 814 Installing the BBU cables. 2. For details on the cable connections of the BBU, see page 8 Cable Connections of the BBU.

Checking the Power-On Status of the BBU


For details, see page 14 Checking the Power-On Status of the BBU. 22

Installing the BBU in the PS4890 Cabinet a


Installing the DCDU-03C
Slide the DCDU-03C into the PS4890 cabinet. Then, tighten the four M6 screws. Install the DCDU-03C input power cable. Connect one end of the power cable in blue to the DC output terminal LOAD2(-) on the power subrack and the other end to the DC input terminal NEG(-) on the DCDU. Connect one end of the power cable in black to the DC output terminal RTN(+) on the power subrack and the other end to the DC input terminal RTN(+) on the DCDU.

DC input terminal on the DCDU-03C

DC output terminal on the power subrack

Installing the BBU Case

Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.

23

Installing the BBU in the PS4890 Cabinet c


Installing the BBU Cables

CPRI optical cable BBU power cable E1 cable Monitoring signal cable between the PMU and the BBU BBU alarm cable
Connect the BBU power cable to the DC output terminal LOAD6 on the DCDU-03C.

1. The procedure for installing the BBU cables in the PS4890 cabinet is the same as that in the APM30. For details, see pages 814 Installing the BBU cables. 2. For details on the cable connections of the BBU, see page 8 Cable Connections of the BBU.

Checking the Power-On Status of the BBU


For details, see page 14 Checking the Power-On Status of the BBU.

24

Installing the BBU in the OMB Cabinet a


Installing the BBU Case
Slide the BBU case into the OMB cabinet gently. Then, tighten the four M6 screws.

Installing the BBU Cables (220 V AC Input)


Install the PGND cable of OMB cabinet .

25

Installing the BBU in the OMB Cabinet b


Installing the BBU Cables (220 V AC Input)
Install the AC input power cable. Install the CPRI optical cable.

Install the E1 cable. (E1 transmission)

Install the FE cable. (FE transmission)

26

Installing the BBU in the OMB Cabinet b


Installing the BBU Cables (48 V DC Input)

The procedure for installing the BBU cables in the 48 V DC input scenario is similar to that in the 220 V AC input scenario. The only difference is that the DC input power cable instead of the AC input power cable needs to be installed on site. Routing of the BBU cables:

PGND cable BBU power cable E1 cable E1 transfer cable CPRI optical cable DC input power cable

27

Installing the BBU in the TMC a


Installing the BBU Case
Slide the BBU case into the TMC. Then, tighten the four M6 screws.

Installing the BBU Cables

Slide the BBU into the TMC. Then, tighten the four M6 screws. CPRI optical cable E1 cable E1 transfer cable TMC monitoring signal cable BBU power cable

1. The procedure for installing the BBU cables in the TMC is the same as that in the APM30. For details, see pages 814 Installing the BBU cables. 2. For details on the cable connections of the BBU, see page 8 Cable Connections of the BBU. 28

Installing the BBU in the TMC b


Installing the BBU Cables
APMI panel Procedure for installing the TMC alarm cable: a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU. b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals on the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT+ and OUT- alarm wiring terminals on the APMI. d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals on the DCDU. Door status sensor

Checking the Power-On Status of the BBU


For details, see page 14 Checking the Power-On Status of the BBU.

29

Installing the BBU in the TMC11H


Routing of the BBU cables

CPRI optical cable E1 cable E1 transfer cable BBU power cable Monitoring signal cable between the HEUA and the BBU

1. The procedure for installing the BBU cables in the TMC is the same as that in the APM30. For details, see pages 814 Installing the BBU cables. 2. For details on the cable connections of the BBU, see page 8 Cable Connections of the BBU.

30

Reference
a
Cable PGND cable

Cable List
Connector OT terminal OT terminal Connects to Grounding bolt of the BBU3900 Protection grounding bar

BBU power cable

3V3 connector Bare wire. The connector needs to be made on site according to the field requirements. (The following figure shows the BBU power cable by taking OT terminals as an example.)

PWR port on the UPEU External power supply

CPRI optical cable

DLC connector

Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI3 ports on the WBBP

DLC connector

E1 cable

DB26 male connector

E1/T1 port on the GTMU or WMPT, or OUTSIDE port on the UELP Peer device

The connector needs to be made on site according to the field requirements.

