Documente Academic
Documente Profesional
Documente Cultură
KEY KEY
Electricity Grid
End User
CO2 Pipeline
2
Stage #2 Raw Material Transport Ocean Tanker & Pipeline Manufacturing Train Operation Regasification
Plant Operation
Plant Decommissioning
Deinstallation
End Use
3
Current Technology
*Red
Natural Gas
Air
Cooling Water
Combustion Turbine
Blower
Stack Gas
Reboiler Steam
MEA
Condensate Return
Stack
CO2 Compressor
NOx Control: LNB + SCR to maintain 2.5 ppmvd @ 15% O2 Steam Conditions: 2400 psig/1050F/950F
4
Cost and Performance Baseline for Fossil Energy Plants, NETL August 2007
Study Scenarios
Parameters wo-CCS w-CCS
555
474
555
474
Information Source
NGCC LCI&C
NGCC LCI&C
NGCC w/Foreign NG
NGCC w/Domestic NG
30 Overnight
In Delivery Price
NA NA 604
Southern Mississippi 555 474 50 85% 90% 2215 100 1% / 100 yrs
7% Pre-Existing
GHG Emissions (2007 IPCC CO2e Values, 100 Year basis) Carbon Dioxide (CO2) Methane (CH4) Nitrous Oxide (N2O) Sulfur Hexafluoride (SF6)
Non-GHG Emissions Criteria Air Pollutants Carbon Monoxide (CO) Nitrogen Oxides (NOX) Sulfur Oxides (SOX) Volatile Organic Compounds (VOC) Particulate Matter (PM) Lead (Pb) Species of Interest Ammonia (NH3) Mercury (Hg)
GHG Emissions
2007 GWP
600
500
400
59%
300
65%
SF CH
200
N O
CO
100
0 LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom wo-CCS w-CCS wo-CCS w-CCS wo-CCS w-CCS wo-CCS w-CCS wo-CCS Total w-CCS
0.5
CO 0.3
NOx
0.1
0.0 LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom wo-CCS RMA
11
w-CCS
wo-CCS RMT
w-CCS
wo-CCS ECF
w-CCS
wo-CCS Total
w-CCS
Water Usage
2,500
1,500
-500 LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom LNG Dom wo-CCS RMA
12
w-CCS
wo-CCS RMT
w-CCS
wo-CCS ECF
w-CCS
wo-CCS Total
w-CCS
CO NO CH SF Pb Hg
104.94 0.36 23.98 0.00 129.29 6.6E-07 4.2E-08 9.6E-02 9.2E-02 2.3E-01 1.2E-02 1.1E-01 7.7E-03 57.6 -100.2
123.00 0.42 28.11 0.00 151.54 7.7E-07 4.9E-08 1.1E-01 1.1E-01 2.7E-01 1.4E-02 1.3E-01 9.0E-03 67.6 -117.4
2.23 0.00 10.67 0.00 12.90 1.7E-07 5.2E-09 1.1E-06 5.3E-04 5.1E-04 3.1E-04 3.3E-05 1.3E-04 2.1 0.7
2.62 0.00 12.50 0.00 15.12 1.9E-07 6.1E-09 1.3E-06 6.2E-04 5.9E-04 3.6E-04 3.8E-05 1.6E-04 2.5 0.9
393.00 0.00 0.01 0.01 393.03 2.7E-06 2.5E-08 1.9E-02 3.1E-03 3.1E-02 1.2E-03 1.2E-04 4.3E-04 1038.9 803.3
51.27 0.01 0.02 0.01 51.30 3.1E-06 3.5E-08 2.0E-02 4.5E-03 3.4E-02 1.7E-03 1.9E-04 7.0E-04 2063.3 1541.4
500.18 0.37 34.66 3.28 538.48 3.5E-06 7.2E-08 1.1E-01 9.5E-02 2.6E-01 1.3E-02 1.1E-01 8.3E-03 1098.7 703.9
Total
Input Consumption
13
CO NO CH SF Pb Hg
21.00 0.20 48.05 0.01 69.26 2.0E-06 7.2E-08 1.1E-06 4.4E-02 4.9E-01 5.9E-03 1.1E-04 1.0E-03 181.9 -31.0
24.61 0.24 56.32 0.01 81.18 2.3E-06 8.5E-08 1.3E-06 5.1E-02 5.7E-01 6.9E-03 1.2E-04 1.2E-03 213.2 -36.4
5.83 0.00 28.65 0.00 34.48 1.7E-07 5.2E-09 2.9E-06 7.3E-04 1.1E-03 3.2E-04 7.5E-05 2.5E-04 2.1 0.7
6.84 0.00 33.58 0.00 40.42 1.9E-07 6.1E-09 3.5E-06 8.5E-04 1.3E-03 3.8E-04 8.8E-05 2.9E-04 2.5 0.9
393.00 0.00 0.01 0.01 393.03 2.7E-06 2.5E-08 1.9E-02 3.1E-03 3.1E-02 1.2E-03 1.2E-04 4.3E-04 1038.9 803.3
51.27 0.01 0.02 0.01 51.30 3.1E-06 3.5E-08 2.0E-02 4.5E-03 3.4E-02 1.7E-03 1.9E-04 7.0E-04 2063.3 1541.4
419.83 0.21 76.72 3.28 500.04 4.8E-06 1.0E-07 1.9E-02 4.8E-02 5.2E-01 7.4E-03 3.0E-04 1.7E-03 1222.9 773.1
Total
Input Consumption
14
Capital Costs
$2,200 $2,000 $1,800 Total Overnight Costs ($/kW) $1,600 $1,400 $1,200 $1,000 $802/kW $800 $600 $400 $200 $0 Total Capital ($/kW) CO Injection Well CO Pipeline $1,913/kW
15
$0.0400
$0.0200
$0.0000 CO T, S & M
Capital Costs Variable O&M Costs Labor Costs Utility Costs (Feedstock+Utility) Total LC LCOE
16
Key Findings
GHG Emissions
CO2 is the dominant emission
Mostly from the NGCC ECF
wo-CCS 79% on LNG, 92% on DNG w-CCS 30% on LNG, 55% on DNG
LNG - Large spike with Drilling operations 17% wo-CCS, 56% w-CCS
W-CCS
LNG 171 kg CO2e/MWH DNG 92 kg CO2e/MWH
17
18
Addition of CCS
Water input
LNG 94% increase DNG 90% increase
Water consumption
LNG 90% increase DNG 81% increase
19
Addition of CCS
Additional costs for CO2 pipeline & sequestration site 17% of CC w-CCS Increased Decommissioning costs (Extra equipment) increases 115%
LCOE
Utility costs are the primary component
wo-CCS 68% of LCOE w-CCS 53% of LCOE
Contact Information
Timothy Skone
Lead General Engineer Situational Analysis & Benefits
(412) 386-4495 timothy.skone@netl.doe.gov
Robert James
General Engineer Situational Analysis & Benefits
(304) 285-4309 robert.james@netl.doe.gov