Sunteți pe pagina 1din 1

Food factory layout diagram

innovation suite (theatrical) Innovation room O10 (food goes in, none comes out) Consumer monitoring lounge visual connections Modelling workshop (non-edible models, non-food only) Off-site functions waste Sensory (public) Analytical analysis Microbiological testing Laundry Machine store (additional) Machinery parts manufacture Manufacturing workshop Cafeteria

GMP High Care GLP General

General office space O1 Meeting and training rooms O4

Staging area

Food taste area

File server/router room Office toilets O7.1

Changing/cleandown area

Innovation stores (modelling materials, models) GMP high care Concept kitchen (Ramseyesque) Innovation stores (food, packaging)

Breakout/refreshment space O2 Chair store O9

Packaging and development store O1.4 Library and archive

links to offices and meeting room

Sensory booths and kitchen O3 Intermediate storage S1

Decant big bags area W9 Sanitise IBC/drums De/re pallet and cages Mens and womens changing/shower room external packaging W4.3 Toilets W6

Warehouse W1.1 Warehouse office W5

Mould archive S6

Ambient storage / test materials store / nibbled crumb store / chilled materials store 25 / frozen materials store 18 / flavour store S1.1 to S1.8 Wet/dry decant area

process area Visitors area O6.3 Visitors office O8 Visitors meeting room Candy development (high flavour) P8.1, P8.2, P8.4 Mint room P8.3 Entrance (staff, visitors) Lobby O6.1 Main reception O6.2 Plug and play P9 Chocolate beverage development P6.1, P6.2 Chocolate forming P7.1, P7.2, P7.3 Hot stove flavoured P4.1

flavour-controlled area

Laboratories L1 process (no glass) chemical (glass)

Allergens

reagents glass

Glass

Visitors toilets O7.2

Chocolate development (flavour-controlled) P5.1, P5.2, P5.3 Hot stove nonflavoured P4.2 waste equipment waste product WIPs (FC, HF, GEN, conditioned) S2 Packaging store/ defuming P8

Quarantine Waste P11 Returns Bailer(s) Controlled disposal Weigh general waste Delivery and dispatch bay Holding area W7

Mould storage S5

Utensils storage S4

Wrap and pack room P10

Label, log W3

validated product glass

Mould drying P3.3

Utensils drying P3.2 Finished goods store S3.1

Packaging lab

Sample and reseal

W2

non-validated product Dispatch W8

Mould wash

Utensils wash P3.1

Machines Reference sample store S3.2 Stability rooms (8) S7 Engineering E1, E2, E3 Process equipment clearance

Mens and womens toilets F3, F4

to production area

Mens and womens changing/shower rooms F1, F2

General GMP access, noticeboards

Production office P1 GMP meeting rooms P2 Machine store

Lorry driver facility and toilet W11

Laundry store

F5

S-ar putea să vă placă și