Traditional pavers

Excavation To minimum of 120mm. (Allow for base rubble, bedding sand and paver) Base 50mm deep using 10mm rubble or similar. Bed Bedding sand 25mm deep using washed concrete sand or similar.

Installation

Pedestrian application
Important notes  To achieve the best results from your Traditional pavers, it is recommended that your paving be designed by a qualified engineer
Figure 1

Edge restraint The paved area must be adequately restrained on all sides using a 100 x 100mm concrete edge restraint which includes 50mm galvanised mesh. (see figure 2)

Grouting & compacting  Traditional pavers should be installed by Use a suitable vibrating machine to compact a pavior with the necessary experience paved area. Placing a mat between machine to satisfactorily complete the job and pavers will protect the face of pavers. Always ensure that the paving surface  Product Paved area should be grouted using a fine is kept below the damp course level of Traditional Piazza range pavers may be used. dry grouting sand. After first pass of vibrating any building. The amount by which paving machine sweep in more grouting sand Laying must be kept below will vary from region to ensure joints are filled completely and When laying Traditional pavers it is to region. The local authority should be compact again. Complete job by sweeping important that they be gapped. 1 to 2mm is Stack bond with Stack bond Alternate coursing consulted before commencement of square paving units off any excess sand. recommended. When using the compatible paving works Traditional Range numerous interesting Sealing Stack bond with Stack bond Alternate coursing variation must slope Basketweave bond Stretcher bond Stack bond with Stack bond Paving away from any building paving patterns, many of which require no Traditional pavers can be rendered stain Basketweave square paving units square paving units cutting, can be created. (see figure 1) resistant by the use of chemical sealers. The finished job will only be as good as the preparation and base compaction

StackStack bond bond with with square paving units units square paving

StackStack bond bond

Basketweave variation

Basketweave bond

Stretcher bondcoursing with Alternate square paving units 90 herringbone 90 herringbone

Basketweave Basketweave variation

45 stretcher bond bond 45 stretcher

Stack bond with square paving units 90 herringbone

Stack bond

Alternate coursing

Basketweave variation 90 herringbone

45 stretcher bond bond Basketweave

Stretcher bond 45 herringbone

45 herringbone Stretcher bond with with header square course paving units 45 herringbone

Basketweave 45 stack bond with square paving units 45 herringbone with header course

45 stretcher bond

45 herringbone

45 herringbone with header course

45 stack bond with 90 herringbone square paving units

45 stretcher bond Figure 2

Soil

Paving Washed concrete sand Concealed concrete edge restraint

1Bi

90 herringbone

45 stretcher bond

45 herringbone

45 herringbone with header course

45 stack bond with square paving units

S-ar putea să vă placă și