31

Reference
c a
Cable List
Connector DB26 male connector DB25 male connector Connects to PWR port on the UPEU E1/T1 port on the GTMU or WMPT Cable E1 transfer cable

FE cable

RJ45 connector RJ45 connector

FE0 port on the WMPT Routing equipment

FE transfer cable

RJ45 connector RJ45 connector

FE0 port on the WMPT FE0 port near the INSIDE label on the UFLP

Monitoring signal cable between the PMU and the BBU

RJ45 connector RJ45 connector

RS232/RS422 port on the PMU MON port on the BBU

32

Reference
a
Cable List
Connector Connected before delivery RJ45 connector MON1 port on the UPEU Connects to APMI

Cable Monitoring signal cable between the APMI and the BBU

EMUA monitoring signal cable

RJ45 connector

MON0 or MON1 port on the UPEU RS-485 port on the EMUA

DB9 male connector

Alarm cable

RJ45 connector

EXT-ALM0 or EXT-ALM1 port on the UPEU

RJ45 connector

External alarm device

33

Reference b
Engineering Specifications of the BBU
Item Dimensions Weight Input voltage Specification 86 mm (height) x 442 mm (width) x 310 mm (length) Typical configuration: 7 kg; full configuration: 11 kg 48 V DC or +24 V DC

Checking the DIP Switches of the BBU


Remove the BBU boards.

Check the DIP switch settings of the WMPT, GTMU, UTRP, and UELP.

Wear an ESD wrist strap or a pair of ESD gloves when performing operations related to the boards, as shown in the figure below.

ESD strap

ESD gloves

34

Reference
c
Setting the DIP Switches
Set the DIP switches of the BBU. Settings of the DIP switches on the UELP

Settings of the DIP switches on the WMPT

Settings of the DIP switches on the UTRP

35

Reference c
Setting the DIP Switches
Reinstall the boards.

ed

Pin Assignment of the BBU Signal Cables


75-ohm E1 cable Pin on the DB26 Male Connector X1.1 X1.2 X1.3 X1.4 X1.5 X1.6 X1.7 X1.8 X1.19 X1.20 X1.21 X1.22 X1.23 X1.24 X1.25 X1.26 Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring Tip Ring 36 8 6 4 2 7 5 3 1 RX1+ RX1RX2+ RX2RX3+ RX3RX4+ RX4TX1+ TX1TX2+ TX2TX3+ TX3TX4+ TX4Wire Type Coaxial SN. Label

Reference d
Pin Assignment of the BBU Signal Cables

120-ohm E1 cable Pin on the DB26 Male Connector X1.1 X1.2 X1.3 X1.4 X1.5 X1.6 X1.7 X1.8 X1.19 X1.20 X1.21 X1.22 X1.23 X1.24 X1.25 X1.26 Blue Twisted pair White Orange White Green Twisted pair White Brown Twisted pair White Grey Twisted pair White Blue Twisted pair Red Orange Twisted pair Red Green Twisted pair Red TX4TX3TX4+ TX2TX3+ TX1TX2+ RX4TX1+ RX3RX4+ Twisted pair RX1RX2+ RX2RX3+ RX1+ Wire Color Wire Type Label

37

Reference

Pin Assignment of the BBU Signal Cables

FE cable Pin on the RJ45 Connector X1.2 X1.1 X1.6 X1.3 X1.4 X1.5 X1.8 X1.7 Wire Color Wire Type Pin on the RJ45 Connector X2.2 X2.1 Twisted pair X2.6 X2.3 Twisted pair X2.4 X2.5 Twisted pair X2.8 X2.7

Orange White/orange Green White/green Blue White/blue Brown White/brown

Twisted pair

Monitoring signal cable between the APMI and the BBU Pin on the RJ45 Connector Wire Color Pins on the X2, X3, X4, and X5 X2 Twisted pair X1.2 Orange X3 Twisted pair X1.4 Blue X4 Twisted pair X1.5 White X5 Twisted pair 38 RXRX+ TXWire Type Port on the APMI

X1.1

White

TX+

Reference d
Pin Assignment of the BBU Signal Cables

EMUA monitoring signal cable Pin on the RJ45 Connector Pin on the DB9 Male Connector X2.3 Wire Color Wire Type Port on the APMI

X1.1

White

Twisted pair

TX+

X1.2

X2.7

Orange

Twisted pair

TX-

X1.4

X2.2

Blue

Twisted pair

RX+

X1.5 Alarm cable Pin on the RJ45 Connector X1.1 X1.2 X1.3 X1.6 X1.5 X1.4 X1.7 X1.8

X2.6

White

Twisted pair

RX-

Pin on the RJ45 Connector X2.1 X2.2 X2.3 X2.6 X2.5 X2.4 X2.7 X2.8

Wire Color

Wire Type

White/orange Orange White/green Green White/blue Blue White/brown Brown

Twisted pair

Twisted pair

Twisted pair